Planning Scotland’s Seas Summer Consultation – Staff Seminar Marine Planning and Policy Joint Summer Consultation • National Marine Plan • Marine Protect Areas Network (& List of Priority Marine Features) • Sectoral Marine Plans for Offshore Renewable Energy • Terrestrial/marine planning circular Planning Scotland’s Seas Summer Consultation 16 week consultation: July – November 2013 Presentation • • • • • • Branding Consultation Documents MS website Leaflets/Banners/Posters National Marine Plan interactive (NMPi) & Msi Social Media Engagement • • • • • Web publications Stakeholder database Public Events Sectoral Meetings Correspondence to vessel owners What can you do ? • Inform your stakeholders • Official Support at Public Events & Sectoral Meetings • Other events/activities which align with Public Consultation Events More information: www.scotland.gov.uk/Topics/marine/marine-consultation Planning Scotland’s Seas Scotland’s First National Marine Plan • Promote sustainable use of marine resources and economic development • Manage conflict in the marine environment and inform decision making • Contribute to the delivery of Good Environmental Status The Scottish Marine Planning Area Legislative Planning for Scotland MSA & MCAA MPS National Marine Plan Regional; Marine Plan • Marine Scotland Act and Marine and Coastal Access Act provides legislative basis for a marine planning system in Scottish inshore (0 -12nm) and offshore waters (12 -200nm) • Marine Policy Statement (MPS) is the UK framework for preparing marine plans and taking decisions • National Marine Plan will translate the MPS into policy and spatial guidance for the Regional Marine Plans • Regional Marine Plans will provide greater spatial policy and guidance at a local level for inshore area (0 – 12nm). • Marine plans will inform decision-making relating to a plan area. The MPS does this in absence of a plan. • Development of marine plan for offshore area delegated to Scottish Ministers, but Defra Secretary of State must agree before publication & adoption. Legislative requirements • The condition of the area – summary of significant pressures and human impacts • Policies for sustainable development • Economic, social, marine ecosystem and climate change objectives • Policies on MPAs and other relevant nature conservation designated sites • Conformity with MPS • Assessments: Sustainability Appraisal; BRIA and EQIA National Marine Plan Development • National strategic objectives • Linking to evidence base • Incorporating spatial information and policies • Wide range of existing policy and management regimes • Establishing planning policies Cross cutting policies Sectoral planning policies Marine Planning Polices General / Cross Cutting Policy: GEN 1: There is a presumption in favour of sustainable development and use of the marine environment when consistent with the policies and objectives of this Plan. GEN 5: Development proposals which enable multiple uses of marine space are encouraged where possible in planning and decision making processes, subject to their being consistent with policies and objectives of the Plan. GEN 12: Marine planning and decision-making authorities should ensure that development and use of the marine environment complies with legal requirements for protected areas and protected species and does not result in a significant adverse effect on the national conservation status of other habitats or populations of species of conservation concern. Example Sectoral Planning Policy AQUACULTURE 3: Further marine finfish farm development is expected on the West Coast and islands of Scotland. There is a continuing presumption against further marine finfish farm developments on the north and east coasts to safeguard migratory fish species (over 80% of wild salmon are located on the east and north coasts of Scotland). TRANSPORT 3: Ferry routes and maritime transport links (Maps 17-19 refer) to island and remote mainland activities provide essential connections and should be safeguarded from inappropriate marine activities and development that would significantly interfere with their operation. Developments will not be consented where they will interfere with lifeline ferry services. Planning Circular • Onshore Implications • Integration between terrestrial and marine plans • Public authority must take any authorisation or enforcement decision in accordance with the appropriate marine plans National Marine Plan Key Dates • Summer 2013 16 week Public Consultation • Winter 2013 UK Ministerial Consideration & Approval of Plan for adoption • Spring 2014 Scottish Ministerial Consideration • Summer 2014 Scottish Parliamentary consideration • Winter 2014 Adoption of Plan Regional Marine Planning in Scotland Scottish Marine Regions • Next step is laying of Boundaries Order in Scottish Parliament. •Provisional plan is to form 2 MPPs a year until we have complete coverage around the Scottish coast. •Working with local coastal partnerships to develop Marine Planning Partnerships (MPPs) in a step-wise manner. Marine Planning interactive (NMPi) National Marine Plan interactive (NMPi) is being developed to provide a GIS platform to support the consultation on the draft National Marine Plan. NMPi can be accessed at: http://www.scotland.gov.uk/Topics/marine/seamanagement/nmpihome / Scotland’s Marine Atlas – Ebook We have also recently converted Scotland’s Marine Atlas into an e-book, which is available for free download: http://www.scotgov.ehublibrary.co. uk/marine-scotland/marine-atlas A brief recap … • Marine (Scotland) Act 2010 & UK legislation • Framework resources to manage demand for marine • First statutory basis for marine planning – out to 200nm • Covers reserved issues with agreement • UK, national, regional tiers Lynsay Ross Marine Planning and Policy Lynsay.Ross@scotland.gsi.gov.uk marine.consultation@scotland.gsi.gov.uk The Scottish MPA Project The MPA network Sdfh Sdfjkh Aims Tell you; • how we got here • about our consultation • What our post consultation aims are Scottish MPA project • • • • • Report to Parliament December 2012 33 Nature Conservation MPA proposals 4 MPA search locations under consideration Proposals = 11% of Scotland’s seas Total network = 23% of Scotland’s seas Marine (Scotland) Act 2010 Marine and Coastal Access Act 2009 • • • • • Inshore / Offshore Duty to have a MPA network Power to designate Marine Protected Areas (MPAs) Duties and powers to protect any MPAs Power to take account of socio-economics Scottish MPA project • Aims to deliver the MPA network duty • Science-led selection process • Stakeholder participation 1. Marine Strategy Forum 2. Sectoral bi-lateral meetings 3. 