Instrument for Stability Long-term component 2013 Draft Annual Action Programme Adriaan van der Meer, European Commission Civil Society Dialogue Network Meeting Brussels, 6 December 2012 IfS Long-term assistance Threats to law and order, to the security and safety of the individuals, to critical infrastructure and to public health • Counter-terrorism • Fight against organised crime • Protection of critical infrastructures Risk mitigation (CBRN materials) • Export control • Scientists' engagement • Control illicit trafficking CBRN materials • Disaster preparedness • Dismantlement/conversion weapon facilities 2 Some project examples – 2011/2012 (1) Container Control along the Heroin Route Fight against trafficking in human beings Countering Violent Extremism in the Horn of Africa Strengthening airport communication and building drug-interdiction capacities (AIRCOP) Developing a regional system to collect and share police information in West Africa Seizure from COCAIR operation: 24 kg of Cocaine 3 Some project examples – 2011/2012 (2) Capacity building in the fight against the illicit accumulation and trafficking of firearms in Africa Strengthening LE capacities against the production and trafficking of falsified medicines Building capacities against cybercrime and to respond to cyber attacks Protecting critical maritime routes in the Wider Indian Ocean Seizure from COCAIR operation: falsified medicines 4 Some project examples – 2011/2012 (3) Setting up infrastructure for CBRN risk mitigation initiative Strengthening forensic capacities against illicit trafficking of chemical agents at borders Capacity building against threats of CBRN substances Detector against dirty bombs (test) 5 Some project examples – 2011/2012 (4) Developing guidelines for biosafety risk management Strengthening CBRN legal frameworks Developing national CBRN response plan Lebanon Security system at anthrax cattle grave, Kyrgyzstan Capacity building of first responders in case of CBRN incidents Storage of dangerous pathogen collections 6 Training Centre, Almaty Some project examples – 2011/2012 (5) SAFETY UPGRADE SENSITIVE INSTALLATION Before After 7 Draft AAP 2013 – Priority Areas (1) Counter-terrorism • Fighting against money laundering, combatting financing of terrorism and regional law enforcement (Horn of Africa and Yemen) • Countering Violent Extremism in Pakistan 8 Draft AAP 2013 – Priority Areas (2) Fight against organised crime • Cocaine Route Programme Monitoring and Support (CORMS, Second Phase) • Seaport Cooperation Programme (SEACOP, Third Phase) Seizure from COCAIR operation: arms • Support to the fight against money laundering in Latin America (GAFISUD, Third Phase) • Anti-trafficking Human Beings along the Heroin Route (Second Phase) • Anti-trafficking Small Arms and Light Weapons Seizure from COCAIR operation: cash 3M euro 9 Draft AAP 2013 – Priority Areas (3) Protecting Critical Infrastructures • Protecting Critical Maritime Infrastructures in the Wider Indian Ocean (CRIMARIO) CBRN Risk Mitigation • Support to regional Secretariats and strengthening CBRN risk mitigation capacities in various countries • Implementation strategy: use regional organisations, i.e. ASEAN LE training in the HoA 10 Draft AAP 2013 – Priority Areas (4) Strengthening capabilities against biological threats Assistance and cooperation in export control dualuse goods Support for retraining and alternative employment of former weapon scientists and engineers 11 Indicative Financial Allocation 2007-2013 (MEUR) Domain Range Counter-terrorism 20-27 Fight against organised crime 70-79 Protecting Critical Infrastructures 20-25 CBRN Risk Mitigation 85-100 Border Monitoring 19-21 Scientists’ engagement 45-52 Export control dual-use goods 16-18 Biosafety/biosecurity 20-22 Safeguards IAEA 28-30 12 The IfS future 2013 Budget MFF New Instrument 13 Thank you for your attention 14