ADVANCED SYSTEM DESIGNS Confidential > Technology People. Business Results. Getting iReady for Power 7 Sept 9, 2010 IBM Solutions MICROSOFT Solutions SECURITY Solutions NETWORK Solutions BUSINESS INTELLIGENCE Solutions Greg Kyburz gkyburz@asd.net BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 1 ADVANCED SYSTEM DESIGNS Confidential > Why Power 7? • Better price/performance $/CPW • Better Efficiency – Power/Cooling • Better Hardware and Software Maintenance Costs • Better space efficiency – More CPW / “U” •Maintain an upgrade path for your system •Move up to ‘i’ Incentive/User licensing incentives •Service Vouchers BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 2 ADVANCED SYSTEM DESIGNS Confidential > Where to Start? • OS Compatibility with Applications • Hardware Compatibility • Cost Factors – IO replacement, maintenance • Financial Status of Machine • Migration Effort / Downtime • Performance BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 3 ADVANCED SYSTEM DESIGNS Confidential > OS Compatibility with Applications • Power 7 requires 6.1.1 or 7.1 • May require Application upgrade prior to or after OS upgrade •ANZOBJCVN to determine whether objects are observable •http://www-912.ibm.com/a_dir/as4ptf.nsf/$$search?openform •Search on ANZOBJCVN to find the latest for your release • Can get assessment done by IBM or IBM BP •Obtain latest ‘resave’ of target release •http://www-947.ibm.com/systems/support/i/planning/resave/v7r1.html BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 4 ADVANCED SYSTEM DESIGNS Confidential > OS Compatibility • OS Jumping • 5.2 to 5.4 then to 6.1.1 or 7.1 (no anzobjcvn for 5.2) • 5.3 to 6.1.1 then to 7.1 •5.4 to 7.1 • Could do reload and jump releases also /additional risk, time and $$ •Reference material for release upgrades/recovery etc. •http://www01.ibm.com/support/docview.wss?rs=0&dc=DB520&dc=D900&dc=D800&dc=DA900&dc=DA800&q1=V5R4M5 +AND+AS400KBXXYYZZRCH&uid=nas1b6c5ed39e84670648625740f007c74e3&loc=en_US&cs=UTF8&lang=all BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 5 ADVANCED SYSTEM DESIGNS Confidential > OS Compatibility • Release Upgrade Pre-Install Verification tool • https://www14.software.ibm.com/webapp/iwm/web/reg/download.do?source=ipvt&S_PKG=dl3&lang=en_US • GUI that will guide you through the upgrade planning and preparation process • More Doc! Getting ready for 6.1.1 and beyond! •http://www.redbooks.ibm.com/redpieces/abstracts/redp4293.html?Open BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 6 ADVANCED SYSTEM DESIGNS Confidential > Hardware Compatibility • Power 7 requires 6.1.1 or 7.1 • May Require a server firmware update on current machine to go to 5.4 or beyond •http://www912.ibm.com/s_dir/slkbase.NSF/c32447c09fb9a1f186256a6c00504227/23c4789ba6f5321886256fd300586b7f ?OpenDocument • May require a HMC code update also •http://www-912.ibm.com/s_dir/slkbase.NSF/DocNumber/408316083 • Partition considerations – all must be at 6.1.1 or above on P7 BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 7 ADVANCED SYSTEM DESIGNS Confidential > Hardware Compatibility • NO HSL adapters or HSL attached towers supported on P7 • May require I/O replacement •What isn’t supported? •http://www-03.ibm.com/systems/power/hardware/sod2.html • Common things not supported on P7 • IOPs, QIC tape drives, twinax, IOP based IOAs, SCSI 10k RPM drives and drives 35Gb and smaller BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 8 ADVANCED SYSTEM DESIGNS Confidential > Hardware Compatibility • P5-P6 upgrades supported through year end • P6-P7 upgrades supported now Link for all planning hw/software and release planning information http://www-947.ibm.com/systems/support/i/planning/upgrade/futurehdwr.html#power7 • Not sure what code is required? Use the ‘prerequisite’ checker •https://www-912.ibm.com/e_dir/eserverprereq.nsf BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 9 ADVANCED SYSTEM DESIGNS Confidential > Cost Factors • May have to replace some/all of the current IO to go to P7 • Application Vendors may charge for SW on the new system based upon CPW not P group • Might need a new HMC •OS Licensing and 5250 Requirement • Disposal cost of old system •Economic Sales Replacement tool /Consolidate multiple servers BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 10 ADVANCED SYSTEM DESIGNS Confidential > Financial Status of Machine •Is the machine on lease? •Operating vs. Capital • Purchased? • Fully depreciated? • Lease sellback •Diminimous •If you need it you need it BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 11 ADVANCED SYSTEM DESIGNS Confidential > Migration/Downtime • If you are on a P5 or below – and want to maintain some of your I/O consider P6 • If you have significant amount of unsupported hardware for P7 / consider P6 • If you cant go to 6.1.1 – consider P6 • If you are on 5.2 or old hardware and can go to 6.1.1 – P7 might be a fit •If you are on P6 and want to maintain an upgrade path go to P7 BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 12 ADVANCED SYSTEM DESIGNS Confidential > Migration/Downtime • If you want to take advantage of the P7 benefits – planning will be key • If you can go to 7.1 consider P7 • If you want the latest and greatest – go to P7 •Migration Consideration: If you are replacing disk unless you use a Mimix type product you will probably be reloading, make sure you have compatible media types on source and target machine. BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 13 ADVANCED SYSTEM DESIGNS Confidential > Migration/Downtime • The number of partitions will impact the downtime • Skipping releases will increase the downtime •The time to perform object conversion will effect downtime • Time for saves/restore will effect the downtime •Type of migration will impact the downtime – hardware/OS can be staged ahead of time BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 14 ADVANCED SYSTEM DESIGNS Confidential > Performance • Careful planning required • In most cases CPW increases are significant •Ensure a commensurate amount of memory is added • Review I/O rates and model drive reduction with WLE or other tools http://www-912.ibm.com/wle/EstimatorServlet • Identify and document current bottlenecks to help justify a P7 BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 15 ADVANCED SYSTEM DESIGNS Confidential > Preguntas? BUSINESS INTELLIGENCE Solutions NETWORK &SECURITY Solutions IBM Solutions MICROSOFT Solutions 16