Наименование презентации дата “Omsk Institute of project engineering for petroleum refining and petrochemical industries” “OMSKNEFTEKHIMPROEKT” Open Joint Stock Company Date of foundation • February 17, 1953 Москва Legal address • 19A,Prospect Mira, Omsk, 644029, Омск (Центральный офис) Russian Federation Белград Астана Mailing address • 19A,Prospect Mira, Omsk, 644029, Russian Federation Contact us • +7 (3812) 28-55-34 Fax • +7 (3812) 28-55-44 E-mail • ONHP@omsknet.ru 2 ONHP branch offices Moscow Omsk (Central Office) Belgrade Nakhodka Astana Beijing Dubai - currently existing ONHP branch offices - branch offices to be established in the near future 3 ONHP Profile Basic trends in ONHP activities: Complex design development for the facilities of petroleum refining, petrochemical, gas-processing and chemical industries; Complex of design and exploration work performance for construction of new facilities, extension, reconstruction and modernization of existing industrial and civil facilities; Participation in selection ofМосква equipment, products and materials for the Clients’ construction sites; precommissioning and start-up; Омск (Центральный офис) Field supervisionБелград and engineering supervision over construction of the designed buildings, structures and Астана facilities. 4 ONHP Profile 2. Deep Conversion Complexes; Storages; Currently ONHP develops design of the facilities as follows: 1.Process units for petroleum refining, petrochemical and chemical plants, including: - Crude oil refining - FCC Naphtha Hydrotreating - Diesel Hydrotreating - Catalytic Cracker - Visbreaker - Reformer - Gas Fractionation - Isomerization - Hydrogen Production - PSA Москва Омск Астана 3. Offsite Facilities and Utilities: - Tank farms for crude and products storage - LPG tank farms - Intermediate tank farms - Industrial and storm water treatment facilities and sanitary sewer - Nitrogen and oxygen stations - Air compressor stations - Rail tank car loading and unloading racks - Rail tank car on-spot loading racks - Road tank car loading racks recovery unit (Центральный- Vapor офис) - Chemical supply system - Naphtha self-blending stations - Fuel handling facilities - Flare system - Transformer substations - Hydrogen handling facilities - Laboratories - Networks and Utility Services (incl. Process, Combustion Engineering, etc.) - Control Stations - Chemical water conditioning systems - Fire Fighting Facilities - Water Supply Facilities - Water Drainage Facilities - Power Supply Facilities - Furnace Rooms, Boiler Rooms 5. Other facilities. 5 ONHP Action Fields Investment Phase Pre-Investment Phase Pre-FEED Conceptual Project Basis; Pre-Feasibility Study ; Bankable Feasibility Study Basic Engineering (BDEP); Basic Implementation (Project Design); Definitive Implementaion (Detailed Design) FEED, Detail Design Design Documentation development; Design and Estimate Documentation maintenance of expertise in accordance with law requirements of country of facility location; Bid Package Development for Contractor’s Work and Equipment Procurement; Performance of Engineering Survey (all types); Development of Engineering Design Documents; Optional Equipment Design Development; Development of Method Statements Reference Standards. Operation Phase Construction ЕРСм services for new construction; Operation ЕРСм services for reconstruction and modernization facilities, including field and engineering supervision; Apart: Schedule Control; Project Budget Operation Documents Management; Development (Emergency Equipment delivery Response Plans; Process management; Engineering Supervision for and Engineering Procedures) Equipment Manufacturing, Equipment Forwarding; Field and Engineering Supervision over Construction 6 ONHP authorization to perform activities Authorization to exercise activities in the Russian Federation: 1. Design: Certificate СРО-НП-СПАС-П-5501035050-0030-2 “Of access permit to perform design activities effecting safety of capital structures”. The company is granted permission to perform all types of design activities (13 types). Self-regulated organization “Interregional union of Siberian designers and architects”. 2. Engineering survey: Certificate И-03-11-25-025 “Of access permit to perform design activities effecting safety of capital structures”. The company is granted permission to perform 4 types of work. Self-regulated organization “Union of surveyors for "Neftegazizyskaniya-alliance” energy complex design and construction. 3.Construction:Москва Certificate 0375.02-2010-5501035050-С-021 “Of access permit to perform specific work type or types effecting safety of capital structures”. The companyОмск is granted permission to офис) perform 4 types of work. Self-regulated (Центральный organization “Union of surveyors for "Neftegazizyskanija-alliance” energy complex design and construction”. Белград Астана Availability of licenses to implement activities in the Republic of Kazakhstan: 1.State License (General License) granting permission to perform design and survey activities in the Republic of Kazakhstan. 