ASSOCIATED TRANSMISSION LINES Estimated Cost

advertisement
NATIONAL TRANSMISSION &
DESPATCH COMPANY
NTDC’s PRESENT SYSTEM, FUTURE PLANS,
BOTTLENECKS & KPIs
PRESENTATION BY
MUMMAD DAUD
GENERAL MANAGER PLANNING
NTDC
SEQUENCE OF PRSENTATION
1.
2.
3.
4.
5.
6.
General- WAPDA/PEPCO- Structure & Roles
NTDC system capacity
Future challenges & Target
NTDC expansion plan
Bottle necks
Key performance indicators
3
General- WAPDA/PEPCO- Structure
& Roles
4
Pakistan
Water and Power Development Authority (WAPDA)
WAPDA was formed in 1958. The major responsibilities of
WAPDA were;
– Meet electricity demand of the country (except area of Karachi) by
installing new power plants, transmission lines and distribution
system.
– Develop hydro storage project ( dams) for meeting irrigation and
demand of the country and install hydro plants at dams locations.
WAPDA consisted of two segments :
Power Wing: For meeting electricity demand and responsible for
generation, transmission and distribution.
Water Wing : For developing hydro projects for irrigation
requirements.
5
PAKISTAN POWER SECTOR: BACKGROUND
1. The GoP approved Pakistan Power Sector Strategic Plan for
restructuring and reform in 1992, according to which, the power wing of
WAPDA was structured into four (4) Generation Companies (GENCOs),
one (1) National Transmission and Dispatch Company (NTDC) and nine
(9) Distribution Companies (DISCOs).
2. PEPCO was established in 1998 as an independent entity with mandate
to restructure Pakistan Power Sector, corporatise & commercialize the
restructured entities, and to bring about reforms thru introduction of
competition, enhancement of efficiencies and best financial and prudent
utility practices.
3. PEPCO initiated the restructuring and reform process in 1998 with
limited initial success. The reform process was considerably slowed
down beyond 2001 when PEPCO was reduced to a Division in WAPDA.
6
4. The GoP reactivated the mandate of PEPCO in October 2007 to bridge
the increasing demand supply gap and to reduce the resulting load
shedding in the country.
6
NEW FACE OF PAKISTAN’S POWER SECTOR
GOP/MW&P
Chairman PEPCO
Chairman WAPDA
MD PEPCO
PEPCO Management
Team
MEMBERS: Hydel power,
Finance, Water
WATER
WING
FINANCE
WING
POWER
WING
RESIDUAL WAPDA
WINGS PART
TRANSITION TO
CORPORATE ENTITIES
WATER
HYDEL
FINANCE
HYDEL
POWER
COMMON
SERVICES
RESTRUCTURED POWER
WING
AUTONOMOUS COMPANIES WITH
INDEPENDENT COMMERCIAL
OPERATIONS THROUGH BOD
• HOSPITALS
• ACADEMY
• ETC
SERVICES
GENCOs
(4)
NTDC
(1)
DISCOs
(9)
7
National Transmission and Dispatch Company Ltd.
National Transmission & Despatch Company (NTDC)
Limited was incorporated on 6th November, 1998 and
commenced commercial operation on 24th December,
1998. It was organized to take over all the properties,
rights and assets, obligations and liabilities of 220 KV and
500KV Grid Stations and Transmission Lines/Network
owned by Pakistan Water and Power Development
Authority (WAPDA). .
8
NTDC Structure
NTDC segments.
1.
2.
3.
4.
Transmission Network Operator (TNO)
System Operator (SO)
Central Power Purchasing Agency (CPPA)
Contract Registrar and Power Exchange
Administrator (CRPEA)
9
NTDC system capacities
10
Length of Transmission Lines
Year
500kV (circuit kM)
220kV (circuit kM)
1980
315
2101
1985
1239
2422
1990
1863
2922
1995
3315
3848
2000
4094
5498
2005
4344
6993
2010
5078
7366
11
500 kV
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987
1986
1985
1984
1983
1982
1981
1980
Growth in Length of Transmission Lines
(NTDC)
8,000
7,000
6,000
5,000
4,000
3,000
2,000
1,000
0
220 kV
12
No. & Capacity of Substations (NTDC)
500- KV Substations
220- KV Substations
No
MVA
No
1980
0
0
5
1985
2
1350
10
1990
6
4974
14
1995
7
6774
18
2000
9
8274
24
2005
9
8274
26
2010
12
14850
26*
*1 No. 220 KV gird station was added & 1No.
