PRESENTATION ON SECC, 2011 FOR THE TRAINING CUM WORKSHOP 1. MEASUREMENT OF POVERTY – Done by Planning Commission 2. IDENTIFICATION OF POOR – Done through quinquennial door- to -door Census conducted by MoRD in collaboration with the states CENSUS 1ST BPL CENSUS 2ND BPL CENSUS 3RD BPL CENSUS YEAR CONDUCTED METHODOLOGY 1992 – FOR 8TH PLAN ANNUAL INCOME OF RS. 11000 PER FAMILY AT 91-92 PRICES WAS TAKEN AS CUT- OFF 1997- FOR 9TH PLAN USED EXCLUSION CRITERIA, AND REMAINING FAMILIES WERE LISTED USING CONSUMER EXPENDITURE WITH STATE SPECIFIC POVERTY LINES 2002- FOR 10TH PLAN 13 SOCIO- ECONOMIC INDICATORS WERE USED. SCORE BASED RANKING DONE USING STATE CUT-OFF. BPL CENSUS, 2002 HAD SERIOUS LIMITATIONS AND CONSEQUENTLY BPL LIST DRAWN HAD REPORTED ERRORS OF EXCLUSIONS AND INCLUSIONS THUS , NEED TO DEVISE A NEW METHODOLOGY , PLUGGING THE LACUNAE OF EARLIER BPL CENSUSES WITH THIS IN MIND , MoRD APPOINTED EXPERT GROUP IN AUGUST 2008 TO SUGGEST METHODOLOGY FOR IDENTIFICATION OF POOR DR. N.C. SAXENA, CHAIRPERSON OF THE EXPERT GROUP SUBMITTED REPORT IN AUGUST 2009 TO TEST VALIDITY OF SUGGESTED METHODOLOGY , PILOT SURVEY WAS CONDUCTED IN 2010 FIRST STAGE: SOCIO-ECONOMIC SURVEY USING STRUCTURED QUESTIONNAIRE SECOND STAGE: PARTICIPATORY SOCIO-ECONOMIC SURVEY (PSES) USING PRA (PARTICIPATORY RURAL APPRAISAL) TECHNIQUE. PILOT CONDUCTED IN 254 SELECTED VILLAGES PILOT RESULTS DISCUSSED WITH STATE GOVERNMENTS. OBJECTIVES IDENTIFICATION OF HOUSEHOLDS LIVING BELOW POVERTY LINE BOTH IN URBAN AND RURAL AREAS RANKING OF HOUSEHOLDS BASED ON THEIR SOCIO- ECONOMIC STATUS BOTH IN URBAN & RURAL AREAS TO PREPARE A CASTE BASED PROFILE INCLUDING THE SOCIOECONOMIC CONDITION AND EDUCATIONAL STATUS OF THE PEOPLE OF DIFFERENT STATES CASTE WISE SOCIO-ECONOMIC PROFILING OF THE POPULATION TO BE USED BY THE REGISTRAR GENERAL OF INDIA THE CENSUS TO IDENTIFY BPL FAMILIES IN 2011 IS BEING TERMED AS SOCIO- ECONOMIC CASTE CENSUS (SECC) FIRST, A SET OF HOUSEHOLDS ARE EXCLUDED SECOND, A SET OF HOUSEHOLDS ARE COMPULSORILY INCLUDED THIRD, REMAINING HOUSEHOLDS ARE RANKED AS PER THE NUMBER OF DEPRIVATION INDICATORS THE ENTIRE PROCESS IS PAPERLESS MADE POSSIBLE BY THE USE OF TABLET-PC SCOPE OF MISREPORTING REDUCED TO MINIMUM THROUGH MULTILEVEL VERIFICATION GREATER TRANSPARENCY AND PROVISION FOR REDRESSAL OF CLAIMS AND OBJECTIONS IMPROVISATION OVER THE PREVIOUS BPL CENSUS HHs OWNING MOTORIZED VEHICLES,FISHING BOATS HHs OWNING MECHANIZED EQUIPMENTS SUCH AS TRACTORS HHs HAVING KISAN CREDIT CARD WITH CREDIT LIMIT OF 50,000 AND ABOVE HHs WITH ANY MEMBERS AS Govt. EMPLOYEE,PUBLIC SECTOR UNDERTAKINGS , Govt. AIDED AUTONOMOUS BODIES HHs WITH ENTERPRISE REGISTERED WITH THE