DEH CHO BRIDGE PRESENTATION TO MOTOR CARRIERS October 2012 INTRODUCTION • Benefits of Deh Cho Bridge • Overview of Tolling System – Toll Structure – Infrastructure – Enforcement/Regulation • Questions and Comments OVERALL BENEFITS • Year Round Uninterrupted Access • Reduced Vulnerability to the Effects of Climate Change • Reduced Energy Consumption and Greenhouse Gas Emissions in Trucking and Ferry Operations • Reduced Risk of Fuel Spills • Reduced Cost of Living • Increased Economic Development, esp. from Tourism • Reduced Sense of Isolation INDUSTRY BENEFITS • • • • • • • • Reduced Down Time for Equipment Greater Certainty for Supply Chain / JIT Delivery Increased Cycle Time Reduced Fuel Consumption - Emissions Increased Competitiveness with Southern Firms Shortened Delivery Time 24 Hour Service Reduced Warehousing Costs PRE-CLEARANCE • Partners in Compliance Program (PIC) Motor carrier safety program initiated in Alberta that rewards motor carriers with exemplary safety records. • The Department of Transportation has signed an MOU with the Alberta Motor Transport Association to expand PIC to the NWT. • The transponders used in the Deh Cho Bridge tolling system are also being used to support the PIC program in Alberta. INFRASTRUCTURE COMMERCIAL TOLL TOLLING – Northbound Commercial Vehicles > 4500 kg. – Number of Axles Category # of Axles A 2 to 4 B 5 and 6 C 7 and greater TOLL RATES/COLLECTION Category # of Axles Remittance Transponder Equipped A 2-4 $75.00 $91.25 B 5-6 $150.00 $166.25 C 7+ $275.00 $291.25 Single-use Toll Permit REMITTANCE AGREEMENTS • Benefits of becoming a Toll Remitter – Lower costs of toll permit – Remit payment monthly • Remittance documents available online at www.tolling.dot.gov.nt.ca TRANSPONDERS • Required for Self Remitting • Transponder Industry Standard • Unique to Each Vehicle. TRANSPONDERS • Transponders must be registered with International Road Dynamics (IRD) – transponder.admin@irdinc.com • To register a transponder with IRD, clients must provide: – Vehicle registration information – photograph of the passenger side of the vehicle INFRASTRUCTURE Enterprise Scale • Transponder Check • Future Pre-Clearance TECHNOLOGY • Transponder • Axle Count • Weight • Photos ENFORCEMENT • On Road Enforcement - Focus on non-remitting carriers • Electronic Enforcement - Focus on carrier compliance AUTOMATED ENFORCEMENT • Automated Analysis - Vehicle Registrations - Permits, Toll, Fuel Tax - Over-dimensional/overweight Permits - Speed FINES • $1,725 Failing to pay or arrange to pay for toll. • $2,875 Evading, obstruction, interfering or tampering with tolling. • $575 Obstructing a Transport Officer • $115 Failing to display owner information on the side of your vehicle. DEH CHO BRIDGE UPDATE • Construction Update • Bridge opening QUESTIONS? DEH CHO BRIDGE - NUTS 'N' BOLTS Total Length: 1,045 m Total weight of structure: 49,923 tonnes Road (Deck) width: 10.4 m Maximum traffic load: 2,000 tonnes Deck height above river: 30.55 m (48 Super B tankers) Pylon Tower peak height: 53.85 m Temperature range at Ft. Providence Widest span between piers: 190 m (daily mean): +25 C to -44 C Tonnes of Steel: 11,636 Canadian manufacturing content: 98% Total length of 24 cables: 1,434m Cost: $202 million Design Life: 75 years