MTO TRAFFIC MODEL The following presentation contains references to Figures 6.02 and 6.03, Tables 6.01 and 6.04, all of which are posted under subsection 2.6 of the course notes on the instructor’s website. Viewer discretion is advised as some scenes contain material of a graphic, tabular and mathematical nature and are intended for mature audiences. MTO TRAFFIC MODEL What does it do? Enables you to estimate the number of passes of a standard unit (ESAL) over a pavement during a specific design period. What information do you need? Analysis Period, Ap AADT in first year of Ap Annual Percent Traffic Growth Rate Number of Traffic Lanes & Directions Percent Trucks in Initial & Final Year of Ap Total ESAL’s, Nf Over Analysis Period ESAL’s/day The MTO uses a trapezoidal representation of the total accumulated ESAL’s over the analysis period Initial ESAL’s/day Final ESAL’s/day Average ESAL’s/day or DTN Nf is the area of the trapezoid = number of days in Ap x DTN Time Analysis Period, Ap Initial Year Middle Year Final Year Accumulated ESAL’s, N The MTO uses a parabolic model to determine the accumulated ESAL’s after Y years of the analysis period The Equations Factor days out of equation 2 N f Ap days AADT 0.5 T LDF TF AADT i i i i f 0.5 T f LDF f TF f 2 N f Ap days DTN EXAMPLE The initial AADT for a 4-lane road is 12500 vpd and is expected to grow over the next 20 years at the rate of 3.5%/year. If the percent trucks is expected to increase from 10% initially to 15% at the end of the analysis period. Find the accumulated ESAL’s after 12 years of traffic. Truck Factor, TF 40% HCT OK, now pull out your copy of Table 6.04 30% HCT 1.5 TABLE 6.01 Parameter/Calculation MTO LANE DISTRIBUTION FACTORS Description 0.97 Lane Distribution Analysis Period Highway Type 2 lanes 0.5 AADT (vpd) Factor, LDF Traffic All Growth Rate (%/year) 1.00 Final 0.85 4 lanes 15000 - 25000 > 25000 4 20 4 3.5 ? .36 24,872 24,872.36 100 0.5 8000 T 0.10 0.15 LDF 0.80 ? ? 0.75 TF ? 0.77 ? 0.97 ESAL/day 385 ? 1357.098 ? 0.70 FIGURE - MTO TRUCK FACTORS:0.55 4-LANE HIGHWAYS 150006.03b - 25000 Daily Total ESAL's/day 0.45 = AADT x DF x T x LDF x TF 3.5% 0.5 Traffic/Lane (= AADT/4 for 4-Lane 0.60 Highways) < 15000 > 40000 TGR DF 3000 4000 5000Total Traffic 6000 7000 Truck Fraction of 6 Truck lanes Factor: ESAL's/truck (Figure 6.03) 25000 - 40000 0.50 20 AADT 12,500 AADT f 12,500 1 0.75Split Directional Lane Distribution Factor (Table 6.01) AP Lanes Number of Traffic Lanes < 5000 - 15000 0.80 Average Annual5000 Daily Traffic, two directions 0.0 2000 Initial (After: "Pavement Design and Rehabilitation Manual", 1990) 1.0 0.77 Parameter 10% HCT Designation 20% HCT 12 24 , , 500 872 . 36 ESAL 24,872.36 0.05.3125 0.015 0.097 1357 ESAL 5 .10 0.0.75 .80 .77 385.098 AADT / lane 6218 09 f /i day i / day 12,500 44 Bring it on home! Parameter/Calculation Description Daily Total ESAL's/day = AADT x DF x T x LDF x TF Parameter Designation Initial Final ESAL/day 385 1357.098 Days per year for truck traffic days 300 Design Traffic Number for Design Period = [(ESAL/day)i + (ESAL/day)f]/2 Total ESAL's over Analysis Period, Ap = DTN x Days x Ap DTN 871.0490929 ? Nf 5,226,295 ? Design Period, years Y 12 Total ESAL's over Design Period, Equation 1, Figure 6.02 N 2,720,529 ? 2 5,226,295 2 12,500 24,872.36 12,500 Y N Y 20 20 12,500 24,872.36 12,500 24,872.36 N 385 1357.098 DTN 871.0490929 2 N 871 . 0490929 20 300 5 , 226 , 294 . 55735706 5 , 226 , 295 f 261,314.75 0.668943558 Y 0.016552822 Y 2 N 174,804.819Y 4,325.49657Y 2 N 174,804.81912 4,325.4965712 2,720,529 2