Govt. HHs WITH ANY MEMBER EARNING MORE THAN Rs. 10,000 p.m HH PAYING INCOME TAX OR PROFESSIONAL TAX HHs WITH 3 OR MORE ROOMS WITH PUCCA WALLS AND PUCCA ROOFS HHs OWNING REFRIGERATOR,LAND LINE PHONES HHs OWNING 2.5 acres OR MORE OF IRRIGATED LAND WITH ATLEAST 1 IRRIGATION EQUIPMENT 5 acres OR MORE LAND IRRIGATED FOR 2 OR MORE CROP SEASONS HHs WITHOUT SHELTERS DESTITUTES/LIVING ON ALMS MANUAL SCAVANGERS PRIMITIVE TRIBAL GROUPS LEGALLY RELEASED BONDED LABOURERS DEPRIVATION CRITERIA HHS WITH ONLY ONE ROOM WITH KUCHHA WALLS AND KUCHHA ROOF HHS WITH NO ADULT MEMBER BETWEEN AGE 16 TO 59 FEMALE HEADED HHS WITH NO ADULT MALE MEMBER HHS WITH DISABLED MEMBER AND NO ABLED-BODIED ADULT MEMBER SC/ST HHS HHS WITH NO LITERATE ADULT ABOVE 25 YRS LANDLESS HHS DERIVING A MAJOR PART OF THEIR INCOME FROM MANUAL CASUAL LABOUR NOTIFICATION OF INTENT NOTIFICATION OF QUESTIONS PROCURING THE COMPLETE UPDATED LAYOUT MAP , CHARGE REGISTER CARVING OF ENUMERATION BLOCKS UPDATING ABRIDGED HOUSELISTS (AHL) Contd. APPOINTING CHARGE OFFICERS /SUPERVISORS/ENUMERATORS ISSUING APPOINTMENT LETTERS/ID CARDS/ ACKNOWLEDGMENT SLIPS/COMPLETION STICKERS ETC CONDUCTING TRAINING PREPARATION OF LIST OF PANCHAYATS FOR EACH EB PRINTING OF SC/ST LIST THERE ARE 64,350 ENUMERATION BLOCKS (EB) IN THE STATE ONE ENUMERATION BLOCK WILL COVER 100 TO 125 HOUSEHOLDS 1 ENUMERATOR WILL ENUMERATE 4 ENUMERATION BLOCK (PLAIN DISTRICTS) 1 ENUMERATOR WILL ENUMERATE 2 ENUMERATION BLOCK (IN 2 HILL DISTRICTS) 1 SUPERVISOR WILL SUPERVISE 4 ENUMERATORS THE ENUMERATION WORK WILL BE COMPLETED IN 45 DAYS . ENUMERATION STAGE :DATA COLLECTION RESPONDENT BASED CANVASSING METHOD FOR THE CENSUS ENUMERATOR WILL VISIT EVERY HOUSEHOLD AND CANVASS THE QUESTIONNAIRE RESPONSES OF THE PERSONS NOTED WITHOUT ANY VERIFICATION NO PROOF OF DOCUMENT ASKED FROM THE RESPONDENTS CONTD. 16 ENUMERATION STAGE :DATA COLLECTION ENUMERATOR ASKS THE QUESTIONS; DATA ENTRY OPERATOR PROVIDED BY SERVICE PROVIDER ENTERS THE RESPONSES INTO A TABLET PC ENUMERATOR READS OUT THE INFORMATION TO THE RESPONDENT IF RESPONDENT DISAGREES, FACTS VERIFIED BY ENUMERATOR. ENUMERATOR CONDUCTS SUMMARY ENQUIRY, VERIFY FACTS AND CHANGE DATA IF FOUND CORRECT 17 Contd. ACKNOWLEDGEMENT SLIP ISSUED TO EACH HOUSEHOLD AFTER THE ENUMERATION THE DATA IS THEN SAVED ON THE TABLET PC AND CAN NOT BE RETRIEVED TO AVOID TAMPERING OF DATA IN CASE ENUMERATOR DISAGREES WITH THE INFORMATION PROVIDED BY THE RESPONDANT, HE MAKES A NOTE OF IT IN THE PC Contd. ENUMERATOR PASTES A STICKER ON THE WALL OF THE HOUSEHOLD TO ENSURE HOUSEHOLD IS ENUMERATED THAT THE ENUMERATOR INFORMS SUPERVISOR ABOUT THE INFORMATION HE FINDS PRIMA FACIE INCORRECT SUPERVISOR VISITS