AHK: Energy Efficiency in Greenhouse Industries Den Haag, 16.02.2011 – Andreas Jenne REHAU AG+Co. www.rehau.de Bau Automotive Industrie MARKET SITUATION ENERGY SUPPLY FOR THE GREENHOUSE INDUSTRY – MULTIPLE POSSIBILITIES > Wood Chip Plants > Heat Pumps > Biogas Plants > Biomass Boiler REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011 RAUTHERMEX – PRE-INSULATED PIPE SYSTEM RAUTHERMEX Pre-insulated pipe for large district heating networks, heat transport with great distances - Permanently sealed connection with REHAU compression sleeve - Excellent heat insulation - Rapid, simple and reliable RAUTHERMEX insulation sleeve technology REHAU Support • Feasibility study for community heating schemes • Design and delivery of district heating networks • Local site support REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011 RAUVITHERM – PRE-INSULATED PIPE SYSTEM RAUVITHERM Pre-insulated pipe for small community heating schemes, installation in narrow site conditions - Permanently sealed connection with REHAU compression sleeve - Easy, fast and safe installation through flexible pipe characteristics and easy shrout technology - Best thermal insulation REHAU Support • Feasibility study for community heating schemes • Design and delivery of district heating networks • Local site support REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011 RAUBIO – DIGESTER HEATING SYSTEM RAUBIO DIGESTER HEATING PE-Xa heating system with protective film for fermenter heating directly in the biomass or in the digester wall - No microbiological corrosion as stainless steel - High acid, temperature and pressure resistance - Fastest heating-up through direct installation REHAU Support • Design of digester heating • Delivery of complete system and internat. site support • Matching with Biogas Plant Contractors REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011 Efficient heating concept for the flower grower Pfann, Nuremberg / South Germany Challenge: Cost efficient heating of a new 100.000m² greenhouse area with a heat consumption of 1.5 Mio KWh / year for flower growing Solution: Transport connection to a CHP-Unit of an existing biogas plant in the nearby area REHAU Support • Design of pre-insulated piping • Delivery of the heating system • Site support for the heating installation REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011 Polytunnel heating scheme for Cobrey Farms, Wales / Ross on Whye Challenge: Extend the growing period of asparagus crops on an area of 40.000 m² inside a polytunnel Solution: Constant temperature of 13,5°C inside the polytunnel through the winter and spring time period (water temperature 35°C) REHAU Support • Design of the subsurface heating system • Delivery of the complete heating system • Site support for the heating installation REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011 Biogas Plant for a the tomato grocery Biotec, United Kingdom Challenge: Production of renewable heat and power by using the tomato waste of an existing tomato grocery. Solution: Build of a horizontal anaerobic digestion plant using a vertical fermenter heating system REHAU Support • Design of the fermenter heating • Design of the connected pre-insulated piping • Site and installation support REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011 Subsurface lawn heating for the Wankdorf Stadium, Wankdorf / Switzerland Challenge: Ice and snow free lawn area during winter period for the Wankdorf Stadium in Switzerland Solution: Subsurface lawn heating and drainage system from REHAU REHAU Support • General expertise and consultancy • Design of underground heating system • Delivery and site support for the installation REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011 Heating of the new greenhouse area Biokraft Hennstedt by CHP, North Germany Challenge: Cost efficient heating of a new 600.000m² greenhouse area including delivery of CO2 to improve the tomato growing Solution: Construction of a biogas plant and additional installation of a wood chip boiler with ORC-Process (power generation) to generate heat, power and CO2 for the tomato greenhouse REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011 Community heating scheme for Bioenergy village Waldmünchen, Bavaria Challenge: Renewable heat supply for a small community in an existing housing area with limited space between the dwellings Solution: Heating network with a flexible pre-insulated piping system with connection to a CHP-Unit of an existing biogas plant in the nearby area REHAU Support • Design of heating network • Delivery of the heating transport system • Site support for the heating installation REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011 BIOENERGY FOR GREENHOUSE APPLICATION - ITS A BRIGHT FUTURE! THANKS FOR YOUR ATTENTION ! www.rehau.de Bau Automotive Industrie