ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010 Alstom Nuclear Equipment At the heart of the Nuclear Power Plant Nuclear island Turbine island Balance of Plant AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 2 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Alstom Nuclear Equipment Fitting all type of reactors • EPR • VVER1200 • AP1000 • 700 MWe PHWR (India) • Kerena AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 3 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Alstom Nuclear Equipment Best Performance out of Any Nuclear Reactor • Best efficiency with single flow expansion: - Proven combined HP/IP module. Continuous R&D developments. • Excellent Reliability: - 300,000 Operating Hours experience. • Solid welded rotor: - Best resistance to Stress Corrosion Cracking. Secured supply chain. Chooz first ARABELLE • Mature family of last stage blades: - Oskarshamn 3 Last stage Blade (1750 mm) is world longest operating blade since 2009. • Design for low maintenance cost: - Reliability and durability proven by 300,000 Operating Hours experience. Oskarshamn 3 LP Rotor AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 4 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Key Player of Nuclear Renaissance Main contracts in Execution (New and Retrofit) Switzerland • Leibstadt Mexico • Laguna Verde 1+2 France • Flamanville 3 USA • Calvert Cliffs 3 • North Anna 1+2 • Surry 1+2 • Quad Cities 1+2 • Dresden 2+3 • Peach Bottom 2+3 • San Onofre 2+3 • Fort Calhoun South Africa • Koeberg 1+2 Sweden • Ringhals 4 South Korea • Ulchin 1+2 Finland • Olkiluoto 1+2 Legend •New Equipment •Retrofit China • Ling Ao 3+4 • Taishan 1+2 • Hongyanhe 1-4 • Ningde • Fuqing • Fangjiashan 1 + 2 AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 5 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Main contracts in Execution Flamanville 3, 1750 MWe in France • Turbine Island excluding Civil: • Power Conversion systems, transportation and site erection. • Other Equipment such as: • Circulating Water pumps, Emergency Generator, etc. April 2010 World largest ARABELLETM steam turbine March 2010 Lifting of an LP heater at site AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 6 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Main contracts in Execution Quad Cities 2, 900 MWe Retrofit in USA • Supply of 3 Low Pressure Turbine inner block retrofits and full Installation. MWe output uplift guarantee provided. • Installation completed within the 24 day, turbine synchronized on 18th April 2010. • Quad Cities 2 is the first of six Nuclear retrofit projects with Exelon, the last being completed in 2014, each designed to increase the efficiency, reliability and capacity of each power plant. Steam Turbine rotor, Chattanooga facility AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 7 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. A worldwide organization A global business footprint … Levallois: • Execution centre • Nuclear systems integration R&D Chattanooga: • Execution center • Calvert Cliffs 3 project management St Petersburg: • AAEM execution center • Tendering support and local supply chain development India: • Execution center • Local sourcing Wuhan: • Engineering Execution center • Local supply chain development AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 8 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. A worldwide organization …relying on a global manufacturing network • Rotating Machines: Beijing, Belfort, Bexbach, Birr, Elblag (Foundry), Elblag (Turbines), Chattanooga (turbines), Mannheim, Morelia, Wroclaw. • Static Equipment: Budapest, Brno, Durgapur, Neumark, Sizhou, Setubal, Surabaya, Wuhan , Chattanooga (boilers). • Service Factories: Berlin, Richmond, Bucharest T, Bucharest G, Rugby, Sesto, Gatineau, Stafford, Karlovac. • Other factories: Shahabad, Wellsville, Concordia, Kassel, Vinhedo, Osaka, Shanghai. Rotating Machines Static Equipment Service Factories Other Factories AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 9 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. A worldwide organization Alstom is extending its nuclear activity INDIA • • USA • • • • • Alstom Technology has been selected by NPCIL and BHEL for the new 700 MW Indian designed PHWR Nuclear power plant program. Alstom is working with Areva on the EPR project Jaitapur for NPCIL, to supply Conventional Island. Manufacturing and engineering of large equipment for nuclear, gas new and retrofit in Chattanooga Operational in June 2010 World’s largest balancing facility Easy access to 80% of existing or planned US nuclear power plants 350.000 m2 under a single roof AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 10 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Alstom’s nuclear activity in Russia Alstom set-up Joint Venture AAEM with AEM, Rosatom affiliate. 49% 51% License to manufacture turbine - generator equipment based on ARABELLE™ technology AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 11 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Alstom’s nuclear activity in Russia • Good progress in Technology Transfer to AAEM JV. • Alstom is ready for the next steps: - To develop manufacturing in Russia and execute projects based on VVER1200 reactors. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 12 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. www.alstom.com AAEM manufacturing facility in Podolsk Renovation project Workshop space: ~ 53,000 sq. m. Office space: ~ 15,000 sq.m. Employees: ~ 840. Special machines and tools: 43 pcs. Heat treatment equipment: 14 pcs. Welding equipment: 29 pcs. Blanking equipment: 6 pcs. Automatic lines: 2 pcs. Stands and benches: 51 pcs. Презентация - 01/01/2007 - P 14 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Transfer and adaptation of technical information is up and running at the JV Заказчики Customers АЭМ AEM Поставщики Suppliers ALSTOM ALSTOM Защищенный Secure VPN channel VPN Канал between связи АльстомAlstom and AAEM ААЭМ Санкт-Петербург St. Petersburg ИнженерныйCentre центр Engineering Workstations Подольск Podolsk ААЭМ Input-output devices, servers Производство Manufacturing Input-output devices, servers ERP Workstations ● A common information space has been established to join the Engineering Centre in St.Petersburg and the manufacturing facility in Podolsk. ● The system for project information exchange (PIRS) allows AAEM’s integration into the common framework of data flow between Alstom and its partners. PDM AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 15 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.