2014-05-13 Public Hearing_Project ABC_Orangewood_VOA

advertisement
Public Hearings
May 13, 2014
Project ABC Planned Development
Case:
CDR-13-12-297
Project:
Project ABC Planned Development
Applicant:
Jim Hall, VHB MillerSellen, Inc.
District:
4
Request:
Substantial Change to existing PD to split
existing PD Tact 8B into two (2) separate tracts
(Tract 8B and Tract 8C). PD Tract 8B retains
entitlements for 21,250 sq. ft. of miniwarehouse and 121 hotel rooms; remaining
120,000 sq. ft. of office/industrial entitlements
allocated to PD Tract 8C and converted into
240 multi-family residential units.
Project ABC Planned Development
Zoning Map
Project ABC Planned Development
Future Land Use Map
Project ABC Planned Development
Land Use Plan
Project ABC Planned Development
Action Requested
Make a finding of consistency with the
Comprehensive
Plan
and
approve
the
substantial change to the Project ABC Planned
Development / Land Use Plan (PD/LUP) subject
to the conditions listed in the staff report.
Orangewood Planned Development
Case:
CDR-13-09-233
Project:
Orangewood Planned Development (PD) /
Lake Ridge Village Preliminary Subdivision
Plan (PSP)
Applicant:
Bryan Funk, Disability Rights Florida
District:
1
Request:
Substantial Change to existing PSP to
modify BCC Condition of Approval #5 to
allow an above ground temporary pool at
10649 Lazy Lake Drive.
Orangewood Planned Development
Orangewood Planned Development
Orangewood Planned Development
Action Requested
Make a finding of consistency with the
Comprehensive
Plan
and
approve
the
substantial change to the Orangewood Planned
Development / Lake Ridge Village Preliminary
Subdivision Plan (PSP) subject to the conditions
listed in the staff report.
VOA / Nerbonne Planned Development
Case:
CDR-13-11-279
Project:
VOA / Nerbonne Planned Development
Applicant:
Jay R. Jackson, Kimley-Horn and
Associates, Inc.
District:
1
Request:
Substantial Change to existing PD to
increase development entitlements within
PD Tract 4 only from 360 hotel units to 600
hotel units.
VOA / Nerbonne Planned Development
Zoning Map
VOA / Nerbonne Planned Development
Future Land Use Map
VOA / Nerbonne Planned Development
Land Use Plan
VOA / Nerbonne Planned Development
Action Requested
Make a finding of consistency with the
Comprehensive
Plan
and
approve
the
substantial change to the VOA / Nerbonne
Planned Development (PD) subject to the
conditions listed in the staff report.
The Rialto Planned Development
Case:
CDR-14-02-037
Project:
The Rialto Planned Development / The
Rialto Preliminary Subdivision Plan (PSP)
Applicant:
Ted R. Brown, Holland & Knight, LLP
District:
1
Request:
Substantial Change to existing PSP to
modify BCC condition of approval #3(l)
regarding a cross access easement
The Rialto Planned Development
The Rialto Planned Development
The Rialto Planned Development
The Rialto Planned Development
Action Requested
Make a finding of consistency with the
Comprehensive
Plan
and
approve
the
substantial change to the Rialto Preliminary
Subdivision Plan (PSP) subject to the conditions
listed in the staff report.
Lakeside Village Center South
Planned Development
Case:
PSP-13-11-286
Project:
Lakeside Village Center South Planned
Development / Lakeside Village Center
South Preliminary Subdivision Plan (PSP)
Applicant:
Juli S. James, Shutts & Bowen, LLP
District:
1
Request:
Subdivide the property into two (2)
commercial lots to construct 42 agerestricted dwelling units and 199,733 sq. ft.
of commercial uses
Lakeside Village Center South
Planned Development
Lakeside Village Center South
Planned Development
Lakeside Village Center South
Planned Development
Action Requested
Make a finding of consistency with the
Comprehensive Plan and approve Lakeside
Village Center South PD / Lakeside Village
Center South Preliminary Subdivision Plan
(PSP) subject to the conditions listed in the staff
report.
Lakeside Village Center South
Planned Development
Case:
DP-14-01-018
Project:
Lakeside Village Center South Planned
Development / Lakeside Village Center
South PSP / Lakeside Village South
Infrastructure & Lot 2 Development Plan
(DP)
Applicant:
Jay R. Jackson, Kimley-Horn and
Associates, Inc.
District:
1
Request:
86,320 sq. ft. self storage facility and
associated site infrastructure
Lakeside Village Center South
Planned Development
Lakeside Village Center South
Planned Development
Lakeside Village Center South
Planned Development
Lakeside Village Center South
Planned Development
Action Requested
Approve the Lakeside Village Center South PD /
Lakeside Village Center South Preliminary
Subdivision Plan / Lakeside Village Center
South Infrastructure & Lot 2 Development Plan
(DP) subject to the conditions listed in the staff
report.
Boggy Creek Crossings
Planned Development
Case:
LUP-13-02-036
Project:
Boggy Creek Crossings Planned
Development / Land Use Plan
Applicant:
Rick Merkel, Highland Engineering, Inc.
District:
4
Acreage:
19.56 gross acres
Request:
170,000 square feet of commercial (C-1)
uses
Boggy Creek Crossings
Planned Development
Boggy Creek Crossings
Planned Development
Boggy Creek Crossings
Planned Development
Boggy Creek Crossings
Planned Development
Boggy Creek Crossings
Planned Development
Action Requested
Make a finding of consistency with the
Comprehensive Plan and approve the Boggy
Creek Crossings Planned Development / Land
Use Plan (PD / LUP), subject to the conditions
listed in the staff report.
Public Hearings
May 13, 2014
Download