2.State License (General License) granting permission to perform expert works and engineering services in the Republic of Kazakhstan 3.State license granting permission to perform and render environmental protection works and services in the Republic of Kazakhstan. 4.State License (General License) granting permission to perform design of facilities in petrochemical, gas- and petroleum refining industries. 5.State License (General License) granting permission to perform design of boilers operating under working pressure of min. 0.7 kg/cm2 and heat-transfer agent temperature of min. 115oС, vessels and pipelines operating under pressure of min. 0.7 kg/cm2 in oil and gas industries. 6.Certificate granting permission to perform industrial safety activities in the Republic of Kazakhstan. 7 Staff strength Москва Омск (Центральный офис) Белград 8 Personnel structure as of October 01, 2011 % % The general labour experience of employees (average value) 19 years Москва Омск (Центральный офис) Белград % Labour experience of employees in ONHP (average value) 12 years Personnel mean age – 37,5 years 9 Program “School – Higher School – Company” Higher school Company School Company ‘s strategic pool of trained reserve ONHP Junior Assistants Company’s strategic pool of trained reserve (Schoolchildren, Students) ONHP Young Professionals Program of vocational adjustment ONHP Professionals Company’s pool of trained reserve 10 10 Participants of the Program "School – Higher School – Company" ONHP Ministry of Education, (Republic of Serbia) AO "Oil Company KazMunaiGas” (Republic of Kazakhstan) Atyrau Institute of Oil and Gas (Republic of Kazakhstan) Ministry of Education, Omsk region Participants of the Program "School – Higher School – Company" Belgrade State University (Republic of Serbia) Department of Education, Omsk city 6 Higher Schools of Omsk city Schools of Omsk city (among them there are 11 sponsored schools) Marine Engineering Institute (Vladivostok city, Nakhodka city) 11 Industrial practice in ONHP Familiarization conducted loop tour around ONHP departments Job-oriented assignment to Higher Schools for fundamental (engineering) specialties Schoolchildren study activities of ONHP Russian and foreign partners Computerized work station in ONHP department Tutor (ONHP Young Professional) Industrial practice in ONHP Individual rating of schoolchildren ONHP Certificates for Student's Industrial Practice School rating 12 Data on Program 2010 Participants Matriculation (2011 school-leavers) 13 Experience in General Design Oil Company Refinery Capacity, MTA Site, ha OAO Gazpromneft (Russia) OAO Gazpromneft – Omsk Refinery 19,5 1125 NIS a.d. (Serbia) Pančevo Refinery, Novi Sad Refinery 5,7 320 Oil Company “Alliance” (Russia) OAO Khabarovsk Refinery 3,0 90 AO Oil Company “KazMunaiGaz” (Kazakhstan) TOO Atyrau Refinery 5,0 242 14 14 ONHP Major Projects Feed Capacity Gazpromneft – Omsk Refinery FCC Naphtha Hydrotreating & Diesel Hydrotreating Complex (General Designer) FCC Naphtha Hydrotreating. Diesel Hydrotreating. Off-site Facilities 1.2 MTA 3 MTA Gazpromneft – Omsk Refinery Off-site Facilities for Light Naphtha Isomerisation Москва Plant (Isomalk-2) (General Designer) Off-site Facilities for Isomerisation Plant 800 TTA Gazpromneft – Omsk Refinery Gasoline Quality БелградDesigner) Upgrading Complex (General Омск (Центральный офис) Continuous Catalytic Reforming Plant. Off-site Facilities Астана 1 MTA Feed Capacity Petrochemical Complex. 20 MTA Terminal направлена на приближение места разработки Стратегия создания и развития филиалов компании рабочей документации к месту строительства для сокращения коммуникации в процессе 236 TTA производства строительно-монтажных работ.Hydrogen Unit (the largest in Russia) LPG Storage and Self-Loading Complex (hydrogen) OOO “RN-Tuapse Refinery” Crude Oil Tank Farm Modernization (3 + concrete dike with the capacity - существующие на сегодняшний день Spheres офисы ОАО «Омскнефтехимпроект» of 20 000m3) Primorsky Refinery - офисы, открытие которых запланировано в ближайшем будущем Hydrocracking Complex OAO Komsomolsky Refinery 1.8 MTA 15 ONHP Major Projects Feed Capacity Khabarovsk Refinery Hydroprocess Complex Facilities (General Designer) Off-Site Facilities for Hydrocracking, Hydrotreating Combined Unit 1 MTA 500 TTA Khabarovsk Refinery Москва VT-Visbreaker Complex (General Designer) VT Unit; Visbreaker; Off-Site Facilities. 