Overview of USAID Studies for the Diamer Basha Dam Project

advertisement

Overview of USAID Studies for the Diamer

Basha Dam Project

Michael R. Curtis, Ph.D.

Director, Energy Office

USAID/Pakistan

1

Step 1 - Rapid Data Review - completed

Rapid Data Collection

To collect data, information, and copies of studies and reports prepared by the GOP and other partners

Rapid Gap Analysis

Identify gaps in the existing data, information and analyses in comparison to international best practices

Scopes of Work (detailed analysis)

Technical Environmental Financial

2

USAID Support – Step 2

• Environmental and Social Impact Assessment

Required under the U.S. Government Laws

– Initiated Environmental and social Impact Assessment

– Hired internationally credible consulting company

– Estimated time – 24 months (September 2016)

• Financial Assessment

Pave the way for financing of the Project

Help GOP develop a realistic financing plan

RFP issued for hiring international investment firm

– Estimated time – 12 months (Nov/Dec 2015)

• Technical Assessment

Review the dam type and design, Vis-

à-vis seismology, other geographic conditions, construction phasing and value engineering

– RFP issued to hire international consulting firm

Estimated time

– 12 months (Nov/Dec 2015)

3

Coordination with International Financers/Donors

• Our efforts are to ensure that the plans meet requirements of international donors/financers.

• Coordinating with the ADB to review the studies and outcomes of the work

4