Company Overview
Presented to
Wyoming Pipeline Authority
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Willbros
Group, Inc.
Overview
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Brief History

Founded in 1908 as Williams
Brothers Company

Employed by more than 400 clients
in over 50 countries

Operated internationally since 1939

Sustained permanent presence in
Oman, Canada, and the United States

Public company since 1996; listed on
the New York Stock Exchange

Achieved ISO 9001 certification in
1996

Engineered / constructed over
200,000 km (124,000 miles) of
pipeline
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Family Tree
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Worldwide Operations
CANADA
Ft. McMurray
Edmonton
UNITED STATES
Casper
Salt Lake City
Kansas City
Tulsa
Houston
PANAMA
Panama City
Current Work
Countries
Past Work Countries
Willbros Offices
p\mktg\presentations\WPA Presentation 2007 DM.ppt
OMAN
Muscat
Willbros North American Offices
Salt Lake City, UT
WILLBROS ENGINEERING / EPC
(Facilities Engineering)
Casper, WY
WILLBROS MIDSTREAM SERVICES, LLC
(Producer EPC and Operations Services)
Tulsa, OK
WILLBROS ENGINEERING / EPC
WILLBROS GOVERNMENT SERVICES, INC.
(Pipeline / Facilities Engineering / Government Services)
Kansas City, MO
WILLBROS ENGINEERING / EPC
(Pipeline Engineering / Integrity Services)
Houston, TX
WILLBROS ENGINEERING / EPC
(International Facilities Engineering)
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Willbros Safety
Willbros Believes:




In the prevention of all injuries,
incidents, and illnesses to our
employees, clients, and
community
Our employees are our most
valuable asset
The health and safety of our
employees is a core value
In empowering employees for
proactive performance…E2P2
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Willbros Will:

Promote safety continuously
throughout the organization

Pursue excellence and make no
excuses for inadequate
performance

Become “World Class” in safety
performance

Be the “Employer of Choice” in
the global marketplace

Recognize superior performers
and be accountable for failure

Do the job right the first time
Focus

Project management / Program management

Project definition and planning, route and site selection

Preliminary engineering and permitting

Detailed engineering

Procurement

Construction

Continually improve safety

Value added constructability analysis

Turnkey EPC projects

Project solutions

Optimization

Funding
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Expertise

Field gathering and production facilities

Processing facilities

Meter stations

Compressor and pump stations

Onshore pipeline systems (natural gas, petroleum
products, LPG, crude oil and water)

Fuel storage and terminal facilities

Underground storage facilities

Pipeline integrity management
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Project Capabilities
Pipeline Integrity
Management
Due Diligence /
Feasibility Studies
Operations /
Maintenance
Financial
Assistance
Personnel
Training
Project
Management
PROJECT
Commissioning
& Startup
Engineering
Construction
& Construction
Management
Row / Permitting
Logistics
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Procurement
Project Management

Twenty-one (21) people have
been certified to date as Project
Management Professionals
(PMP).

Recognizes Project Management
as a separate profession from
engineering

Provides consistency

Project initiation

Project planning

Project execution and control

Project close-out

Subcontractor control
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Wyoming
Relevant Projects
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Opal Processing Plant TXP-4

Williams Gas Processing
Company and Willbros
Group, Inc.

Engineering, procurement,
construction and funding of a
350 MMscfd cryogenic gas
processing plant designed to
recover up to 10,000 bpd of
natural gas liquids
p\mktg\presentations\WPA Presentation 2007 DM.ppt
0203
Jonah Dehydration Facility

Williams Gas Processing
Company

Engineering, procurement and
construction of a 1.0 Bscfd gas
dehydration facility at Williams’
Opal hub
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Kern River Gas Transmission System

Kern River Gas Transmission
Company



Engineering services for a 1,102 km
(685 mile) 36-inch natural gas
pipeline system from Opal,
Wyoming to Daggett, California
With an initial capacity of 700
MMscfd, the system included
three compressor stations,
measurement and maintenance
facilities, a communication and
data acquisition system and a
separate 30- and 42-inch pipeline
system from Daggett to Bakersfield,
California
Services included field and as-built
survey; right-of-way acquisition;
material receiving and control; and
the preparation of alignment sheets,
permit drawings, construction
specifications and bid documents
p\mktg\presentations\WPA Presentation 2007 DM.ppt
8992
Pony Express Pipeline Conversion

K N Energy, Inc.,
(now Kinder Morgan, Inc.)

