TGVF - Industry Day Meeting Room Einstein
Give an overview of the TGVF Tender data package to enable the Tenderer to deliver high quality proposals.
09:30 Welcome (N. Aouad – TGVF contract responsible)
09:45 TGVF presentation (S. Binda
– TGVF responsible)
10:15 TGVF Core Infrastructure (D. Jimenez – TGVF Core Infrastructure responsible)
10:45 OVF (F. Gonzalez
– TGVF OVF responsible)
11:15 TVF (A. Mudrak – TGVF TVF responsible)
12:00 Lunch
13:00 Visit GPC group A* (D. Jimenez)
14:00 Visit GPC group B* (S. Binda)
* Einstein room available from 13:00 to 15:00. For the visits to the GPC: group A should be ready in Einstein at 12:45, group B should be ready in Einstein at 13:45.
16 April, 2020 The European GNSS Programmes 2
Navigation solutions powered by Europe
ESA presentations will be given
Visit to the Facilities will be performed
Only clarifications on the presentations text can be provided at the meeting
Complete Applicable Documents and stripped-down TGVF IOV EIDP will be provided tomorrow (to companies having signed the NDA)
It will be possible to send in writing detailed questions to the Contract Officer after the meeting (i.e the usual Clarification process is in place)
A clear distinction will be kept in Presentations and Clarifications distribution between:
material referring to the TGVF Tender published on EMITS
material referring to the documents subject to NDA (e.g. stripped down TGVF IOV
EIDP)
Presentations/clarifications related to the TGVF Tender Data Package will be published on EMITS
Presentations/clarifications related documents subject to NDA (e.g. stripped down
TGVF IOV EIDP) will be distributed only to companies having signed it
16 April, 2020 The European GNSS Programmes 3
Navigation solutions powered by Europe
On EMITS:
CT
CL
CTR
PSI
CISL
SOW
SOW
CU
GLOSSARY
REQSPEC
TGVF Open procedure Conditions of Tender.pdf
TGVF Open procedure Cover Letter.pdf
TGVF Open procedure Draft Contract.pdf
EUROPEAN-GNSS-PSI_2.0.pdf
GAL-CISL-ESA-SYST-X-1475_1.0_CISL.pdf
GAL-SOW-ESA-SYST-X-1466_1.0_FOC_TGVF_SOW.pdf
GAL-SOW-ESA-SYST-X-1466-A1_1.0_DRL.pdf
GAL-SOW-ESA-SYST-X-1466-A2_1.0-CU.pdf
GAL-SOW-ESA-SYST-X-1466-A3_1.0_Glossary.pdf
GAL-REQ-ESA-SYST-X-1477_1.0_FOC_TGVF_REQ.pdf
Clarification no 2 published as well on EMITS
16 April, 2020 The European GNSS Programmes 4
Navigation solutions powered by Europe
SYSTEM EXTERNAL INTERFACES (acting as precursor of future Time Service
Provider TSP and Geodetic Reference Service Provider GRSP)
GSS station coordinates (OVF)
PTF qualification (TVF)
Galileo System Time (GST) Steering to UTC (TVF)
Reference clocks and orbits to compute operational GMS Navigation Message errors (OVF)
IOT/SYSTEM INTEGRATION VERIFICATION (SIV) CAMPAIGNS
PERFORMANCE MONITORING
Signal In Space Monitoring by network of Experimental Sensor Stations
GMS-external characterisation of orbits and clocks for IOT/SIV purposes
User Equivalent Range Error budget estimations (in support of Early Service validation)
16 April, 2020 The European GNSS Programmes 5
Navigation solutions powered by Europe
The TVGF Upgrade shall make use of the TGVF IOV infrastructure, unless the
Contractor elects not to do so because he can provide the same functionality and performance within the requested time frame.
Six Work packages have been identified in order to allow the TGVF Upgrade to provide the requested functionality and performance.
The TVF requires some upgrades but needs to be operated immediately as of the
KO in a Service Level Agreement (SLA) regime. After the upgrades have been completed, the TVF will be operated in a tightened SLA.
The OVF shall be operated as of the KO in a SLA regime.
The Core Infrastructure needs to be updated, but needs as well to be operated immediately as of the KO. There is no SLA defined for the Core Infrastructure, even though its performance during all phases of Operations shall be monitored routinely and subject to review.
Important activities:
16 April, 2020 The European GNSS Programmes 6
Navigation solutions powered by Europe
Work Package 1: TGVF Prime. This work package covers the activities to be performed at TGVF System level to ensure a consistent Design, Development, Verification, Validation,
Deployment, Operations and Maintenance of the TVF, OVF and
Core Infrastructure.
Work Package 2 : TVF Service Level Agreement (TVF SLA).
This work package covers the upgrade of TVF to generate timing products as necessary for provision of Galileo OS and
PRS SiS. This work package covers also the delivery of these identified products for which the definition of a Service Level
Agreement is appropriate. These products are well defined and described in GMS-GTSP. This work package includes finally the Site Hosting and Network Internal and External Services for the TVF. Note that this includes provision of data by UTC laboratories to TVF under similar SLA conditions as the TVF towards Galileo.
LEGEND:
TVF
OVF
DQF
Timing Validation Facility
ODTS Validation Facility
Data Quality assesment Facility
DPAF Data Processing & Analysis Facility
UMF UERE Monitoring Facility
DPS
DSF
DMZ
Data Provisioning System
Data Server Facility
De-Militarised Zone
R
O
Routine/ Production
Offline/ Campaign based Testing
FOC Upgrades
Ext data (BIPM,
IERS,
…)
GALILEO FOC1
SIS
GPS SIS
Galileo Sensor Station
Network
OVF
(Geodetic Reference
Service Provider)
R
External
Reference Data
Sources
(IGS, SLR,
…)
GALILEO FOC1
S-Band
Galileo Telemetry
Ground Mission Segment Interface
(SPF)
GCC
FUC
GTSP I/F GRSP I/F
GCC
OBE
Ground Control
Segment Interface
(SCCF)
TVF
(Galileo Time Service
R
Provider)
Work Package 3 : OVF Service Level Agreement (OVF SLA).
