March 5, 2013 Vincent Gastoni, PE Delivering Major Minnesota Bridges Hastings Bridge Design Build Project MnDOT – ACEC/MN Annual Conference Leading TogetherInnovative Solutions for an Evolving Industry HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE Redundancy and Service Life Project Location Map Base Map Source: Google Maps HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 2 Project Overview - Existing Bridge • Highway 61 over Mississippi River • Highest daily two-lane highway traffic volume in the state • MnDOT Chapter 152 Bridge • Project replaces 1950 steel arch truss • Lowest 1% in the state for overall sufficiency HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 3 Project Overview - Aerial Plan HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 4 Project Overview - Design-Build Process • Design-Build SOQ Issued: October 2009 • Design Build Selection: June 2010 • MnDOT identified two acceptable alternatives • RFP allowed Alternative Technical Concepts (ATC’s) • Design Build Team: HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 5 Project Overview - Design-Build Process INNOVATIVE RFP FEATURES • Alternative Technical Concepts (ATC’s) – Allow innovation and flexibility • Pre Approved Elements (PAE) – Reduce risk and provide best value opportunities Redundancy Concepts for the Main Structure Segment o Scour Analysis Method o Bridge Fixity and Thermal Expansion of Bridge No. 19004 o Refined Analysis Method o HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 6 Project Overview - Design-Build Process TECHNICAL PROPOSAL SCORING • Bridge 34 Points • Environmental Management 6 Points • Maintenance of Traffic 5 Points • Public Communications 2 Points • Schedule 3 Points HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 7 Project Overview - Design-Build Process TECHNICAL PROPOSAL SCORING • Bridge – Durability/Quality of Bridge No. 19004 34 Points 13 Points – Inspection/Maintenance 9 Points – Geotechnical 5 Points – Erection of Bridge No. 19004 4 Points – Demolition of Bridge No. 5895 3 Points HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 8 Project Overview - Design-Build Process SCORING DRIVES INNOVATION • Selection = Bid Price Technical Score HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 9 Project Overview - Design-Build Process SCORING DRIVES INNOVATION • Selection = • Win Strategy= Bid Price Technical Score Minimize Bid Price Maximize Technical Score HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 10 Project Overview - Design-Build Process SCORING DRIVES INNOVATION • Selection = • Win Strategy= Bid Price Technical Score Minimize Bid Price Maximize Technical Score • Use innovative ATC’s & PAE’s to: – Minimize Risks – Optimize Design Solution Need A Better Mouse Trap HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 11 Design-Build Process – Base Concepts MnDOT RFP Baseline Options HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 12 Design-Build Process – Base Concepts MnDOT Cable Stayed Option HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 13 Design-Build Process – Base Concepts MnDOT Arch Option HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 14 Base Concept Evaluation • Evaluate Base Designs – Preliminary engineering analysis – Cost estimating exercises • Produce Comprehensive Evaluation Matrix Tool – Material costs & risks • Develop Alternative Designs HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 15 Innovation – Develop Alternatives • Evaluate Alternative Designs – Prescriptive design/performance criteria – Aesthetic requirements – Technical scoring criteria – Cost & schedule impacts • Add to Comprehensive Evaluation Matrix Tool • Develop Overall Best Value Technical Approach HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 16 Innovation – Develop Alternatives Lunda/Ames-Parsons Alternatives HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 17 Innovation – Develop Alternatives • HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 18 Innovation – Develop Alternatives • HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 19 Innovative Winning Alternative • Successful Proposal-Free Standing Tied Arch $120M • 545 ft. Main Span Project Architect: Bradley Touchstone, Touchstone Architecture HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 20 Innovative Winning Alternative Project Architect: Bradley Touchstone, Touchstone Architecture HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 21 Visual Quality Process & Color Selection HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 22 Aesthetic Lighting Lighting Design: Illumination Arts HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 23 Innovative Features - Concrete Tie • Best value solution • More durable than steel box • Higher level of redundancy • No shop assembly and fit-up issues • Ease of inspection/maintenance • Active tension control HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 24 Innovative Features - Concrete Knuckle • Framed into pier and rib • Post-tensioned anchorage • Improved durability/fit-up • Highly redundant HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 25 Innovative Features – Steel Box Arch Rib • Aesthetically pleasing • Simplified fabrication • Improved maintenance • Best Value solution HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 26 Innovative Features - Floor System Redundancy HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 27 Innovative Features - Erection HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 28 Innovative Features - Erection • Build low TEMP BRACING ARCH RIB FLOOR SYSTEM TEMP TIE & FORMS TEMP LIFTING CONNECTION HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 29 Innovative Features - Erection • Build Low On Land TEMP BRACING ARCH RIB FLOOR SYSTEM TEMP TIE & FORMS TEMP LIFTING CONNECTION HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 30 Innovative Features - Erection • Build Low On Land HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 31 Erection • Move onto Barges Using SPMT’s HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 32 Innovative Features - Erection • Move onto Barges Using SPMT’s HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 33 Innovative Features - Erection • Float HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 34 Innovative Features - Erection • Float HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 35 Innovative Features - Erection • Skid HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 36 Innovative Features - Erection • Skid HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 37 Innovative Features - Erection • Skid HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 38 Innovative Features - Erection • Lift HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 39 Innovative Features - Erection • Lift HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 40 Innovative Features - Erection • Lockoff HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 41 Innovative Features - Erection • Get Some Sleep HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 42 Other Innovative Features • Column Supported Embankment • Long Span Precast Concrete Beams HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 43 Other Innovative Features COLUMN SUPPORTED EMBANKMENT • 4” over 25 years • CSE -10’x10’ Pile Grid • Conc. Caps • Sand/Geogrid HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 44 Other Innovative Features LONG SPAN PRECAST BEAMS • Precast Pretensioned Concrete Beams • 5 Spans of 9-Girder Lines • 173’-7” Long Span • Longest Beam Overall length = 174’-3” • Innovative beam design became the basis of MnDOT’s new MW Long Span Precast Concrete Beam Standards HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 45 Other Innovative Features LONG SPAN PRECAST BEAMS Photos: Joel Mich, Cretex HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 46 Other Innovative Features LONG SPAN PRECAST BEAMS Photos: Joel Mich, Cretex HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 47 Other Innovative Features LONG SPAN PRECAST BEAMS HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 48 Summary • Innovative RFP Process • Best Value Approach Drives Innovation • MnDOT Partnering in Innovation • Continued Commitment to Innovation HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 49 Thank You HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE 50