Name Title Date Data center operational efficiency best practices Enabling increased new project spending by improving data center efficiency RLP03010-USEN-00 © 2012 IBM Corporation IT professionals are under increasing pressure to deliver transformative business value Increased connection Increased demand Increased risk 700M 2.7ZB 40% smartphones and tablets will ship in 2012, a jump of 34% of digital content in 2012, a 50% increase from 2011 Increased opportunity Increased expectations 60% 68% of CIOs view cloud computing as critical to their plans 2 of Fortune 500 and popular websites contain a vulnerability of senior management rank technology as critical to business success © 2012 IBM Corporation The study addressed server, storage, network, facility and data center operations to learn what is being implemented today It represents 308 clients in 7 countries and 25 industries Geography Asia Pacific 30% Sector Europe 29% Other 18% Comms 10% Latin America 10% North America 31% Public 21% Organization Size Distribution 12% >10,000 employees 13% 0 – 999 employees 28% Industrial 26% Financial Services 13% 1,000 – 9,999 employees 59% 58% plan significant data center investments in next 2 years 68% are the first to adopt or rapid technology adopters 3 © 2012 IBM Corporation One in five, or 21%, of clients have highly efficient data centers— and are allocating 50% more of their IT budget to new projects How much of your IT budget is spent on: Maintain existing infrastructure New projects 35% Basic data centers 65% data centers • Improving public safety or providing more citizen services • Transforming core banking and payment systems • Implementing smart grids or improving generation performance New projects Strategic Improving data center operational efficiency allows spending to go to: 53% • Allocating funds to other business priorities 47% 4 © 2012 IBM Corporation Characteristics of highly efficient data centers Optimize the IT and facilities assets to maximize capacity and availability Design for flexibility to support changing business needs Use automation tools to improve service levels and availability Have a plan that aligns with the business goals and keep it current 5 © 2012 IBM Corporation Optimization Leaders have moved beyond consolidation to high levels of virtualization for server, storage and network environments Asset optimization: virtualization is table stakes 93% 92% 48% 27% Percent of servers virtualized 21% Use storage virtualization 14% Use data deduplication technologies Strategic Basic Leaders have 2.5x more servers managed per administrator (27 versus 10). They have higher virtual machine densities of 8.2 versus 4.5 VM’s per server. 6 © 2012 IBM Corporation Flexibility Leaders design for flexibility, with optimal levels of availability and redundancy in their IT and facilities infrastructure Design for flexibility…and minimize disruption to operations 90% 46% 47% 45% 31% 21% 9% 8% Primary data center replicated with active-active Replication used for storage backup Network architected to flexibility introduce new services Upgrade mechanical / electrical equipment without disruption Strategic Basic Business resilience for IT is increasingly essential to address new regulations, security threats and service outages; leaders are using more sophisticated methods. 7 © 2012 IBM Corporation Automation Leaders employ higher levels of automation to offload manual tasks, reduce error rates and meet service level agreements Automation provides flexibility to improve availability 87% 58% 31% 30% 1% Move virtual machines to meet SLA’s 3% Implemented a storage service catalog 3% Network services are automatically provisioned 0% Monitor thermal conditions Strategic Basic Over 30% of leaders have implemented self-service portals to provision virtual machines, with 80% of leaders planning them by 2013 to support cloud computing. 8 © 2012 IBM Corporation Planning Leaders adopt and refresh technology faster Have a plan – don't wait to adopt new technology 86% 75% 62% 43% 31% 27% 21% 9% First and fast technology adoption Refresh technology within 12-23 months Plan to implement converged infrastructure Planned growth rate in server virtualization in the next year (mean response) Strategic Basic Leaders value faster migration of workloads to new technology and integration into existing service management processes. 9 © 2012 IBM Corporation Planning Leaders use fact-based planning to be more flexible and responsive to rapidly changing needs Forecast to be flexible to the business needs 77% 68% 53% 33% 25% 14% 2% 0% Build capacity in smaller increments Forecast space (10 to 20 years) Forecast power demand Implement low and high density zones Strategic Basic Good design is an insurance policy that provides flexibility to support new technology. Vendor and technology tradeoffs can reduce total data center costs 15 – 30%. 10 © 2012 IBM Corporation Planning Leaders realize their staffs can not do everything Leverage managed services and outsourcing resources 80% 64% 15% 12% 13% 3% Use own data center Use outsourcing provider Use managed services provider 8% 5% Use Colocation provider Strategic Basic Leaders tend to use more off-premises resources to complement their IT resources and free up critical staff to meet their business needs. 11 © 2012 IBM Corporation As companies move up the efficiency scale, they become more cost effective and better able to respond rapidly to change Basic Operations 11+ years 2.5+ Facilities Data center age Power usage effectiveness < 3 years < 1.5 None High Mechanical/electrical redundancy Mechanical/electrical upgrade disruptiveness Full Not at all Servers <10% 0-4 Percent virtualized Virtual machines per physical server Storage 10-20% Backup as archive Network Days Applications Managed by and tools individuals Sourcing & Governance Slow Mainly inhouse Staffing 0-10 < 30% Not efficient 12 Strategic Storage virtualization Archiving Disaster recovery time Application portfolio decisions Ease of decision making Use of off-premise resources Physical servers per FTE Staff time on new projects 60%+ 8+ 80-90% eDiscovery data mapping Seconds Centralized approach Quick Managed and outsource Over 100 60%+ Highly efficient © 2012 IBM Corporation Operating at the strategic level: Albiant-IT, BPCE supports 36M financial customers, served by 117K employees and 8K branches Data center environment at a glance: Optimize assets 4 data centers 2 sites (Paris and south of France) 80K sq ft combined Unix servers 2 1.7 of servers are virtualized; high levels of storage virtualization and deduplication PUE* actual and planned