ACTION PLAN FOR ODISHA R.S.Gopalan Director of Agriculture, Odisha AGENDA – I.I INTERVENTION WISE PHYSICAL & FINANCIAL PROGRESS UNDER BGREI- 2010-11 Sl. No Name of the Project Physical Financial Rs. In Lakh Unit Item wise target Ach. Outlay Appd. by GOI Funds released by State Govt. Expenditure incurred 1 System of Rice Intensification ha. 18352 18352 596.44 596.44 596.44 2 Sugarcane Development Package for Sugar Factory Areas ha. 1250 1250 99.00 99.00 99.00 3 Integrated Technological Approach for Sustainable Sugarcane Cultivation ha. 600 600 125.70 125.70 125.70 4 Bio-Fertiliser Application for Sustainable Crop Production Qtl. 7200 3554 111.43 111.43 111.43 5 Popularisation of Hybrid Maize Cultivation in the State (Kharif) ha. 30000 30000 1210.00 1210.00 1210.00 6 Management of Acid Soils ha. 11300 8035 234.28 100.00 100.00 7 Capacity building of Extension Personnel Nos . 3245 2595 198.06 128.06 128.06 8 e-Pest Surveillance Nos 13 13 269.50 240.30 240.30 9 Intensification of Hybrid Sunflower Cultivation in Orissa under P-P-P Mode during Rabi 2010-11 ha. 12040 11790 548.34 532.95 532.95 Popularisation of Hybrid & HYV paddy minikits Nos . 4525 4525 8.20 8.20 8.20 10 Cont… Sl. No Name of the Project Unit 11 Popularisation of Hybrid Maize in P-P-P Mode (Rabi-2010-11) Financial Rs. In Lakh Physical Item wise target Ach. Outlay Appd.By GOI Funds Released by State Govt. Expenditure incurred 5150 5000 208.00 202.00 202.00 ha. 12 Upscaling of Pulse Production in the State ha. 60000 60000 1922.64 1922.64 1922.64 13 Popularisation of New Cultivars of Mustard (Toria) ha. 5700 5700 126.00 126.00 126.00 14 Popularisation of Pumpsets Nos . 10370 9702 785.00 685.00 685.00 Nos . 87215 30270 1489.00 779.93 779.93 ha. 7480 7480 621.00 621.00 621.00 8552.59 7488.65 7488.65 15 16 Popularisation of Agricultural Machineries / Implements / Equipments Promotion of SRI Paddy in Rabi 2010-11 TOTAL AGENDA – I.II PHYSICAL & FINANCIAL PROGRESS UNDER BGREI 2011-12 (Financial in lakh Rs.) Sl. No Physical Name of the Project Bringing Green Revolution to Eastern India (BGREI) Unit Item wise target Financial Ach. Outlay Appd. By GOI Funds Released by State Govt. Expenditure incurred Components 1 Crop Demonstration (Rice) Ha 52000 52000 3752.04 3752.04 3752.04 2 Asset Building (Pumpsets) Nos . 11690 14030 1168.96 1168.96 1168.96 1341.00 1341.00 670.00 6262.00 6262.00 5591.00 3 Site Specific Needs Total Nos . 172 Work under Progress in all projects AGENDA – II & III Reason for shortfall if any:Work under site specific activities are under progress and will be completed by end of June-2012. The work was delayed due to imposition of Model code of Conduct on account of 3-tier Panchayatraj election. Unspent balance available in state as on 01.04.2012:Rs 671.00 Lakhs remaining unspent will be fully utilized by end of June-2012 AGENDA – IV Implementation Impact of BGREI in the State Wide acceptance of technological interventions like line sowing and line transplanting of Paddy. Reduction in cost of cultivation by effective weed management Acceptance of mechanized paddy cultivation (Direct sowing by Drum Seeder,Community Transplanting by Transplanter ) Yield advantage by use of Micro Nutrient (Zinc Sulphate) Spread effect of cluster approach in demonstration AGENDA – V Monitoring Programme by CRRI/ Other scientists Regular visit at frequent interval by CRRI and SAU scientists Timely Technological advice was ensured AGENDA – VI Success / Short comings of the Programme Mechanized paddy cultivation has over come labour shortage during peak Agriculture operations and ensured timely operations A new class of Entrepreneurs / Service provider developed - Transplanter / Tractor drawn Rotavator owner / Community Nursery raiser groups etc. Community Nursery has provided insurance against vagaries of nature AGENDA – VII Suggestions Programme may be extended to all districts of the State The subsidy provision under asset building ( Shallow Tube well and Bore well ) may be at par with other state sponsored programme (Shallow Tube well – Rs 20,000/- & Bore well – Rs. 50,000/ Cluster size may be reduced to 250 ha. Weeding by use of manual weeder / Power weeder may be encouraged instead of Chemical weed Management AGENDA – VIII Proposed action plan for 2012-13 Ecology Nos. of demos. allotted by GoI (1000 ha each ) Nos. of demos. programmed Financial Outlay (Lakh Rs) Rainfed Upland Rice @ Rs 7912/ha Rainfed shallow Low land Rice @ Rs7912/ha Irrigated HYV Rice @ Rs7852/ha Irrigated Hybrid Rice @ Rs 7817/ha Total 10 30 75 40 155 8 58 69 20 155 632.96 4588.96 5417.88 1563.40 12203.20 • Due to non availability of required variety and quantity of seed the demonstrations have been altered as per availability. • Financial outlay has been altered to a small extent to accommodate the proposed clusters in different eco-systems Asset Building • No of Pump set to be promoted: 43178 • Projected outlay 4317.80 Lakh To avoid disparity in subsidy pattern (subsidy under state plan on Shallow tube well is Rs 20,000/-) the entire allocation on Asset Building is proposed to be utilised on pumpsets. SITE SPECIFIC NEEDS Name of Work Units Unit Cost (Rs Lakh) Total (Rs Lakh) 1000 0.6 600.00 684 6 4104.00 10 50 500.00 Sl No 1 2 3 Farm cum fish Pond in submerged Lowlands (Puri, Cuttack, Jagatsinghpur, Kendrapada, Jajpur, Bhadrak, Balasore) Creation of Community irrigation projects in 23 Districts except at Sl 1 above Check Dam/ Diversion Weir Irrigation Projects ( Check dam + Pump+ Pipe Line) G. Total 5204.00 ABSTRACT Sl No Components Financial Outlay (in lakh Rs) 1 Crop Demonstration (Rice) 2 Asset Building (Pumpsets in Subsidy) 4317.80 3 Site Specific Needs 5204.00 TOTAL 12203.20 21725.00