A3-14(AG01)028-IWD Study Committee B3 STUDY COMMITTEE B3 STUDY COMMITTEE B3 Prepared by Slawomir SAMEK in February 2014 SUBSTATIONS Design, construction, maintenance and ongoing management of substations and electrical installations in power stations (excluding generators) SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 STUDY COMMITTEE B3 STUDY COMMITTEE 24 Regular Members, 14 Observer Members, 2 Special Reporters, all WB Convenors Advisory Area AA1 CONCEPTS & DEVELOPMENTS Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 Advisory Area AA3 Advisory Area AA4 AIR INSULATED SUBSTATIONS SUBSTATION MANAGEMENT SC B3 for SC A3, Delft, 12th March, 2014 STUDY COMMITTEE B3 Study Committee B3 Study Committee Chairman Terry KRIEG SAG CAG Terry KRIEG Michael MACKEY SC Secretary Claude COUNAN (Romain MIGNE) TAG Piet KNOL AA1 AA2 AA3 AA4 Mark OSBORNE Peter GLAUBITZ Akira OKADA Johan SMIT SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 MEETINGS 49th SC B3 meeting on 30th August 2012 in Paris 50th SC B3 meeting on 12th September 2013 in Brisbane, together with SC B3/D1 colloquium 51st SC B3 meeting on 28th August 2014 in Paris SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Strategic Advisory Group SAG KEY TASKS: Update of the Strategic Plan and of the Action Plan Discussing and preparing proposals for future activities Propose new Working Groups Screening and reporting of the activities of Working Groups and SC members Selection and preparation of future meetings or events Issuing proposals to the Technical Committee Cooperation with other international bodies such as IEE, IEEE, CIRED, VDE SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Customer Advisory Group CAG ACTIVITIES: Identify opportunities to increase customer satisfaction Collect relevant feedback from CIGRE customers Prioritize new work and suggest preferential subjects Develop and implement concepts for active communication with customers Report on the above for discussion during the meetings of the Study Committee SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Customer Advisory Group CAG TARGET GROUPS: Engineers and managers in the electrical power industry Consultants/Contractors Utilities Investors/Owners Non-engineer personnel of utilities, power plants Governmental or non-government agencies Regulators Universities Young engineers and students SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Tutorial Advisory Group TAG ACTIVITIES: ELECRAMA 2012 (India, 20/21 January): Responsible use of SF6 (P. Glaubitz) Standardization vs. Innovation in substation design (T. Krieg) Joint D1/B3 Colloquium 2013 (Australia, 11 September): SF6 - What are the Issues? (T. Krieg) International Situation - Regional Issues (P. Glaubitz) SF6 Analysis and GIS Residual Life Management (E. Duggan, K. Pohlink) SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Tutorial Advisory Group TAG ACTIVITIES: Discussion tutorial subjects for the SCB3 meeting in 2015 and possible other events Stimulate WG’s to provide tutorials as an delivery SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs SAG, CAG, TAG ACTIVITIES: SAG/CAG/TAG Meeting, 7 ÷ 9 May, 2014, The Netherlands SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA1 CONCEPTS & DEVELOPMENTS WG B3.13 „ Reducing replacement time of HV equipment” (Francois Gallon) - struggling with membership Technical Brochure due 2013. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA1 CONCEPTS & DEVELOPMENTS JWG B3/C1/C2.14 „Circuit configuration optimisation” (Gerd Lingner) No C2 membership. One Corresponding member from C1. Technical Brochure was sent for approval in August 2013. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA1 CONCEPTS & DEVELOPMENTS WG B3.35 „Substation Earthing System design optimisation through the application of quantified risk analysis” (Bill Carman) Final Report 2016. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA1 CONCEPTS & DEVELOPMENTS WG B3.36 „Special considerations for AC collector systems and substations associated with HVDC connected wind power plants” (Peter Sanderberg) Technical Brochure due 2013. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA1 CONCEPTS & DEVELOPMENTS FUTURE WORK TOPICS NEW TERMS OF REFERENCE (TOR) IN DEVELOPMENT DC Substation requirements, Impact of cables on substation design, Recommendations for design and operation of rural substations, Impact of NCIT on substation design - adapting design for IEC 61850, location of Control and Protection, Lightning protection for substations. