TRB National Transportation Planning Applications Conference Columbus, OH May 2013 Estimating Bus and Rail Travel Times For Transit Corridor Studies Presented by: James Baker, Vice President Connetics Transportation Group 1 “Baking” Transit Ridership Forecasts Ingredients Alignment Station Locations Demographics Service Plans Auto Travel Times Transit Travel Times 2 Travel Time Estimates in Relation to Project Development Idea Concept Feasibility Average Speed Assumptions Alternatives Analysis Preliminary Engineering Spreadsheet Applications Final Design Construction Opening Day! Rail Simulation Programs Travel Time Detail Increases with Project Development 3 Travel Time Estimates in Relation to Project Development Idea Concept Feasibility Average Speed Assumptions Alternatives Analysis Preliminary Engineering Spreadsheet Applications Final Design Construction Opening Day! Rail Simulation Programs Travel Time Detail Increases with Project Development 4 Travel Time Estimates Used for… • • • • • • • • Ridership Forecasts Operating Schedules Vehicle Requirements Operating & Maintenance Cost Estimates Speed Profiles Single Track Analysis Power/Substation Requirements Noise Impact Analysis 5 Travel Time Components • • • • Vehicle Speeds Alignment Station Dwells Traffic Congestion and Signal Delays Objective: Build a Travel Time Estimate With Reasonable Planning Level Assumptions for Each Component 6 Vehicle Speeds Typical Maximum Vehicle Speeds & Range of Acceleration and Deceleration Rates Mode Typical Max. Speed Range of Rates Bus 65-70 mph 1.5 to 2.0 mphps Streetcar 40-45 mph 2.0 to 2.5 mphps Light Rail 55-65 mph 2.5 to 3.0 mphps Heavy Rail 65-75 mph 2.5 to 3.0 mphps Commuter Rail 70-80 mph 1.0 to 1.5 mphps Diesel Multiple Unit 70-80 mph 1.5 to 2.5 mphps 7 Vehicle Speeds Acceleration Rates from 0 to X mph Acceleration Time: (Final Velocity/100)/acceleration rate/60 Deceleration Time: (Initiial Velocity/deceleration rate/60 Acceleration Rate (mphps) 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 0-5 0-10 0-15 0-20 0-25 0-30 0-35 0-40 0-45 0-50 0-55 Acceleration (0 to X mph) 3.0 mphps 2.0 mphps 1.5 mphps 8 Vehicle Speeds Distance Required for 0 to 25 mph Acceleration Time Required for 0 to 25 mph Acceleration 600 30 25 sec 500 Seconds 20 16.7 sec 15 12.5 sec 10 sec 10 8.3 sec 477 400 318 300 238 191 200 159 100 5 0 Distance (Feet) 25 1.0 1.5 2.0 mphps 2.5 3.0 0 1.0 1.5 2.0 2.5 3.0 mphps 9 Alignment Plan and Profile Drawings Identify: • Station/Stop Locations • Start and End of Horizontal Curves • Maximum Speeds Through Curves • Vertical Grades 10 Station Dwell Times Factors that Impact Station Dwell Times • Passenger Boarding & Alighting Volumes • Payment Method • Passenger Volume Inside Vehicle • Number of Doors on Vehicle • Level vs. Step Boarding & Alighting • ADA Boardings/Alightings • Bicycle Loadings 11 Station Dwell Times: Fare Collection Service Times TCRP Report 90 Passenger Boarding and Alighting Rates (Seconds per Passenger) Situation Observed Range Suggested Default BOARDING (sec. per pass.) 2.25-2.75 2.5 Single ticket or token 3.4-3.6 3.5 Smart card 3.0-3.7 3.5 Exact change 3.6-4.3 4.0 4.2 4.2 ALIGHTING (sec. per pass.) Front door 3.3 3.3 Rear door 2.1 2.1 Prepayment Swipe or dip