HOUSEHOLDS - VERIFY DATA THAT IS DISPUTED; ALSO RANDOM VERIFICATION OF HOUSEHOLDS IN THE VILLAGE - ENSURE THAT ALL HOUSES ARE CANVASSED BEFORE SUBMITTING COMPLETION REPORT DATA WILL BE UPLOADED DIRECTLY FROM TABLET PC TO DATABASE 19 CHECKS AND BALANCES ENUMERATOR SHOULD BE FROM A DIFFERENT VILLAGE/PANCHAYAT RESPONSIBLE CITIZENS, MEMBERS OF THE PUBLIC, NGOS, MEMBERS OF PANCHAYAT AND GRAM SABHA MAY BE PRESENT AT THE TIME OF DATA COLLECTION BY THE ENUMERATOR USE OF TABLET PC REDUCES DATA ENTRY ERRORS AND FALSIFICATION OF INFORMATION 20 Contd. DATA ONCE SAVED CANNOT BE RETRIEVED BY ENUMERATOR. ENSURES THAT NO MANIPULATION CAN BE DONE TO DATA THIRD PARTY MONITORING TO ENSURE THAT THE PROCESSES ARE BEING FOLLOWED CORRECTLY DRAFT LIST MADE AVAILABLE AT THE GRAM PANCHAYAT, BLOCK DEVELOPMENT OFFICE, CHARGE CENTRE AND DISTRICT COLLECTOR’S OFFICES THE GRAM SABHA WILL CONVENE WITHIN A WEEK OF PUBLICATION OF THE DRAFT LIST. ALL ANSWERS WILL BE READ OUT AND CLAIMS ANDS OBJECTIONS WILL BE DEALT WITH 21 21 DRAFT PUBLICATION : LIST OF COLLECTED INFORMATION TO BE PUBLISHED(INFORMATION ON RELIGION CASTE/TRIBE NOT TO BE PUBLISHED) CLAIMS AND OBJECTIONS : OFFICERS APPOINTED BY THE STATE GOVT. TO TAKE DECISION ON CLAIMS & OBJECTIONS FILED IN CASE OF INCLUSIONS/ EXCLUSIONS /CORRECTIONS/MODIFICATIONS IN THE PUBLISHED DRAFT LIST. FINAL LIST PUBLICATION : AT THE END OF THE 31ST DAY FROM THE PUBLISHING OF THE FINAL LIST WILL BE PUBLISHED. POST FINAL LIST STATUS : NO CHANGES IN THE DATA IN THE PUBLISHED FINAL LIST FOR ONE YEAR CLAIMS AND OBJECTIONS AFTER THE SURVEY, THE DATA COLLECTED IN THE FIELD AS PER QUESTIONNAIRE WILL BE UPLOADED IN THE WEBSITE OF THE GOVT. OF INDIA WHICH WILL BE CIRCULATED AT VILLAGE LEVEL CLAIM AND OBJECTION MAY BE FILED WITH THE BDOS STATE GOVT. WILL DESIGNATE SOME OFFICERS TO TAKE HEARING OF THE CLAIMS AND OBJECTIONS NECESSARY CORRECTION MAY BE MADE AND UPLOADED IN THE WEBSITE TAKING DECISION AT THE DISTRICT LEVEL STATE LEVEL CO-ORDINATION COMMITTEE HEADED BY THE CHIEF SECRETARY OF THE STATE P&RD WILL BE THE NODAL DEPTT FOR BOTH URBAN AND RURAL AREAS THE DISTRICT MAGISTRATE/DEPUTY COMMISSIONER WILL BE THE PRINCIPAL SOCIO ECONOMIC CASTE CENSUS OFFICER AND WILL BE RESPONSIBLE FOR BOTH RURAL AND URBAN AREAS ONE ADDITIONAL DEPUTY COMMISSIONER WILL BE THE DISTRICT CENSUS OFFICER CONTD/- DISTRICT MAGISTRATE/DEPUTY COMMISSIONER WILL APPOINT THE CIRCLE OFFICERS AS CHARGE OFFICERS FOR RURAL AND URBAN CHARGES THE ENUMERATOR AND SUPERVISORS WILL BE APPOINTED BY THE CHARGE OFFICERS FOR THEIR RESPECTIVE CHARGE AREAS THE PROJECT DIRECTORS, DRDA OF THE DISTRICT WILL BE THE CO-ORDINATING OFFICER WITH THE DISTRICT CENSUS OFFICER FOR RURAL AREAS THE BDOs FALLING UNDER THE CIRCLE WILL BE CO- ORDINATING OFFICERS WITH THE CHARGE OFFICERS FOR RURAL AREAS ROLE OF AMTRON AMTRON WILL MAKE AVAILABLE OF THEIR POP CENTERS LOCATED AT VARIOUS BLOCKS & MAKE THEM FUNCTIONAL THEY WILL PROVIDE THE FOLLOWING INFRASTRUCTURE AT THE CHARGE CENTERS/ DATA CENTERS 1. 