GAAL website - Polokwane International Airport

advertisement
Website Presentation to GAAL
Company Profile
Profile



79 % Women empowerment
61.5 % Black empowerment
Based in Limpopo, branch in Gauteng
Certifications



Microsoft
– Microsoft Certified Systems Engineers
– Microsoft Certified Development Engineers
– Microsoft Certified Professionals
– Microsoft Certified Small Business Specialists
Cisco
– Cisco Certified Network Associates
- Cisco Sales Engineers
– Cisco Certified Design Associates
– Cisco Certified IPT Express & Wireless Engineers
Linux
– RedHat Certified Engineers - Mikrotik Certified Engineers
– Astaro Certified Engineers - Asterisk Pro Installer
Partnerships










Cisco Premier Partner – the only one in Limpopo
Cisco Unified Comms – the only one in Limpopo
RedHat Advanced Partner – the only one in Limpopo
HP Preferred Partner
Fujitsu Select Partner
Dell Partner
IBM Partner
Sun Partner
Microsoft Partner
Lexmark Partner
Lines of Business and Products

IT Consulting i.e.
–






Master Systems Plans, Disaster Recovery, Performance Management, Project
management
Wireless connectivity and communications
Telephony - VoIP
Maintenance and support of Hardware and systems
Supply of Hardware
Development of online Systems and Websites
Supply of IT Human Resources
Recent Mayor Projects









SISP for Limpopo Treasury (Strategic Information Systems Plan)
Performance Management for Tshwane Municipality - QPR
Disaster Recovery Plan for Vhembe District Municipality
Master Systems Plan for Capricorn District Municipality
Website and Conference system for University of Limpopo
Intranet and Database for Limpopo Gambling Board
Wireless infrastructure for various Municipalities and Departments
Provision of hardware and services on all SITA contracts
Provision of specialist resources to various departments
Our websites portfolio









University of Limpopo website, conference system & intranet
Limpopo gambling board
Ikando Consulting
AFQL
Various Government Dept. through SITA i.e. Transport and
Agriculture
Mashagosebo tribe
Edupark
Suthagroup
Merwede
Our websites portfolio
Website Content Management
Objective
•
•
The objective of any website is to serve as communication media
and marketing tool between the organization and the intended
audience. With this is mind, the objective of this website, is to:
Constantly publish any relevant information by working closely
with University of Venda and it’s relevant departments
Benefits
•
•
•
•
•
•
Up-to-date website
Save a lot of money on advertising
Communications Tool
Marketing Tool
Access to Information
See statistic on number of visits etc.
Risks


In most instances, the availability of content can be regarded as
the largest risk factor in any project of this nature. The lowering of
this risk is essential to the success of any project and this can be
achieved by following the strategy below.
Creation of a user group, were all the departments will have a
representative that will collect all the relevant data that has to be
on the website.
Technologies to be used





PHP scripting language (the language of facebook )
Postgresql database
Html
Java scripting language
Apache
OR

Microsoft backbone
Options
Maintain current HTML site as is
OR
 Re-create and combine the Polokwane
International site with GAAL site to reflect an
intelligent database structure to ensure proper
functionality and statistics

Methodology





Workshop to understand the needs with all stakeholders
Create sample designs and present for signoff
Create a new database back-end and populate the database with
all existing data as currently available.
The full extent of existing data is not currently known. With this in
mind, we suggest that the initial content be captured with the
assistance of ourselves.
When all or convincing data has been populated to the demo site,
we will then review the whole site (with signoff from GAAL) and
then publish the website as live.
Time frame – Web-site






The development of the back-end can start within 1 week of
acceptance of this proposal.
Workshop to determine needs (1 day)
Development of new look and feel (1 week)
Presentation of new look and feel (1 day)
The publishing of existing data will vary in the time required
depending on the amount of data that we are requested to assist
in capturing. This will be determined during the
workshop. (estimated 1 month)
The timely completion of the project will depend on the availability
of information as requested from the client.
Project Plan
Task Name
Duration
Website development
23 days
Design
3 days
Development of back-end system
15 days
Transfer of current data
5 days
Intranet development
32 days
Design
2 days
Development of back-end system
15 days
Transfer of current data (if available)
15 days
Time frame – Intranet





Workshop to determine needs (1 day)
Development of new look and feel (1 week)
Presentation of new look and feel (1 day)
Development of back-end systems. This will be determined
during the workshop. (estimated 2 weeks)
Capturing of data
Costing
–





PHASE 1 (WEBSITE)
The total revamp of the current design of the
web-site and building of the new structure
1 day workshop to determine deliverables,
design and layout of the new site
Design of the site
Creation of the structure and database
Cost: R89,832 (incl. VAT)
Costing (Cont.)

Phase 2 (Intranet)
–
–
–
–

Workshop to determine needs (1 day)
Development of new look and feel (1 week)
Presentation of new look and feel (1 day)
Development of back-end systems. This will be
determined during the workshop.
Cost: R64,182.00 (Incl. VAT)
Maintenance and support
Provide a resource to ensure continuous
updates – 2 days per week
 Cost: - R15,000 including VAT (Monthly).
OR
 8 hours per month
 Cost: - R4012.80 including VAT (Monthly)

Project Plan






Phase 1: Workshop to assess the needs
Phase 2: Redesign of the site and background
systems
Phase 3: Present designs and Collect new
information
Phase 4: Place new information and test site
Phase 5:Publish site and do final handover
Phase 6: On-going support
Project Management


ITMaster follows Prince 2 methodology with aspects of PMBOK to
ensure proper risk management
Focus are placed on:
– Clear identifiable project focus and project steps
– Defined team structure and project members
– Clear deliverables and management of timelines
– Communication strategy and escalation procedures
– Risk management i.e. availability of resources and content
Project Management Cont.






iTMaster will appoint a Project Manager to manage all aspects of
the implementation and supply weekly progress reports
A formal project charter has been developed in conjunction with a
detailed project plan that will be used by both parties involved
The project plan will be made available online through the online
project management portal
All stakeholders will have login details to access the project plan
online through the portal
Weekly project progress meeting will be held
iTMaster will be happy to follow the any required project
methodology not included in our methodology
Capacity
Website examples





University of Limpopo: www.ul.ac.za
Mashagobo Tribe: www.mashagosebo.co.za
Ikando Consulting: www.ikando.co.za
Limpopo Gambling Board: www.lgb.org.za
GAAL:
www.itmaster.co.za/test_web/www.gaal.co.za
Download