CNS/ATM Project of CAA Taiwan Presented by Frank LIN, ATM Program Manager 07/29/2009 CNS/ATM Project Schedule Item 2003 2004 2005 2006 2007 2008 2009 2010 2011 1. ATS Services Network (ASN) 2. ATS Message Handling System (AMHS) Relocation Communication 3. Voice/Data Link VOLMET and ATIS 4. Data Link Service Provider Partnership 1. SBAS Navigation Relocation D/ATIS & VOLMET/DSP ATM/DSP Planning 2. GBAS Planning 3. APEC GNSS Test bed Project Surveillance 1. ADS-B 1. ATC Organization Consolidation and Airspace Re-structure 2. Construction of North & South ATS Centers 3. Air Traffic Management System (ATMS) 4. Digital Voice Communication Switching System (DVCSS) 5. Aeronautical Information Service System (AISS) 6. ATS Facilities Relocation 7. Independent Back ATC System (IBAS) Planning Trail Sys Modify Transition Completed by Mid 2007 Planning Procurement Implementation (39 months) Transition Planning Procurement Implementation (39 months) Transition Planning Procurement Implementation (39 months) Transition Relocation Relocation CNS/ATM Project Air Traffic Management Preplan 2 Communication ASN (ATS Services Network) AMHS (ATS Message Handling System) Voice/Datalink VOLMET and ATIS Air-Ground Datalink AIDC (ATS Inter-facility Data Communications) CNS/ATM Project 3 ATS Services Network Commission: 2009.04 ASN2 WAN架構 豐年 FERCE 花蓮 助航台 FERCE 清泉崗 助航台 FERCE 大屯山 助航台 FERCE 翔安 北竿塔台 (圖7) 南竿塔台 (圖6) 松山 諮詢臺 台北 諮詢臺 松山塔台/ 業務室 (圖5) 台北塔台 (圖4) 微波 綠島塔台 (圖15) 2*512k 蘭嶼塔台 (圖14) 2*512k 馬公 助航台 FERCE (圖10) 512k 恆春 助航台 FERCE (圖12) 512k 嘉義 助航台 FERCE (圖16) 512k 豐年塔台 (圖13) 2*512k 恆春塔台 (圖11) 2*512k 馬公塔台 (圖9) 2*512k 金門塔台 (圖8) 2*512k 2*512k 2*E1 2*512k 2*E1 2*E1 HiLink ATM Network 2*T3 2*T3 南管園區 (圖3) 2*NGSDH(4M) 2*NGSDH(4M) CNS/ATM Project 高雄塔台 北管園區 (圖2) 高雄 諮詢臺 15JUN2008 ASN WAN 圖1 IMC 4 AMHS System Acceptance: 2005.10 CNS/ATM Project 5 VOLMET & ATIS System Acceptance: 2005.12 CNS/ATM Project 6 Navigation SBAS GBAS APEC GNSS Test Bed Project RPS (RAIM Prediction System) RTRS (Real Time RAIM System) CNS/ATM Project 7 APEC GNSS Test Bed Starting 2005.10 Taipei TRS successfully integrated in 2006 CNS/ATM Project 8 CAA TRS Subsystem Architecture Computer (Linux) 10BaseT Ethernet GPS L1/L2 Signals Connection To TMS Site L1/L2 GPS Receiver GPS L1 Signals RS-232 Serial Serial / Ethernet Switch 10BaseT Ethernet Router GPS L1/L2 Antenna Remote Login Connection 10 MHz Reference GPS L1 Antenna NTP Server 10BaseT Ethernet CNS/ATM Project DCB Oscillator 9 MSAS Coverage CNS/ATM Project 10 RPS (RAIM Prediction System) NCKU funded by CAA Offline processing CNS/ATM Project 11 RTRS (Real Time RAIM System) NCKU funded by CAA Real-time processing CNS/ATM Project 12 Surveillance Radars Multi-lateration ADS-B CNS/ATM Project 13 Radar Installation 10 civilian radars (1 with Mode-S capability) Replacement of 2 radars CNS/ATM Project 14 ADS-B System 6 ground stations Contract: 2009.04 System acceptance: 2009.12 CNS/ATM Project 15 ADS-B Coverage CNS/ATM Project 16 ATM Program ATS organization