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 WG B3.24 „Benefit of Partial Discharge diagnosis on Gas Insulated Switchgear condition assessment” (Mark Reuter) Technical Brochure 2015. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 WG B3.25 „SF6-analysis for AIS, GIS and MTS Condition Assessment” (Eamonn Duggan) TB No 567 SF6 Analysis for AIS, GIS and MTS Condition Assessment was published in February 2014. Report with the some title was published in ELECTRA, No 272, February 2014. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 JWG B3/B1.27 „Factors for investment decision GIL vs. Cables for AC Transmission” (Hermann Koch) Publication scheduled for 2014. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 WG B3.29 „Field Tests Technology on UHV Substation during construction and operation” (Guangfan Li) TB No 562 Field Tests Technology for UHV Substations was published in December 2013. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 WG B3.30 „Guide to minimize the use of SF6 during routine testing of electrical equipment”(Silvio Stangherlin) A draft of the Technical Brochure was sent to SC B3 members in February 2014 - internal approval in SC B3 by February 28, 2014. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 JWG B1/B3.33 „Common dry type interfaces for GIS connections above 52 kV for Extruded AC cables” (Pierre Mirebeau) Publication scheduled for 2013/2014. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 WG B3.37 „Internal arc effects in medium voltage switchgear (1÷52 kV) - mitigation techniques” (Didier Fulchiron) ToR approved 07/2013. Target: fault current limitation in MV GIS/AIS review methods, mapping of existing technical solutions, review of standards and specifications, benefits, guidance for the user on relevant selection parameters. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 WG B3.37 „Internal arc effects in medium voltage switchgear (1÷52 kV) - mitigation techniques” (Didier Fulchiron) 22 experts currently proposed from 10 National Committees. Web page and collaboration area set-up. Final report scheduled in 2017. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 JWG D1/B3.57 „Dielectric Testing of gasinsulated HVDC Systems” (Claus Neumann) Report in ELECTRA or Technical Brochure with summary in ELECTRA - 2016. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 FUTURE WORK TOPICS NEW TERMS OF REFERENCE (TOR) IN DEVELOPMENT Measuring the parameters of SF6 Gas, HV DC GIS Switchgear, The impact on GIS based on the implementation of NCIT technology. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 FUTURE WORK TOPICS NEW TERMS OF REFERENCE (TOR) IN DEVELOPMENT WG B3.39 „Impact of NCIT applications on HV Gas Insulated Switchgear” (Karsten Pohlink) Start: Final report: 2014 2017 SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA2 GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 FUTURE WORK TOPICS Mobile substations, Influence of HV testing (GIS cable) on GIS, GIS-single line diagram layout - Gas compartment optimization and service continuity, GIS interfaces, extension, maintenance concepts. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA3 AIR INSULATED SUBSTATIONS WG B3.23 „Guidelines for Uprating & Upgrading of Substations” (Hiroshi Imagawa) TB No 532 Substation Uprating and Upgrading was published in April 2013. Report with the some title was published in ELECTRA, No 267, April 2013. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA3 AIR INSULATED SUBSTATIONS WG B3.31 „Air Insulated Substations Design for Severe Climate Condition” (Mark McVey) Publication in ELECTRA June 2014 / Technical Brochure August 2014. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA3 AIR INSULATED SUBSTATIONS WG B3.32 „Saving through Optimized Maintenance of Air Insulated Substations” (Hugh Cunningham) Publication in ELECTRA September 2014 / Technical Brochure December 2014. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA3 AIR INSULATED SUBSTATIONS WG B3.38 „Management of risk in Substations” (Gerald Buchs) Start: Summary in ELECTRA: Technical Brochure: Tutorial: March 2014 October 2017 December 2017 2017 SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA3 AIR INSULATED SUBSTATIONS FUTURE WORK TOPICS NEW TERMS OF REFERENCE (TOR) IN DEVELOPMENT Substation earthing system design optimisation deterministic and probabilistic approach SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA4 SUBSTATIONS MANAGEMENT WG B3.06 „Substation Management” (Johan Smit) TF01: Revision of a document on contracting of maintenance outsourcing. / Publication at the Doble Conference in Boston, March 25÷30, 2012. Practical Guide for the Outsourcing of Asset Management Services is finalized SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA4 SUBSTATIONS MANAGEMENT WG B3.06 „Substation Management” (Johan Smit) TF05: Practical Application of asset management information strategies. TB No 576 IT Strategies for Asset Management of Substations – General Principles was published in April 2014. The majority of active members of WG B3.06 transfer their activities to WG B3.34. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA4 SUBSTATIONS MANAGEMENT SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 Overview of SC B3 running WBs Advisory Area AA4 SUBSTATIONS MANAGEMENT WG B3.34 „Expected Impact of Future Grids on Substation Management” (Johan Smit) The WG expects to issue a final Technical Brochure in 2014. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Green Book Schedule Still early days on the SC B3 Green Book. SC B3 agreed to proceed at the Paris 2012 session. Discussion at Brisbane 2013. Duration will be approximately 2÷3 years. SC B3 for SC A3, Delft, 12th March, 2014 SC B3 GREEN BOOK Study Committee B3 Organisation for Substation Reference Book Chapter Title Chapter Manager Introduction John Finn Planning and Concepts John Finn Air Insulated Substations Vacant Gas Insulated Substations Vacant Mixed Technology Substations and Gas Insulated Lines Tokio Yamagiwa UHV and Offshore Substations Takeshi Yokota Secondary Installations John Ainsworth Environmental Effect of and on Substations Jarmo Elovaara Substation Management Issues Johan Smit Future Trends Mark Osborne SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Organisation for Substation Reference Book CHAPTER 1 INTRODUCTION • Explain purpose of the book and how to use it SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Organisation for Substation Reference Book CHAPTER 2 PLANNING AND CONCEPT • • • • • • • • • • Turnkey substations Combining innovation and standardization Functional specs and evaluation Philosophy of substation reliability Use of computers in design and building of stations Substation design process Effect of safety regulations on design of substations Evaluation of different switchgear technologies Substations bus-switching arrangements - requirements and reliability New functionalities on Substation design SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Organisation for Substation Reference Book CHAPTER 3 AIR-INSULATED SUBSTATIONS • • • • • • • • • • • Cost reduction AIS Renewal AIS Mechanical aspects AIS: various brochures and papers available Design of AIS, mechanical effects of short-circuit currents, stiff busbars, aeolian vibration tubular busbars, dynamic short-circuit stress of busbar structures, paper-oil measurement transformer Influence of clearance distances on price of 420 kV outdoor substations Measurement of short-circuit stresses on rigid conductor busbar systems Thermal and dynamics effects of heavy short-circuit currents in HV ss Phase to ground and phase to phase air clearances in substations Uprating and upgrading Seismic performance existing stations Foundations of steel and prefab concrete SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Organisation for Substation Reference Book CHAPTER 4 GAS-INSULATED SUBSTATIONS • GIS: economical and environmentally optimized design, installation and maintenance experience, database, earthing, condition monitoring, uprating and upgrading, various brochures and Electra papers, transient ground potential rise in GIS, pressure rise in GIS (single phase type), disconnect switches, grounding switches, work conditions for maintenance, • Arrangement metal enclosed substations • Enclosures for gas filled electrical equipment • Effect of current rating on cost of metal-clad HV switchgear • Testing of metal enclosed HV stations SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Organisation for Substation Reference Book CHAPTER 5 MIXED TECHNOLOGY SUBSTATIONS • Explain the relevance and use of mixed technology equipment within substations SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Organisation for Substation Reference Book CHAPTER 6 UHV AND OFFSHORE SUBSTATIONS • Off-shore substations • Requirements UHV substations, reliability in design, repair and maintenance tines, integrated mechanical design open type UHV