Engineering, procurement and
project management for the
decommissioning of a 916-mile,
8- through 24-inch, crude oil
pipeline, conversion to natural
gas service and construction of
a new 114-mile, 12-inch, crude
oil pipeline and a 100-km (62mile), 16-inch, natural gas
lateral
 Services included preliminary
cost estimates and due
diligence investigation, FERC
application support,
hydrotesting, permitting, field
services and construction
inspection
p\mktg\presentations\WPA Presentation 2007 DM.ppt
9698
Wasatch Sour Gas Gathering System

Union Pacific Resources Pipeline
Company



Engineering services to perform a
piping stress analysis on portions
of a 60 km (37 mile) 6- and 10-inch
gas gathering pipeline system
designed to transport 65 MMscf/d
of sour gas at 1,760 psig
Services were provided for the
southern portion of the system
consisting of 6-inch laterals, six
well sites, one flare site, two inline
heater sites and three gathering
trunk line junctions
The project included a metallurgical
evaluation and the detailed design
of the anchoring and piping
modifications required for code
compliance
p\mktg\presentations\WPA Presentation 2007 DM.ppt
9494
Medicine Bow Lateral

Colorado Interstate Gas
Company

Drafting and field services to
support the FERC application
and construction of a 234 km
(145 mile) 24-inch gas pipeline

The project included route
selection and route maps, road
and waterway crossing permit
drawings, ownership plats and
pipeline alignment sheets
p\mktg\presentations\WPA Presentation 2007 DM.ppt
9899
Husky Oil Company

Ralston Gas Products Plant


Detailed design, procurement
assistance, plant evaluation,
specifications, as-built
drawings, O&M manuals,
process facilities inspections,
air quality studies and
modeling
Byron Sour Gas Treating
Plant

Detailed engineering, material
specifications, procurement
assistance, field engineering
assistance and inspection, air
quality studies and modeling
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Overland Pass Pipeline Project

Oneok

Engineering, procurement,
construction management, and
support services for 754 miles
of 14-inch and 16-inch pipeline
to transport NGL
p\mktg\presentations\WPA Presentation 2007 DM.ppt
0508
Double Eagle Petroleum

12 mile 12 inch Gathering
Pipeline

Location: Dad Wyoming

Supplied Engineering,
Procurement, and
Construction

Currently provide Operation
& Maintenance Services
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Willbros Midstream
Services (WMS)
Casper, Wyoming
p\mktg\presentations\WPA Presentation 2007 DM.ppt
Wyoming Operations

Established a Casper Office

Employ 4 full time employees

Provide Operating and Maintenance Services to Producers
and Midstream Companies

Employ 35 construction workers
p\mktg\presentations\WPA Presentation 2007 DM.ppt
WMS Current Projects

Double Eagle/Eastern Washakie Atlantic Rim Expansion

Provide Engineering, Procurement, Construction and Operations

Five year expansion of the Cow Creek Field

Gathering Pipelines, Pipeline Expansion, Compression, Treating
p\mktg\presentations\WPA Presentation 2007 DM.ppt
WMS Wyoming Focus

Assist oil and gas producers

Feasibility evaluations

Optimization studies

Stranded gas solutions

Project development services

Engineering and construction services

Strategic Alliances to assist in funding of Midstream Assets,
Exploration & Production

Operations
p\mktg\presentations\WPA Presentation 2007 DM.ppt
WMS Wyoming Focus (cont’d)

Continue proactive dialogue with clients contemplating
natural gas/crude oil midstream, and transmission assets
within Wyoming

Continue to support Wyoming Pipeline Authorities efforts
to facilitate sourcing and transmission of natural gas,
crude oil, refined products, and NGL
p\mktg\presentations\WPA Presentation 2007 DM.ppt
WMS 2007 & 2008 Goals

Increase our operations & maintenance services

Increased development of strategic alliances to provide
funding of midstream, exploration, and production
projects

Establish a Cooperative program with the University of
Wyoming Engineering School

Increase our staff to 15 full time employees
p\mktg\presentations\WPA Presentation 2007 DM.ppt
WILLBROS
Solutions for Wyoming
p\mktg\presentations\WPA Presentation 2007 DM.ppt