OPN Logo Here Industrial Manufacturing -Name- -Title- Client Logo Here The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle. Prepared For: Client Logo Here Copyright ©2009, Oracle. All rights reserved. Agenda • Oracle Primavera Industry Leadership • Business Challenges • Solutions for Industrial Manufacturing • Customer Success Copyright ©2009, Oracle. All rights reserved. What Customers are Saying… With its multi-user access to the system, integration capabilities, powerful performance, sophisticated analytical capabilities, and availability of resource loading, we knew Primavera was the best choice for Cat. “We selected Primavera because it is a bestin-class project planning tool… It didn’t take long for our business managers to recognize the benefits of using the Primavera project management solution.” Fawn Briggerman, PMP, project management leader “Primavera PertMaster v8 has given my team even greater insight and ability to ensure that the project keeps moving to meet with time and budget constraints,”. “The speed of the information back to the risk management team makes it easier to respond to challenges that arise. We can also alert management so there are no surprises.”.” David Nemetz, Project Manager “By using Primavera, project managers were able to streamline our internal processes, eliminating redundancies within the entire portfolio. Alfred Kucera, Head of Alcatel’s Automatic Train Protection Systems Bill Hunter, PMP manager, planning and scheduling, Aker Kvaerner Copyright ©2009, Oracle. All rights reserved. Agenda • Oracle Primavera Industry Leadership • Business Challenges • Solutions for Industrial Manufacturing • Customer Success Copyright ©2009, Oracle. All rights reserved. The Challenges We Are Hearing From Our Customers Changing Customer Demands • Will we deliver on time and on budget? • How can we eliminate silos of information? • How do we increase visibility & accountability to all stakeholders? Global Competition How do we… • Select and win profitable contracts? • Differentiate and grow the business Sales Design & Engineer Manufacture\ Ship Eroding Margins • How can we improve project visibility and communication across the mfg supply chain? • Prevent project scope creep? • Be alerted to problems before they become major fire? Copyright ©2009, Oracle. All rights reserved. Deploy Islands of Information • How do I provide real-time information visibility across the value chain? • How do we continually improve quality, cost & cycle time through the value chain Industrial Manufacturers’ Project-based World 1 Siloed groups manage part of the project lifecycle Customers ` 2 and most have poorly defined processes Sourcing Service Planning & Execution $€ £ ¥ Profitability Operations Managers Manufacturing Monitoring Performance Strategic Goals Contract managers Design Engineers Project and Program Managers Cost Controls Programs and Projects Risk Mitigation Strategy Executives Suppliers Talent Search Financial Reporting Distributed Information Copyright ©2009, Oracle. All rights reserved. The result: Failed Project Deliverables 3 Product exceptions Budget over-runs Delayed deliverables Silos of information Squandered resources Slow customer response Standalone products are the problem, not the solution. 7 EPPM: Integrated Project Manufacturing Fluid seamless communication across the project manufacturing lifecycle ENTERPRISE PROJECT PORTFOLIO MANAGEMENT (EPPM) Business Value PROJECT PORTFOLIO MANAGEMENT (PPM) PROJECT MANAGEMENT (PM) RESULTS Plan and Schedule Complex Projects PROJECT CONTROLS Planners Project Managers Project Controls RESULTS Programs Resource Management Risk Management Change Management Plan and Schedule Key and Complex Projects DIVISION/LOB Planners Project Managers Project Controls Resource Managers Program Managers RESULTS Talent Management Budget and Cost Estimates Performance and Control Programs Resource Management Risk Management Change Management Plan and Schedule All Projects ENTERPRISEWIDE Planners Project Managers Project Controls Resource Managers Program Managers Team Members/ Engineers Executives Strategy Copyright ©2009, Oracle. All rights reserved. 8 Agenda • Oracle Primavera Industry Leadership • Business Challenges • Solutions for Industrial Manufacturing • Customer Success Copyright ©2009, Oracle. All rights reserved. Oracle Primavera Enterprise Project Portfolio Management • Unified Information Architecture Centralized Repository Align • Real-time collaboration of Plan Report global team across the value chain Analyze Execute Monitor • Integrated business processes designed to work together • Common data model ensures single version of the truth • Communicate changes to schedule or budget across the project Copyright ©2009, Oracle. All rights reserved. 