card Note: Rates can vary depending on # of standees and type of bus (low floor) 12 Station Dwell Times: Suggested Rates Suggested Dwell Times • BRT: 10-30 seconds • HRT, LRT and Streetcar: 15-30 seconds • Commuter Rail and DMU: 30-60 seconds 13 Traffic Congestion & Signal Delays Roadway Congestion Impacts • Maximum Speed Adjustments Based on Road LOS Intersection Delay Impacts • • • • Cycle Length Green time/cycle time (g/c) ratio Volume/capacity (v/c) ratio Bus Priority Treatments (TSP, queue jumpers) 14 Traffic Congestion & Signal Delays Intersection Delay Curves in TCRP Report 118 • 60, 90 and 120 second cycle length curves • Curves for g/c ratios of 0.40, 0.50 and 0.60 Avg. Delay per Intersection: 120-Second Cycle Lengths 0:01:20 0:01:10 Delay, seconds per vehicle TCRP Report 118 Delay curves for 120 second traffic signal cycles 0:01:00 0:00:50 0:00:40 0:00:30 0:00:20 0:00:10 0:00:00 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 Volume-to-Capacity Ratio g/c=0.40 g/c=0.50 g/c=0.60 15 Traffic Congestion & Signal Delays Transit Signal Priority • Improves g/c ratio (e.g., from 0.40 to 0.50 g/c) Queue Jumper Lanes • Reduces v/c ratio (e.g., from 0.70 to 0.40) Reductions Calculated with TCRP Report 118 Traffic Signal Delay Curves 16 Example Calculation of Traffic Signal Delay Intersection Characteristic No Treatment With TSP With Queue Jumper 120 seconds 120 seconds 120 seconds g/c Ratio 0.40 0.50 0.40 v/c Ratio 0.70 0.70 0.40 36 seconds 28 seconds 28 seconds Signal Cycle Length Estimated Delay Existing Travel Time Observations Should Be Used to Validate Assumptions 17 Example Application #1 Oakland Park Blvd. Alternatives Analysis • Major East/West Arterial Road in Broward County, FL • Potential Modes are BRT and Streetcar • Alignment Options include Mixed Traffic, Business Access and Transit (BAT) Lane, and Exclusive Lane 18 Example Application #1 Oakland Park Blvd. Alternatives Analysis Modes/Vehicles Being Considered • Bus Rapid Transit (2.0 mphps accel/decel rates) • Streetcar (2.5 mphps accel/decel rates) Alignment Acceleration Time • 15.4 miles • 16 Stops Stop Dwell Times • 15-20 seconds 60.0 Time (Seconds) 50.0 40.0 30.0 20.0 10.0 0.0 0-5 0-10 0-15 0-20 0-25 0-30 0-35 0-40 0-45 0-50 Acceleration (0 to X mph) Bus Streetcar 19 Example Application #1 Oakland Park Blvd. Alternatives Analysis Signalized Intersection Delays Avg. Delay per Intersection: 90-Second Cycle Lengths Inter. Class. Class 1 Delay, seconds per vehicle 0:01:10 0:01:00 0:00:50 0:00:40 0:00:30 0:00:20 0:00:10 0:00:00 Class 2 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 Volume-to-Capacity Ratio g/c=0.40 g/c=0.50 g/c=0.60 Avg. Delay per Intersection: 120-Second Cycle Lengths Class 3 0:01:20 Delay, seconds per vehicle 0:01:10 0:01:00 0:00:50 0:00:40 LOS A B C D E F A B C D E F A B C D E F No TSP 0:00:29 0:00:31 0:00:34 0:00:38 0:00:47 0:01:02 0:00:16 0:00:18 0:00:21 0:00:24 0:00:33 0:00:46 0:00:11 0:00:13 0:00:16 0:00:19 0:00:26 0:00:39 w/ TSP 0:00:21 0:00:23 0:00:26 0:00:30 0:00:39 0:00:53 0:00:11 0:00:13 0:00:16 0:00:19 0:00:26 0:00:39 0:00:08 0:00:09 0:00:11 0:00:14 0:00:21 0:00:34 w/ QJ 0:00:27 0:00:27 0:00:27 0:00:29 0:00:31 0:00:34 0:00:15 0:00:15 0:00:15 0:00:16 0:00:18 0:00:21 0:00:11 0:00:11 0:00:11 0:00:11 