INTERACTIVE SPACE OAS EDUCATION BREAKFAST SEMINAR Traditional versus Design & Build procurement for an office relocation OAS EDUCATION INTERACTIVE WORKING INTERACTIVE WORKING Client References OAS EDUCATION INTERACTIVE WORKING 4 Stages These are the 4 Stages to a relocation project SPACE ANALYSIS SPACE PLANNING, INTERIOR DESIGN, IT AND M&E BUILDING APPRAISAL STAGE 1 STAGE 2 STAGE 3 Your future office space needs The image for your new offices The programme for the project Specific technical requirements A space plan to show fit for shortlisted buildings Information on flexibility for each building Report & validation of A/C and Elecs Technical Support for your Agent in negotiating the lease OAS EDUCATION INTERACTIVE WORKING Construction drawings Specifications of work Design coordination Budget control Tender process CONSTRUCTION AND RELOCATION STAGE 4 Fitting Out the new Space Working drawing packages Approvals Quality assurance, CDM The MOVE TRADITIONAL ROUTE TEAM STRUCTURE Client Main Board or CEO CLIENT STEERING GROUP PROJECT MANAGER (Contract Administrator) & MAIN CONTRACTOR COST CONSULTANT M & E Engineers OAS EDUCATION INTERACTIVE WORKING DESIGN TEAM DESIGN & BUILD TEAM STRUCTURE Client Main Board or CEO CLIENT STEERING GROUP PROJECT MANAGER? (Contract Administrator) & D&B CONTRACTOR COST CONSULTANT? M & E Engineers Or subcontractors OAS EDUCATION INTERACTIVE WORKING DESIGN TEAM OFFICE RELOCATION / REORGANISATION Business Issues Factors the Client needs to consider Reduce costs Location benefits Property Issues Market conditions Quantity of space Team working Image and Style Lease end Lease & Rental levels Budget Overheads IT strategy Workplace Communications INTERACTIVE WORKING Growth & Change Acquisition Recruit & retain staff Dilapidations OAS EDUCATION Flexible working Image and Culture Issues HOW DO WE DEFINE YOUR PROJECT? WHO By understanding your business We need to get to know you in order to understand how you work, what processes you use and what your future plans are. WHAT BUSINESS PLATFORM There is an optimum quantity and type of office space that will allow your company to function efficiently. It is our role to define that space. OAS EDUCATION INTERACTIVE WORKING WHERE HOW PROJECT OBJECTIVES / BRIEF The overall objective is for us to assist you in developing a Project Strategy for the new space that will identify: • • • • • • • OAS EDUCATION Space standards, i.e. how much space each person will need for each job function Your future office space needs i.e. exactly how many square feet your company will need, including expansion or contraction An idealised model of your organization showing the most effective adjacencies for your teams / departments Suggestions and ideas on the future use of space and new ways of working Specific technical requirements such as IT, power, air conditioning and ventilation The image you wish to portray to your Clients and Staff in a new building Timescales to show when the key decisions have to be made INTERACTIVE WORKING NEW WAYS OF WORKING Culture Hot desking Touchdown Hotelling New technologies: IT strategy Voice strategy “Video conferencing will be replaced by hologram 3D projection technology” OAS EDUCATION INTERACTIVE WORKING SPACE FORECASTING seats 70 277 Visitor Meeting Spaces Workspace Internal Meeting Spaces Support Spaces Net Usable Area 