Disaster Management Plan for Thermal Power Plants

advertisement
Disaster Management Plan for
Thermal Power Plants
By : H.M. Gangopadhyay
Dy. General Manager (Safety)
Corporate Safety Department
NTPC Limited
Presentation Outline











Classification of Disaster
Requirement under the Laws
Objective of the Plan
Disasters in Thermal Power Plants
Risk Assessment & Vulnerability Mapping
Emergency Equipments, Training & Mock Drills
Disaster Management Organisation
Responsibilities of Team Members
Emergency Control Centre (ECC)
Evacuation and Assembly Points
Mutual Aid Scheme
• Natural disasters (earth quake, flood, Tsunami
etc.,)
• Technical disasters – collapse of buildings, release
of gases, major fires, explosions.
Classification of Disaster

A disaster occurring in the plant may affect/cause
 several sections within it
 serious injuries / loss of lives,
 Extensive damage to property
 Serious disruption out side the works area

It requires the best use of internal resources as well as
outside resources to handle it effectively.

ON-SITE EMERGENCY : An accident which takes place
in an industry handling hazardous materials and its
effects are confined to the factory premises involving
only the people working in the factory.

OFF-SITE EMERGENCY:
If an accident takes place
in an industry handling hazardous materials and its
effects are felt outside the factory premises, the situation
thus generated is called an Off-Site Emergency
Factories Act Requirement
In accordance with the provision of Section 2 (cb), read
with The Factories Act - 1948, “power generating
industry” is classified as hazardous process under item
5 thereof.
According to Section 41-b, para –4, of Factories Act- 1948,
all factories engaged in hazardous processes must have
Disaster Management Plan.
Section 41-b, Para -4 of Factories Act-1948
Every occupier shall, with the approval of the Chief
Inspector, draw up an on site emergency plan and detailed
disaster control measures for his factory and make known
to the workers employed there in and to the general public
living in the vicinity of factory, the safety measures required
to be taken in the event of an accident taking place.
Approach and Objective of the Plan
The plan is developed to make best possible use of
resources at its command and / or out side agencies
for the following purposes.89








Prevention, Mitigation & Preparedness (Pre phase)
Response, Rehabilitation & Recovery (Post phase)
Safe guard others by evacuating them to safer places;
Rescue of victims and treating them suitably to effect
speedy recovery at hospital;
Identify the personnel affected / dead;
Inform relatives of those deceased / affected;
Providing relevant records / data needed as evidence
for subsequent enquiry;
Rehabilitation of the affected persons;
Possible Disasters in Thermal Power Plants







Fast spreading fires
Explosions
Bursting of pipe lines / vessels
Uncontrolled release of toxic / corrosive / flammable
liquids
Slow isolated fires
Breach of dams / ash dykes
Floods
Fire Hazards In Thermal Power Plants








Coal handling plant:
Coal dust accumulation on
 conveyor decks,
 cable trays,
 head & tail pulleys,
 Crusher house and vibrating screen floors,
 Bunker house ,
Belt sway, belt tension,
Failure of belt joints,
Snapping of belts,
Partially damaged belt in operation,
Smoldering fire in bunkers,
Jamming of idlers and pulleys,
Fire Hazards In Thermal Power Plants








Cables in cable galleries and on trays in all plant
sections,
Coal dust deposited on cable trays in mill area
Fuel oil handling and oil tanks (HSD, HFO, Petrol )
Transformer oil, turbine oil, control fluid, seal oil,
Electrical system
Heat path damaged insulation
Dry grasses
Accumulation of waste materials etc.
Explosion Hazard In Thermal Power Plant

Hydrogen plant
Turbo generators where hydrogen is used for cooling of
TG.

Transformer (oil cooled).

Boiler (Coal/Oil fired).

Coal dust in Mills and Boilers.

Bursting of Pipe Lines, Vessels

Water / Steam pipes due to high pressure/
temperature

H2 Gas lines and Acid lines.