10 Oracle Primavera Industrial Manufacturing Solutions Streamline. Automate. Accelerate. Eliminate islands of information & collaborate across the value chain Align Optimize enterprise assets, resources and reduce uncertainty Drive, manage and control through flexible processes and standards Accelerate revenue growth and expand service offerings Copyright ©2009, Oracle. All rights reserved. Report Plan Analyze Execute Monitor Centralise Project Information Eliminate islands of information & collaborate across the value chain Copyright ©2009, Oracle. All rights reserved. Manage Simple & Complex Projects Across the Enterprise Eliminate islands of information & collaborate across the value chain Copyright ©2009, Oracle. All rights reserved. Vanderlande Industries Delivering Quality Projects: On Time. On Budget COMPANY An engineering project manufacturing global company specializing in the design, implementation and service of automated material handling systems, and is one of the leading suppliers of baggage handling systems worldwide. . CHALLENGES Needed to deliver the project on time and budget whilst collaborating with the customer on design and engineering refinement. Had to manage subcontractors and 12 different divisions. Every few months the project’s focus changed, For instance, the emphasis shifted from steelwork and mechanical concerns to the electrical and testing aspects of the project. “We had to make sure that all of the subprojects were linked in the right way, while keeping an eye on the project’s overall critical path. “Primavera enabled us to create indices of cost, schedule and labor performance, all of which were closely monitored SOLUTIONS Used Primavera P6 resource and project management in every aspect of their project manufacturing project from sales to engineering, manufacturing and deployment. Copyright ©2009, Oracle. All rights reserved. CUSTOMER PERSPECTIVE “With Primavera it’s much easier to sort and organize different views of a project than with other project management software.” Monique Wood, Lead Planner RESULTS Completed Heathrow Terminal 5 Project on time. Project included: o A core building and 2 satellite facilities o Accommodate 100 million passengers. o Passengers will have 175 elevators and 131 escalators. o Handle baggage up to 12,000 bags per hour o will travel more than 11 miles of conveyor belts controlled by an integrated network of 118computer servers There were no cost overruns or disruption to the overall Terminal 5 project. 15 Oracle Primavera Industrial Manufacturing Solutions Streamline. Automate. Accelerate. Eliminate islands of information & collaborate across the value chain Align Optimize enterprise assets, resources and reduce uncertainty Drive, manage and control through flexible processes and standards Accelerate revenue growth and expand service offerings Copyright ©2009, Oracle. All rights reserved. Report Plan Analyze Execute Monitor Balance the demands of new work against organizational capacity Optimize enterprise assets, resources and reduce uncertainty • Top down resource planning and requesting without the need for detailed project plans • Book Resources and Roles at Project and all levels of the WBS Documents • Optimize the use of resources by using search algorithms • Multiple reporting options Copyright ©2009, Oracle. All rights reserved. Do We Have Enough People to Ensure Successful Completion of Project? Copyright ©2009, Oracle. All rights reserved. Capacity Planning Copyright ©2009, Oracle. All rights reserved. Enterprise Resource Levelling Copyright ©2009, Oracle. All rights reserved. Enterprise Resource Levelling Copyright ©2009, Oracle. All rights reserved. Alcatel TAS-Austria: Managing Complex Resource Requirements COMPANY Alcatel TAS-Austria develops and installs software systems for railway infrastructures, both within control centres and the Austrian network itself. These projects often last for several years and are resourced by a pool of employees. These people offer a range of skills and tend to work on several projects simultaneously. CHALLENGES To be successful in the international arena, Alcatel TAS-Austria needed to become project-focused. At first, the organisation relied on project management software that needed to be enhanced by a variety of tools developed and implemented by individuals to suit their own requirements. As a result, valuable information was isolated in silos that only a few people could access. SOLUTIONS Oracle Primavera P6 EPPM Since the existing software tool was unable to cope with the complex multi-project environment and handle the resource planning needs of the organisation, Alcatel TAS-Austria decided that a radical new solution was required – Primavera. Within six months of implementing the project portfolio management software, the time required for project tracking was dramatically decreased by 50 percent while re-planning time was reduced 25 percent. Copyright ©2009, Oracle. All