Draft 2013 Instrument for Stability Annual Action Programme

advertisement
Instrument for Stability
Long-term component
2013 Draft Annual Action
Programme
Adriaan van der Meer, European Commission
Civil Society Dialogue Network Meeting
Brussels, 6 December 2012
IfS Long-term assistance
 Threats to law and order, to the security and safety of the
individuals, to critical infrastructure and to public health
• Counter-terrorism
• Fight against organised crime
• Protection of critical infrastructures
 Risk mitigation (CBRN materials)
• Export control
• Scientists' engagement
• Control illicit trafficking CBRN materials
• Disaster preparedness
• Dismantlement/conversion weapon facilities
2
Some project examples – 2011/2012
(1)
 Container Control along the Heroin
Route
 Fight against trafficking in human
beings
 Countering Violent Extremism in the
Horn of Africa
 Strengthening airport communication
and building drug-interdiction
capacities (AIRCOP)
 Developing a regional system to
collect and share police information
in West Africa
Seizure from COCAIR
operation: 24 kg of Cocaine
3
Some project examples – 2011/2012
(2)
 Capacity building in the fight
against the illicit accumulation and
trafficking of firearms in Africa
 Strengthening LE capacities
against the production and
trafficking of falsified medicines
 Building capacities against
cybercrime and to respond to
cyber attacks
 Protecting critical maritime routes
in the
Wider Indian Ocean
Seizure from COCAIR operation:
falsified medicines
4
Some project examples – 2011/2012
(3)
 Setting up infrastructure for
CBRN risk mitigation
initiative
 Strengthening forensic
capacities against illicit
trafficking of chemical
agents at borders
 Capacity building against
threats of CBRN substances
Detector against dirty bombs (test)
5
Some project examples – 2011/2012
(4)
 Developing
guidelines for
biosafety risk
management
 Strengthening CBRN
legal frameworks
 Developing national
CBRN response plan
Lebanon
Security system at anthrax
cattle grave, Kyrgyzstan
 Capacity building of
first responders in
case of CBRN
incidents
Storage of dangerous
pathogen collections
6
Training Centre, Almaty
Some project examples – 2011/2012
(5)
SAFETY UPGRADE SENSITIVE INSTALLATION
Before
After
7
Draft AAP 2013 – Priority Areas
(1)
 Counter-terrorism
• Fighting against money laundering, combatting financing
of terrorism and regional law enforcement (Horn of Africa
and Yemen)
• Countering Violent Extremism in Pakistan
8
Draft AAP 2013 – Priority Areas
(2)
 Fight against organised
crime
• Cocaine Route Programme Monitoring and
Support (CORMS, Second Phase)
• Seaport Cooperation Programme (SEACOP,
Third Phase)
Seizure from COCAIR
operation: arms
• Support to the fight against money
laundering in Latin America (GAFISUD, Third
Phase)
• Anti-trafficking Human Beings along the
Heroin Route (Second Phase)
• Anti-trafficking Small Arms and Light
Weapons
Seizure from COCAIR operation:
cash 3M euro
9
Draft AAP 2013 – Priority Areas
(3)
 Protecting Critical
Infrastructures
• Protecting Critical Maritime
Infrastructures in the Wider Indian
Ocean (CRIMARIO)
 CBRN Risk Mitigation
• Support to regional Secretariats and
strengthening CBRN risk mitigation
capacities in various countries
• Implementation strategy: use regional
organisations, i.e. ASEAN
LE training in the HoA
10
Draft AAP 2013 – Priority Areas
(4)
 Strengthening capabilities against biological threats
 Assistance and cooperation in export control dualuse goods
 Support for retraining and alternative employment of
former weapon scientists and engineers
11
Indicative Financial Allocation
2007-2013 (MEUR)
Domain
Range
Counter-terrorism
20-27
Fight against organised crime
70-79
Protecting Critical Infrastructures
20-25
CBRN Risk Mitigation
85-100
Border Monitoring
19-21
Scientists’ engagement
45-52
Export control dual-use goods
16-18
Biosafety/biosecurity
20-22
Safeguards IAEA
28-30
12
The IfS future
 2013 Budget
 MFF
 New Instrument
13
Thank you for your attention
14
Download