substations • Insulation characteristics of SS up to 765 kV • Planning, design and operation of future substations SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Organisation for Substation Reference Book CHAPTER 7 SECONDARY INSTALLATIONS • Secondary installations, application policy, design and maintenance practice, design and installation of equipment, secondary systems interface modeling, change management, acceptance tests digital systems, control system selection, design and operating experience computer based systems, reliability of substations with regard to secondary equipment., EMI in secondary systems • Instrument transformer technology and service behaviour; several papers, new principles in GIS SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Organisation for Substation Reference Book CHAPTER 8 ENVIRONMENTAL IMPACT OF AND ON SUBSTATIONS • Handling, recycling, disposal, status, reuse • SF6 mixtures • Substation environmental impact SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Organisation for Substation Reference Book CHAPTER 9 SUBSTATION MANAGEMENT ISSUES • • • • • • • Replacement management Condition monitoring management Substation security Asset management electric infrastructure Substation reliability. Comparison of two methods Maintenance of SS in technical, economical and organisational respect Dynamic loading of transmission equipment SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Organisation for Substation Reference Book CHAPTER 10 FUTURE TRENDS • Much of this chapter will need to be written as new because the previous work on future trends is well over ten years old and we should be up to date at least at first publication SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Organisation for Substation Reference Book The idea to prepare a chapter covers maintenance issues, and particularly live working maintenance in substations is under consideration. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SC B3 GREEN BOOK Guide Book for SF6 CIGRE Green bank on SF6 using the available and upcoming SF6 brochures SC B3 for SC A3, Delft, 12th March, 2014 CIGRE SC B3 AND D1 JOINT COLLOQUIUM Study Committee B3 B3/D1 International Colloquium and Study Committee Meeting Brisbane, Queensland Australia - September 8th ÷ 13th, 2013 MANAGING SUBSTATIONS IN THE POWER SYSTEM OF THE FUTURE Trends in Technology, Design, Materials and Diagnostics PREFERRENTIAL SUBJECTS: 1. Latest Developments in Substation Design. 2. Impact of Modern Materials and Emerging Test. Techniques on Substation Equipment 3. Life Cycle Management and Maintenance. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 PARIS SESSION 2014 STUDY COMMITTEE B3 PREFERRENTIAL SUBJECTS PS1 SUBSTATION DEVELOPMENTS TO ADDRESS FUTURE NEEDS • Integration of new approaches to grid automation in transmission and distribution substations, • Impact of new grid developments on substation design. • Off shore substations, • Low cost and fast deployment distribution substations. PS2 LIFE-CYCLE MANAGEMENT OF SUBSTATIONS • Renovation, refurbishment, extension and up-rating of substations, • Asset management, maintenance, monitoring, reliability and sustainability issues, • Managing risk in design, installation and operation of substations. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 NAGOYA MEETING 2015 CIGRE SC A3 & B3 Joint Colloquium / Tutorial Challenges for Further Reliable HV/MV Substation and Equipment in the Future (tentative) SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 NAGOYA MEETING 2015 CIGRE SC A3 & B3 Joint Colloquium / Tutorial Underground Substation Nagoya Castle SC B3 for SC A3, Delft, 12th March, 2014 PROPOSALS FOR SC A3 FUTURE ACTIVITY Study Committee B3 PROPOSALS WITH RELATION TO SC B3 1. Solutions for severe climate conditions. 2. Development of solutions for power evacuation from off shore wind farms. 3. DC solutions for power evacuation from wind farms. 4. Green book. 5. The evolution of substations for 2050. 6. The environmental footprint of substations. SC B3 for SC A3, Delft, 12th March, 2014 PROPOSALS FOR SC A3 FUTURE ACTIVITY Study Committee B3 PROPOSALS WITH RELATION TO SC B3 after discussion during Brisbane meeting 1. Secondary and monitoring systems of HV Equipment. SC B3 for SC A3, Delft, 12th March, 2014 Study Committee B3 SEE YOU IN PARIS Thank you very much for your attention See you in Paris please send your questions and comments to S.Samek@energoprojekt.krakow.pl SC B3 for SC A3, Delft, 12th March, 2014