220 KV Grid station was converted to 500 KV
13
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987
1986
1985
1984
1983
1982
1981
1980
MVA
Growth of Transmission System capacity –MVA
(NTDC)
16000
14000
12000
10000
500 kV
8000
220 kV
6000
4000
2000
0
14
NTDC T&T LOSSES
Year
T&T Losses (%)
Remarks
2005
7.63
Includes losses of 132 kV Sys
2006
7.26
Includes losses of 132 kV Sys
2007
3.80
500 & 220 kV only
2008
3.48
500 & 220 kV only
2009
3.58
500 & 220 kV only
2010
3.12
500 & 220 kV only
15
16
Future challenges & Targets
17
Future Required Generation Capacity
Year
Peak Demand
(MW)
Gen Capacity
Required (MW)
Gen Capacity
Planned (MW)
2010
20101
25126
21388
2011
21705
27131
22697
2012
23441
29301
23788
2013
25306
31633
26279
2014
27438
34298
29405
2015
29463
36829
33630
2016
31672
39950
42530
2017
33154
41443
45338
2018
35568
44460
50034
2019
38557
48196
53284
2020
41783
52229
57470
18
PEPCO System Historical Data / Forecast
Historical
PMS
Peak
Peak
Difference
( MW )
(MW)
(%)
1999-00
9289
9311
0.24
2000-01
9718
9736
0.18
2001-02
10922
10243
-6.21
2002-03
10484
10799
3.00
2003-04
11078
11398
2.80
2004-05
12035
12087
0.43
2005-06
13212
12916
-2.20
2006-07
15138
15213
0.50
2007-08
16838
16480
-2.10
2008-09
17252
17867
3.50
2009-10
17847
19451
8.90
Years
19
EXISTING GENERATING CAPACITY
Type of Generation
Nameplate
Derated/
/Installed Dependable
Capacity
Capacity
(MW)
(MW)
(Oct, 2010)
Availability (MW)
Summer
Winter
WAPDA Hydro
6444
6444
6250
2300*
GENCOs
4829
3580
2780
3222**
IPPs (incl Nuclear)
7911
7695
5750
6900**
Rental
62
60
60
60**
Total
19246
17779
14840
12482
*
Hydro availability based on last 5 years average
** Excludes 10% Forced Outages for GENCOs & 6.0% for IPPs & Rental
20
21
22
FUTURE GENERATION PROJECTS SYSTEM
(Up to Year 2020)
23
NTDC Expansion plan
NTDC ONGOING DEVELOPMENT PROJECT
SR.
NO.
NAME OF SUBSTATIONS
TRANSFORMER
CAPACITY (MVA)
ASSOCIATED TRANSMISSION
LINES
EXPECTED
COMMISSIONING
1
Ext. at 500 kV Sheikh
Muhammadi
1x450
-
Dec, 2010
2
Ext. at 500 kV Tarbela.
1x237
-
Dec, 2010
3
Ext. at 220 kV Bannu
1x160
-
4
Augmentation of 220
kV at N.K.L.P Lahore
3x250
-
5
Upgradation of
existing 132 kV to
new 220 kV GIS
Wapda Town Lahore.
3x160
220 kV Lahore - K.L.P D/C
In/Out at Wapda Town. (10+10
km)
6
New 220 kV GIS
Bandala
2x160
220 kV Gatti - K.S.K D/C In/Out
at Bandala. (5+5 km)
Dec, 2011
7
Installation of SVCs at
220 kV N.K.L.P.
Lahore.
SVCs
Static Var Compensators of
appropriate capacity.
Dec, 2011
June, 2011
T2 & T3
Commissioned
T1: Dec. 2011
G/station
commissioned
T/Line by Mar.
2011
NTDC ONGOING DEVELOPMENT PROJECTS
SR.NO.