2. 3. 4. 5. 6. 7. TWO COMPUTERS WITH UPS & PRINTER DVDs POWER POINT ETHERNET SWITCH LOCAL WIRING IN DATA CENTER/ ADJUTANT ROOM AS NEED BE GENERATOR SET MANPOWER IN POP CENTERS Contd. SETTING UP OF INFRASTRUCTURE TO BE COMPLETED BY 15 DECEMBER’ 2011 DEPUTY COMMISSIONER WILL PROVIDE FUEL FOR GENERATOR TONER, STATIONARY PAPERS, EMERGENCY LAMPS, FIRE EXTINGUISHER, FURNITURE FOR CHARGE CENTERS TO BE PROCURED AND PROVIDED BY DEPUTY COMMISSIONER ROLE OF ECIL/SERVICE PROVIDER PROVIDE TABLET PCs RECRUIT AND TRAIN THE DATA ENTRY OPERATORS ENSURE CATALOGING AND UPLOADING OF AHL DATA IN THE TABLET PCs FROM 15 DECEMBER’ 2011 MONITOR ON DAILY BASIS DATA CAPTURED IN THE TABLET PCs AND ENSURE THEIR UPLOADING IN SERVER Contd. ENSURE CHARGING OF BATTERIES ENSURE PROPER FUNCTIONING OF TABLET PCs AND REPLACE THEM IF NECESSARY APPOINT SUITABLE OFFICIALS IN THE CHARGE CENTER LEVEL TO PROVIDE GUIDANCE TO THE DATA ENTRY OPERATOR IMMEDIATE STEPS TO BE TAKEN BY THE DEPUTY COMMISSIONER TO IDENTIFY AND APPOINT ENUMERATORS, SUPERVISORS & MASTER TRAINERS TO PROCURE ALL REQUIRED MATERIAL INCLUDING ENUMERATOR’S KIT TO FINALISE THE DATE FOR TRAINING AND INITIATE THE TRAINING PROCESS COMPLETE PRINTING OF APPOINTMENT LETTERS ,ENUMERATOR’S GUIDELINE IN VERNACULAR LANGUAGES Contd. PRINTING AND MARKING OF ACKNOWLEDGEMENT SLIPS AND COMPLETION STICKERS ENSURE THAT CONNECTIVITY AND OTHER INFRASTRUCTURAL REQUIREMENTS ARE IN PLACE COMPLETE TAGGING OF POPS (POINTS OF PRESENCE) WITH THE CHARGE OFFICES IDENTIFY ADDITIONAL SPACE ADJACENT TO THE POPS (SAME CAMPUS) TRAINING & CAPACITY BUILDING DEPUTY COMMISSIONER WILL ENSURE AT LEAST TWO ROUNDS OF TRAINING TO CHARGE OFFICERS/ Addl. CHARGE OFFICERS MASTER TRAINER WILL IMPART TWO ROUNDS OF TRAINING TO SUPERVISOR AND ENUMERATOR A FINAL ROUND OF COMBINE TRAINING TO BE IMPARTED TO BOTH ENUMERATOR AND DATA ENTRY OPERATOR CHARGE OFFICER WILL BE IN CONSTANT TOUCH WITH THE OFFICIALS OF ECIL AND SERVICE PROVIDER THEY WILL ALSO COORDINATE WITH AMTRON OFFICIALS ROLE OF THE DISTRICT/Addl. DISTRICT SECC, 2011 OFFICER THE PRINCIPAL SECC OFFICER WILL BE OVERALL INCHARGE FOR THE DISTRICT AND HAS TO CARRY OUT ALL SUCH JOBS FOR SUCCESSFUL L COMPLETION OF THE SECC,2011 DISTINCT DEMARCATION OF HIS DISTRICT INTO SECC,2011 ENUMERATION BLOCK COMPILE UP-TO-DATE LIST OF VILLAGES AND TOWNS AND PREPARE THEIR JURISDICTIONAL MAP