20% Circulation Net Internal Area 10% additional open plan desks over 5 years Open Plan Desks Staff Coats Additional Net Usable Area 20% Circulation Additional Net Internal Area OAS EDUCATION seats 25 25 INTERACTIVE WORKING sqm sqm 5.0 0.1 area 284.0 1,517.0 160.0 413.7 2,374.7 474.9 2,849.6 s qm 30,662 s qft Notes area 125.0 2.5 127.5 25.5 153.0 s qm 1,646 s qft Notes 10.3 s qm per pers on 111 s qft per pers on 10.0 s qm per pers on total 107 s qft per pers on total If a Space Audit saves you 5,000 sq ft, over a 10 year lease period the financial savings are significant: Saving in rent @ 55 per sq ft: 275,000 pa Service Charge @ 12 per sq ft: 60,000 pa Rates @ 28 per sq ft: 140,000 pa Total Saving over 10 years: £4,750,000 Excluding fees, fit out, maintenance, cleaning, dilapidations 3-person Office Open Plan Separate Open Plan Hot Desk 9.0 9.0 7.5 7.5 5.0 1 18.0 21.6 PA 1 7.5 9.0 Directors 3 15.0 18.0 HR 1 5.0 6.0 Facilities (incl recep) 3 22.5 27.0 Marketing 4 36.0 43.2 4 Compliance 2 18.0 21.6 2 Internal Audit 2 18.0 21.6 2 Underwriting 4 36.0 43.2 4 IT 3 17.5 21.0 1 1 3 1 3 1 PC1 Reinsurance 2 18.0 21.6 PC2 Motor Fleet 22 186.0 223.2 2 20 PC4 BEIB 3 33.0 39.6 1 2 PC6 Media 6 45.0 54.0 PC7 Sport & Travel 18 145.5 174.6 1 17 PC8 Speciality Markets 14 108.0 129.6 2 PC9 North America 59 457.5 549.0 4 PC10 Direct 3 22.5 27.0 3 Expansion 9 67.5 81.0 9 532.8 639.4 Support Facilities Total Area Area per person Total Area Area per person INTERACTIVE WORKING 18.0 CEO Total OAS EDUCATION 2-person Office Space Standards Single Office Required Area (incl 20% expansion) Required Area (Net) Division Headcount THE VALUE OF A SPACE AUDIT 2 2 6 160 1,810.0 2,172.0 sq m 11.3 13.6 sq m 19,476 23,371 sq ft 122 146 sq ft 12 6 40 9 5 20 6 114 9 6 90.0 180.0 54.0 855.0 67.5 30.0 BUILDING SEARCH CRITERIA Agent will advise on: The Client needs to know: • How much space • Location • Number of floors • Length of tenure • Flexibility – subletting / expansion space • Rent and rates • Image of building • Service charge • Budget for fit out • Incentives – rent free OAS EDUCATION INTERACTIVE WORKING • Technical needs: IT, M&E STAGE 2 SPACE ANALYSIS SPACE PLANNING, INTERIOR DESIGN, IT AND M&E BUILDING APPRAISAL STAGE 1 STAGE 2 STAGE 3 Your future office space needs The image for your new offices The programme for the project Specific technical requirements A space plan to show fit for shortlisted buildings Information on flexibility for each building Report & validation of A/C and Elecs Technical Support for your Agent in negotiating the lease OAS EDUCATION INTERACTIVE WORKING Construction drawings Specifications of work Design coordination Budget control Tender process CONSTRUCTION AND RELOCATION STAGE 4 Fitting Out the new Space Working drawing packages Approvals Quality assurance, CDM The MOVE VIEW SUITABLE BUILDINGS - THEN SHORTLIST OAS EDUCATION INTERACTIVE WORKING OBJECTIVE AND STRUCTURED COMPARISON OF BUILDINGS Floorplate Efficiency OAS EDUCATION Daylight Penetration Cellularisation Potential INTERACTIVE WORKING Fit Factor Column-free Space Sub-let Potential ONCE HEADS OF TERMS HAVE BEEN AGREED - DUE DILIGENCE SURVEYS AND THE EXCHANGE CONTRACTS: Measured survey M&E surveys and validations of systems Engineer or Subcontractor?? Building survey Structural survey Specialist reports – IT, telecoms, lifts OAS EDUCATION INTERACTIVE WORKING