Alstom Nuclear Equipment
At the heart of the Nuclear Power Plant
Nuclear island
Turbine island
Balance of Plant
AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 2
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Alstom Nuclear Equipment
Fitting all type of reactors
• EPR
• VVER1200
• AP1000
• 700 MWe PHWR (India)
• Kerena
AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 3
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Alstom Nuclear Equipment
Best Performance out of Any Nuclear Reactor
• Best efficiency with single flow expansion:
-
Proven combined HP/IP module.
Continuous R&D developments.
• Excellent Reliability:
-
300,000 Operating Hours experience.
• Solid welded rotor:
-
Best resistance to Stress Corrosion Cracking.
Secured supply chain.
Chooz first ARABELLE
• Mature family of last stage blades:
-
Oskarshamn 3 Last stage Blade (1750 mm) is
world longest operating blade since 2009.
• Design for low maintenance cost:
-
Reliability and durability proven by 300,000
Operating Hours experience.
Oskarshamn 3 LP Rotor
AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 4
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Key Player of Nuclear Renaissance
Main contracts in Execution (New and Retrofit)
Switzerland
• Leibstadt
Mexico
• Laguna Verde 1+2
France
• Flamanville 3
USA
• Calvert Cliffs 3
• North Anna 1+2
• Surry 1+2
• Quad Cities 1+2
• Dresden 2+3
• Peach Bottom 2+3
• San Onofre 2+3
• Fort Calhoun
South Africa
• Koeberg 1+2
Sweden
• Ringhals 4
South Korea
• Ulchin 1+2
Finland
• Olkiluoto 1+2
Legend
•New Equipment
•Retrofit
China
• Ling Ao 3+4
• Taishan 1+2
• Hongyanhe 1-4
• Ningde
• Fuqing
• Fangjiashan 1 + 2
AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 5
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Main contracts in Execution
Flamanville 3, 1750 MWe in France
• Turbine Island excluding Civil:
• Power Conversion systems, transportation and site erection.
• Other Equipment such as:
• Circulating Water pumps, Emergency Generator, etc.
April 2010
World largest ARABELLETM steam turbine
March 2010
Lifting of an LP heater at site
AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 6
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Main contracts in Execution
Quad Cities 2, 900 MWe Retrofit in USA
• Supply of 3 Low Pressure Turbine inner
block retrofits and full Installation. MWe
output uplift guarantee provided.
• Installation completed within the 24 day,
turbine synchronized on 18th April 2010.
• Quad Cities 2 is the first of six Nuclear
retrofit projects with Exelon, the last being
completed in 2014, each designed to
increase the efficiency, reliability and
capacity of each power plant.
Steam Turbine rotor, Chattanooga facility
AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 7
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
A worldwide organization
A global business footprint …
Levallois:
• Execution centre
• Nuclear systems
integration R&D
Chattanooga:
• Execution center
• Calvert Cliffs 3 project
management
St Petersburg:
• AAEM execution center
• Tendering support and
local supply chain
development
India:
• Execution center
• Local sourcing
Wuhan:
• Engineering Execution
center
• Local supply chain
development
AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 8
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
A worldwide organization
…relying on a global manufacturing network
• Rotating Machines: Beijing, Belfort,
Bexbach, Birr, Elblag (Foundry), Elblag
(Turbines), Chattanooga (turbines),
Mannheim, Morelia, Wroclaw.
• Static Equipment: Budapest, Brno,
Durgapur, Neumark, Sizhou, Setubal,
Surabaya, Wuhan , Chattanooga (boilers).
• Service Factories: Berlin, Richmond,
Bucharest T, Bucharest G, Rugby, Sesto,
Gatineau, Stafford, Karlovac.
• Other factories: Shahabad, Wellsville,
Concordia, Kassel, Vinhedo, Osaka,
Shanghai.
Rotating Machines
Static Equipment
Service Factories
Other Factories
AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 9
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
A worldwide organization
Alstom is extending its nuclear activity
INDIA
•
•
USA
•
•
•
•
•
Alstom Technology has been
selected by NPCIL and BHEL for
the new 700 MW Indian designed
PHWR Nuclear power plant
program.
Alstom is working with Areva on
the EPR project Jaitapur for
NPCIL, to supply Conventional
Island.
Manufacturing and engineering of
large equipment for nuclear, gas
new and retrofit in Chattanooga
Operational in June 2010
World’s largest balancing facility
Easy access to 80% of existing or
planned US nuclear power plants
350.000 m2 under a single roof
AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 10
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Alstom’s nuclear activity in Russia
Alstom set-up Joint Venture AAEM with AEM,
Rosatom affiliate.
49%
51%
License to manufacture turbine - generator equipment based on
ARABELLE™ technology
AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 11
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Alstom’s nuclear activity in Russia
• Good progress in Technology Transfer to AAEM JV.
• Alstom is ready for the next steps:
- To develop manufacturing in Russia and execute projects
based on VVER1200 reactors.
AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 12
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
www.alstom.com
AAEM manufacturing facility in Podolsk
Renovation project
Workshop space: ~ 53,000 sq. m.
Office space: ~ 15,000 sq.m.
Employees: ~ 840.
Special machines and tools: 43 pcs.
Heat treatment equipment: 14 pcs.
Welding equipment: 29 pcs.
Blanking equipment: 6 pcs.
Automatic lines: 2 pcs.
Stands and benches: 51 pcs.
Презентация - 01/01/2007 - P 14
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Transfer and adaptation of technical
information is up and running at the JV
Заказчики
Customers
АЭМ
AEM
Поставщики
Suppliers
ALSTOM
ALSTOM
Защищенный
Secure VPN
channel
VPN Канал
between
связи АльстомAlstom and
AAEM
ААЭМ
Санкт-Петербург
St. Petersburg
ИнженерныйCentre
центр
Engineering
Workstations
Подольск
Podolsk
ААЭМ
Input-output
devices,
servers
Производство
Manufacturing
Input-output
devices,
servers
ERP
Workstations
● A common information
space has been established
to join the Engineering
Centre in St.Petersburg and
the manufacturing facility in
Podolsk.
● The system for project
information exchange
(PIRS) allows AAEM’s
integration into the common
framework of data flow
between Alstom and its
partners.
PDM
AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 15
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.