rights reserved. CUSTOMER PERSPECTIVE “By using Primavera, project managers were able to streamline our internal processes, eliminating redundancies within the entire portfolio.” Alfred Kucera, Head of Alcatel’s Automatic Train Protection Systems. RESULTS • Decreased time required for project tracking by 50% • Reduced time for re-planning by 25% • Cut report generation by 33% 22 Oracle Primavera Industrial Manufacturing Solutions Streamline. Automate. Accelerate. Eliminate islands of information & collaborate across the value chain Align Optimize enterprise assets, resources and reduce uncertainty Drive, manage and control through flexible processes and standards Accelerate revenue growth and expand service offerings Copyright ©2009, Oracle. All rights reserved. Report Plan Analyze Execute Monitor Increase Visibility of Critical Issues Drive, manage and control through flexible processes and standards • Using scenario analysis, Engineering capture issues early and quickly take action on project specific exceptions (shortages, excesses, reschedule-in or out, cancellations) Manufacturing • Share and track common activities to improve efficiencies Project Manager Copyright ©2009, Oracle. All rights reserved. Enterprise Visibility & Control Copyright ©2009, Oracle. All rights reserved. Quickly React to Customers’ Changing Needs Compare Values from Reflection Project vs. Active Project Multiple process steps can be completed on one screen What-if Scenario 1 Live Version of Live Version of Project Live Version of Project Live Version of Project Project Baseline Projects Copyright ©2009, Oracle. All rights reserved. Active Project What-if Scenario 2 What-if Scenario 3 Project Portfolio Insight and Role-Based Analysis Drive, manage and control through flexible processes and standards View by… Roles Executives Personalized Dashboards Organization • Margin • Actuals to Operations Managers Budget Resource • Bookings & Backlog • Utilization Project and Program Managers Projects and Programs Copyright ©2009, Oracle. All rights reserved. Create & Manage Simple and Complex Projects Copyright ©2009, Oracle. All rights reserved. Operational Reports Copyright ©2009, Oracle. All rights reserved. FMC Technologies Enhancing Global Planning Processes COMPANY OVERVIEW The company provides technology solutions for the energy industry and other industrial markets, operating 23manufacturing facilities in 19 countries. Spun off from parent company FMC Corporation in 2000, FMC Technologies designs, manufactures, and services technologically sophisticated systems and products, such as subsea production and processing systems, surface wellhead systems, high-pressure fluid control equipment and measurement solutions. CUSTOMER PERSPECTIVE “We selected Primavera because it is a best-in-class project planning tool Early on…It didn’t take long for our business managers to recognize the benefits of using the Primavera project management solution.” David Nemetz, Project Manager Challenge FMC Technologies recently launched a global planning systems (GPS) initiative designed to help redefine and improve corporate planning and project management processes. Previously, detail planning was executed on a per-plant basis. With the formation of the GPS team in late 2006, FMC Technologies recognized project management as a core competency that the company needs to develop and grow. Solution The rapid growth of the oil and gas industry challenges FMC Technologies to optimize all of its resources. Besides straining the supply base, dramatic market growth makes it difficult to acquire resources that can quickly add value to the organization. The company is also facing the change introduced by its quality programs. Once just a manufacturing initiative, the increased focus on building a quality culture introduced change into groups ranging from engineering and project management to financials and customer service. Copyright ©2009, Oracle. All rights reserved. RESULTS The GPS team has created global standards, settled on a single work breakdown structure for projects, and outlined unified planning policies. When the rollout is complete, some 6,500 employees will be affected by the change. The value delivered by Primavera solutions should only increase as the GPS rollout proceeds. FMC Technologies believes that the new GPS initiative will deliver the change management capabilities that will drive additional business success. 