When should the Client decide on his procurement route? SPACE ANALYSIS SPACE PLANNING, INTERIOR DESIGN, IT AND M&E BUILDING APPRAISAL STAGE 1 STAGE 2 STAGE 3 Your future office space needs The image for your new offices The programme for the project Specific technical requirements A space plan to show fit for shortlisted buildings Information on flexibility for each building Report & validation of A/C and Elecs Technical Support for your Agent in negotiating the lease OAS EDUCATION INTERACTIVE WORKING Construction drawings Specifications of work Design coordination Budget control Tender process CONSTRUCTION AND RELOCATION STAGE 4 Fitting Out the new Space Working drawing packages Approvals Quality assurance, CDM The MOVE TRADITIONAL ROUTE TEAM STRUCTURE Client Main Board or CEO CLIENT STEERING GROUP PROJECT MANAGER (Contract Administrator) & MAIN CONTRACTOR COST CONSULTANT M & E Engineers OAS EDUCATION INTERACTIVE WORKING DESIGN TEAM Pros and Cons Traditional • The Client has complete control over the design and the quality of design Single set of construction drawings and single specification of works enabling a more transparent evaluation of like for like pricing at tender stage Cost certainty at key stages and overall costs are lower • Achievement of the most competitive price for the works • Transparent audit trail and demonstration of value for money Projects are fully designed and specified before tender = less risk to the Client and more control over the design OAS EDUCATION INTERACTIVE WORKING Lack of contractor involvement at design stage for advice on buildability and value engineering The Contractor may claim for works that are not included in the drawings or specification The Client may enter into many different contracts (PM, QS, Architect, M&E, CDM, Contractor, other Specialists…….) TRADITIONAL METHOD OF PROCUREMENT - Traditional OAS EDUCATION INTERACTIVE WORKING DESIGN & BUILD TEAM STRUCTURE Client Main Board or CEO CLIENT STEERING GROUP PROJECT MANAGER? (Contract Administrator) & D&B CONTRACTOR COST CONSULTANT? M & E Engineers Or subcontractors OAS EDUCATION INTERACTIVE WORKING DESIGN TEAM Pros and Cons Design & Build Excellent for smaller projects and smaller Clients eg below 5k. Design risk is with the contractor Choice of designs via a number of companies pitching Design to a margin? Uncertainty over end product Engineers or subcontractors (PI insurance)? Time consuming at the brief and tender stages. Overlap of design and construction and contractors expertise at design stage One company to deal with and good communications between designers and contractors Hard to evaluate costs and value for money at pitch stage More expensive. Overheads of Fit Out contractors are usually 15-20% lower than Design & Build contractors. D&B Contractor may present a less detailed specification and may claim for items of work not included for. OAS EDUCATION INTERACTIVE WORKING C404 UC152*152*30 C402 UC203*203*46 C407(?) RHS150*100*5.0 B415 UB305*165*46 5 B411 UB203*133*25 B.O.C 460 01SG109 150Ø 32 FCU 119 01SG109 01SG109 150Ø 01SG109 32 FCU 120 35Ø 01SG115 01SG115 32Ø 01SG115 01SG115 B305 UB457*191*67 100Ø RWP(7) FA & TB. C306 UC356*368*177 01SG115 01SG115 32Ø 01SG115 01SG109 01SG109 01SG109 01SG109 32Ø 2081 VCD 01SG109 150Ø 150Ø 32 FCU 101 VCD 150Ø 300 B.O.T: 460 150Ø 150Ø 01SG115 B316 UB305*165*46 