International Linear Collider Status The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host Mike Harrison 1 A Global Initiative for an ILC International Committee for Future Accelerators (ICFA) representing major particle physics laboratories worldwide. •Chose ILC accelerator technology (SCRF) •Determined ILC physics design parameters •Formed Global Design Effort and Mandate 2006 Mike Harrison 2 Technical Design Completed Dec 2012 • Technical design completed and reviewed (PAC Dec 2012). TDR completed. • Value cost estimate of $7.6B based on TDR + 22.6M man-hrs of explicit labour (~$2B). Value estimate does not cover US specific cost elements such as escalation, contingency, pre-ops, etc. • Generic site(s): flat terrain & mountainous • Using “reasonable” assumptions, ~9 years from ground breaking to start of beam commissioning Mike Harrison 3 ILC Schematic Tunnels in the Japanese Mountains New Tunnel Shape Grooved Insert for CesrTA Wiggler ILC Cost Breakdown Dumps and Collimators Instrumentation Integrated Controls and LLRF Computing Infrastructrure Other High Level RF Area-specific Systems Cavities and Cryomodules Vacuum Magnets and Power Supplies Cryogenics Installation Conventional Facilities L-band High Level RF ILC TDR Value Estimate ILC Value – by Area Systems Main Cost Driver 4,500 4,000 ILC Units - Millions 3,500 3,000 2,500 Conventional Facilities 2,000 Components 1,500 1,000 500 0 Main Linac Damping Rings RTML Positron Source BDS Global Design Effort Common Exp Hall Electron Source 7 7 SRF Linac Technology Mike Harrison 8 SRF Linac Technology Beam pipe Two-phase He pipe HOM coupler LHe tank HOM coupler Frequency tuner 9-cell cavi es Input coupler 1.3 GHz Nb 9-cellCavities 16,024 Cryomodules 1,855 SC quadrupole pkg 10 MW MB Klystrons & modulators 673 426 / 461 * * site dependent Approximately 20 years of R&D worldwide Mike Harrison 9 Cavity Production Yield XFEL Cryomodule Cost breakdown XFEL CM approximate cost breakdown • 8 cavities + 1 sc quad – ~12 m cryomodule • Including testing Tes ng 26% Cavity 36% • Testing String & CM assembly 9% BPM 0% Cryostat/ cold-mass 8% SC Quadrupole 2% – cavity vertical test – cryomodule pulsed test Tuner 5% High-power coupler 14% – Assumes 100% DESY infrastructure – 100% testing – second largest cost driver after sc cavities EXFEL Cryomodule flow Fabrication Companies Testing at Host Lab - DESY Cryomodule Assembly EXFEL Cavity Qualification at DESY 13 Coupler testing and processing: 14 EXFEL Cryomodule Fabrication 15 EXFEL Cryomodule Fabrication Information 16 EXFEL Cryomodule Database 17 EXFEL Cavity Qualification 2012-11-13 18 RF Power Source Marx modulator 10MW MB Klystron Adjustable local power distribution system Presentation by S. Fukuda 19 A Model for Cavity and CM Production and Qualification Process Step hosted Industry Industry/Labo ratory Hublaboratory ILC Hostlaboratory Regional constraint no yes or no yes yes Sub-comp/material - Production/Procurement Nb, Ti, specific comp. … Procurement 9-cell Cavity - Manufacturing 9-cell-cavity, Process, He-Jacketing Procurement 9-cell Cavity - Performance Test Cryomodule component - Manufacturing Cryomodule/Cavity - Assembly Cold, gradient test V. vessel, cold-mass ... Procurement Cav-string/ CM-assembly SCRF Cryomodule - Perofrmance Test Cold, gradient test Accelerator integration, Commissioning A. Yamamoto: 2013.2.6 Accelerator sys. Integ. SCRF Cost Overview 21 The Linear Collider Collaboration ICFA Program Advisory Committee ILC – Mike Harrison Linear Collider Board Directorate – Lyn Evans Deputy (Physics) – Hitoshi Murayama CLIC – Steinar Stapnes Physics & Detectors – Hitoshi Yamamoto The GDE will close-out TDR related business – formal end in June 25 Political 26 Political 27 Political 28 Science 29 Industry 30 Political 31 Conclusions • Technical focus will shift to cryomodules via the XFEL production • Site specific conceptual design next step • Value engineering on linac systems • The US R&D program ends with the GDE. Awaits further development towards a project • Japan seriously considering offering to host • New global collaboration after the GDE. It contains all the linear collider activities, not just the ILC. HEPAP Facilities Panel Feb 2013 Mike Harrison 32