WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION 30/08/2013 Beveridge Williams development & environment consultants THE SITE • Parcels A & B are freehold • Parcel C - Wurundjeri Way Road & Reserve • Parcel D owned by Public Transport Development Authority • Parcel E - Collins Street Bridge development & environment consultants “BUNJIL” THE EAGLE • Feature of Wurundjeri Way since 2002 • Sculpture is 25m high & weighs approx. 20 tonnes. • Sits on a concrete base thought to weigh 90 tonnes. • Designed by artist Bruce Armstrong • Movement of the Eagle will require agreement and consent between: - The Wurundjeri Council - Melbourne City Council - Vic Roads - Places Victoria - Bruce Armstrong development & environment consultants THE PROPOSED DEVELOPMENT BY LEND LEASE • Lend lease has won the tender to develop the entire site • The proposed development will include 100,000m² of office space • 600 Apartments in 7 towers • Construction of a public plaza • Approximate construction cost of 1.5 billion dollars • I’m not allowed to show you any impressive plans • Approval for the development will be by the Minister for Planning , The Hon. Mr Matthew Guy………… not Melbourne City Council development & environment consultants KEY STAKEHOLDERS AND INTERESTED PARTIES VIC ROADS - Land Owner - Professional Advice LEND LEASE - Developer - Key financier BEVERIDGE WILLIAMS - Surveying Services (Road Closure) - Professional Advice for Places Victoria PLACES VICTORIA - Land Owner - Developer MADIGAN SURVEYING - Surveying Services (Subdivision) - Professional Advice for Lend Lease PUBLIC TRANSPORT VIC MELBOURNE CITY COUNCIL - Land Owner - Referral Authority - Professional advice development & environment consultants LOT IN AIRSPACE • Lot has been designed as a series of sloping and tilting planes • Lot design maximises the amount of developable land in airspace • The lot in airspace must not breach the 5.9m minimum clearance to the constructed road development & environment consultants LOT IN AIRSPACE (CONTINUED) development & environment consultants NOT SO TYPICAL CROSS-SECTIONS • Multiple Sections required to clarify lower limits of the lot • Reduced levels computed to accord with intersection of the relevant section with the outer edge of each tilted plane development & environment consultants NOT SO TYPICAL CROSS-SECTIONS (CONTINUED) • The creation of the lot was designed and computed by Madigan Surveying and verified by Beveridge Williams development & environment consultants CREATION OF FREEHOLD TITLE TO BE INSERTED INTO MADIGANS STAGED SUBDIVSION • Discontinuance of Wurundjeri Way will take place under Section 12 of the Road Management Act 2004 by notice in the Government Gazette • Some confusion on who the land vests in after its discontinuance - Crown has absolute property in Land over which there is an Arterial Road or Freeway (Schedule 5 (1a) RMA 2004) YET……… development & environment consultants - If VicRoads has discontinued the use of a road or part of a road, it may in accordance with this clause sell the land on which the road or part of the road was located (Schedule 5 (15)(1) RMA 2004) • Legal Advice has been sought and the Victorian Government Solicitor has advised: - VicRoads can transfer land to a third party purchaser or - Include this land within a Plan of Subdivision under Section 35 of the Subdivision Act 1988 development & environment consultants FUTURE WORKS – CONSTRUCTION PHASE • Bridge deck will be constructed to sit within the airspace lot (1.5 billion dollar development will lie on top of the bridge deck) • Columns and Pile Caps will have to be sunk and constructed into Wurundjeri Way to support the bridge deck: - Who is going to be responsible for them? - Are titles for the supports required? • Possible solutions included: - Leave the columns under the control of VicRoads - Create a Section 173 agreement that covers maintenance - Create (In conjunction with the O.S.G.) C.A.’s for the area covered by the deck and columns. development & environment consultants FUTURE WORKS – CONSTRUCTION PHASE (CONTINUED) • The agreed solution: - The columns and pile caps within the road will be located and discontinued - The titles will be inserted into the Madigans Staged Subdivision and become Common Property along with the deck that they support. - Owners Corporation will be responsible for maintenance of structure within Common Property - Owners Corporation must be fully funded, have the appropriate rules, regulations, insurance and procedures from its inception development & environment consultants COLLINS STREET BRIDGE DECLARATION • Collins Street Bridge has been accepted by the public and is on Melbourne City Councils public register of roads • The bridge was incorrectly declared as Docklands Hwy (Wurundjeri Way) in 2000 development & environment consultants COLLINS STREET BRIDGE DECLARATION (CONTINUED) • Declaration Survey of Collins Street Bridge Required: - Thorough search of Land Status - As-constructed survey of the bridge deck and piers - Search of historical design drawings for the bridge development & environment consultants COLLINS STREET BRIDGE DECLARATION (CONTINUED) • A best fit of our as-constructed survey with the design drawings for the bridge revealed that one of the pile caps encroached into Wurundjeri Way • This is of particular importance as: - We do not want to discontinue any part of the Collins Street bridge structure - We do not want to sink columns (required for Lend Lease Development) into pile caps development & environment consultants • Varying Depth and Height Limitations for Collins Street Bridge Declaration development & environment consultants SIMILAR PROJECT…… DIFFERENT PROCESS • Jolimont Railyards - This project has been in the pipeline for years - Construction of a deck over the Railyards opens up Federation Square to the Yarra development & environment consultants THANKYOU development & environment consultants QUESTIONS? development & environment consultants