Diesel Fuel Price Adjustment Special Provision Summary of New Revisions www.dot.state.pa.us Categories • Special Provisions prior to 2/10: – Category A – Category B Courses – Category C Shoulders – Category D Shoulders – Category E - Earthwork Subbase and Aggregate Base Flexible Bases, Pavements, & Rigid Bases, Pavements, & Structures www.dot.state.pa.us Categories • New Revisions: – Category A split into: • Small Excavation - 50,000 to 1,000,000 CY • Large Excavation - > 1,000,000 CY – Flexible Base Replacement (316), Stone Matrix Asphalt (419), & Manual Bituminous Patching (450) added to Category C – Concrete Pavement Patching (516) added to Category D www.dot.state.pa.us Categories • New Revisions: – ATPB (360) & CTPB (303) moved from Categories C & D (respectively) to Category B – Milling (491 & 492) added as new Category F – *Notes added to Categories B, C, & D to: • Exclude ineligible work items • Explain how adjustment will be computed when work is measured & paid for under varying units of measure (e.g. on a “Material Used Basis” or on an “Area Basis”). www.dot.state.pa.us Categories • Excluded Work Items: – Presplit Blasting items associated with Section 203 (Category A) – Cleaning Existing Ditches item associated with Section 204 (Category A) – Shoulder Backfill items associated with Sections 654 & 656 (Category C) – Patching Joint, New Pavement Joint, & Subbase Material for Concrete Pavement Patching items associated with Section 516 (Category D) www.dot.state.pa.us Categories • Items Paid on Material Used Basis: – “Coarse Aggregate” and “Bituminous Material” items associated with ColdRecycled Base Course (Sections 341 & 342) – “Coarse Aggregate for . . .” and “Bituminous Material for . . .” items associated with FB-1 Wearing & Binder, Seal Coats, & Surface Treatments (Sections 439, 440, 470, 471, 480, & 481) • Adjustment will be computed based on the “Coarse Aggregate” / “Coarse Aggregate for . . .” item quantity only. www.dot.state.pa.us Categories • Items Paid on an Area Basis Where Depth is Not Indicated in Item Description: – Seal Coats and Surface Treatments (Sections 470, 471, 480, & 481) • A depth equal to the maximum allowable size of the type of aggregate used, as specified in Section 703.2, Table C, will be assumed. www.dot.state.pa.us Fuel Usage Factors • Category A – Small Excavation: 0.34 gal/CY – Large Excavation: 0.25 gal/CY • Category B – Increased from 0.62 to 0.71 gal/Ton • Category C – Reduced from 2.98 to 2.00 gal/Ton www.dot.state.pa.us Fuel Usage Factors • Category D – Increased from 0.98 to 1.77 gal/CY • Category E – Reduced from 8.00 to 4.00 gal/$1000 of work performed • Category F – Established at 1.15 gal/CY www.dot.state.pa.us Conversion Factors • Category B (CY -> Tons) – New CF established at 3,240 lbs./CY • Category C (SY -> Tons) – Reduced from 120 to 110 lbs / inch of depth / SY • Category F (SY -> CY) – Established 2 inches as average depth for variable depth milling (Sect. 491). – Established 1 inch as average depth for profile milling (Sect. 492). www.dot.state.pa.us Category E Structures • Consider all work identified on S-drawing / BPAA-drawing – Lump sum item (8xxx-xxxx) with one or more associated items; or – Rehab work tabbed as one or more separate contract items • Exclude: – – – – Fabricated Structural Steel Prestressed Concrete Bridge Beams Bearings & Bearing Pads Design-related work www.dot.state.pa.us Category E Structures • Include: – Items on S-drawing or BPAA-drawing tabbed as “Roadway Items”; and – Removal, Painting & Containment, and Causeways (whether or not tabbed on Sdrawing or BPAA-drawing). • Value of all applicable Structure work for the project must exceed $1,000,000. www.dot.state.pa.us Category E - Example 1 • A project includes the following contract items: Item: 8600-0007 Description: RETAINING WALL, AS DESIGNED, S-25499 Item: 9070-0050 Description: ZONE PAINTING EXISTING STRUCTURAL STEEL USING ORGANIC ZINC COATING Item: 9075-0001 Description: CONTAINMENT Item Type: Contract Item Unit Price: $2,769,000.00 Item Type: Contract Item Unit Price: $100,000.00 Item Type: Contract Item Unit Price: $35,000.00 www.dot.state.pa.us Category E - Example 1 • Item 8600-0007 has the following Component Item Schedule: Seq Item Description UoM Quantity Unit Price Total 10 8600-0007 CLASS 3 EXCAVATION CY 376.000 $200.02 $75,207.52 20 8600-0007 PREFABRICATED BASE DRAIN LF 1210.249 $10.20 $12,344.54 30 8600-0007 CLASS AA CEMENT CONCRETE CY 550.000 $499.00 $274,450.00 40 8600-0007 LEAN CEMENT CONCRETE CY .000 $0.00 $0.00 50 8600-0007 SELECTED BORROW EXCAVATION, STRUCTURE BACKFILL CY 3620.000 $50.00 $181,000.00 60 8600-0007 36" DIAMETER DRILLED CAISSONS, SHAFT SECTION LF 3667.000 $130.00 $476,710.00 70 8600-0007 30" DIAMETER ROCK SOCKETS LF 237.000 $240.00 $56,880.00 80 8600-0007 FABRICATED STRUCTURAL STEEL LB 727056.000 $1.20 $872,467.20 90 8600-0007 WOOD LAGGING SF 9379.000 $11.00 $103,169.00 100 8600-0007 ROCK ANCHORS EACH 79.000 $9,073.06 $716,771.74 www.dot.state.pa.us Category E - Example 1 • The value of all Structure work for the project is computed as follows: – – – – Retaining Wall (LS) $2,769,000.00 Fabricated Structural Steel ($ 872,467.20) Painting Existing Structural Steel $ 100,000.00 Containment $ 35,000.00 – Total Value $2,031,532.80 • The Total Value of all Structure work exceeds $1,000,000 – Payments made under the above items, excluding the Fab Steel component item, are subject to price adjustment under Category E. www.dot.state.pa.us Payment / Rebate • Price Adjustments to be computed on a quarterly basis. – Initial adjustment quarter to begin as of the month/year when the first item of applicable work is performed. – New adjustment quarters to begin every 3 months thereafter. • Quarterly price adjustments amounting to less than $1,000 will be disregarded. www.dot.state.pa.us Payment / Rebate • Example: – Consider a project that includes items for Class 1 Excavation, Milling, and Superpave HMA Wearing Course. – If Class 1 Excavation operation is the first of these items to be initiated and work begins in August 2012: • Initial Adjustment Quarter: August thru October 2012 • New Adjustment Quarters would begin in November 2012, February 2013, May 2013, etc. www.dot.state.pa.us Implementation • Revised specification has been approved by FHWA and is to be included in all projects let after February 25, 2010. • A revised Excel spreadsheet has been provided by BoCM. www.dot.state.pa.us Thank You www.dot.state.pa.us Questions www.dot.state.pa.us