30 Oracle Primavera Industrial Manufacturing Solutions Streamline. Automate. Accelerate. Eliminate islands of information & collaborate across the value chain Align Optimize enterprise assets, resources and reduce uncertainty Drive, manage and control through flexible processes and standards Accelerate revenue growth and expand service offerings Copyright ©2009, Oracle. All rights reserved. Report Plan Analyze Execute Monitor Align Organizational Goals & Portfolios of Projects Accelerate revenue growth and expand service offerings Define Objectives and metrics Build business case Prioritize and Rank Projects With KPI Plan Portfolio Balance Portfolio Communicate Performance Monitor Portfolio Execute Portfolio Copyright ©2009, Oracle. All rights reserved. Make The Right Decisions Copyright ©2009, Oracle. All rights reserved. Make The Right Decisions ? Risk: 3. High Risk Risk: 3. High Risk Project: Fly-by-wire Controls Project: Fly-by-wire Controls Priority: 3. High Priority: 3. High At Completion Total Cost (GBP): 513,353.6 Total Cost (GBP): 513,353.6 At Completion ? Copyright ©2009, Oracle. All rights reserved. Make The Right Decisions – What if? Copyright ©2009, Oracle. All rights reserved. Primavera PPM Solutions for Industrial Manufacturing Oracle | Primavera PPM Reduce risk of project or cost over-runs, avoiding contract penalties Allocate resources intelligently for reduced waste and greater cost efficiency Accurately assess value and priority of new projects or bids Develop the ability to adapt to change in markets, costs, specifications Enforce appropriate project practices and ensure consistent working standards enterprise-wide Oversee dispersed or out-sourced teams to ensure effective collaboration and credible reporting Primavera P6 Enterprise Project Portfolio Management • Balance resource capacity • Plan, schedule, and control • Allocate best resources and track • • • • progress Monitor and visualize project performance vs. plan Manage and plan for changes Foster team collaborative management Integrate with ERP & CRM systems Provide realistic status and value reporting to stakeholders & regulatory bodies Copyright ©2009, Oracle. All rights reserved. Agenda • Oracle Primavera Industry Leadership • Business Challenges • Solutions for Industrial Manufacturing • Customer Success Copyright ©2009, Oracle. All rights reserved. Vanderlande Industries Delivering Quality Projects: On Time. On Budget COMPANY An engineering project manufacturing global company specializing in the design, implementation and service of automated material handling systems, and is one of the leading suppliers of baggage handling systems worldwide. . CHALLENGES Needed to deliver the project on time and budget whilst collaborating with the customer on design and engineering refinement. Had to manage subcontractors and 12 different divisions. Every few months the project’s focus changed, For instance, the emphasis shifted from steelwork and mechanical concerns to the electrical and testing aspects of the project. “We had to make sure that all of the subprojects were linked in the right way, while keeping an eye on the project’s overall critical path. “Primavera enabled us to create indices of cost, schedule and labor performance, all of which were closely monitored SOLUTIONS Used Primavera P6 resource and project management in every aspect of their project manufacturing project from sales to engineering, manufacturing and deployment. Copyright ©2009, Oracle. All rights reserved. CUSTOMER PERSPECTIVE “With Primavera it’s much easier to sort and organize different views of a project than with other project management software.” Monique Wood, Lead Planner RESULTS Completed Heathrow Terminal 5 Project on time. Project included: o A core building and 2 satellite facilities o Accommodate 100 million passengers. o Passengers will have 175 elevators and 131 escalators. o Handle baggage up to 12,000 bags per hour o will travel more than 11 miles of conveyor belts controlled by an integrated network of 118computer servers There were no cost overruns or disruption to the overall Terminal 5 project. 38 Alcatel TAS-Austria: Managing Complex Resource Requirements COMPANY Alcatel TAS-Austria develops and installs software systems for railway infrastructures, both within control centres and the Austrian network itself. These projects often last for several years and are resourced by a pool of employees. These people offer a range of skills and tend to work on several projects simultaneously. CHALLENGES To be successful in the international arena, Alcatel TAS-Austria needed to become project-focused. At first, the organisation relied on project management software that needed to be enhanced by a variety of tools developed and implemented by individuals to suit their own requirements. As a result, valuable information was isolated in silos that only a few people could access. SOLUTIONS Oracle Primavera P6 EPPM Since the existing software tool was unable to cope with the complex multi-project environment and handle the resource planning needs of the organisation, Alcatel TAS-Austria decided that a radical new solution was required – Primavera. Within six months of implementing the project portfolio management software, the time required for project tracking was