WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-094 Leader: Per Ohlund / Kazuki Kobayashi Lab process-EV meeting in Brussels Face to Face meeting was held on 16th and 17th of May in Brussels. Open issues were discussed. Shorten test procedure for BEV Utility factor RCB correction Break off criteria gtr text and so on. Open issues of E-lab sub group Item No Issue Solution Status Vehicle 7 Criteria for end of charging The state of charge after charging shall not be less than that before CD test. Specific tolerance may be allowed based on further investigation. Closed. gtr text should be considered PEV OVC-HEV 14 RCB correction window (next page) L+M :+/- 1.5% L+M+H: +/-1.0% L;M+H+exH:+/-0.5% Closed NOVC-HEV OVC-HEV 19 Calculation method of CD to CS break off criteria Based on Cycle energy demand Criteria should be 3 or 4 %. Almost Closed 3 or 4 % will be decided later. OVC-HEV Charging Condition [Ah] 7 19 Fully Charged ΔE0 ΔE1 Test n Driving cycle [/] (transient) Recharge soak Recharging Item No Issue Solution Status Vehicle 14 RCB correction window L+M :+/- 1.5% L+M+H: +/-1.0% L;M+H+exH:+/-0.5% Closed OVC-HEV (CS test) NOVC-HEV of Energy content of the consumed fuel RCB correction window ∆RCB (Ah) Within window Start =>No correction Start Cycle ⊿RCB during test End Item No Issue Solution Status Vehicle 21 Vehicle classification PMR:All electric vehicle shall be Class 3. Max speed: To be discussed PMR: Closed Max Speed: Open PEV OVC-HEV NOVC-HEV L3+M3+H3 (ver.5.1) All electric vehicle shall be Class 3. L3+M3+H3 (+ExH3) (ver.5.3) Class3 34 L2+M2+L2 PMR L2+M2+H2 L2+M2+H2(+ExH2) Class2 22 Class1 L1+M1+L1 L1+L1+L1 70 90 120 135 Maximum speed Japan proposed to use Maximum speed in R68 . Maximum speed means: For electric vehicle, the highest average value of the speed, which the vehicle can maintain twice over distance of 1 km. Further discussion is necessary to finalize vehicle classification. Phone meeting will be held after GRPE. Item No Issue Solution Status Vehicle 22 Shorten test procedure Japan prepared 2 options. Almost Closed PEV Option 1:Calcuration method for Each phase range Japan proposed to calculate each phase range from total WLTC result =>Written in gtr with square bracket. Option 2:Shorten test procedure proposed by Japan =>To be considered in WLTP Phase 2 Item No Issue Solution Status Vehicle 24 Methodology to make Utility factor Regional Utility Factor For WLTP Phase 1 Closed OVC-HEV Closed OVC-HEV Global harmonized UF should be considered Phase 2. 26 Number of Utility factor Regional Utility Factor For WLTP Phase 1 Global harmonized UF should be considered Phase 2.