1.8 MTA 750 TTA Омск (Центральный офис) Белград Астана OOO Tobolsk-Neftekhim Broad Fraction of Light Hydrocarbons Processing Complex Expansion (min. 5.8 MTPA) Gas Fractionation Unit – 2. Northern and Southern Bases Feed Capacity 3.2 MTA Feed Capacity OAO SurgutNefteGas Gas Processing and Compression Facilities No.1, 2 for associated gas processing and recovery of broad fractions of light hydrocarbons from such gas and dry stripped gas recovery Gas Processing and Compression Facility No.1, 2. Facility Commissioning Year – 2010 4.0 bln.m3 / year 16 ONHP Major Projects Feed Capacity TOO Atyrau Refinery Petrochemical Complex (General Designer) Catalytic Reforming Plant. Aromatics Plant (benzene, toluene, paraxylene). Off-Site Facilities. 1 MTA 1 MTA 16 Process Units: 1. Fluid Catalytic Cracker 2,4 MTA 2. Non-Saturated Gas Fractionation Section Москва 3. LPG Desulphurization Unit. 2,4 MTA 4. Pre-Treatment. Oligomerization Unit. 5. ButeneОмск Oligomerization Unit. офис) (Центральный 6. Polybenzine Hydrogenation. Белград 7. Cat Naphtha Selective Hydrogeneration Unit. TOO Atyrau Refinery Астана 8. LCCN (Light Catalytically Cracked Naphtha) Deep Conversion Complex 1,2 MTA Etherification Unit. (General Designer) 9. Naphtha Hydrotreater. 10. Gasoil Hydrotreater. 1,4 MTA 11. Sulphur Recovery Unit. 12. Amine Regeneration Unit. Стратегия создания и развития филиалов компании направлена на приближение места разработки 13. Sulphur Recovery and Forming (Granulation) Unit рабочей документации к месту строительства для сокращения коммуникации в процессе 14. Saturated Gas Fractionation Section производства строительно-монтажных работ. 15. Isomerization Unit 16. Hydrogen Production Unit - существующие на сегодняшний день офисы ОАО «Омскнефтехимпроект» Hydrotreater / Hydrocracker (FEED+DD) Sour Water Stripper MHC/DHT Complex at Pančevo Refinery - офисы, открытие которых запланировано в ближайшем будущем Gas Fractionation Unit Modernization (General Designer) Off-Site Facilities LPG Storage Feed Capacity 3 MTA 17 Cooperation with Foreign Companies ONHP has signed agreements with world leading engineering companies such as Sinopec Engineering (China), Kellogg Brown & Root (Great Britain), CB&I (Czech Republic), who are experienced and applying the most modern technical resources and up-to-date software products Engineering: Sinopec Engineering (China) KBR (USA) Marubeni (Japan) Technology Development: AXENS (France) CB&I Lummus (Czech Republic ) UOP (Great Britain) Foster Wheeler (USA) 18 Cooperation Experience with foreign engineering companies • ONHP develops design in compliance with International and European codes (ASME, API, DIN, ANSI, EN): • NIS a.d.: General design development for Oil Refineries in Novi Sad and Pancevo, Republic of Serbia. • NIS a.d.: Oil Refinery Modernization Project Москва of Serbia. • in Pancevo, Republic • OAO "Oil Company KazMunaiGas”: General Contract on FEED (project Омск (Центральный офис) design documents development) and BDEP management for new Белград Астана petrochemical complex with the capacity of 1 MTA (feed) at TOO Atyrau Refinery – in cooperation with AXENS. • OAO "Oil Company KazMunaiGas”: FEED (project design documents) development for Deep Conversion Complex, which includes 16 process Стратегия создания и развития филиалов компании направлена на приближение места разработки units at TOO Atyrau Refinery in cooperation with AXENS, UOP, Foster рабочей документации к месту строительства для сокращения коммуникации в процессе производства строительно-монтажных работ. Wheeler. • OAO "Oil Company KazMunaiGas”: Design Engineering of Offsite facilities asнаwell as consulting engineering under detailed design project - существующие сегодняшний день офисы ОАО «Омскнефтехимпроект» developed by JGC Corporation at TOO Atyrau Refinery. - офисы, открытие которых запланировано в ближайшем будущем 19 Техническое оснащение Hardware and Software Взаимосвязь программных продуктов Software interconnection at all design stages на всех стадиях проектирования PreFEED FEED, Design documentation Detailed Design Documentation PIMS Aspen Icarus Aspen Icarus Aspen Icarus Aspen Icarus (AspenTech) (AspenTech) (AspenTech) (AspenTech) (AspenTech) Decisions economic evaluation Economic evaluation itemization Analysis based upon construction results Analysis based upon operation results Refinery process diagram improvement based upon linear simulation taking into consideration market researches on product yield maximum increase Basic Engineering Design Packages Procurement Construction, precommissioning SmartPlant P&ID SmartPlant P&ID SmartPlant P&ID (Intergraph) (Intergraph) Process diagrams for processes Process diagrams itemization at “Project” stage Operation SmartPlant P&ID (Intergraph) (Intergraph) Process diagrams itemization at “Detailed Design” stage Process diagrams for all processes Piping classes, equipment