target Focus on energy efficiency Operate in active-active mode 2(N+1) Design for flexibility capacity, extendable to 97K sq ft 18K servers 80% x86 servers 7 mainframes, plus 60% Activeactive Plan for the future 10 years architecture Each data center replications into the other; workloads moved as necessary Backup onsite with geo-replication Recovery from outages in real time Ten-year capacity plan Capacity is added in small increments Evaluating introduction of new technology: converged infrastructure *Power usage effectiveness We are already using automated hierarchical storage, storage virtualization and deduplication as well as dynamic resource allocation. Pierre Debagnard, General Manager 13 © 2012 IBM Corporation Moving from basic to consolidated: Associazione Bancaria Italiana focuses on mechanical/electrical and power and cooling Data center environment at a glance: 1 data center 110 servers 50 switches and routers Optimize assets 35% Accommodate requirements of cultural Design for flexibility 860 sq ft in one In-rack water cooling location (reduced from 6) 600 internal connections + thousands of external connections reduction in average power consumption of IT infrastructure (25 kW) heritage building (no raised floor) APC in-rack water cooling blocks connected to chillers above rack cabinets Allow for expansion within existing footprint Continue server virtualization Plan for the future 5 years Consolidate servers from rack-mounted units to blades Incorporate advanced management tools By transforming our data center, we have reduced the average power consumption of the IT infrastructure by about 35 percent or 24Kw. Antonio Buratti, CIO 14 © 2012 IBM Corporation How available becomes strategic: the University of Bristol reaps the benefits of efficient power usage and high automation levels Data center environment at a glance: Optimize assets 1 new data center, 2 20 kW Clustered floor space in new center Design for flexibility Lightsout 600 server nodes 1.3 petabytes of storage APC hot-aisle configuration and distributed system configuration, with high levels of virtualization and redundancy Alleviates the need for staff to enter the storage systems 190 sq meters of per rack, with built-in potential for higher densities data center for routine tasks Data center managed by staff of 4 system administrators Automated scripts monitor machine room environment Expand 38 racks to 48 Plan for the future 10 years Pursue green initiatives, including intelligent software for more efficient use of processing power We have developed lights-out administration tools that let us manage the data center and the data storage systems with a staff of four FTEs. Dr. Ian Stewart, Director of Advanced Computing 15 © 2012 IBM Corporation Invest in simple actions to improve your efficiency and determine where to leverage managed services alternatives Server Drive high levels of server optimization and standardization Use automation tools to prepare for cloud Storage Drive high levels of storage optimization Use automation to provision storage faster Network Develop and execute a network strategy Implement network automation tools Data Center Facility Right size capacity and availability Design for flexibility Optimize total costs over the long term Design for flexibility Take advantage of technology Business Resilience Review your business continuity and resiliency plan Understand the impact of not having optimal levels of availability Evaluate managed services and outsourcing 16 © 2012 IBM Corporation Enable new projects by improving data center operational efficiency 4 out of 5 Companies are not operating their data centers as efficiently as possible 3 out of 4 IT managers planning transformational projects will turn to the outside for help 17 © 2012 IBM Corporation Leverage the unparalleled strength of IBM to help A comprehensive end-to-end enterprise portfolio—software, systems, services and leading-edge research working in concert to drive client value Rich enterprise cloud computing capabilities, with more than $3 billion in cloud acquisitions Unmatched investments in services research and development Robust Smarter Planet industry capabilities with deep industry expertise Industry-leading business analytics technologies and skills Consistent senior management focused on a clear vision and strategy The only way to drive the results from a small shop like the NFL is being able to partner with IBM to get the world-class results faster and with better outcomes. Nancy Galietti. VP Information Technology, National Football League 18 © 2012 IBM Corporation Thank you Register for the data center study paper ibm.com/data-center/study 19 © 2012 IBM Corporation Four distinctive stages differentiate data centers from one another as IT organizations move toward business alignment. 32% % of survey respondents 30% 21% 17% 1 standard deviation Basic Consolidated 1 standard deviation Available Strategic Efficiency level 20 © 2012 IBM Corporation Legal information © Copyright IBM Corporation 2012 IBM Global Services Route 100 Somers, NY 10589 U.S.A. Produced in the United States of America April 2012 IBM, the IBM logo and ibm.com are trademarks of International Business Machines Corporation in the United States, other countries or both. If these and other IBM trademarked terms are marked on their first occurrence in this information with a trademark symbol (® or TM), these symbols indicate U.S. registered or common law trademarks owned by IBM at the time this information was published. Such trademarks may also be registered or common law trademarks in other countries. Other product, company or service names may be trademarks or service marks of others. A current list of IBM trademarks is available on the web at "Copyright and trademark information" at ibm.com/legal/copytrade.shtml This document is current as of the initial date of publication and may be changed by IBM at any time. Not all offerings are available in every country in which IBM operates. The performance data discussed herein is presented as derived under specific operating conditions. Actual results may vary. It is the user’s responsibility to evaluate and verify the operation of any other products or programs with IBM products and programs. THE INFORMATION IN THIS DOCUMENT IS PROVIDED “AS IS” WITHOUT ANY WARRANTY, EXPRESS OR IMPLIED, INCLUDING WITHOUT ANY WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND ANY WARRANTY OR CONDITION OF NON-INFRINGEMENT. IBM products are warranted according to the terms and conditions of the agreements under which they are provided. 21 © 2012 IBM Corporation