Acid/Alkali tanks

H2 Gas Cylinders

Compressed air header.

Compressed air receivers.

H2 Gas Holder.
Release of Gases / Dust






Chlorine in water treatment plant
Hydrogen in turbo generator area of main plant
Pulverized coal dust from mills and associated piping
Fly ash from chimneys and ash ponds, ESP hoppers and
bottom ash system
Coal dust in transfer points, CHP, Crusher & mill area.
Flue gas from the ducts
Release Of Liquid





Acid and alkali tanks in water treatment plants
Chlorine toners in WTPs
Fuel oil tanks in fuel oil handling section
Ash dyke
Turbine oil and seal oil leakage
Floods


Breach of balancing reservoir.
Breach of ash dykes
Sections prone to Emergencies





Coal handling plant
Main plant, including Boiler, TG, ESP
Water treatment plant, use of Chlorine gas
Hydrogen generation plant
Fuel Oil Handling areas
Common elements of a model
Disaster Management Plan
Components of Disaster Management Plan

Plant emergency organization

Plant & area risk evaluation

Notification procedures & communication systems

Emergency equipments and facilities available

Procedure for returning to normal operations

Training and mock-drills for specialized services

Regular tests of emergency organization and procedures

Review of Plan and updates

Emergency response procedures

Detailed operating manual
Risk Assesment & Vulnerability Mapping
Consists of the following components:






Maximum quantitative and qualitative assessment of
hazards at any given point of time
Location of hazardous operations and systems
Properties of hazardous systems (MSDS)
Location of isolation systems
Special fire-fighting procedures
Special handling requirements.
Communication systems







Alarm systems
Communication equipments
Plant management, Local Officials, Response Agencies,
Neighbouring industries, Neighbourhood population
Names and telephone numbers of the designated officials
and their alternates
Designated persons for media contacts
Procedures for notifying families of injured employees
Central reporting office (ECC).
Emergency equipments & facilities









Fire-fighting equipment
Emergency medical supplies
Toxic gas detectors
Wind direction (wind sock)/speed indicators
Self-contained breathing apparatus
Protective clothings
Other on-site equipments according to the local conditions
Containment facilities around tanks/vessels
Interfaces & lines of communication with off-site officials,
neighbouring industries.
Training, Simulation & Mock Drills

Knowledge of chemicals (properties, toxicity, etc.)
and procedures for reporting emergencies

Alarm systems and communication network

Location of fire-fighting/first-aid equipment

Use of fire-fighting/first-aid equipment

Use of protective equipment(respirators,
apparatus, clothing, etc.)

Decontamination procedure for protective clothing and
equipment; demolition and repair

Evaluation procedures and rescue services

Records of documented simulated emergencies which
should be conducted frequently.
breathing
Training, Simulation & Mock Drills
 Training and drills for specialized services
 Regular
tests of emergency organization and
procedures
 Plan updates
 Emergency response procedures
 Detailed operating manual
Disaster Management Organisation
Task Force
Team
HR Team
Matls Mgmt.
Team
Autobase Team
Chief Incident
Controller
Support Team
Work Incident
Controller
Communication
team
Support
Team
Maint
Team
Rescue Team
Medical team
Security Team
Responsibilities of WIC
The WIC shall identify;
 All probable emergency causing situations and take
proper precautionary measures to prevent / control such
situations;

Ensure that all emergency team under him are informed
about their functions before and during emergency;

Direct all operations within the affected area with the
following priority;



Secure the safety of personnel
Minimise damage to plant & environment
Minimise loss of material
Responsibilities of WIC

Ensure that all non-essential workers in the affected areas
are evacuated to appropriate assembly point.

Set up communication contact through telephone
messenger etc. With emergency control centre (ECC).

Report significant developments to the chief incident
controller.