0:00:13 0:00:16 w/ TSP&QJ 0:00:20 0:00:20 0:00:20 0:00:21 0:00:23 0:00:26 0:00:11 0:00:11 0:00:11 0:00:11 0:00:13 0:00:16 0:00:07 0:00:07 0:00:07 0:00:08 0:00:09 0:00:11 0:00:30 0:00:20 0:00:10 0:00:00 0.20 0.30 0.40 0.50 0.60 0.70 Volume-to-Capacity Ratio g/c=0.40 g/c=0.50 g/c=0.60 0.80 0.90 1.00 Roadway Congestion Factors to Posted Speed Limits LOS Speed Red. A B C D E F 0.95 0.85 0.75 0.65 0.55 0.45 20 Example Application #1 Oakland Park Blvd. Alternatives Analysis Example Portion of Travel Time Worksheet Sta. No. 1 Intersection/Station Sawgrass Mills Station Type PrePay? Inter. Class. TSP? Queue Jumper? n/a Yes n/a n/a No Green Toad Rd/NW 136th Ave. Stop No No Red Snapper Road/136th Ave. 3 No No Orange Grove Road/136th Ave. 3 Pat Salerno Dr./Azure Al/136th Ave. 3 N. Flamingo Road/136th Ave. (LT) 2 SR 816/Flamingo Road. 1 N.W. 120th Way/OPB 2 No No No N. Nob Hill Rd./OPB 3 M Yes Pine Island Road/OPB University Dr./OPB Inverrary Blvd. W./OPB 2 M Yes 1 3 H Yes M Yes Yes No No 2 1 No No No No No 40 0.26 45 A 45 0.27 45 A 45 0.34 45 D 30 0.26 45 F 20 0.54 45 D 30 0.23 45 D 30 0.45 45 D 30 0.36 0.58 45 E 25 0.57 45 E 25 0.49 45 E 25 0.35 45 E 25 0.18 45 F 20 0.16 0.50 45 D 30 0.34 45 D 30 0.25 45 D 30 0.21 45 D 30 0.31 0:08:32 0:00:24 0:09:50 0:00:19 0:10:52 0:00:19 0:11:30 0:00:15 0:14:26 0:16:27 0:00:15 0:18:38 0:20:01 0:00:26 0:20:53 0:00:26 0:00:34 0:00:26 0:00:20 0:22:13 0:00:38 0:23:09 0:00:18 0:01:08 0:00:24 0:00:15 0:24:56 0:00:49 0:00:19 0:26:04 0:00:24 0:26:57 0:00:19 0:27:41 0:00:30 6.95 No 0:00:24 0:00:26 6.70 No 0:07:39 0:00:39 6.36 No 0:01:02 0:00:57 5.86 No 0:05:00 0:00:33 5.61 30 0:00:48 0:01:17 5.45 D 0:03:40 0:00:53 5.27 45 0:00:11 0:01:28 4.92 0.25 0:03:00 0:01:49 4.43 30 0:00:11 0:00:20 3.86 B 0:02:27 0:00:43 3.28 45 0:01:39 0:00:11 0:00:54 3.12 20 0:00:15 0:00:29 2.76 F 0:00:00 0:01:37 2.31 45 0:00:00 0:00:32 2.08 0.16 0:00:00 0:00:28 1.54 30 Total Time (hr:min:sec) 0:00:22 1.28 D Dwell Time (hr:min:sec) 0:00:36 0.94 45 Delay Time (hr:min:sec) 0:01:24 0.67 No Yes Run Time (hr:min:sec) 0.41 No Yes No A No No 3 M Yes 45 Total Distance 0.00 No Yes 2 N.W. 60th Ave./OPB No 0.41 No 1 3 N.W. 64th Ave./OPB Yes 20 No 3 2 Landings Dr./N.W. 68th Ave./OPB Inverry Blvd./N.W. 56th Ave./OPB 1 No A No Yes W. Atrium/OPB 6 No 20 No 2 N.W. 84th Terrace/OPB 5 No Distance [mi] No 2 N.W. 84th Ave./OPB 4 No Coded Speed No N. Haitus Road/OPB N.W. 94th Ave./OPB 3 No Segment LOS No NW 115th Terrace/OPB NW 33rd St./OPB 2 No Posted Speed 0:00:25 7.16 0:00:45 7.47 0:00:29 0:00:15 0:29:10 21 Example Application #1 Oakland Park Blvd. Alternatives Analysis Eastbound Travel Time Summary EB Travel Time Components as Portion of Total TIme 0:50:24 0:41:59 0:43:12 0:41:59 0:41:07 0:37:02 0:36:39 0:35:46 0:36:00 0:29:28 0:27:51 0:26:43 0:28:48 0:23:59 0:23:59 0:21:29 0:21:36 0:14:24 0:12:29 0:10:10 Existing 0:12:29 0:10:10 0:07:12 0:00:00 0:18:57 0:18:42 No-Build Alt. 0:04:15 0:04:15 0:04:15 BRT Mixed (No BAT) BRT Mixed (w/ BAT) BRT Exclusive Alt. Running Time Signal Delay Time 0:04:15 SC Mixed (No BAT) 0:04:15 SC Mixed (w/ BAT) 0:04:15 Streetcar Excl. Alt. Dwell Time 22 Example Application #1 Oakland Park Blvd. Alternatives Analysis Eastbound Travel Time Summary Project Alternative Existing No-Build Alt. BRT