8
9
NAME OF
SUBSTATIONS
Looping In/Out of
220 kV G/BarothaS/Bagh T/L at
Mardan
TRANSFORMER
CAPACITY (MVA)
-
ASSOCIATED TRANSMISSION
LINES
EXPECTED
COMMISSIONING
Looping in & out of one circuit
of Ghazi Barotha – Shahi Bagh
at Mardan (30 km)
Mar, 2011
Extension/Augmenta
tion at existing
substations:
500 kV Dadu
1x450
1x160
220 kV Burhan
1x160
220 kV Mardan
1x250
500 kV Sheikh
Muhammadi
1x160
500 kV New Rewat
1x250
220 kV Shikarpur
10
1x160
220 kV Okara
3x250
11
220 kV Toba Tek
Singh/Gojra
-
3x250
Dec, 2011
Commissioned
220 kV Yousafwala - Sarfaraz
Nagar D/C In/Out at Okara. (5 +
5km)
220 kV Faisalabad-Multan D/C
In&Out at T.T.Singh/Gojra. (1+1
Dec, 2011
NTDC ONGOING DEVELOPMENT PROJECTS
SR.
NO.
12
13
NAME OF NEW
SUBSTATIONS
Installation of
SVC at Quetta
TRANSFORMER
CAPACITY (MVA)
SVC
Ext. at Ghazi
Brotha for
addition of 600
MVA 500/220 kV
T/F.
1x600
14
220 kV Loralai
2x250
15
Augmentation of
220 kV Ravi at
Lahore.
3x250
500kV D.G Khan
Substation.
2x600
2x250
16
ASSOCIATED TRANSMISSION
LINES
Static Var Compensators of
appropriate capacity
EXPECTED
COMMISSIONING
Jun, 2012
Jun, 2011
220 kV D.G Khan – Loralai (250 km)
Dec, 2012
March, 2011
500kV Guddu-Multan 2nd cct In/Out
at D.G. Khan substation(20+20) km
Dec, 2012
NTDC ONGOING DEVELOPMENT PROJECTS
SR.
NO.
NAME OF NEW
SUBSTATIONS
17
220 kV Rohri
New for
interconnection
of IPPs at Engro
Energy PP and
Mari (Dharki)
CCPP
TRANSFORMER
CAPACITY
(MVA)
2x250
ASSOCIATED TRANSMISSION
LINES
EXPECTED
COMMISSIONING
220 kV D/C T/L Dharki CCPP–
Rohri New (115 km)
132 kV D/C T/L for In/Out of
Rohri-Khairpur/Gambat D/C T/L
at Rohri New (1+1 km)
220kV D/C Rohri New-Shikarpur
T/L (50 km)
Dec, 2011
220 kV D/C T/L for In/Out of
Dharki -Rohri New at Engro
CCPP (5+5 km)
132 kV Rohri New-Gambat D/C
T/L (53 km)
18
19
220 kV
Gridstation at
Khuzdar,
220 kV Grid
Station at Ghazi
Road, Lahore
2x160
3x160
220kV D/C Dadu – Khuzdar
Transmission Line (300 km)
220 kV D/C T/L for In&Out of
NKLP – Sarfraz Nagar at Ghazi
Road. (30 km)
220 kV D/C T/L for In&Out of
Ravi– KSK at Ghazi Rd. (30 km)
Dec, 2011
Dec, 2012
NTDC ONGOING DEVELOPMENT PROJECTS
SR.
NO.
NAME OF NEW
SUBSTATIONS
T/F
CAPACITY
(MVA)
220 kV Grid Station at
Kassowal along with
associated 220kV D/C
T/Lines.
2x160
21
220 kV GIS substation
at Gwadar
2x160
22
500 kV R.Y.Khan
23
220 kV GIS Shalamar
(Mehmood Buti)
20
ASSOCIATED TRANSMISSION
LINES
220 kV D/C Transmission Line for
In&Out of Vehari – Yousafwala at
Kassowal. (45+45 km)
EXPECTED
COMMISSIONING
Jan, 2012
220 kV D/C T/L from Pak-Iran
border to Gwadar (100 km)
Jun, 2012
2x600
500 kV Guddu - Multan 3rd Circuit
In/Out at R.Y.K (30+30 km)
Jun. 2012
3x250
220 kV Ravi-KSK D/C In/Out at
Shalamar (9km long overhead
T/L) & (3+3km) cable
Jun.2012
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
S.#
Name of
Project
Transformer
Capacity
(MVA)
ASSOCIATED
TRANSMISSION
LINES
Estimated
Cost
(Rs. in
Million)
Eqt. US$
in Million
Expected
Approval
by
Financing commissioning
ECNEC
1
220 kV
Gujrat
3x250
220 kV ManglaGhakkar D/C In/Out at
Gujrat (2+2 km)
2805
33
22.10.2007
JICA
2
220 kV
Chishtian
2x250
220 kV Vehari Chishtian D/C T/Line.