Assume duties of chief incident controller pending his arrival
and in particular;
1.
2.
/
Direct the shut down and evacuation of plant and affected
areas likely to be threatened by the emergency.
Ensure key personnel are informed and they are called in
Responsibilities of CIC





Relieve the works incidence controller from the
responsibility of over all main control.
Declare major emergency, if considered necessary and
ensure out side emergency services are called in and near
by industries are informed.
Directing shutting down and evacuation of plant, establish
liaison with head of fire, safety, medical, HR, security and
local police.
Arrange for relief of personnel and catering facilities for
affected in emergency.
Ensure information / reporting to Corporate Office and
Statutory authorities as per provisions of state Factory rules
and Factory Act
Emergency Control Centre (ECC)

Emergency control centre shall be established and
equipped with adequate means of communication to
areas inside and outside.

The emergency control room will be manned by the Chief
Incident Controller, Work Incident Controller, key
personnel and Sr.Officers of out side services called for
assistance.

It should have general map and guide for Assembly
Points, location of Hazardous process/operation

No other personnel shall have access to the ECC.
Emergency Control Centre (ECC)
ECC must contain the following information:

Safety data pertaining to all hazardous materials likely to
cause emergency.

Procedure of major and special fire fighting, rescue
operations, first aid etc.

Emergency call out list of persons drafted for emergency
control eg key personnel from fire, safety, medical, HR,
security, local police and District Admn. Authorities.
Evacuation And Assembly Points

In an emergency, it will almost certainly be necessary to
evacuate personnel from affected areas.

On evacuation, employees shall assemble at assembly
points.

Assembly point must be shown in Disaster Management
Plan.
Key Personnel

Apart from WIC and CIC, other works personnel will have
key role to play in providing advice and in implementing
the decisions made by CIC.

Key personnel includes
1.
Incharge of generation, electrical & mechanical
maintenance, C&I, Chemistry (& WTP)
2.
Heads of HR, safety, PR, Medical, Security & Fire
Department.
Mutual Aid Scheme

An understanding for mutual aid between nearby
industries to send assistance to each other in case of an
emergency;

Details of facilities offered by the mutual aid partners
should be mentioned in the plan;

Details of contact phone nos. of officers responsible for
emergency action of mutual aid partners should be
mentioned in the plan
Support team to CIC & WIC


In addition to the teams already mentioned there will be
one additional team known as support team.
This team will assist CIC & WIC during an emergency.
The responsibilities of the team given below;



Contacting statutory authorities.
Arranging for relievers and catering facilities.
Giving information to media.
Responsibilities Of Support Team

Arranging shelters for affected persons.

Contacting medical centres and nursing homes.

Providing all other support, as necessary.

Arranging for urgently required materials through cash
purchase or whatever means.

Arranging funds for various relief
emergency purchase of materials.
measures
as
Responsibilities of key personnel










Departmental heads:
The departmental heads will provide assistance as required
by the works incident controller. They will decide which
members of their departments are required at the incident
site.
Head of Tech. Services
On knowing the major emergency, he will proceed to the
site and report to CIC.
He will provide technical information as required to
CIC/WIC.
Head of Safety:
On knowing the emergency, he will immediately report to
site and keep in touch with CIC
He will make sure that all safety equipments are made
available to the emergency teams.
Participate in rescue operations.
Maintain inventory of items in ECC.
Mock Drill

Mock-drills are conducted to test the effectiveness of
action plan / emergency preparedness.

Periodicity of mock drill is at least once in every six
months (As per Factories Act-1948).

Deficiencies found are to be recorded and corrective
actions are to be taken immediately for effectiveness of
the plan.
Emergency Siren
------------------------------------------------------------------------------------------Type
Duration
------------------------------------------------------------------------------------------
In case of fire
10 seconds on
05 seconds off,
3 times

In case of
Heavy chlorine leak
20 seconds on,
10 seconds off,
5 times.
Continuous
siren for 3 min,
only once.
--------------------------------------------------------------------------------
All clear signal
Thank you
Let us develop a positive safety culture
involving all our employees & associates