Webinar will start shortly (This will be recorded) TOM TORLAKSON State Superintendent of Public Instruction • Note: The Webinar will be in 2 phases: – Phase 1, Information will be delivered by presenters. Questions will be taken in the second phase. – NOTE: It is very important that you remain on mute during this time period. Thanks! – There will be a 3-5 minute pause. – Phase 2, Questions or points of clarification will be asked and responded to. – Both phases will be recorded and available later. TOM TORLAKSON State Superintendent of Public Instruction E-rate for California CALNET 2 AND CALNET 3 UPDATES February 12, 2014 CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 2 Webinar Assumption TOM TORLAKSON State Superintendent of Public Instruction • The following presentation is for those applicants that used the State CALNET 2 contract last year. – The guidance provided is based upon this assumption – If you have never used CALNET 2 in the past, then continue using your existing process. But, check in with us next fall. Link Resources: http://www.usac.org/_res/documents/sl/pdf/contracts/Scenario-b.pdf http://www.usac.org/sl/applicants/step03/state-replacement-contracts.asp http://www.usac.org/sl/applicants/step03/state-master-contracts.aspx CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 3 Agenda TOM TORLAKSON State Superintendent of Public Instruction 1. The role of CA Dept of Ed and State Library 2. CalNet 2 Expiration, Extension – No Waiver 3. Guidance for FY 2013 E-rate Funding Requests 4. Status of CalNet 3 5. Guidance for FY 2014 E-rate Funding Requests 6. E-rate Mini Bid Requirements 7. Q & A CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 4 General Information about E-rate The role of CA Dept of Ed and State Library TOM TORLAKSON State Superintendent of Public Instruction CDE/K-12 HSN & State Library: Have no statutory authority to administer the federal Erate program May only offer general information about the E-rate program including: training and outreach, reference materials, and other publicly available SLD/USAC resources The following information is provided to assist applicants with their applications. It is remains each applicant’s responsibility to ensure FCC/USAC, State, and local agency rules and practices are followed. All liability and risk rests upon each applicant for E-rate approval. CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 5 Key Terms TOM TORLAKSON State Superintendent of Public Instruction 1. California Office of Technology Services (“Otech”) 2. CALNET 2 and CALNET 3 contracts 3. Master Service Agreement (“MSA”) 4. Authorization to Order (“ATO”) 5. State Replacement Contract (“SRC”) 6. Contractor, Service Provider, Vendor 7. E-rate applicant 8. Funding Request Number (“FRN”) CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 6 CALNET 2 Expiration TOM TORLAKSON State Superintendent of Public Instruction CALNET 2 extended through January 30, 2016 – HOWEVER FCC does not see this as a valid extension for E-rate applicants State finalized extension of contract end date from January 29, 2014 to January 30, 2016 MSAs 1 and 2 AT&T services (landline services and long distance) MSAs 3 and 4 Verizon services (VoIP) Purpose of extension is to facilitate transition of services to CALNET 3 Only applies to existing services, and NEW services must be ordered off of CALNET 3 CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 7 CALNET 2 Extension CALNET 2 extension does not have a viable use for E-rate purposes TOM TORLAKSON State Superintendent of Public Instruction FCC has indicated that a waiver for the contract extension will NOT be allowed for CALNET 2 with the 2005 State Form 470 Even if applicant filed its own Form 470 and checked the box for voluntary contract extensions when it awarded CALNET 2, FCC does not see validity of allowing for continued use of CALNET 2 contract for E-rate purposes Reason has to do with language on RFP for CALNET 2 that only indicated extensions through January 30, 2014 and no further CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 8 CALNET 2 Extension How does this affect applicants for FY 2013? TOM TORLAKSON State Superintendent of Public Instruction Applicant MUST transition to CALNET 3 as soon as possible if it used the State Replacement Contract (“SRC”) process