interconnection in 3D simulation including equipment tags in accordance with P&ID SmartPlant 3D ONHP is applying the most modern equipment, technical resources and up-to-date software products, which allow planning and control implementation of entire project at the earliest stage. That is in accordance with all recent international requirements pertaining to each design stage from Justification of Investments to Operation. (Intergraph), AVEVA PDMS Layout decisions in 3D SmartPlant 3D (Intergraph), AVEVA PDMS Facility 3D simulation SmartPlant Foundation (Intergraph) Facility data storage and systematization SmartPlant Instrumentaton (Intergraph) Detailed Design Documentation on Instrumentation SmartPlant Electrical (Intergraph) Detailed Design Documentation on Electrical part SmartPlant Materials (Intergraph) Orders development and processing procedures, order technical part (requisition), attachment to a contract (purchase order) SmartPlant 3D (Intergraph), AVEVA PDMS SmartPlant 3D (Intergraph), AVEVA PDMS Physical simulation for all construction and installation nodes, isometrics. Control based upon laser scanner. Operating production 3D simulation PIMS (AspenTech) Method Statements (work production plan) development taking into consideration sales requirements by means of units operation mode change 20 20 20 Technical resources and software products for project management Entire enterprise resources Procurement management Projects planning and control PS Production management Sales Human Projects system management resources Finance Controlling management Project Management. Project management including planning and control. Timesheets. Data acquisition on actual working hours and material expenditures PrimaveraWeb (MyPrimavera). Remote access for internal and external users + additional functions providing visualization at analytical data review Document flow management 3D 3-D Design Document flow and document archives It allows defining major process and construction blocks, which influence start point of commissioning depending on their readiness state; it also enables to accurately coordinate installation sequence of major equipment and critical construction structures. It allows performing quality control of critical structures and process equipment installation at early installation stage by scanning implemented works and performing stacking on target model. Software complexes integration allows covering all processes within the refinery 21 Communication procedure Организация коммуникаций по проекту Client General Designer Vendors General contractor Contractors Licensors Design companies Communication procedure defines a specialist responsible for carrying on correspondence and providing coordination with other project participants Coordination & functional organization chart Communication procedure defines technical resources and access rights of project participants General Designer Initial data Design and estimate documentation, including revisions Letters, messages Reports, MOMs Accountancy Coordination technical resources Communication procedure Coordination Procedures Communication procedure determines project procedures: Letters, MOMs, other documents designation procedure; Addressees and mailing lists; Format of documents to be submitted; Electronic documents arrangement rules (placing onto ftp-server); Project reporting forms; Letters reply and reporting submission deadlines. Identification of documents to be submitted Initial data Initial data Design and Letters, estimate messages documentation, Reports, MOMs including revisions Accountancy Letters, messages Reports, MOMs Client Ftp-server Initial data Design and estimate documentation, including revisions Letters, messages Reports, MOMs Design and estimate documentation, including revisions Letters, messages Accountancy Project participants Communication procedure determines: Letters, MOMs, other documents designation procedure; Forms of accompanying documents (Transmittal); Requirements for naming files of design and estimate documentation, including revisions and considering automatic processing of document packages based upon attached list (Transmittal); Applied code numbers for design and estimate documentation 22 22 ONHP development concept Expansion of ONHP activities geography (including ONHP new branch offices establishment); Formation of backlog of business, where the share of international business projects shall make min. 80% (currently it makes 64%); Rendering complete package of engineering services; Increase in scope of work to be performed in petrochemical and chemical industries 23 THANK YOUR FOR YOUR ATTENTION! 19А, Prospect Mira, Omsk, Russia Tel. +7(3812) 28-55-34, Fax +7(3812) 28-55-44. E-mail: onhp@omsknet.ru Web: www.ONHP.ru 24