dramatically decreased by 50 percent while re-planning time was reduced 25 percent. Copyright ©2009, Oracle. All rights reserved. CUSTOMER PERSPECTIVE “By using Primavera, project managers were able to streamline our internal processes, eliminating redundancies within the entire portfolio.” Alfred Kucera, Head of Alcatel’s Automatic Train Protection Systems. RESULTS • Decreased time required for project tracking by 50% • Reduced time for re-planning by 25% • Cut report generation by 33% 39 FMC Technologies Enhancing Global Planning Processes COMPANY OVERVIEW The company provides technology solutions for the energy industry and other industrial markets, operating 23manufacturing facilities in 19 countries. Spun off from parent company FMC Corporation in 2000, FMC Technologies designs, manufactures, and services technologically sophisticated systems and products, such as subsea production and processing systems, surface wellhead systems, high-pressure fluid control equipment and measurement solutions. CUSTOMER PERSPECTIVE “We selected Primavera because it is a best-in-class project planning tool Early on…It didn’t take long for our business managers to recognize the benefits of using the Primavera project management solution.” David Nemetz, Project Manager Challenge FMC Technologies recently launched a global planning systems (GPS) initiative designed to help redefine and improve corporate planning and project management processes. Previously, detail planning was executed on a per-plant basis. With the formation of the GPS team in late 2006, FMC Technologies recognized project management as a core competency that the company needs to develop and grow. Solution The rapid growth of the oil and gas industry challenges FMC Technologies to optimize all of its resources. Besides straining the supply base, dramatic market growth makes it difficult to acquire resources that can quickly add value to the organization. The company is also facing the change introduced by its quality programs. Once just a manufacturing initiative, the increased focus on building a quality culture introduced change into groups ranging from engineering and project management to financials and customer service. Copyright ©2009, Oracle. All rights reserved. RESULTS The GPS team has created global standards, settled on a single work breakdown structure for projects, and outlined unified planning policies. When the rollout is complete, some 6,500 employees will be affected by the change. The value delivered by Primavera solutions should only increase as the GPS rollout proceeds. FMC Technologies believes that the new GPS initiative will deliver the change management capabilities that will drive additional business success. 40 Appendix Copyright ©2009, Oracle. All rights reserved. A Need for Change: Oracle Primavera Integrated Project Manufacturing Solution Sales • Accurately predict profitable projects in your pipeline • Improve the accuracy of your bids and reduce time spent responding to RFPs • Balance the demands of new work against organizational capacity Design and Engineering • Effectively prioritize in the face of unforeseen changes to schedules without increasing costs • Standardize, streamline, automate manual processes • Schedule for learning curve • Ensure constant information flow between different groups engaged on the project • Manufacturing • Link sales, engineering, manufacturing and delivery systems so that there is a flow of project information across the value chain Shipping •Ensure that there are •Find resource no cost overruns, disruptions to the overall project given changes in shipping delays or supply damages bottlenecks that could hamper the success of your projects and product launches • Ensure that there are no cost overruns, disruptions to the overall project or product defects, given fluid requirement specs Business performance, intelligence and shared services Application integration and master data management Copyright ©2009, Oracle. All rights reserved. Installation and commis-sioning •Track both the internal and external workforce for all project activities to maximize utilization Industrial Manufacturing Leaders Get Better Results with Oracle Applications Did You Know… 9 of the top 10 Fortune’s industrial and farm equipment manufacturers run Oracle applications 8 of the top 10 Industry Week’s leading machinery manufacturers run Oracle Applications 7 of the top 10 construction equipment manufacturers run Oracle applications 10 of the top 15 leading container & packaging companies run Oracle applications 7 of the top 10 electrical equip. manufacturers on the Fortune 500 run Oracle Applications Copyright ©2009, Oracle. All rights reserved. Next Steps Copyright ©2009, Oracle. All rights reserved. Contacts Copyright ©2009, Oracle. All rights reserved. Questions & Answers Copyright ©2009, Oracle. All rights reserved.