for FY 2013 applications During the conversion/transition period starting January 30, 2014 though the effective date of CALNET 3 ATOs, USAC will treat services as month-to-month The entire 2013 funding year will be covered Working with USAC to define and facilitate this process – more information forthcoming CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 9 CALNET 2 Extension How does this affect applicants for FY 2014? TOM TORLAKSON State Superintendent of Public Instruction CALNET 2 cannot be used for FY 2014 funding requests Applicants can use CALNET 3 and 2013 State Form 470 for FY 2014 applications OR file their own Form 470 and conduct their own bidding processes More information on using 2013 State Form 470 later in presentation CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 10 CALNET 3 Status Award of Category 1 Voice and Data Services TOM TORLAKSON State Superintendent of Public Instruction California Office of Technology Services (OTech) posted a State Form 470 and contracts were awarded November 15, 2013 Six subcategories were awarded Multiple awardees in some subcategories Important information posted on State’s website regarding services, pricing and awards http://marketing.dts.ca.gov/calnet3/ ALL PRICING IS NOW AVAILABLE ON THE STATE’S WEBSITE CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 11 CALNET 2 to CALNET 3 TOM TORLAKSON State Superintendent of Public Instruction Services Transition (see Grid on next slide) • Certain services under CALNET 2 are transitioned to same provider (blue) • Certain services under CALNET 2 are now available from multiple providers (yellow) • Not all services available under CALNET 2 have been awarded yet under CALNET 3 (white) – The State has posted an additional form 470 that could add to the available services (Broadband Services ) on the state master contract for E-rate purposes. However, this will be done outside the window, and will not be available for the current E-rate window. CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 12 CALNET 2 On CALNET 2 State Form CALNET 2 Services 470? CALNET 3 On On CALNET 3 CALNET 3 CALNET 2 Request for State Form CARRIER Bid? 470? CALNET 3 CARRIER Subcategory CALNET 2 MSA1 TOM TORLAKSON State Superintendent of Public Instruction POTS/1 MB YES AT&T YES YES AT&T 1.6 Centrex YES AT&T YES YES AT&T 1.6 PBX/DID Trunks YES AT&T YES YES AT&T 1.6 Voicemail YES AT&T YES YES AT&T 1.6 ISDN BRI YES AT&T YES YES AT&T 1.6 Frame Relay and ATM YES AT&T YES YES AT&T 1.6 Local Calling Plan YES AT&T YES YES AT&T 1.6 ISDN PRI and DID YES AT&T YES YES AT&T,Verizon 1.1 T-1/DS-1 YES AT&T YES YES AT&T,Verizon 1.1 T-3/DS-3 YES AT&T YES YES AT&T, Verizon 1.1 Internet NO AT&T NO NO In Process IFB-B in process Ethernet Metropolitan Area Network NO AT&T NO NO In Process IFB-B in process Synchronous Optical Network (SONET) NO AT&T NO NO In Process IFB-B in process YES AT&T YES YES AT&T, CenturyLink 1.4 YES AT&T, Integra, Jive, Verizon and NWN for converged VoIP only 1.2 and 1.3 CALNET 2 MSA2 Long Distance CALNET 2 MSA3 Hosted IP Telephony (VoIP) NO Verizon YES CALNET 2 to CALNET 3 Transition Ordering Services under CALNET 3 TOM TORLAKSON State Superintendent of Public Instruction • Identify services received under CALNET 2 – Review CALNET 2 ATOs and bills for service – Make a list of services and ID what can be moved to CALNET 3 now • Visit State’s website for service descriptions, pricing and ATOs http://marketing.dts.ca.gov/calnet3/ • ID services that require an E-rate mini-bid and conduct a mini-bid if necessary (discussed later) • Execute ATO(s) for service – An ATO must be signed by the applicant, service provider, and the State before it is valid CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 14 CALNET 2 On CALNET 2 State Form CALNET 2 Services 470? CALNET 3 On On CALNET 3 CALNET 3 CALNET 2 Request for State Form CARRIER Bid? 470? CALNET 3 CARRIER Comment for FY 2013 State Replacement Contract ("SRC") FRNs using the dummy SPIN starting after expiration of CalNet 2 January Subcategory 30, 2014 CALNET 2 MSA1 POTS/1 MB YES AT&T YES YES AT&T 1.6 If SRC SPIN was used no mini-bid is required Centrex TOM TORLAKSON State SuperintendentPBX/DID Trunks YES AT&T YES YES AT&T 1.6 If SRC SPIN was used no mini-bid is required YES AT&T YES YES AT&T 1.6 If SRC SPIN was used no