( 65 km)
3740
44
22.10.2007
JICA
12665
149
PC-I
cleared by
CDWP on
18.03.2010
JICA
3
500 kV New
Lahore
2x750
Two 500 kV S/C
T/Lines for In/out of
500 kV Sahiwal –
Lahore S/C at Lahore
New (15+15 km)
Two 500 kV S/C
T/Lines for In/out of
500 kV Lahore –
Gujranwala S/C at
Lahore New (50+50
km)
220 kV D/C T/Line for In/out
of 220 kV NKLP-Ghazi
Road at Lahore New. (50
km)
220 kV D/C T/Line for In/out
of 220 kV NKLP-Wapda
Town at Lahore New.
(54km)
2011-12
2011-12
2012-13
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
S.#
Name of
Project
Transformer
Capacity
(MVA)
ASSOCIATED
TRANSMISSION
LINES
Expected
Estimated
Eqt. US$
Year of
Cost
Approval
in
Financing
commissi(Rs. in
by ECNEC
Million
oning
Million)
Two 500 kV S/C
T/Lines for In/out of
500 kV Dadu-Guddu
circuit No:1 at
Shikarpur (20+20
km)
500 kV
4- Shikarpur
2x600
Two 500 kV S/C
T/Lines for In/out of
500 kV Dadu-Guddu
circuit No:2 at
Shikarpur. (22+22
km)
220 kV D/C for
In/Out of 500/220 kV
Guddu – Sibbi S/C
at Shikarpur (50 km)
8160
96
Pc-I
Cleared
by CDWP
on
18.03.2010
JICA
2012-13
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
Name of
Project
S.#
Expected
TransforEstimated
ASSOCIATED
Eqt. US$
Year of
mer
Cost
Approval
TRANSMISSION
in
Financing
commissiCapacity
(Rs. in
by ECNEC
LINES
Million
oning
(MVA)
Million)
-
220 kV D/C T/L
for In/out of
MansheraIslamabad T/L
(40 km)
1105
13
PC-I under
ADB Tr-IV
preparation
2012-13
2 Source of
supply to Hala
6Road Grid
Station
-
220 kV D/C T/L
from T.M Khan
Road to Hala
Road (30 km)
850
10
PC-I under
ADB Tr-iV
preparation
2012-13
220 kV
Nowshera
2x160
-
850
10
06.02.2008 ADB Tr-iV
2012-13
2X250
220 kV Chakdara
– Mardan (85
km)
3230
38
PC-I under
ADB Tr-iIV
preparation
2013-14
nd
2 source of
supply to
5Islamabad
University
nd
7-
220 kV
8Chakdara
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
Transformer
S.# Name of Project
Capacity
(MVA)
Augmentation
of 500 & 220 kV
existing
substations
ASSOCIATED
TRANSMISSI
ON LINES
Expected
Estimated
Eqt. US$
Year of
Cost
Approval
in
Financing
commissi(Rs. in
by ECNEC
Million
oning
Million)
-
500 kV Rewat
1x750
-
500 kV Sh.
Muhammadi
4x250
-
9- 220 kV Mardan
2x250
-
220 kV Burhan
4x250
-
220 kV Bund Rd
4x250
-
220 kV
Bahawalpur
2x250
-
220 kV Quetta
Industrial
2X250
-
3825
45
PC-I
submitted
to GoP in
Aug,2010
ADB Tr-I
(Ext-II)
2011-12
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
Transfor
S.#
-mer
Name of Project
`
Capacity
(MVA)
10-
11-
220 kV Mirpur
Khas
220 kV Taxila.
12- 220 kV Manshera
13-
220 kV D.M
Jamali
Interconnection
of 1200 MW AES
Imported coal
14based Power
Plant near
Karachi (Part-I)
ASSOCIATED
TRANSMISSION
LINES
Expected
Estimate
Eqt.
Year of
d Cost
Approval
US$ in
Financing
commissi
(Rs. in
by ECNEC
Million
-oning
Million)
2x160
220 kV D/C T/L from
Hala Rd. to .M.Khan
Rd. (10 km)
In/Out of one
circuit of above
220 kV proposed
T/L at Mirpur Khas
New (70 km).