This work package covers the delivery of well identified products for which the definition of a Service Level Agreement is sufficient for the purposes of the Galileo System. This applies to OVF geodetic products as necessary for provision of Galileo
OS and PRS SiS. These products are well defined and described in GMS-GRSP ICD. This work package also includes the Site Hosting and Network Internal and External Services for the OVF.
GALILEO FOC1 &
GPS SIS
GESS Network
Upgraded Receiver for
FOC1
DMZ
External User Access
DSF
Archive
R O
DQF
G(E)SS Data Quality &
Error Budget
R O
DPAF
ODTS/ Timing / User /
Service Data Analysis
DPS
Telemetry/
Telecommand History
Retrieval
External Data
Sources
(Celestrak,
IERS,UMF
…)
CoreInfrastructure
16 April, 2020
Time and Geodetic Validation Facility (TGVF)
The European GNSS Programmes 7
Navigation solutions powered by Europe
Work Package 4 : Core Infrastructure development, integration and validation. This work package covers the upgrade of the Core Infrastructure, which will be performed based on [AD.2] requirements to upgrade the sensor station to receive Galileo FOC1 signals, ensure review of the algorithms and ensure software development to tailored DAL-E level or equivalent.
Work Package 5 : Core Infrastructure Operations. This work package covers:
Extension of operations of the Core Infrastructure part which is hosted at ESA/ESTEC (DSF, DMZ,
DQF, DPAF, DPS, ESTEC GESS)
Operations of the set of Galileo Experimental
Sensor Stations part of the Core Infrastructure at their current locations
LEGEND:
TVF
OVF
DQF
Timing Validation Facility
ODTS Validation Facility
Data Quality assesment Facility
DPAF Data Processing & Analysis Facility
UMF UERE Monitoring Facility
DPS
DSF
DMZ
Data Provisioning System
Data Server Facility
De-Militarised Zone
R
O
Routine/ Production
Offline/ Campaign based Testing
FOC Upgrades
Ext data (BIPM,
IERS,
…)
TVF
(Galileo Time Service
R
Provider)
GALILEO FOC1
SIS
GPS SIS
OVF
(Geodetic Reference
Service Provider)
R
External
Reference Data
Sources
(IGS, SLR,
…)
GALILEO FOC1
S-Band
Galileo Sensor Station
Network
Galileo Telemetry
Ground Mission Segment Interface
(SPF)
GCC
FUC
GTSP I/F GRSP I/F
GCC
OBE
Ground Control
Segment Interface
(SCCF)
GALILEO FOC1 &
GPS SIS
Work Package 6 : Security Accreditation. This work package covers all the activities necessary to enable connection of the Upgraded TGVF to the Galileo
Control Centres (GCC-I and GCC-D), in accordance with the Local Site Accreditation Plan (AD.7).
GESS Network
Upgraded Receiver for
FOC1
DMZ
External User Access
DSF
Archive
R O
DQF
G(E)SS Data Quality &
Error Budget
R O
DPAF
ODTS/ Timing / User /
Service Data Analysis
DPS
Telemetry/
Telecommand History
Retrieval
External Data
Sources
(Celestrak,
IERS,UMF
…)
CoreInfrastructure
16 April, 2020
Time and Geodetic Validation Facility (TGVF)
The European GNSS Programmes 8
Navigation solutions powered by Europe
16 April, 2020 The European GNSS Programmes 9
Deliverables are defined in the SOW/Contract:
HW/SW deliverables
Service Products deliverables
Validation Products deliverables
Documents
Navigation solutions powered by Europe
16 April, 2020 The European GNSS Programmes 10
Navigation solutions powered by Europe
The TVF/OVF Service Level Agreement regime consists of:
The provision of services (i.e. signals and reports) with accuracy, frequency, latency and availability in accordance with the Requirement Specification
The delivery of Key Performance Indicators to demonstrate that the accuracy, frequency, latency and availability requirements are routinely met
A provision such that the failure to perform as specified shall result in the application of Service Credits as specified in the SoW and in the Contract
The set of Key Performance Indicators shall be established by the Contractor and agreed by ESA for
TVF/OVF at the Kick Off as follows:
The list of signals to be delivered is defined in the SOW
Measurable performance parameters related the accuracy, frequency, latency and availability to these signals shall be established according to the Requirement Specification
The measurable performance parameters shall be computed routinely and reviewed at each Quarterly
Review
At every Quarterly Review, the Contractor shall be authorised to charge the Agency for the Services delivered in the SLA in accordance to the following:
the Normalised KPI (i.e. the unweighted average of the KPIs normalised with respect to their respective
Requirement Specification values) shall be computed
ranges for the normalised KPI shall be as defined in the Contract
the Service charge per Quarter shall be defined as three times the monthly price of the TVF/OVF SLA work package related to the provision of the signals defined in the SOW
the Agency shall be given a Service Credit (i.e. a reduction on the Service charge) corresponding to the range achieved by the Normalised KPI as defined in the Contract
The OVF KPIs level are defined at the KOM. The TVF KPIs are defined at the KOM and redefined (tightened) at the AR)
16 April, 2020 The European GNSS Programmes 11
Navigation solutions powered by Europe
16 April, 2020 The European GNSS Programmes 12