FGS Overview Presentation Lean in Operations Title: Non Exempt Time Keeping Process Operations/ Station Problem HR Payroll Compliance to new corporate policy requires excessive labor and risk of non compliance After % Improved Removed muda from the process by eliminating NVA Metrics process steps and creating (UOM) a poka yoke to ensure compliance with federal and local authorities CT Hrs Results Before Customer Action Taken 176 137 22% Savings Hard (USD/ month) Americas Sites Tools Used X Goals Defect x1/10 Lead-Time x1/2 Inventory x1/2 Scrap x1/10 X Productivity x2 Space x1/2 Before Kaizen Soft (USD/ month) $27K Inventory / AR/AP (USD/ month) Installed permanently on line - Implemented Standard Work Implementation Start Date 1-May-10 100% Implementation Plan 1-Jun-10 Potential Savings/Month after 100% Implementation Lean Six Sigma Method for Sustaining Hard Soft Inventory / AR/AP US$0 US$27K US$0 After Kaizen 1 Lean in Operations Title: Time Of Management Process Improvement 2 Lean in Office – Title: OJT Database Over Processing: Repeated manual entry of data Operations/ Station Dallas Operations Customer NA Problem Action Taken FlexTalent is not conducive for entering/storing OJT training - Repeated Data Entry: Must complete various templates in order to upload the training records (course ID template & 4tab upload template) Tools Used X Lean X Results Method for Sustaining Savings Create a user friendly database to store the sites OJT training - System pulls the course info directly from the Course Catalog - No template is needed to enter the data (single entry) X Defect x1/10 Metrics (UOM) Bef ore Af ter % Improve d Steps 16 5 69% Cycle Time 26 5 81% Hard (USD/ month) Sof t (USD/ month) Net Working Capital ( NWC) Reduction (USD/month) Training Implementation Start Date 11/09 100% Implementation Plan 11/09 735 Lead-Time x1/2 Inventory x1/2 Scrap x1/10 Productivity x2 Space x1/2 Potential Savings/Month af ter 100% Implementation GOALS Six Sigma Hard US$0.74K X Before Kaizen Steps = 16 Review Course ID referenced on Training Records YES Is Course ID listed in Course Catalog? Enter course number on training record. Time = 26 min. Enter Training Record on template to upload records in Flex U Download template NO Add Course ID to Texas Course Catalog Enter employee’s email address or 32 digit SID number Complete Event Template, upload in Flex U FlexTalent Process Flow YES Log into Flex U, verify instructor’s name is listed Flex Email? Supervisor submits training record to training coordinator Review Course ID referenced on Training Records Is instructor listed and is email available? NO Upload template in User Upload Tool and validate Enter information manually Steps = 5 Is Course ID listed in Course Catalog? YES Enter course number on training record. NWC Reduction US$XXK Time = 5 min. Enter data in Sharepoint OJT database. (Data may be entered by supervisor or training coordinator) NO NO Enter employee’s Workday ID, Legacy ID or Agency ID Upload Event Template and check progress Verify data entered is correct. Ensure no conflicts exist. (Training, date, time, location) After Kaizen Verify correct User ID for employees is entered. Soft US$XXK SharePoint Process Flow Add course ID to Texas Course Catalog View details, review the Roster and Session to ensure successful upload YES Click submit button. YES Roster details should Upload list employee’s user successful? ID. Session details should list session’s NO ID. Run report of selected sample of events, verify data was entered in employee’s transcript. YES Records found? Initial and date training report. Scan training record and create file name referencing that specific training. Enter data (data automatically loaded in system) Initial training record hard copy and list date entered Scan record to desk top to rename document to that specific training. Retain file on the G drive:\Training\ Training Dept Use Only\Training Rosters – Filing. Place in the appropriate month/ year. Dispose of paper copy. NO Investigate and correct issue Retain file on the G drive:\ Training\Training Dept Use Only\Training Rosters – Filing. Place in the appropriate month/year. NO File the original. Is file available? YES Create File Site Yokoten Implementation Status: Guide: 81% ~ 100% 3 Lean in Office – Optimize re-hiring process Title: Reduce the LT for training 4 Lean in Office – Human Resources Title: Attached Worker UI Process Improvement After Kaizen Before Kaizen Work now completed by HRSS Manual Process by local HR OPS Site Yokoten Implementation Status: Guide: 81% ~ 100% Defect Reduction 59% Reduction in Process Time 5 Lean in Office – Optimize Re-hiring Process Title: Reduce Re-hire Recruiting LT 6 Lean in Office – Human resources Title:Medical Leave Reduction Improvement Counseling Procedure / Skip Level Meeting / Help Desk Operations: Problem 1. No ownership & coordination. 2. Insufficient Plant 2 learning & development program. 3. Insufficient Customer: awareness of the availability of Cisco Tools Used specialist services. Lean Action Taken 1. Counseling Procedures. 2. Skip Level Meetings. 3. Improved Help Desk. Before Kaizen Metrics (UOM) MC Days Man days Loss (USD) Six Sigma Method for Sustaining Results Hard Soft HR & Operations Savings Savings review on (USD/ (USD/ periodic basis % Improved month) month) (quarterly) Before After 1047 673 36% USD 39,897 USD 27,705 31% USD 12,193 After Kaizen Learning & Development Material includes procedure Savings of USD 12,193 / mth. NIL Site Yokoten Implementation Status: Guide: 81% ~ 100% 7 Lean in Office Title : Recruitment Process Improvement Operations: Problem Action Taken Metrics (UOM) HR 1) No visibility of Introduce visual board recruitment status in HR office to monitor in HR Office and recruitment status need time to Customer: track and update record sheet on Internal Requester hiring status Tools Used Lean X Man hour/mth (min) Before After % Improved $ Soft $ Hard saving saving USD/mt USD/mth h Establish standard work Implementation Start Date 288 24 92% Saving of 44 $44 / Month 10/08 100% Implementation Plan 10/08 Potential Savings/Month af ter 100% Implementation Hard US$XXK Six Sigma Before Kaizen 1 Method for Sustaining Results Soft US$44 After Kaizen 2 Hiring Aging Green – Day 1 to 20 Yellow – Day 21 to 30 Retrieve Manpower Request (MR) file 3 Red – Day > 30 Search for outstanding ‘Manpower Request Document’ Visual Card: Indicate # of vacancy & Dept request. 4 Separate Ageing Request Candidate accepted job offer: Targeted Timeline Manual Consolidate number of outstanding by date Reduce processing time and improve visibility of recruitment status Site Yokoten Implementation Status: Guide: 81% ~ 100% 8