2975
35
PC-I under
preparation
ADB Tr-IV
2013-14
2x250
In/Out of 220 kV
Burhan - ISPR S/C
at Taxila. (6 km)
2295
27
PC-I under
preparation
ADB Tr-IV
2013-14
2x160
In/out of 220 kV Alai
Khawar-Sangjani
T/L at Manshera
(0.5+.0.5 km)
1105
13
PC-I under
preparation
Iranian
Loan
2013-14
1x160
1x100
in/out of 220 kV
Uch-Guddu S/C at
D.M. Jamali (5 km)
10
PC-I
submitted
to GoP
PM’s Fund
2013-14
-
500 kV Jamshoro-R.Y.K (535 km)
500 kV Moro-Dadu
(55 km)
298
PC-I cleared
by CDWP
on
18.03.2010
ADB Tr-III
2015-16
850
25330
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
SR
#.
1-
NAME OF NEW
SUBSTATIONS
ESTIMATE
D COST*
(Rs.in
Million)
Eqt.
US$ in
Million
REQUIRED
YEAR OF
COMMISSIONING
2890
34
2012-13
2975
35
2012-13
2x250
220 kV Gatti - Ludewala
D/C In/Out at Chiniot
Industrial. (2+2 km)
2380
28
2012-13
2x250
220 kV D/C cable from
Shadman to Bund Road
(30 km)
4250
50
2012-13
3825
45
T/F
CAP.
(MVA)
220 kV Chakwal
2x160
2-
3-
4-
5-
7-
220 kV GIS Jhang
Rd. Faisalabad
220 kV Chiniot.
Industrial
2x250
220 kV Shadman
220 kV D.I Khan
220 kV Gharo
2x250
2x250
ASSOCIATED
TRANSMISSION LINES
In/out of 220 kV ManglaRewat S/C at Chakwal
(50 km)
220 kV Samundri Rd. –
Jhang Rd. D/C T/L (40 km)
220 kV D/C T/Line for
In/out of 220 kV Chashma
Nuclear – Ludewala S/C at
D.I Khan (100 km)
220 kV Gharo – T.M Khan
Road ((130)
2012-13
4590
54
2012-13
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
SR
#.
NAME OF NEW
SUBSTATIONS
8-
220 kV Jhimpir
9-
220 kV Mastung
10-
220 kV Jamrud`
11-
500 kV
Faisalabad New
ASSOCIATED
TRANSMISSION LINES
ESTIMATE
D COST
(Rs.in
Million)
Eqt.
US$ in
Million
REQUIRD
YEAR OF
COMMISSIONING
2x250
In/Out of 220 kV Gharo – T.M
Khan Road at Jhimpir (65 km)
3230
38
2012-13
2x250
220 KV Mastung Sibbi (120
km)
4080
48
2013-14
2x250
220 kV Jamrud – Sh.
Muhammadi (10 km)
1445
17
2013-14
2x750
In/out of 500 kV Muzaffargarh
st
– Gatti 1 circuit at at
Faisalabad new (1+1 km)
6630
78
2013-14
3570
42
2013-14
T/F
CAP.
(MVA)
2x250
12-
220 kV M-3
Industrial
Estate
Faisalabad
220 kV Faisalabad New – T.T
Singh D/C T/Line (70 km)
220 kV M3 Industrial Estate –
Faisalabad New (70 km)
2x250
In/Out of 220 kV Faisalabad
New - M3 Industrial Estate at
220 kV Chinot Industrial New
(30 km)
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
SR
#.
NAME OF NEW
SUBSTATIONS
13-
500 kV
Peshawar New
T/F
CAP.
(MVA)
ASSOCIATED
TRANSMISSION LINES
ESTIMATE
D COST
(Rs.in
Million)
Eqt.
US$ in
Million
REQUIRED
YEAR OF
COMMISSIONING
5440
64
2014-15
5950
70
2014-15
2635
31
2014-15
425
5
2014-15
1445
17
2015-16
In/out of Tarbela – Sh.
Muhammadi at Peshawar
New (2+2 km)
2x750
In/Out of 220 kV Sh.
Muhammadi-Shahibagh at
Peshawar New (5 km)
14-
220 kV Kohat – Peshawar
New (50 km)
220 kV Kohat
2x250
15-
220 kV
Islamabad I-10
16-
Ext. at 220 kV
Gujrat
17-
220 kV
Kamalabad
2x250
1x250
2x250
220 kV Kohat – Bannu
(150 km)
In/Out of 220 kV Rewat –
Islamabad University D/C at
Islamabad I-10 (30+30 km)
-
In/out of Rewat – Islamabad
Peshawar Rd. at Kamalabad
(5+5 km)
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
SR
#.
