Design and execution of a comprehensive PCB Management Plan

advertisement
Design and execution of a
comprehensive PCB Management Plan
for Kazakhstan
IPEN Global Assembly
19 October 2010
General information
• Implementing agency: UNDP-Kazakhstan
• Project duration: 5 years
• Project implementation modality – NEX
- Ministry of Environmental Protection • Office location: Astana
• GEF grant: USD 3,300,000
Project Management
Steering Committee
Beneficiary
Ministry of Environmental
Protection
Chairman
National Director
UNDP
Quality Assurance
UNDP
GEF National coordinator
(MoEP)
National project
manager
Project team
Project Assistant
Experts
Consultants
Project financing
• Financial contribution :
Source:
US $
GEF
3,300,000
UNDP
15,000
International private sector
2,983,000
National private sector
3,635,324
• In-kind contribution : US$ 10,901,356
- Government of Kazakhstan
• Total project budget: US$ 20,834,680
Project Objective:
Ensure minimization of PCB releases and
subsequent health and environmental
impacts through systematic capacity
development for sound PCB management
in the country
Facts and figures
• Production of PCB capacitors until 1989
• 4 PCB hotspots
–
–
–
–
Ust-Kamenogorsk storage pond
Ust-Kamenogorsk capacitor plant
Ekibastuz power sub-station
Dariyal-U former military base
• 116 pure PCB transformers (~ 950 tons)
• 56 000 PCB capacitors (~ 2,500 tons)
• 225,000 tons of highly PCB contaminated soil
PCB equipment map of Kazakhstan
PCB capacitors
PCB capacitor batteries
PCB transformers
• PCB Hotspots Map
Project Outcomes
Outcome 1 - Regulatory and administrative
strengthening for sound PCB management
Outcome 2 - Capacity building for sound PCB
management, identification of additional PCB
sources
Outcome 3 - Disconnecting, dismantling and
disposal of 850 tons of PCB transformers (in
partnership with ArcelorMittal Temirtau)
Outcome 4: Regionally organized secure storages
and disposal of PCB capacitors
Regulatory and administrative
strengthening for sound PCB management
• Output 1.1: Environmental Code and other PCB related legislation
reviewed, changes developed. Environmental Code revised to
include a chapter on PCB management and disposal.
• Output 1.2: Responsibilities vis-a-vis International Chemicals´
Conventions in the government re-aligned
• Output 1.3: Detailed PCB rules, guidelines, incentive schemes
developed
• Output 1.4: Capacity for implementing and knowledge of PCB
regulations and guidance among public sector actors, including
training of customs department in PCB identification, enhanced.
• Output 1.5: Awareness raising campaigns on PCB risks and
regulatory requirements among authorities and wider public
conducted.
National Chemical
Safety Policy
A. PCB Management
Guidelines
B. PCB Regulations
- Rules of PCB inventory (2010)
- Stocktaking and monitoring rules (2011)
- Rules of PCB equipment phase-out
(2011)
-Technical requirements for temporary
PCB/HW storage facilities (2011)
-Rules of packaging, labeling and
transportation of PCB (2011)
-Technical requirements for incineration
of hazardous waste (2011-2012)
- Others (?) – 2012-2015
C. Action Plan 2011-2015
- Objectives & Targets
- Components/Outcomes (e.g. Inventory Plan)
- Stakeholders/Partners
- KPIs/deliverables
D. Budget Program 20112015
- National level (Government)
- Regional level (local authorities)
- Local level (PCB holders)
E. Monitoring and
Evaluation Plan 20112015
Other key elements of PCB Management
Plan
• Stakeholder Engagement Strategy
• Communication Strategy
• PCB Information Management Systems:
– Web site
– Databases
– GIS-based Information Management System.
2010 – 2011: design and development phase
• 2010 – design (regulation)
• 2011 – planning (management system)
•
+ inventory (initial phase)
Capacity building for sound PCB
management, identification of
additional PCB sources
• Output 2.1: Improved capacities of PCB holders for sound PCB
management
• Output 2.2: PCB holder-wise management and replacement plans
• Output 2.3: PCB inventory expanded and updated
• Output 2.4: Enhanced PCB analysis preparedness at State
Hydro-meteorological services and Ministry of Health
laboratories
• Output 2.5: Risk based priority setting tools for PCBs
management initiatives developed..
Key indicators
 National Inventory Plan 2011-2015
 Setting clear targets for closed and open systems
 Setting deadlines for large companies, small and medium size
companies, municipalities
 PCB Management Plans for 20 companies - first 3 years
 Accreditation of reference POPs laboratory
 Training and awareness raising plan 2011-2015 (PCB MP)
Replacement, setting-up safe dismantling
of 850 tons of PCB transformers and
their safe disposal
• Output 3.1: Phase-out and procurement of
replacement transformers planned and scheduled
• Output 3.2: Transformers disconnected, drained,
dismantled and cleaned, metals recycled
• Output 3.3: Disposal of oils and associated waste
Regionally organized secure storages
and disposal of PCB capacitors
• Output 4.1: Secure, temporary PCB storage facilities
identified, constructed/upgraded
• Output 4.2: Safe operation of storage sites secured
• Output 4.3: PCB collection and disposal put in place and
implemented
• Output 4.4: 15,000 PCB capacitors at Darial-U
capacitor site disconnected, packed and stored.
• Output 4.5: Clean-up premises and pack all potentially
PCB contaminated wastes.
• Output 4.6: Transportation and disposal of approximately 600 tons of PCBs and associated waste disposed.
Key indicators
 Disposal of Dariayl-U 6,000 capacitors (~200 t)
 Establishment of 3 storage facilities for PCB waste
(capacitors, transformers)
 200 t of additional PCB waste collected and disposed
 Design of transportation scheme (inside Kazakhstan,
transportation routes to EU region and from Central
Asian countries) – PCB MP
 Dariyal-U clean-up project developed
Working area
Freely accessible
10 m
21, 32 m
Transformer
draining area
10,1
Scal
8, 2 m
e
2
2
Transformer
draining area
PCB oil
tank
Cra
ne
2
For
klift3m,1
Cra
ne
Capacitor
draining area12,1 m
10,2
m2
6,2 m2
Material
sluice
14,4 m
2
m2
Temporary
storage
5,1 m
Out
put
area
Input
area
2 x 20
m3
area
Driveway
Personnel
sluice
Storage for materials /
tools
5, 2
16,1
m2
m2
Emergency
Air
Entra
Thank you for attention!