ASSIST THE DIRECTOR CENSUS OPERATION/NODAL OFFICER IN COMPILING THE REQUIREMENT RELATED STATISTICAL DATA AS PER Contd. ARRANGE FOR GIVING PROPER PUBLICITY TO SECC,2011 WHICH WILL HELP IN GETTING PROPER RESPONSE FROM THE PUBLIC ENSURE THAT PROPER TRAINING IS IMPARTED TO THE ENUMERATORS AND SUPERVISORS THROUGH THE CHARGE OFFICERS PREPARE A SUMMARY/CONSOLIDATED STATEMENT OF THE DISTRICT FROM THE ENUMERATORS ABSTRACT TO ENSURE ADEQUATE INFRASTRUCTURE AT CHARGE OFFICE LEVEL ROLE OF THE CHARGE OFFICER ARRANGE FOR APPOINTMENT OF SUPERVISORS AND ENUMERATORS FOR HIS CHARGE PREPARE BASIC DOCUMENTS LIKE GENERAL VILLAGE REGISTER, CHARGE REGISTER AS PER INSTRUCTION OF THE DCO/NODAL OFFICER TO FACILITATE IN THE PROPER TRAINING OF THE ENUMERATORS AND SUPERVISORS ENSURE WORK GOES ON ACCORDING TO THE TIME SCHEDULE ENSURE FULL COVERAGE , ACCURACY AND TIMELINESS OF THE SECC,2011 TO PROVIDE REQUIRED INFRASTRUCTURE AT THE CHARGE OFFICE ANY OTHER TASKS REQUIRED FOR SUCCESSFULLY CARRYING OUT THE SECC,2011 DUTIES OF ENUMERATORS PRE-ENUMERATION STAGE : FAMILIARIZING HIMSELF WITH THE ENTIRE AREA GETTING ACQUAINTED AND BUILDING PROPER RAPPORT WITH THE PEOPLE ENSURE RECEIPT OF THE APPOINTMENT LETTER DULY SIGNED BY THE COMPETENT AUTHORITY ENSURE THAT THE NO. OF THE AHL IN THE APPOINTMENT LETTER IS THE SAME AS THE ONE ALLOTTED ATTEND THE TRAINING SESSSIONS ENSURE WITH THE DEO THAT THERE IS NO MISMATCH BETWEEN THE NPR IMAGE LOADED IN THE HHD THE ONE PROVIDED TO HIM OBTAIN ALL THE MATERIALS AFTER THE TRAINING IS OVER CONTD. Contd. DURING ENUMERATION STAGE : IDENTIFY THE BOUNDARIES AND OTHER LANDMARKS WITH THE HELP OF THE LAYOUT MAP UPDATE THE LAYOUT MAP VISIT EACH AND EVERY HOUSE WITHOUT ANY EXCLUSION ENSURE THAT CORRECT INFORMATION IS ENTERED IN THE HHD UPDATE SECTION 2,3 AND 4 OF THE AHL ENUMERATE THE HOUSELESS HHS REVISIT THE LOCKED HOUSES FOR ENUMERATION PREPARE THE ENUMERATOR’S ABSTRACT CONTD. Contd. AFTER THE SECC : ENSURE THAT ALL THE EBS HAVE BEEN COMPLETELY COVERED GET A RELEIVING ORDER AND A COMPLETION CERTIFICATE HANDOVER THE UPDATED LAYOUT MAP, AHL, ENUMERATOR’S ABSTRACT ,FILLED IN ACKNOWLEDGEMENT SLIP BOOKLET AND INVENTORY OF USED AND UNUSED MATERIAL DUTIES OF SUPERVISOR BEFORE THE SECC : ATTENDING THE TRAINING CLASSES ESTABLISH PROPER RAPPORT WITH HIS ENUMERATORS ENSURE THAT ALL THE ENUMERATORS UNDER HIM HAVE BEEN PROPERLY TRAINED HIS ENUMERATORS HAVE RECEIVED ALL THE MATERIAL NEEDED FOR SECC,2011 Contd. • DUTIES DURING THE SECC : CHECK THAT HIS ENUMERATORS ARE DOING THEIR WORK PROPERLY ENUMERATORS ARE MAINTAINING THE TIMELINE CROSS CHECK ATLEAST 10% RANDOMLY SELECTED SCHEDULES CHECK ALL SUCH CASES WHERE THE ENUMERATORS HAVE RECORDED ‘DISAGREEMENT’ • DUTIES AFTER THE SECC : COLLECT THE CERTIFICATE OF COMPLETE COVERAGE , FILLED- IN AND UNUSED ACKNOWLEDGEMENT SLIP BOOKLETS AND INVENTORY OF USED/UNUSED MATERIAL FROM ALL HIS ENUMERATORS AND DEPOSIT AT THE CHARGE OFFICE 1. STATE LEVEL CO-ORDINATION COMMITTEE CONSTITUTED FOR SECC, 2011 2. 