NAME OF NEW
SUBSTATIONS
T/F
CAP.
(MVA)
18-
Ext. at 500 kV
Gujranwala
1x600
19-
Ext. at 500 kV
Lahore New
1x750
20-
220 kV Kamra
21-
220 kV Iqbal
Town
22-
220 kV
Gujranwala
New
ASSOCIATED
TRANSMISSION LINES
-
ESTIMATE
D COST
(Rs.in
Million)
Eqt.
US$ in
Million
REQUIRED
YEAR OF
COMMISSIONING
1700
20
2015-16
2040
24
2015-16
2x250
In/out of 220 kV Tarbela –
Taxila at Kamra (5 km)
1275
15
2015-16
2x250
In/Out of 220 kV Lahore –
Wapda Town D/C at Iqbal
Town (20+20 km)
2125
25
2015-16
2890
34
2015-16
2380
28
2015-16
2x250
In/Out of 220 kV Mangala –
K.S.K at Gujranwala New
(20 km)
220 kV Nokhar - Gujranwala
New (50 kM)
2324-
220 kV Pindi
Bhattian
220 kV Head
Faqirian
2x250
2x250
220 kV Pindi Bhattian Ind. –
Gujranwala (50 km)
220 kV Head Faqirian –
Ludewala (60 km)
28
2380
2015-16
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
SR
#.
NAME OF NEW
SUBSTATIONS
25-
220 kV
Joharabad
26-
220 kV Alizai
27-
2 Source of
supply to 220
kV Chakwal
substation
28-
29-
ESTIMATE
D COST
(Rs.in
Million)
Eqt.
US$ in
Million
REQUIRED
YEAR OF
COMMISSIONING
2x250
In/out of 220 kV D/C
Ludewala –Chashma at
Jauharabad (5+6 km)
1445
17
2015-16
2x250
220 kV Kohat – Ali zai D/C
(110 km)
3825
45
2015-16
1530
18
2015-16
3825
45
2015-16
1445
17
2015-16
82620
972
T/F
CAP.
(MVA)
nd
-
nd
2 Source of
supply to 220
kV Bhawalpur
substation
220 kV Arif
Wala
-
2x250
ASSOCIATED
TRANSMISSION LINES
In/out of 220 kV Mangla nd
Rewat 2 circuit at Chakwal
(60 km)
220 kV R.Y.K – Bahalawlpur
D/C T/L (150 km)
In/Out of 220 kV Yousafwala –
Kassowal D/C at Arifwala
(5+5 km)
Total:
POWER DISPERSAL PROJECTS FOR THERMAL POWER PLANTS
SR
#.
NAME OF NEW
SUBSTATIONS
T/F
CAP.
(MVA)
1-
-
2-
Dispersal of
Power from Uch-2
-
3-
UAE Combined
Cycle power plant
at GTPS
Faisalabad
4-
Eqt.
US$ in
Million
REQUIRED
YEAR OF
COMMISSIONING
7735
91
2012-13
220 kV Uch-II – Sibbi D/C
(125 km)
2975
35
2012-13
In/out of existing 220 kV
T/lines at Proposed power
plant
1700
20
2012-13
14450
(PC-I
cleared by
CDWP on
18.3.10)
170
2015-16
ASSOCIATED
TRANSMISSION LINES
500 kV Guddu New PP –
M. Garh (256 km)
Power Dispersal
from 747 MW
CCPP at Guddu
Interconnection of
1200 MW AES
Imported coal
based power near
Karachi (Part-II)
ESTIMATE
D COST
(Rs.in
Million)
1x160
500 kV
switch
ing
statio
n at
Matiari
In/Out of Guddu – Multan
at New Guddu (10+10 km)
500 kV S/C T/Line from
AES Power Plant to
Matiari switching station
(200 km)
In/Out of 500 kV HubJamshoro S/C T/Line at
AES (45+45 km)
In/out of 500 kV JamshoroR.Y.K at Matiari (5+5 km)
POWER DISPERSAL PROJECTS FOR THERMAL POWER PLANTS
SR
#.
5-
6
NAME OF NEW
SUBSTATIONS
Interconnection of
1200 MW Engro &
1200 MW PEPCO’s
Thar Coal Based
Power Plants at
Thar
Interconnection of
1200 MW Imported
coal based PPIB
and 1000 MW
Imported Coal
based PEPCO’s
power Plants at
Karachi
T/F
CAP.