consolidation Airspace restructure Construction of North and South ATS Parks Implementation of ATMS, AISS and DVCSS ATS facilities relocation CNS/ATM Project 17 ATS Facilities Current Year 2011 CNS/ATM Project 18 Consolidation of ATC Facilities Concurrently with ATC OP transition TACC Taipei TCC North ATS Park Hualien TCC Taichung TCC Taitung TCC South ATS Park CNS/ATM Project Kaoshiung TCC 19 Airspace - Enroute Managed by TACC in North ATS Park CNS/ATM Project 20 Airspace - Terminal North ATS Park Taipei TMA Hualien TMA Matsu TMA Kaoshiung Taitung TMA TMA Kinmen TMA CNS/ATM Project South ATS Park 21 North ATS Park CNS/ATM Project 22 ATC OPS Room in North Park CNS/ATM Project 23 South ATS Park CNS/ATM Project 24 ATC OPS Room in South Park CNS/ATM Project 25 Existing ATC Systems ATCAS Commission: 1994 NAS - TACC ARTS - Taipei, Taichung, Kaohsiung TCC Eurocat-1000 Commission: 2000 Hualien, Taitung TCC Micro-ARTS IBAS Commission: 2007 CNS/ATM Project Commission: 1990 26 ATMAS Implementation Major components ATMS (Eurocat-X by Thales ATM) AISS (ANAIS by Thales IS) DVCSS (VCS-3020X by Frequentis) Contract: 2006.10.16 System Acceptance: 2010.02.19 Commission: 2011.02.20 CNS/ATM Project 27 System Architecture CNS/ATM Project 28 ATMS Functionalities MSTS (Multi-Sensor Tracking System) FDP (Flight Data Processing) HMI for stripless operation ATC Tools Conflict Detection ATFM (Air Traffic Flow Management) A-G & G-G Datalink communications Synchronous replay of data and voice Simulation and training CNS/ATM Project 29 AISS ASN LAN ASN LAN ASN LAN&WAN FIC ATMS Development system FIS ATSMO DB AMHS AISS clients IMC DB WAN ATSD AISS main server TAMC FTP server (AOAWS+WAFS) ATMS CWP clients Time Server ASN LAN ASN WAN CAA eAIP Demarcation point Demarcation point Self/Home Briefing Airlines / MIL CNS/ATM Project WWW Application & Web servers 30 Aeronautical Information Distribution AIS DISTRIBUTION FP L/ g Fl i INTERNET FPL/DPL/PIB/NOTAM/MET/Flight RPTs ht D FPL/RPL/DPL/Flight a ta FIDS FPL/DPL/PIB/ NOTAM/MET/ Flight RPTs/ AIP/Flight Data fo FP L r vali datio n( r) pape FP L FPL for validation RCAA OPMET RCAA NOTAM NOTAM RCAA FPL Validated by AISS RCAA FPL filed in ATMS ATSD eAIP AISS Boundary of ANWS’s Systems RC AA L FP FP V a alid Lt o te d by A S IT A IS a dd S AMHS G RI Ch B/ AMHS UA ar ts RCAA OPMET /O PM ET /G TS ASN n ti o lida d ad o ITA Lf FP oS t L FP a rv AISS WEB Server (AES) FPL/RPL/DPL/ Flight RPTs RPTs FP SITA Network SITA FPL/DEP,ARR MSG RCAA DEP,ARR MSG RCAA NOTAM NOTAM RCAA FPL Validated by AISS RCAA FPL filed in ATMS R C FP AA L/D FP E P L ,A R C Va l R R AA i d a t MS R R C N ed G R C C A A A A OT b y A A D E OP A M A IS S FP P , A M E L f RR T ile d i MS nA G TM S Other FIRs Boundary of ANWS’s Systems TAMC GRIB/RPL/DPL/AIP Static Data Flight Data to FIDS ATMS 96.09.19 頁數:1 AISS流程 工程隊 CNS/ATM Project MET FTP on a ti dd alid Aa S IT o Lt v fo r Airlines 31 Thank you for your attention! 林向得 Frank LIN sdlin@ms1.anws.gov.tw