Mixed (No BAT) BRT Mixed (w/ BAT) BRT Exclusive Alt. SC Mixed (No BAT) SC Mixed (w/ BAT) Streetcar Excl. Alt. Running Time 0:37:02 0:41:59 0:41:59 0:36:39 0:29:28 0:41:07 0:35:46 0:27:51 EASTOUND TRAVEL TIME Delay Dwell Total Time Time Time 0:21:29 0:10:10 1:08:42 0:26:43 0:10:10 1:18:52 0:23:59 0:04:15 1:10:13 0:18:42 0:04:15 0:59:36 0:12:29 0:04:15 0:46:12 0:23:59 0:04:15 1:09:21 0:18:57 0:04:15 0:58:58 0:12:29 0:04:15 0:44:35 % Impr. Over N.B. n/a n/a -11.0% -24.4% -41.4% -12.1% -25.2% -43.5% 23 w gr Exist AM Pk BRT Mixed, no BAT BRT Mixed, w BAT BRT Exclusive U S 1- A1 -A as s R Mi oa lld No b N H ob il l H i Is l l R la o nd a R d-P d in e Pi U ne ni I ve sl U r s an ni it y d ve rs D Rd r iv Bl ity D e vd r i v W eIn e s In va t va rry rry Bl 56 vd th W Av e N W e stN 56 W th Av Av ee NW 49 N th W 49 th Av eSR SR -7 -7 -N W N 31 W st 31 Av st e Av Av eN N e W W 27 27 th th Av Av eN e NW W 21 21 st st Av R e -P d o Po w er w er lin lin e e Av RdA e An nd dr re ew w s s Av eD ix ie H w D y ix ie H w yU S1 Sa Cumulative Time Example Application #1 Oakland Park Blvd. Alternatives Analysis Eastbound Cumulative Travel Times Cumulative TImes for Bus Alternatives: Sawgrass Mill to A1-A (Eastbound) 1:30:00 1:15:00 1:00:00 0:45:00 0:30:00 0:15:00 0:00:00 No Build 24 Example Application #2 Cotton Belt Corridor Regional Rail Project • Proposed Crosstown Corridor Rail Project in North Dallas Suburbs – from Dallas/Fort Worth Airport to Plano • Proposed Mode: Diesel Multiple Units • Shared Track with Freight Operations • Some Single Track Segments 25 Example Application #2 Cotton Belt Corridor Regional Rail Project Mode/Vehicle • Stadler GTW DMU 2-2/6 Low Floor Vehicle • 2.2 mphps acceleration/2.5 mphps deceleration Alignment • 26.7 to 27.5 miles • 9 to 12 stations • Up to 5 segments with single track operations Station Dwell Times • 30 to 60 seconds Roadway Congestion and Intersection Delay • Not Applicable 26 Example Application #2 Cotton Belt Corridor Regional Rail Project Cotton Belt String Line Diagram 8:00 AM 7:50 AM 7:40 AM 7:30 AM Shiloh Road Plano PBGT UT Dallas/Synergy Park Renner Village Preston Addison Knoll Trail Downtown Carrollton 6:50 AM Cypress Waters 7:00 AM DFW North 7:10 AM DFW Terminal A/B 7:20 AM 6:40 AM 6:30 AM 6:20 AM 6:10 AM 6:00 AM 0 5 10 15 20 25 30 Distance from DFW A/B Sta on (miles) 27 2, 0 20 4, 0 40 6, 0 60 8, 0 80 11 0 ,0 13 00 ,2 15 00 ,4 17 00 ,6 19 00 ,8 22 00 ,0 24 00 ,2 26 00 ,4 28 00 ,6 30 00 ,8 33 00 ,0 35 00 ,2 37 00 ,4 39 00 ,6 41 00 ,8 44 00 ,0 46 00 ,2 48 00 ,4 50 00 ,6 52 00 ,8 55 00 ,0 57 00 ,2 59 00 ,4 61 00 ,6 63 00 ,8 66 00 ,0 68 00 ,2 70 00 ,4 72 00 ,6 74 00 ,8 77 00 ,0 79 00 ,2 81 00 ,4 83 00 ,6 85 00 ,8 88 00 ,0 90 00 ,2 92 00 ,4 94 00 ,6 96 00 ,8 99 00 , 10 000 1, 10 200 3, 10 400 5, 10 600 7, 8 11 00 0, 0 11 00 2, 2 11 00 4, 4 11 00 6, 6 11 00 8, 12 800 1, 12 000 3, 12 200 5, 12 400 7, 12 600 9, 13 800 2, 13 000 4, 13 200 6, 13 400 8, 14 600 0, 14 800 3, 00 0 MPH Example Application #2 Cotton Belt Corridor Regional Rail Project Cotton Belt Speed Profile (Both Directions) 70.0 Train Speeds (mph) 60.0 50.0 40.0 30.0 EB MPH 20.0 WB MPH 10.0 0.0 Feet from DFW Station 28 For More Information James Baker 678-461-0969, Ext. 13 jbaker@ctgconsult.com Thank You! 29