(MVA)
ASSOCIATED
TRANSMISSION LINES
ESTIMATE
D COST
(Rs.in
Million)
Eqt.
US$ in
Million
REQUIRED
YEAR OF
COMMISSIONING
88400
1040
2015-16
85000
1000
2015-16
500 kV D/C T/L form Thar
coal power plants to
Matiari (275 km)
-
500 kV HVDC Matiari –
Lahore/ Faisalabad T/L
(1100 km)
Terminal Stations at both
ends
Two 500 kV circuits from
Power Plants to Matiari
(200 km each)
-
500 kV HVDC Matiari –
Lahore/Faisalabad T/L
(1100 km)
Extension of Terminal
Stations at both ends
POWER DISPERSAL PROJECTS FOR THERMAL POWER PLANTS
SR
#.
7-
8-
9-
NAME OF NEW
SUBSTATIONS
Import of 1000 MW
Power from Iran
Import of 1000 MW
Power from
Tajikistan (CASA1000)
Dispersal of
Power from 340
MW Chashma-III
T/F
CAP.
(MVA)
ASSOCIATED
TRANSMISSION LINES
ESTIMATE
D COST
(Rs.in
Million)
Eqt.
US$ in
Million
REQUIRED
YEAR OF
COMMISSIONING
40120
472
2015-16
16065
189
2015-16
3000
35
2016-17
Two 500 kV HVAC S/C
T/Lines from Zahidan to
Quetta with series
compensation (198 km)
Switching station at
Zahidan, Quetta and
midpoint between Zahidan
& Quetta
-
500 kV HVDC T/L from
Pak-Afghan Border to
Peshawar (71 km)
500 kV Converter Station
Peshawar
220 kV Chashma New –
Bannu (125 km)
-
In/out of 220 kV D.I. Kahan
– Jahurabad S/C at
Chashma New (1 km)
POWER DISPERSAL PROJECTS FOR THERMAL POWER PLANTS
SR
#.
NAME OF NEW
SUBSTATIONS
10-
Interconnection of
2x1000 MW
Nuclear Power
Plants at Karachi
T/F
CAP.
(MVA)
-
ASSOCIATED
TRANSMISSION LINES
ESTIMATE
D COST
(Rs.in
Million)
Eqt.
US$ in
Million
REQUIRED
YEAR OF
COMMISSIONING
Three 500 kV Circuits from
Nuclear Plants to Matiari
(200 km each)
25500
300
2018-19
284945
3352
Total
LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS
SR
#.
NAME OF NEW
SUBSTATIONS
1-
Dispersal of
Power from 969
MW Neelum
Jhelum Hydro
Power Project to
Rawat &
Gujranwala
T/F CAP.
(MVA)
ASSOCIATED
TRANSMISSION
LINES
ESTIMATED
COST
(Rs.in Million)
Eqt.
US$ in
Million
REQUIRED
YEAR OF
COMMISSIONING
19125
225
2015-16
13250
156
2015-16
850
10
2016-17
500 kV Neelum
Jhelum – Rawat S/C
T/Line (110 km).
500 kV Neelum
Jhelum – Gujranwala
S/C T/Line (235 km)
500 kV Karot –
Lahore New (270 km)
2-
Dispersal of
Power from 720
MW Karot HPP
3-
Power Dispersal
of 740 MW
Munda HPP
-
-
In/Out of 500 kV
Neelum Jhelum –
Gujranwala at Karot
(10 km)
In/Out of 220 kV
Peshawar – Shahi
Bagh at Munda (35
km)
LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS
SR
#.
4-
5-
NAME OF NEW
SUBSTATIONS
Dispersal of
Power from 1100
MW Kohala
Hydro Power
Project to
Gujranwala
Dispersal of
Power from
Karot HPP
(Phase-II)
T/F CAP.
(MVA)
Three 500
kV line bays
at Kohala
One 500 kV
line bay at
Gujranwala
ASSOCIATED
TRANSMISSION
LINES
ESTIMATED
COST
(Rs.in Million)
Eqt.
