ILC Global Design Effort & Japanese hosting proposal

advertisement
International Linear Collider
Status
The Design & Value Costs
SRF Technology
The XFEL as a Prototype
Japan as a Host
Mike Harrison
1
A Global Initiative for an ILC
International
Committee for Future
Accelerators (ICFA)
representing major
particle physics
laboratories worldwide.
•Chose ILC accelerator
technology (SCRF)
•Determined ILC physics
design parameters
•Formed Global Design
Effort and Mandate 2006
Mike Harrison
2
Technical Design Completed
Dec 2012
• Technical design completed and reviewed (PAC Dec
2012). TDR completed.
• Value cost estimate of $7.6B based on TDR + 22.6M
man-hrs of explicit labour (~$2B). Value estimate does
not cover US specific cost elements such as
escalation, contingency, pre-ops, etc.
• Generic site(s): flat terrain & mountainous
• Using “reasonable” assumptions, ~9 years from ground
breaking to start of beam commissioning
Mike Harrison
3
ILC Schematic
Tunnels in the Japanese Mountains
New Tunnel Shape
Grooved Insert for
CesrTA Wiggler
ILC Cost Breakdown
Dumps and
Collimators
Instrumentation
Integrated Controls
and LLRF
Computing
Infrastructrure
Other High Level RF
Area-specific Systems
Cavities and
Cryomodules
Vacuum
Magnets and Power
Supplies
Cryogenics
Installation
Conventional Facilities
L-band High Level RF
ILC TDR Value Estimate
ILC Value – by Area Systems
Main
Cost
Driver
4,500
4,000
ILC Units - Millions
3,500
3,000
2,500
Conventional Facilities
2,000
Components
1,500
1,000
500
0
Main Linac
Damping Rings
RTML
Positron Source
BDS
Global Design Effort
Common
Exp Hall
Electron Source
7
7
SRF Linac Technology
Mike Harrison
8
SRF Linac Technology
Beam pipe
Two-phase He
pipe
HOM coupler
LHe tank
HOM coupler
Frequency tuner
9-cell cavi es
Input coupler
1.3 GHz Nb 9-cellCavities
16,024
Cryomodules
1,855
SC quadrupole pkg
10 MW MB Klystrons &
modulators
673
426 / 461 *
* site dependent
Approximately 20 years of R&D worldwide
Mike Harrison
9
Cavity Production Yield
XFEL Cryomodule Cost breakdown
XFEL CM approximate
cost breakdown
• 8 cavities + 1 sc quad
– ~12 m cryomodule
• Including testing
Tes ng
26%
Cavity
36%
• Testing
String & CM
assembly
9%
BPM
0%
Cryostat/
cold-mass
8%
SC
Quadrupole
2%
– cavity vertical test
– cryomodule pulsed test
Tuner
5%
High-power
coupler
14%
– Assumes 100% DESY
infrastructure
– 100% testing
– second largest cost driver
after sc cavities
EXFEL Cryomodule flow
Fabrication Companies
Testing at Host Lab - DESY
Cryomodule Assembly
EXFEL Cavity Qualification at DESY
13
Coupler testing and processing:
14
EXFEL Cryomodule Fabrication
15
EXFEL Cryomodule Fabrication Information
16
EXFEL Cryomodule Database
17
EXFEL Cavity Qualification
2012-11-13
18
RF Power Source
Marx modulator
10MW MB Klystron
Adjustable local power distribution system
 Presentation by S. Fukuda
19
A Model for Cavity and CM
Production and Qualification Process
Step hosted
Industry
Industry/Labo
ratory
Hublaboratory
ILC Hostlaboratory
Regional constraint
no
yes or no
yes
yes
Sub-comp/material
- Production/Procurement
Nb, Ti, specific
comp. …
Procurement
9-cell Cavity
- Manufacturing
9-cell-cavity,
Process,
He-Jacketing
Procurement
9-cell Cavity
- Performance Test
Cryomodule component
- Manufacturing
Cryomodule/Cavity
- Assembly
Cold, gradient
test
V. vessel,
cold-mass ...
Procurement
Cav-string/
CM-assembly
SCRF Cryomodule
- Perofrmance Test
Cold, gradient
test
Accelerator integration,
Commissioning
A. Yamamoto: 2013.2.6
Accelerator
sys. Integ.
SCRF Cost Overview
21
The Linear Collider Collaboration
ICFA
Program Advisory
Committee
ILC – Mike Harrison
Linear Collider Board
Directorate – Lyn
Evans
Deputy (Physics) –
Hitoshi Murayama
CLIC – Steinar
Stapnes
Physics & Detectors
– Hitoshi Yamamoto
The GDE will close-out TDR related business – formal end in June
25
Political
26
Political
27
Political
28
Science
29
Industry
30
Political
31
Conclusions
• Technical focus will shift to cryomodules via the XFEL
production
• Site specific conceptual design next step
• Value engineering on linac systems
• The US R&D program ends with the GDE. Awaits
further development towards a project
• Japan seriously considering offering to host
• New global collaboration after the GDE. It contains all
the linear collider activities, not just the ILC.
HEPAP Facilities Panel
Feb 2013
Mike Harrison
32