ALEX Sweden May 2014

advertisement
ALEX
Automatic
Level Crossing
System
TMALL 0143 Presentation engelsk v 1.0
UNECE
May 2014
About the Swedish Transport Administration
• A government administration responsible for the
long-term planning of the transport system
• In charge of the national road and railway
networks
– 100 000 km road (including 2 000 km motorway)
– 12 000 km railway
2
2014-05-08
Vision Zero (zero fatalities)
System designers are responsible for
the design, operation and the use of
the transport system
Users are responsible for
following the rules for using
the transport system
If the users fail to comply with
these rules the system designers
are required to improve the system
3
2014-05-08
Trafikverket has ~6500 level crossings
Protection
Full barrier 18%
Half barrier 15%
Light and sound 12%
Passive protection 20%
Without protection 35%
4
Key figures for level crossings
• LCC, Life Cycle Cost (25 years)
– Included costs for accidents
• Number of fatalities (25 years)
– Included suicides
• LX replacement value
5
2014-05-08
2440 M€
550 M€
250
125
800 M€
2770 LX have active protection
160
140
120
Installed LX
100
MAINTENANCE DEBT,
46% installed before 1988,
i.e. more than 25 years old!
Replacement cost ~280 M€
80
60
40
20
-
Year
6
2014-05-08
Baseline 2014
Compared to modern solutions available
on the market our old LX control system
design from 1970 is characterized by
•
•
•
•
7
at least 50% higher investment cost
at least 60% higher maintenance cost
at least 400% higher energy cost
difficulty to introduce new solutions to
prevent fatalities
2014-05-08
Project ALEX
• ALEX – Automatic Level Crossing system)
– Procurement of modern techniques for level crossings
– Framework agreements with 2-3 suppliers according to the Public
Procurement Act
• Outsourcing policy
– Purchase of maintenance, systems etc. from suppliers
– Suppliers must take responsibility for the supply of components and
safety cases during the economic lifetime, for about 25 years
– Suppliers can introduce new technologies in their systems when it is
beneficial to both parties – Win-win!
– Safety case according to EN 50126 (RAMS)
8
2014-05-08
ALEX - System design
Inkommande kraft
(handske för elverk,
möjlighet till solceller)
FA Kraftmatning
EA (inkl batteribackup,
överspänningsskydd)
Intilliggande
vägskyddsanläggning
(gem signsträcka,
beroende med
vägförsign)
FJ Ljudsignaler mot väg
(ev var volym,
ER
funktionskontr)
FB Hinderdetektering
FK Ljussignaler mot väg
ES
(vägljussign, bomlykta)
EB
ERTMS
FL Bommar inkl driv
med och utan motvikter ET
(inkl kjolar)
EC
EH
Ställverk
EAH
FM Ljussignaler mot
EU
bana (inkl
funktionskontr)
EK
Linjeplats/växling
EL
FC Styrenhet
EJ
Spårledningar
Spårledn & rälskontakt
Axelräknare
Alt tågdetektering
Status tåg ank, passerat
Status tåg ank, passerat
Kamera
Status tåg ank, passerat
9
2014-05-08
Lokförare
Reducerad automatik
Trafikledning
EX
Larmer
Driftledning
Projektörer
FN Frånkoppling (arbete
EZ
på signsträcka)
EM
FH Manöver
(provn & underhåll)
EN
EAA
Underhållspersonal
(Felsökn
/Arbete)
EW
FP
Loggning
GSM-R
(skicka larmer)
EAJ
EV
EY
Förvarningssignalering
mot väg
Trafikverkets IP-nät
(kommunikation mot
nätverk / internet)
GB Förvarningssignalering mot
bana (inkl
funktionskontr)
ED
ATC
Trafiksignalanläggning
Trafikanter
EAB
EP FD Nätverks-
kommunikation
EQ
FQ
Teknikutrymme
Loggfiler
EAC
Låssystem
EAD
Teknikhus