Vincent Gastoni, PE
Delivering Major Minnesota Bridges
Hastings Bridge Design Build Project
MnDOT – ACEC/MN Annual Conference
Leading TogetherInnovative Solutions for an Evolving Industry
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Redundancy
and Service Life
Project Location Map
Base Map Source: Google Maps
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
2
Project Overview - Existing Bridge
• Highway 61 over Mississippi River
• Highest daily two-lane highway traffic volume in the state
• MnDOT Chapter 152 Bridge
• Project replaces 1950 steel arch truss
• Lowest 1% in the state for overall sufficiency
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
3
Project Overview - Aerial Plan
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
4
Project Overview - Design-Build Process
• Design-Build SOQ Issued:
October 2009
• Design Build Selection:
June 2010
• MnDOT identified two acceptable alternatives
• RFP allowed Alternative Technical Concepts (ATC’s)
• Design Build Team:
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
5
Project Overview - Design-Build Process
INNOVATIVE RFP FEATURES
• Alternative Technical Concepts (ATC’s)
– Allow innovation and flexibility
• Pre Approved Elements (PAE)
– Reduce risk and provide best value opportunities
Redundancy Concepts for the Main Structure Segment
o Scour Analysis Method
o Bridge Fixity and Thermal Expansion of Bridge No. 19004
o Refined Analysis Method
o
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
6
Project Overview - Design-Build Process
TECHNICAL PROPOSAL SCORING
• Bridge
34 Points
• Environmental Management
6 Points
• Maintenance of Traffic
5 Points
• Public Communications
2 Points
• Schedule
3 Points
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
7
Project Overview - Design-Build Process
TECHNICAL PROPOSAL SCORING
• Bridge
– Durability/Quality of Bridge No. 19004
34 Points
13 Points
– Inspection/Maintenance
9 Points
– Geotechnical
5 Points
– Erection of Bridge No. 19004
4 Points
– Demolition of Bridge No. 5895
3 Points
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
8
Project Overview - Design-Build Process
SCORING DRIVES INNOVATION
• Selection =
Bid Price
Technical Score
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
9
Project Overview - Design-Build Process
SCORING DRIVES INNOVATION
• Selection =
• Win Strategy=
Bid Price
Technical Score
Minimize Bid Price
Maximize Technical Score
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
10
Project Overview - Design-Build Process
SCORING DRIVES INNOVATION
• Selection =
• Win Strategy=
Bid Price
Technical Score
Minimize Bid Price
Maximize Technical Score
• Use innovative ATC’s & PAE’s to:
– Minimize Risks
– Optimize Design Solution
Need A Better Mouse Trap
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
11
Design-Build Process – Base Concepts
MnDOT RFP Baseline Options
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
12
Design-Build Process – Base Concepts
MnDOT Cable Stayed Option
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
13
Design-Build Process – Base Concepts
MnDOT Arch Option
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
14
Base Concept Evaluation
• Evaluate Base Designs
– Preliminary engineering analysis
– Cost estimating exercises
• Produce Comprehensive Evaluation Matrix Tool
– Material costs & risks
• Develop Alternative Designs
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
15
Innovation – Develop Alternatives
• Evaluate Alternative Designs
– Prescriptive design/performance criteria
– Aesthetic requirements
– Technical scoring criteria
– Cost & schedule impacts
• Add to Comprehensive Evaluation Matrix Tool
• Develop Overall Best Value Technical Approach
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
16
Innovation – Develop Alternatives
Lunda/Ames-Parsons Alternatives
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
17
Innovation – Develop Alternatives
•
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
18
Innovation – Develop Alternatives
•
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
19
Innovative Winning Alternative
• Successful Proposal-Free Standing Tied Arch $120M
• 545 ft. Main Span
Project Architect: Bradley Touchstone, Touchstone Architecture
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
20
Innovative Winning Alternative
Project Architect: Bradley Touchstone, Touchstone Architecture
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
21
Visual Quality Process & Color Selection
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
22
Aesthetic Lighting
Lighting Design: Illumination Arts
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
23
Innovative Features - Concrete Tie
• Best value solution
• More durable than steel box
• Higher level of redundancy
• No shop assembly and fit-up issues
• Ease of inspection/maintenance
• Active tension control
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
24
Innovative Features - Concrete Knuckle
• Framed into pier and rib
• Post-tensioned anchorage
• Improved durability/fit-up
• Highly redundant
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
25
Innovative Features – Steel Box Arch Rib
• Aesthetically pleasing
• Simplified fabrication
• Improved maintenance
• Best Value solution
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
26
Innovative Features - Floor System Redundancy
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
27
Innovative Features - Erection
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
28
Innovative Features - Erection
• Build low
TEMP BRACING
ARCH RIB
FLOOR SYSTEM
TEMP TIE & FORMS
TEMP LIFTING CONNECTION
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
29
Innovative Features - Erection
• Build Low On Land
TEMP BRACING
ARCH RIB
FLOOR SYSTEM
TEMP TIE & FORMS
TEMP LIFTING CONNECTION
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
30
Innovative Features - Erection
• Build Low On Land
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
31
Erection
• Move onto Barges Using SPMT’s
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
32
Innovative Features - Erection
• Move onto Barges Using SPMT’s
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
33
Innovative Features - Erection
• Float
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
34
Innovative Features - Erection
• Float
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
35
Innovative Features - Erection
• Skid
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
36
Innovative Features - Erection
• Skid
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
37
Innovative Features - Erection
• Skid
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
38
Innovative Features - Erection
• Lift
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
39
Innovative Features - Erection
• Lift
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
40
Innovative Features - Erection
• Lockoff
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
41
Innovative Features - Erection
• Get Some Sleep
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
42
Other Innovative Features
• Column Supported Embankment
• Long Span Precast Concrete Beams
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
43
Other Innovative Features
COLUMN SUPPORTED EMBANKMENT
• 4” over 25 years
• CSE -10’x10’ Pile Grid
• Conc. Caps
• Sand/Geogrid
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
44
Other Innovative Features
LONG SPAN PRECAST BEAMS
• Precast Pretensioned Concrete Beams
• 5 Spans of 9-Girder Lines
• 173’-7” Long Span
• Longest Beam Overall length = 174’-3”
• Innovative beam design became the basis of MnDOT’s
new MW Long Span Precast Concrete Beam Standards
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
45
Other Innovative Features
LONG SPAN PRECAST BEAMS
Photos: Joel Mich, Cretex
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
46
Other Innovative Features
LONG SPAN PRECAST BEAMS
Photos: Joel Mich, Cretex
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
47
Other Innovative Features
LONG SPAN PRECAST BEAMS
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
48
Summary
• Innovative RFP Process
• Best Value Approach Drives Innovation
• MnDOT Partnering in Innovation
• Continued Commitment to Innovation
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
49
Thank You