5 National Workshops Components of MPA network • • • • • Other protected areas (46 SACs, 47 SPAs, 61 SSSIs) Other area-based measures (8 fisheries closures) Demonstration and Research MPAs Historic MPAs Nature Conservation MPAs Scottish MPA project Before proposing new MPAs we looked for; 1. added value from existing protected areas 2. Enhancement opportunities 3. Least Damaged More Natural locations Scottish MPA project • • • • Selecting Nature Conservation MPAs Selection guidelines – 5 stages 41 search features (subset of the PMFs) Multi-feature approach Scottish MPA project • SNH proposals in territorial waters • 17 possible MPAs + 4 search locations • 10 are multi-feature (~59%) Ranging from; Noss Head – Single feature – 9km2 to Small Isles – Multi-feature – 922km2 Scottish MPA project JNCC proposals in offshore waters • 16 possible MPAs – some options • 11 are multi-feature (~69%) • Choices mean minimum of 13 required Ranging from; Norwegian BSP – 161km2 to; NE Faroe Shetland Channel – 26,807km2 NE FSC will be Europe’s largest (beating our own record!) 2013 pre-consultation Mini management workshops • Fishing x10 • Aquaculture x 1 Bilaterals with Renewables and NGOs Also; NWW RAC and NS RAC Some local authorities x 5 2013 summer consultation Suite of papers for each MPA proposal • • • • • Site summary Detailed assessment Data Confidence Impact Assessment Management options 2013 summer consultation What we want to find out; • • • • Is the network adequate? Whether individual proposals be designated Views on the possible future management Views on the impact assessments 2013 summer consultation Events; • The major planned events • Piggy back most of the renewables sessions • SNH & JNCC led drop-ins for inshore and offshore proposals • Bi-lateral meetings • Mini management workshops When will we designate any? Depends on; • Volume of responses • Issues surfaced needing resolution • Independent peer review? But my guess is; Spring 2014! NC MPA management Designation of a NC MPA does not automatically; • Create a No Take Zone • Create a fishery closed area Instead; • Management on principle of sustainable use • Duties on all public authorities Well managed network by end of 2016 (approx 180 MPAs!) The Scottish MPA Project The MPA network Sdfh Sdfjkh Planning for Offshore Renewable Energy in Scottish Waters David Pratt Sectoral Marine Planning for Offshore Renewable Energy The Plan for Offshore Wind Energy Sectoral Marine Planning First Step… • Scoping exercises undertaken in late 2011 – early 2012 OFFSHORE WIND WAVE TIDAL Where then? • ‘Pre-consultation’ – Additional to statutory requirements – Providing an opportunity for early views on the content of the plan, and the preparation process • • • • Areas of Search identified (Scoping) Public Participation Statement Draft Initial Plan Frameworks *Draft Regional Locational Guidance Layers included into each theme Environmental Theme Industrial Theme Socio-cultural theme Draft RLG - Contents Resource Aquaculture Aviation Bathymetry and Seabed Cultural Heritage Defence Environment Designated Sites Landscape Designations within Region Marine Mammals, Basking Sharks and Seals Seabirds Fishing Commercial Fishing Regional Overview Areas of Search Interaction Fish Processing Activities Wild Salmon and Sea Trout Infrastructure and Grid Provision Existing Future Oil and Gas Planning Ports and Harbours Recreation Recreational Angling Recreational Boating Scuba Diving Sea Kayaking Small Boat Activity Surfing and Windsurfing Areas of Search Shipping Social Supply Chain Tourism Where now? • • Draft ‘Plan Options’ identified Draft Plan options currently subject to assessment: – Strategic Environmental Assessment – Habitats Regulations Appraisal – Socio-economic Impact Assessment • Use assessment findings to shape the Draft Plans Offshore Wind Tidal Wave Approach to the Sustainability Appraisal • Assessment informed by: – – – – Current state of the marine environment and its likely future evolution A Socio-economic Baseline Review and Data Gap Analysis Research into the potential effects of devices Initial information from project level assessment and monitoring • Where possible environmental issues were identified at regional level Approach to the Sustainability Appraisal • Assessment looked at potential effects of: – alternative wind, wave and tidal technologies; – development within the alternative draft plan option areas with respect to the environment and existing sea users; and – High, medium and low growth scenarios • Recommendations and mitigation: – Specific to draft plan options – Considerations for project level assessment – Wider marine planning and research Timetable • Undertake Assessments – Current Stage • Publish Draft Plans, along with the Sustainability Appraisal Report, for public consultation in Summer 2013 * • Consultation will be undertaken and analysis published. • Plans finalised in 2013 * Scotland’s first Draft National Marine Plan and proposed network for Marine Protected Areas (MPAs) will also be out for consultation Initial assessment of potential locations for deep water turbines Objective: To investigate deep water sites where floating wind turbines could be installed. Principal requirements: • Depth between 80-120 m • Wind resource > 9 ms-1 (mean annual wind speed) • Relative proximity to electrical substation or cable connection • Relatively low wave activity • Proximity to a harbour • Low constraint level (potential interference with other users of the sea) 2011 Marine Scotland Science Scoping Report - Constraint layer clipped by depth used to identify potential floating turbine areas Additional Layers: Wind Resource Electrical Substation Cable & Cable Landings Wave activity Proximity to Harbour Constraint level Potential T&D Deepwater Locations More information • Offshore Renewable Energy Planning Webpage • http://www.scotland.gov.uk/Topics/marine/ma rineenergy/Planning • Offshore Renewable Energy Planning Mailbox • offshorerenewableenergy@scotland.gov.gsi. uk