mini-bid is required Voicemail YES AT&T YES YES AT&T 1.6 If SRC SPIN was used no mini-bid is required ISDN BRI YES AT&T YES YES AT&T 1.6 If SRC SPIN was used no mini-bid is required Frame Relay and ATM YES AT&T YES YES AT&T 1.6 If SRC SPIN was used no mini-bid is required Local Calling Plan YES AT&T YES YES AT&T 1.6 If SRC SPIN was used no mini-bid is required ISDN PRI and DID YES AT&T YES YES AT&T,Verizon 1.1 If SRC SPIN was used, mini-bid IS REQUIRED T-1/DS-1 YES AT&T YES YES AT&T,Verizon 1.1 If SRC SPIN was used, mini-bid IS REQUIRED T-3/DS-3 YES AT&T YES YES AT&T, Verizon 1.1 If SRC SPIN was used, mini-bid IS REQUIRED Internet NO AT&T NO NO In Process IFB-B in process MUST do own Form 470 Ethernet Metropolitan Area Network NO AT&T NO NO In Process IFB-B in process MUST do own Form 470 Synchronous Optical Network (SONET) NO AT&T NO NO In Process IFB-B in process MUST do own Form 470 YES AT&T YES YES AT&T, CenturyLink 1.4 If SRC SPIN was used, mini-bid IS REQUIRED YES AT&T, Integra, Jive, Verizon and NWN for converged VoIP only 1.2 and 1.3 If SRC SPIN was used, mini-bid IS REQUIRED of Public Instruction CALNET 2 MSA2 Long Distance CALNET 2 MSA3 Hosted IP Telephony (VoIP) NO Verizon YES E-rate Mini Bid Requirements TOM TORLAKSON State Superintendent of Public Instruction Multiple Contractors for Service • If using the State Form 470 or own Form 470 allowing only bids from CALNET 3 contractors, a mini-bid is required: – All contractors capable of providing service in subcategory must be compared – ONLY EXCEPTION is if contractor does not provide service in your area – verify and document – Price of E-rate eligible services must be given the highest possible weight in evaluation process – Download pricing from State’s website or contact all contractors that can provide service for quotes (keep for your e-rate records) CALNET 2 AND CALNET 3 Updates 2013 California Department of Education 16 E-rate Mini Bid Requirements Sample Evaluation Matrix TOM TORLAKSON State Superintendent of Public Instruction CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 17 E-rate Mini Bid Requirements Documentation of Process TOM TORLAKSON State Superintendent of Public Instruction • Copy of evaluation matrix • Copies of pricing schedules • Copies of quotes and vendor correspondence relating to mini-bid (if applicable) • For subcategory 1.6 Legacy Telecommunications, copy of ATR Bulletin 13-04 showing only one possible provider http://www.dts.ca.gov/pdf/stnd/atrbulletins/2013/ ATR13-04.pdf • Copies of executed ATOs • Board minutes if contracts are taken for Board approval CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 18 E-rate FY 2013 Next Steps Conduct Mini-Bid and Execute ATOs TOM TORLAKSON State Superintendent of Public Instruction • For SRC FY 2013 funding requests, an E-rate compliant mini-bid is required for services in CALNET 3 subcategories 1.1, 1.2, 1.3 and 1.4 • Upon selecting service provider(s) sign ATOs and submit for processing as soon as possible • Effective date on ATOs must be on or after the date on the Mini-Bid evaluation matrix • More information coming soon on how USAC will process pending FY 2013 applications with SRC FRNs – SRC FRNs may be split into two or more funding requests depending on providers chosen CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 19 E-rate FY 2014 Next Steps Converting to CALNET 3 TOM TORLAKSON State Superintendent of Public Instruction • Applicant may use State Form 470 and conduct a mini-bid if required (see grid on following slide) – If already doing a mini-bid for 2013 a second mini-bid is not required – ATO s MUST be executed PRIOR to filing of Form 471 and March 26 deadline by all three parties (applicant, provider, and state) – If executing ATOs for FY 2013 a second set of ATOs is not required • For services NOT covered under the State Form 470, applicant must file its own Form 470 and conduct its own bidding process CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 20 CALNET 2 On CALNET 2 State Form CALNET 2 Services 470? CALNET 3 On On CALNET 3 CALNET 3 CALNET 2 Request for State Form CARRIER Bid? 470? CALNET 3 CARRIER Subcategory FY 2014 FRNs CALNET 2 MSA1 POTS/1 MB YES AT&T YES YES AT&T 1.6 Refer to State Form 470, no mini-bid is required Centrex TOM TORLAKSON State Superintendent PBX/DID Trunks of Public