US$ in
Million
11000
129
REQUIRED
YEAR OF
COMMISSIONING
500 kV 225 km long
Kohala – Gujranwala
S/C T/L
Two 500 kV T/Lines
15 km each for in/out
of 500 kV Neelum
Jhelum – Gujranwala
at Kohala
2017-18
500 kV Kohala –
Karot – Gujranwala
(240 km)
-
In/out of 500 kV
Neelum Jhelum –
Karot circuit at
Kohala (4+4)
11820
139
2017-18
LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS
SR
#.
6-
NAME OF NEW
SUBSTATIONS
Dispersal of
Power from 4500
MW Diamer
Basha HPP to
Lahore with
interconnection
at Dasu and
Gujar Khan
T/F CAP.
(MVA)
765 kV
HVAC
substations
at Gujar
Khan &
Lahore with
765/500 kV
3x500 MVA
T/Fs
500 MVAR
SVC at
Gujar Khan
ASSOCIATED
TRANSMISSION
LINES
ESTIMATED
COST
(Rs.in Million)
Eqt.
US$ in
Million
REQUIRED
YEAR OF
COMMISSIONING
113900
1340
2018-19
Three 765 kV HVAC
T/Ls from Basha to
Gujar Khan (407 km
long each)
Two 765 kV HVAC
T/Ls from Gujar
Khan to Lahore (260
km long each)
LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS
SR
#.
7-
NAME OF NEW
SUBSTATIONS
Dispersal of
Power from 5400
-7000 MW Bunji
Hydro Power
Project to
Lahore with
interconnection
at Gujar Khan
T/F CAP.
(MVA)
765 kV
HVAC
substatin
extn at:
Basha,
Dasu,
Thakot,
Gujar khan
Lahore
765 kV new
substation
at Bunji.
ASSOCIATED
TRANSMISSION
LINES
ESTIMATED
COST
(Rs.in Million)
Eqt.
US$ in
Million
REQUIREDD
YEAR OF
COMMISSIONING
126225
1485
2019-20
296170
3484
2 x 765 kV HVAC 110
km long Bunji Basha S/C T/Lines
1x765 kV HVAC 759
km long Bunji –
Dasu-Thakot-Gujar
Khan-Lahore S/C
T/Lines
Total
PC-I for dispersal of Power from Neelum Jhelum HPP has been approved by ECNEC
Studies are being carried out to ascertain the interconnection schemes for the
projects at Sr. No: 2 to 7
BOTTLE NECKS
48
Bottle Necks
• At present no major system constraints
• Intermittent over-loading of transformers at
some places being addressed by addition of
following transformation capacities up to
2014-15
– 500/220 KV
– 220/132 KV
11400 MVA
19330 MVA
49
• For huge future development the bottle necks
would be
1. Availability of finance
2. Responsibility of dispersal from power plants &
uncertainty of generation project.
• Capacity of
1. Planning department
2. Local Consultant
3. Local contractors
• Inconducive Law & order situation for foreign
consultants and contractors.
50
KEY PERFORMANCE INDICATORS
51
Reference documents
• NTDC GRID CODE (JUNE 2005)
• NEPRA PERFORMANCE STANDARDS
(TRANSMISSION) RULES (NOV. 2005)
52
KEY PERFORMANCE INDICATORS
1.System Reliability
• Transmission System incl. Tie Lines
a) System Duration of Interruption
=
A/N
where
A=
sum of the total outage hours recorded at all the interconnection
points (other than 132 kV line tripping) in a period
N = Number of monitoring points (Interconnection Point)
Tie lines means interconnection facility for the transfer of electric power between
the licensee and other utilities not governed by the Act.
53
KEY PERFORMANCE INDICATORS
1. System Reliability
b)System Frequency Interruption
=
A/N
Where
A=
sum of the total outage hours recorded at all the interconnection
points (other than 132 kV line tripping) in a period
N= Number of circuits
54
KEY PERFORMANCE INDICATORS
2.
=
System Security
(Energy not served)
∑ Pi x T
Where
Pi = Power interrupted in MW in a circuit
T = Time Duration in Hours
55
KEY PERFORMANCE INDICATORS
3. Quality of Supply
A)
System Voltage Variation
Grid Performance
Code Standard
-500 kV
Under Normal Conditions
Under N-1 Conditions
-5 +8%
-+10%
-+ 5%
-+ 10%
-5 +8%
-+10%
-+ 5%
-+ 10%
-220 kV
Under Normal Conditions
Under N-1 Conditions
-132 kV
Under Normal Conditions
Under N-1 Conditions
-5 +8%
-+10%
-+ 5%
-+ 10%
56
THANKS
57
Download