www.lincolnescott.com
– Development Guidelines
– Sustainability Guidelines
– Offered best overall package
– Committed to include sustainable initiatives
– Architect: Donaldson and Warn
– ESD, Mechanical, Electrical: Lincolne Scott
– Hydraulics: HDA Consultants
– Structural: GHD
– Quantity Surveyor: RBB
Ottimo Home
Maymont
“Match is a boutique development company, who’s aim is to build quality design based developments.”
Palandri Winery
“Donaldson+Warn is a multidisciplinary contemporary design studio with extensive experience in architecture, urban design, master planning, interior architecture and public art.
For over two decades the practice’s work has consistently featured in national and international publications and attracted numerous awards”
Christchurch Grammar
Lottery West – Tree Top Walk
Rottnest Island
Fremantle
<2 km
South Beach
Cockburn Sound
Garden island
Perth CBD
Lot 232
“The Summer”
Lot 232
“The Summer”
Original
– Agreement with LandCorp to be “Sustainable”
– Sustainability Schedule Approved by LandCorp
Evolution
– MURT Pilot ROI near start of project
– Opportunity to extend commitment to ESD
– Determined that Green Star could be achieved
– Applied and accepted as a pilot project (1 of 7)
– Project was assessed as part of the Green Building Council of
Australia’s (GBCA) Multi Unit Residential Tool Design (MURT)
– Only WA MURT Pilot Project to be assessed
– First residential project to achieve a Green Star rating
Climate Responsiveness and Thermal Performance
– Cross flow ventilation, High performance materials
– “Additional” AccuRate Energy Rating (average 5 Stars with min
4stars)
Energy Conservation and Efficiency
– Low energy lighting
– Gas boosted solar hot water
– Renewable energy (photovoltaic)
Water Efficiency and Conservation
– Efficient fixtures
– Install 3 rd pipe (for future connection)
Materials Innovation and Construction Technology
– Low VOC paints, carpets and adhesives
– “Additional” HDPE plumbing in lieu of PVC
Accessibility
– Lift access to car park, Universal access to units
Affordability
– Diversity of sizes and range of units
Liveability
– Climate control, Cross ventilation, High performance glazing
Green Star
Energy
Management
Water
Indoor Environment Quality
Materials
Land use and Ecology
Transport
Sustainability Schedule
Climate responsiveness and energy efficiency
Water Efficiency and Conservation
Liveability
Materials Innovation and Construction Technology
Energy
– Increase in passive performance from 4 stars average (BCA)
AccuRate to 7 stars AccuRate (insulation, cross ventilation, orientation)
Rainwater used for toilet flushing
Transport initiatives
– Cycle storage facilities
– Visitors cycling facilities
– Reduced car parking
Waste Management
– Recycled waste area
Metering
– Additional electricity, gas and water metering
Lighting/equipment controls – increased
Construction
– Env. Mgt Plan
– Increased commissioning focus
Green Star Rating
15
10
5
0
25
20
4 Star 5 Star
Points Achieved
6 Star
Available Achieved Potential
No technical manual, limited documentation of requirements
Untested criteria
References to Office V3 technical manual (often not applicable)
More assistance from GBCA
Small/medium development with commensurate budget
36 apartments
No site “property manager”- only body corporate
Green Star Strategy
– Build on areas already addressed in submission
• IEQ
• Energy
• Water
– Focus on areas with greatest environmental outcome fro expenditure
– Minimise any ongoing “burden” on occupants/owners
Commissioning has increased focus on handover documentation
Metering – changed from pilot to V1(2 points for smart metering in pilot, plus 2 in energy plus 2 in water, all 6 in Man-16 in V1)
Issues for our project
– Struggled to find an economical solution to “smart metering”
– Use of a BMS was not practical for the scale of the project
– Had difficulty with commissioning requirements, building tuning and commissioning agent role
• Building is simple with simple service
• No property manager for ongoing mgt
• Strata Company with Multiple owners at practical completion, not necessarily on site (could be investors with tenants)
Private external spaces added
Issue for Project
– Struggled with requirements to demonstrate design achieved full noise credits
Sample Daylight Models for Units
18 and 19
Conditional Requirement – average 7 stars AccuRate
(different from V1 which now has 10% improvement over regulated requirement, which is 4 stars average in WA)
Max 15 points in pilot, now 20 in V1
Metering credits in pilot, now in Mgt in V1
Includes energy efficient appliances
Peak Demand reduction criteria easier
Issues for our project
– 7 star “hurdle” required changes to building fabric/insulation etc (even though the building was already very efficient)
– Metering requirements required dedicated electronic metering/monitoring system or BMS to get full points
– Need to provide appliances as part of base building to get credits
High Performance Thermal Materials for construction
Building Orientation
Solar Shading
Operable Louvres for air flow control by occupants
Average 7 Stars AccuRate Rating
4 stars = 118 MJ/m 2
7 stars = 52 MJ/m 2
If all units living areas were air conditioned (option) saving ~ 30 tonnes GHG emissions per annum (~ 1 tonne per apartment)
Gas boosted Solar hot water
Storage tank and boosters on roof
Solar panels will provide approx. 70% of the annual hot
water demand
Will save approximately 100 tonnes CO
2
-e of GHG p.a.
Equivalent to permanently removing 30 medium sized cars off the road
Parking criteria recognise “minimum requirement’ so credits' for not exceeding minimum allowances can be gained
Credits for being close to amenities
Issues for our project
– Location dictated availability of credits
– Small vehicle parking option not practical
Reduced use of potable water credits
Water efficient appliance credit
Pools/spas credits
Issues for Project
– Rainwater collection area limited to roof. (Still sufficient to get
4/5 credits for reduced potable water consumption)
– Need to install washers as part of base building
Rain water will be collected and reused for toilet flushing utilising a 3 rd Pipe
This will provide in excess of 30% (site restrictions limit the amount available) of the total potable water utilised for toilet flushing
The reuse of rainwater will save the equivalent of 6 domestic swimming pools (30kl) or a total of 177 kL per year.
Recycling waste area adapted to residential
Universal Design (adaptability for disabled access) is in this section
Now more credit points available with V1 (cf pilot)
Issues for Project
– Costs were factor in not targeting many materials points
Includes Outdoor Communal Facilities credits
Issues for Project
– Scale of project limited ability to provide communal facilities
Issues for Project
– Ongoing Mgt of on site recycled (black/grey) water and scale of project did not make this viable
– All stormwater retained on site (full credits for watercourse pollution)
Increased Costs vs Market Benefit
– Green Star design and administration
– Construction
Ability to achieve required energy rating (conditional requirement)
Issue of final ownership (multiple owners) and control after settlement
Metering
Use of BMS
Green Star Process
– Applicability to the scale of the development
– Applicability to Residential (vs Office)
– Usual submission requirements (precision,consistency, addressing all requirements…)
Questions?