Instruction YES AT&T YES YES AT&T 1.6 Refer to State Form 470, no mini-bid is required YES AT&T YES YES AT&T 1.6 Refer to State Form 470, no mini-bid is required Voicemail YES AT&T YES YES AT&T 1.6 Refer to State Form 470, no mini-bid is required ISDN BRI YES AT&T YES YES AT&T 1.6 Refer to State Form 470, no mini-bid is required Frame Relay and ATM YES AT&T YES YES AT&T 1.6 Refer to State Form 470, no mini-bid is required Local Calling Plan YES AT&T YES YES AT&T 1.6 Refer to State Form 470, no mini-bid is required ISDN PRI and DID YES AT&T YES YES AT&T,Verizon 1.1 Refer to State Form 470, mini-bid IS REQUIRED T-1/DS-1 YES AT&T YES YES AT&T,Verizon 1.1 Refer to State Form 470, mini-bid IS REQUIRED T-3/DS-3 YES AT&T YES YES AT&T, Verizon 1.1 Refer to State Form 470, mini-bid IS REQUIRED Internet NO AT&T NO NO In Process IFB-B in process MUST do own Form 470 Ethernet Metropolitan Area Network NO AT&T NO NO In Process IFB-B in process MUST do own Form 470 Synchronous Optical Network (SONET) NO AT&T NO NO In Process IFB-B in process MUST do own Form 470 YES AT&T YES YES AT&T, CenturyLink 1.4 Refer to State Form 470, mini-bid IS REQUIRED CALNET 2 MSA2 Long Distance CALNET 2 MSA3 Hosted IP Telephony (VoIP) NO Verizon YES YES AT&T, Integra, Jive, Verizon and NWN for converged VoIP only 1.2 and 1.3 Refer to State Form 470, mini-bid IS REQUIRED E-rate FY 2014 FRN Instructions If using 2013 State Form 470 TOM TORLAKSON State Superintendent of Public Instruction • Form 470 number is 335470001069064 • Service Provider Identification Number (“SPIN”) – Contract the service provider • Contract Award Date = date that State signs ATO • Service Start Date = 07/01/2014 • Contract End Date = Date indicated on ATO CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 22 Important Deadlines TOM TORLAKSON State Superintendent of Public Instruction • If you are on CALNET 2 now (& most public sector CA Education/Library applicants are), then YOU MUST DECIDE for upcoming funding year what you will do for all YOUR services on CALNET 2 contract • BY NO LATER THAN: • LAST DAY TO POST Form 470 (February 26, 2014) • Form 471 application deadline is 8:59 PM March 26, 2014 • Or use state form 470 and process ATO immediately (Review Services on Contract) How to join the CDE E-rate listserv TOM TORLAKSON State Superintendent of Public Instruction • Join the E-rate e-mail list to receive updates about E-rate and the CTF programs. Subscribe to the E-rate listserv by sending a "blank" message to • join-cde-e-rate@mlist.cde.ca.gov. If you would like to unsubscribe from the E-rate listserv, send a "blank" message to unsubscribe-cde-e-rate@mlist.cde.ca.gov. CALNET2 AND CALNET 3 UpdatesI 2014 California Department of Education 24 Join the CALNET 3 listserv TOM TORLAKSON State Superintendent of Public Instruction To Subscribe to the CTA_CALNET3 list • http://www.dts.ca.gov/stnd/calnet-III/calnetIII.asp • You may leave the list at any time by sending a SIGNOFF CTA_CALNET3 command to: LISTSERV@LISTSERV.STATE.CA.GOV, or by sending a blank email • to: CTA_CALNET3-signoff-request@LISTSERV.STATE.CA.GOV. Future Form 470 for State Master Contract TOM TORLAKSON State Superintendent of Public Instruction • There is an additional form 470(s) for State Master Contract posted AFTER the Window closes – This form 470/services may not be available for the E-rate application window of 2014-2015, but will be available for the E-rate 2015-2016 E-rate application year Conclusion TOM TORLAKSON State Superintendent of Public Instruction • CALNET 2 has NOT been extended through January 30, 2016 for E-rate Purposes. – Calnet 2 expires on Jan 30th, 2014 for E-rate • Further clarification for E-rate applicants is forthcoming as information is available • Action Items: – CALNET 3 pricing for mini-bid and process for signing ATOs is now available, process ATO now after selection of provider – K-12HSN/CDE is to work with USAC CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 27 Who to Contact? TOM TORLAKSON State Superintendent of Public Instruction • State Library: Rushton Brandis, (916) 653-5471 rushton.brandis@library.ca.gov • CDE/E-rate: Doris Stephen, 916-324-9943 dstephen@cde.ca.gov • K-12 HSN/Butte COE: Russ Selken 530-532-5678 rselken@bcoe.org CALNET 2 AND CALNET 3 Updates 2014 California Department of Education 28