Audience Memo Highway U-111 stretches and curves along the west bench of Salt Lake County from Herriman to Magna City It is divided into three different jurisdictions; New Bingham Highway to SR 201 (2100 South Freeway) falls under the State’s jurisdiction, New Bingham Highway to Old Bingham Highway is West Jordan’s responsibility, and South Jordan and Salt Lake County have everything south of Old Bingham Highway. Each jurisdiction is obligated to absorb the costs of any improvements or repairs made in their portion. Safety improvements need to be made along all of U – 111, therefore responsible parties in all jurisdictions must be reached. The Utah Department of Transportation (UDOT) would be my first priority since they represent the state and the state has the largest portion of the road. Salt Lake County and South Jordan officials would be the second priority because they hold the second largest portion. Surprisingly West Jordan City is only responsible for a one mile stretch of the road and have 50 percent of the jurisdiction for the Old Bingham and U-111 intersection. A fatal accident recently occurred there in February of this year making it would be beneficial to give my proposal to West Jordan City as well. The history of U-111 shows that if enough people petition for improvements then the improvements are made. A PowerPoint presentation allows me to reach out to all three jurisdictions and it permits me to educate residents in the community affected by this dangerous road. It helps me to come face to face with these people, which helps me to be more effective and more successful. Letters, articles and videos can be skimmed over, thrown away or deleted. A live presentation is harder to brush under the table, especially when there is a group of voting residents sitting in the room. Monthly city meetings permit me to go and present my proposal to officials and to the public. “The squeaky wheel gets the grease,” so the more I squeak the more successful I’ll be. UDOT also holds public meetings and events that would allow me to share my concerns in person. Ethne Sue Stone Age: two http://www.prayersforthefamily.blogspot.com/ Ksl.com Died on February 6th 2012 “Loving Husband & Father" David James Kenney returned to live with his Father in Heaven on December 10, 2011 at the age of 32, after succumbing to injuries sustained in an auto accident. Before his passing, David received loving farewells from his wife Cristina; children Joshua (5) and Jasmine (2); parents Bruce and Jimae Kenney; grandparents James and Maydene Bodell; siblings Nicole and Erik Patterson, Elizabeth and Brian Kirkby, Benjamin and Katherine Kenney, Laura and Kevan Whipple, Alexander and Cindy Kenney; and 23 nieces and nephews. Our “Rocket Scientist" and Eagle Scout was a perpetual learner, creator, and inventor. David earned a Bachelor's Degree in Mechanical Engineering, graduating cum laude, and a Master's Degree in Mechanical Engineering and Fluid Mechanics from the University of Utah…. Deseret News Obituary Highway U-111 (deseretnews.com) Bacchus Highway Accidents 250 200 150 Accidents Trend 100 50 0 2003 04 05 06 07 08 09 10 Bacchus Highway Fatalities 3.5 3 2.5 2 Fatalities Trend 1.5 1 0.5 0 2003 04 05 06 07 08 09 10 11 12 Property Damage cost $1,400,000.00 $1,200,000.00 $1,000,000.00 $800,000.00 $600,000.00 $400,000.00 $200,000.00 $2003 04 05 06 Nsc.org “estimating the cost of unintentional injuries 07 08 09 10 Property Damage cost $1,800,000.00 $1,600,000.00 $1,400,000.00 $1,200,000.00 $1,000,000.00 $800,000.00 $600,000.00 $400,000.00 $200,000.00 $2003 04 05 06 07 08 09 10 Estimated Annual Amount Spent for Fatal Accidents $4,000,000 $3,500,000 $3,000,000 $2,500,000 $2,000,000 $1,500,000 $1,000,000 $500,000 $0 2003 04 05 06 07 08 09 10 11 12 Estimated Forecasted Amount Spent $4,500,000 $4,000,000 $3,500,000 $3,000,000 $2,500,000 $ Spent $2,000,000 Linear ($ Spent) $1,500,000 $1,000,000 $500,000 $0 03 04 05 06 07 08 09 10 11 12 TIME IS NOT ON OUR SIDE! 1. Grade Separated Pedestrian Crossing at 8200 South 2. Old Bingham Highway (10200 South) Intersection Improvements 3. Widen Roadway Shoulders 4. Rail Bridge Removal at 4300 South 5. Rail Bridge Widening at 7500 South 6. Bingham Canyon Mine Entrance (12600 South) Intersection Improvements 7. Construct Multi-Use Trail 8. Upgrade Substandard Barriers 9. Magna By-Pass Short - Term Project Conceptual Cost Grade Separated Pedestrian Crossing at 8200 South Old Bingham Highway (10200 South) Intersection Improvements $1,250,000 Widen Roadway Shoulders $3,603,000 Rail Bridge Removal at 4300 South $2,784,000 Rail Bridge Widening at 7500 South Bingham Canyon Mine Entrance (12600 South) Intersection Improvements $3,332,000 Construct Multi-Use Trail Upgrade Substandard Barriers Magna By-Pass* *Costs are for the full seven-lane section. Costs will be lower for a three or five-lane section. $2,571,800 $35,000 $200,000/Mile $277,000 $64,664,060 Seven-Lane Arterial Shouldn’t we implement things we need in the future now? Not only would it be more cost affective it could prevent tragedies from happening. Udot.utah.gov “Sr-111 Corridor Study” Location Conceptual Cost New Bingham Highway to 8200 South $13,259,490 8200 South to 7800 South $4,027,460 7800 South to 5400 South $28,967,680 5400 South to 4100 South $19,259,910 Total $65,514,450 Some of this money should be designated to improve Highway U-111 Looking south Old Bingham and U-111 Intersection Prioritize exiting funds Federal Funding One Time Tax Bond