“Simuleringsverktyg för optimering av miljö- och kostnadseffektivitet” TCO Simulation Tool: Introduction Project Goals : TCO- and CO2 emissions evaluation tool Optimization Tool for stone quarries (earthmoving…) Soft Offer, using above tool(s) Project Members - Volvo Construction Equipment (Eskilstuna) - KTH Department Of Traffic and Logistics (Stockholm) Volvo Construction Equipment Department, Name, Document name, Security Class 1 Date “Simuleringsverktyg för optimering av miljö- och kostnadseffektivitet” TCO Simulation Tool: Introduction / Project Team CPM : Uwe Muller TPL : Erik Uhlin VPD: Anders Westlund, Conny Carlqvist Prod. Plat: Tore Oscarsson, Thomas Davidsson, Kwangsuk Jee Emerging Technologies: Joakim Unnebäck Customer Solutions: Hans Kauppila VTC: Per Olof Fryk, Inge Qvardford mfl KTH: Jiali Fu Industry Partner: Skanska (Quarries in Vällsta and Angered)’ Finanzing: Vinnova / Transport Effectiveness + Volvo CE Volvo Construction Equipment Department, Name, Document name, Security Class 2 Date “Simuleringsverktyg för optimering av miljö- och kostnadseffektivitet” TCO Simulation Tool: Introduction Stone Quarry : Volvo Construction Equipment Department, Name, Document name, Security Class 3 Date “Simuleringsverktyg för optimering av miljö- och kostnadseffektivitet” TCO Simulation Tool: Introduction Transport Efficiency for Quarries (TCO): - Cost per transported tonne - € / tonne Subparts: - Productivity per hour - Hourly cost - Owning / Fixed Cost - Operating / Moving Cost Volvo Construction Equipment Department, Name, Document name, Security Class 4 Date “Simuleringsverktyg för optimering av miljö- och kostnadseffektivitet” TCO Simulation Tool: Introduction TCO = Sek / Tonne (or $/m3… etc). For a fleet or single machine Tonnes / Hour: Cost / Hour: - Cycle Times : GSP / DES -Owning Cost - Work Load : GSP / DES -Depreciation : Local -Interest: Local -Tax: Local -Insurance: Local - Operating Cost - Fuel: GSP - Operator: Local - Wear Parts: Master Thesis -Tires Undercarriage/Tracks: Master Thesis (Coming) - Repair: SACCelerate / SCQ - Preventive Maintenance: SACCelerate / SCQ Volvo Construction Equipment Department, Name, Document name, Security Class 5 Date “Simuleringsverktyg för optimering av miljö- och kostnadseffektivitet” TCO Simulation Tool: Simulation Tool Job Site Fleet Equipment Production Job Schedule Cost Production req. etc Simulation Tool Volvo Construction Equipment Department, Name, Document name, Security Class 6 Date “Simuleringsverktyg för optimering av miljö- och kostnadseffektivitet” TCO Simulation Tool: Simulation Tool Site Simulation II (S&M) ”Fleet Calc Pro” (R&D) TCO Simulation Tool Project Within the project, two softwares are developed - R&D Tool for engineering and expert usage. Mainly inhouse. - Sales Tool for regional sales support teams Connections and interfaces to be defined • Same input for calculations • R&D Tool Simulations feeds Sales Too (Algorithms, Machine Performance, Optimization). • Work Site Database from Sales Tool made available to R&D Tool Volvo Construction Equipment Department, Name, Document name, Security Class 7 Date “Simuleringsverktyg för optimering av miljö- och kostnadseffektivitet” TCO Simulation Tool: Simulation Tool, system overview Repair and Maintenance Productivity cost calculations and Fuel Simulations Cost Databases Volvo Construction Equipment Department, Name, Document name, Security Class 8 Date “Simuleringsverktyg för optimering av miljö- och kostnadseffektivitet” TCO Simulation Tool: Productivity and Fuel Simulations Quarry Process DES Simulation Machine Performance Calculations Volvo Construction Equipment Department, Name, Document name, Security Class 9 Date Load & Carry Scenario Description Load & Haul Work Schedule Material Transport Road Loading Vehicle Transport Vehicle Machine Selection Performance Simulation MatLab / GSP Cycle Time Transport Mission Definition Cycle Fuel Process Description / DES System Productivity TCO Volvo Construction Equipment Department, Name, Document name, Security Class 10 Date Performance Simulation TCO Simulation Tool Performance Calculations Most important: GSP calcualtions on complete work cycle needs to be correct (in terms of time (i.e vehicle speed) and fuel consumption. – AH: measurements carried out, verification of system in progress. Good preliminary results – WL: Incorporating Reno Fillas operator model in State Flow in GSP. Use measurements by Bobby Frank to verify system behaviour. – EXC: Pending. Waiting for first model in GSP. Volvo Construction Equipment Department, Name, Document name, Security Class 11 Date TCO Simulation Tool Optimization Ongoing work at KTH on genetic algorithms for optimal fleet selection with regards to – Productivity – TCO Research Papers: ”A Microsopic Simulation Model for Earthmoving Operations” – Jiali Fu ”Simulation Based Optimization for Earthmoving Operations” – Jiali Fu (under consideration) Volvo Construction Equipment Department, Name, Document name, Security Class 12 Date