1ST AND 2ND MEETING OF THE SLCC HAS BEEN HELD UNDER THE CHAIRMANSHIP OF CHIEF SECRETARY, GOVT. OF ASSAM 3. DETAILED GUIDELINE ON CONDUCT OF SECC ISSUED TO DC/ADC 4. ONE DAY WORK SHOP CUM TRAINING WITH THE DCS/ADCS/PD ,DRDA WAS HELD Contd. 5. TRANSLATION OF ENUMERATOR GUIDE LINE AND QUESTIONNAIRE TO LOCAL LANGUAGES HAS BEEN COMPLETED AND SAME UPLOADED IN THE DEPARTMENTAL WEBSITE 6. AMTRON HAS BEEN ENTRUSTED WITH PROVIDING COMPUTER AND ACCESSORIES ALONG WITH GENERATOR SETS 7. AMTRON HAS BEEN ASKED TO MAKE POP CENTRES AVAILABLE FOR SECC, 2011 8. CHARGE CENTRE ALONGWITH CHARGE OFFICERS HAVE BEEN IDENTIFIED BY DCs. ALL THE DISTRICTS ARE EXPECTED TO COMPLETE THE PROCESS BY NOW Contd. 9. CONSIGNMENT OF TABLET PCs IS BEING RECEIVED FOR TRAINING PURPOSE 10. A TEAM OF 7 OFFICERS HAS UNDERGONE THE NATIONAL TRAINING PROGRAMME FOR NATIONAL LEVEL MASTER TRAINERS AT HYDERABAD 11. A TEAM OF 6 OFFICERS VISITED TRIPURA FOR FIELD VISIT OF THE ONGOING SECC OPERATION 12. PROPOSAL FOR AN AMOUNT OF RS. 5135.35 LAC HAS BEEN SENT TO MoRD OUT OF WHICH RS. 4202.60 LACS HAS BEEN RECEIVED Contd. 13. 14. 15. 16. 17. 18. 1ST INSTALMENT FOR AN AMOUNT OF RS. 956.241 LACS HAS BEEN RELEASED TO THE DCS FINANCE DEPARTMENT HAS BEEN MOVED FOR DELEGATION OF FINANCIAL POWERS TO DCS ECIL HAS FINALISED LOCAL SERVICE PROVIDER AND ACCORDINGLY CONTRACT HAS BEEN ISSUED DIRECTOR CENSUS OPERATION IS LIKELY TO COMPLETE HANDING OVER CHARGE REGISTER, LAYOUT MAPS, AHL ETC BY 1st WEEK OF DECEMBER A ZONAL LEVEL TRAINING PROGRAMME IS SCHEDULED DURING DECEMBER’2011 TAGGING OF PoPS WITH CHARGE CENTRES IS BEING DONE. THE LIST OF POPS TAGGED WITH CHARGE CENTRES, IS BEING RECEIVED FROM DISTRICTS 1. DUE TO LATE ARRIVAL OF TABLET PCS THE DATE OF COMMENCEMENT OF THE SECC IS LIKELY TO GET DELAYED FURTHER 2. ADDITIONAL BUDGET IS AWAITED FROM THE GOVT. OF INDIA 3. CAPPING OF BPL % IS TO BE FIXED AT BLOCK/DISTRICT LEVEL 4. THE MATTER OF EMPOWERING THE DEPUTY COMMISSIONERS WITH TRANSFER OF/SUSPENDING THE SECC PERSONNEL IS AWAITED NON-FUNCTIONING OF TABLET PCS SOFTWARE PROBLEM IN THE TABLET PCS MIS-MATCH IN THE NPR IMAGE UPLOADED VIS-À-VIS THE EB ALLOTTED NON / LESS PAYMENT OF WAGES TO THE DEO BY SERVICE PROVIDER RESULTING IN STOPPAGE OF WORK BY THEM CO-ORDINATOR OF THE SERVICE PROVIDER IS RARELY AVAILABLE FREQUENT CASES OF MISINFORMATION PROVIDED BY THE RESPONDENTS THANK YOU