01SG109 150Ø 01SG109 86 B.O.U: 345 HI GHLINE WH12CH (RH) 2235 VCD Z307 2301-WB02 150Ø 32Ø 32Ø 32 FCU 102 01SG109 1955 150Ø 2739 200mm LIGHTING/POWER BASKET 100mm FA BASKET B.O.C 460 250x100 B.O.D:300 B.O.D:300 HI GHLINE WH12CH (RH) VCD C302 UC305*305*137 01SG109 250x100 SU Z305 2301-WB02 32Ø 40Ø CHW F 40Ø CHW R 20Ø LTHW F 20Ø LTHW R C.L.P: 240 B.O.U: 345 50Ø CHW F 50Ø CHW R 20Ø LTHW F 20Ø LTHW R C.L.P: 240 B.O.D:300 2025 B.O.U: 345 150Ø VCD 150Ø Z308 2301-WB02 305*1 65 *46 32 FCU 103 VCD 150Ø HI GHLINE WH12CH (RH) B.O.D:300 VCD 150Ø VCD WH6C 104 B314 UB457*191*67 32 FCU 121 32 FCU 123 150Ø VCD 2067 32Ø B.O.T: 5269 460 B.O.D:475 1041 SU 300 SU B315 UKB457*191*106 450 4180 VCD 01SG109 01SG109 4353 B.O.D:300 B318 UB457*191*67 986 HIGHLINE WH6CH (RH) B.O.U: 345 4727 4577 4203 VCD SU SD VCD 01SG109 1200 SD 1687 SD 250x100 2739 450 SD 250x100 1463 150Ø B322 UB203*133*30 300x200B.O.D:325 B.O.D:475 T3 0 2R 802 C.L.D:225225Ø 955 321 1050 B.O.C 460 SU 5499 200mm LIGHTING/ POWER BASKET B.O.C 460 100mm FA BASKET 150Ø B.O.T: 460 L TH W 2 2MB 10 1 MAN IFOLBOU : 3 00 D 1692 01SG135 200Ø 3647 3500 B.O.U: 345 01SG135 5727 FTT 250x100 1312 1670 1520 32Ø 225Ø B.O.D:475 225 700 150Ø 2267 HI GHLINE WH12CH (RH) VCD S U 400x200B.O.D:325 2063 450 SD C.L.P: 240 150Ø C.L.P: 200VCD 4120 3970 B.O.U: 345 2343 730 32Ø 5631 300 VCD 137 3 2MB 10 1 C HW MAN IFOLBOU : 3 00 D 795 541 942 40Ø CHW F 40Ø CHW R 20Ø LTHW F 20Ø LTHW R VCD 32 FCU 124 B.O.D:475 SU 1737 VCD H (RH) FCU 150Ø 285 GRID 6 22Ø 450 HIGHL I NE 32 VCD 01SG135 C303 UC356*368*153 150Ø VCD VCD B.O .T: 460 1293 01S G117 SD 1546 2063 B.O.U: 405 SA HI GHLINE WH9CH (RH) 12 0*1 20 *132 FCU 122 0 200mm BASKET LIGHTING/ POWER TRAY 100mm460 FA BASKET B.O.C 32Ø 15 0Ø SPRINKL ERC.L.P: PIPE 3 00 1590 32Ø CHW F 32Ø CHW R VCD 01SG134 150Ø 150Ø VCD 150Ø B.O.T: 460 1572 160Ø VCD 32Ø 150Ø 150Ø VCD 932 250x100 B.O.D:475 1694 779 629 VCD VCD VCD 01SG134 SD 01SG133 1371 200Ø B.O.U: 345 946 200Ø VCD VCD 500x250 B.O.D:375 203 150Ø 180Ø 32Ø 450 1637 98 450 1341 150Ø 32Ø 3 2MB 10 6 C HW MAN IFOLBOU : 3 00 D B.O.C 145 450 2833 2583 B.O.T: 460 889 639 VCD 01SG134 32 FCU 126 B.O.C 460 B328 PFC-200*90*30 3360 B.O.T: 460 839 HI GHLINE WH9CH (RH) 01SG135 155 1963 B.O.T: 460 VCD Z315 2301-WB04 1501 1626 B.O.C 460 32Ø B.O.C 145 B327 PFC-200*90*30 HI GHLINE WH9CH (RH) B332 UB203*133*30 VCD 32Ø Z313 2301-WB02 B.O.C 145 HI GHLINE WH9CH (RH) S D 15 0Ø SPRINKL ERC.L.P: PIPE 3 00 B326 PFC-200*90*30 PFC-150*90*24 PLUS PLATE E105 RSA150*150*10 01SG134 B320 UB457*191*67 2265 180Ø 2439 32Ø E301 RSA150*150*10 E102 RSA150*150*10 E104 RSA150*150*10 B.O.U: 345 81 E305 RSA150*150*10 B323 PFC-200*90*30 TOWER CRANE 150Ø 150Ø Z111 2301-WB05 E117 RSA150*150*10 SERVICES WITHIN THIS AREA TO BE INSTALLED AFTER REMOVAL OF C304 UC305*305*118 200mm LIGHTING/POWER BASKET 100mm DATA BASKET/ SECURITY B.O.C 460 TRAY 100mm FA BASKET Z328 2301-WB04 100mm ELV BASKET 600mm SUBMAIN TRAY 200mm LV BASKET 3334 3209 100mm F/A BASKET E122 RSA150*150*10 32Ø 32Ø 32Ø VCD 480 730 B106 UB203*133*30 B111 UB203*133*30 32Ø FCU's RUNS TO WVP, WITH HEPVO TYPE DRY TRAP. 150Ø VCD 2532 VCD 32Ø B337 UB203*133*30 B106 RSA150*90*10 32ØRSA150*150*10 CONDENSATE FROM E109 15 0Ø SPRINKL ERC.L.P: PIPE 3 00 Z124 2301-WB03 RSA150*150*10 E112 Z126 2301-WB05 E110 RSA150*150*10 Z101 2301-WB07 E113 RSA150*150*10 Z324 2301-WB03 B113 UB203*133*30 2611 B.O.U: 345 450 150Ø 160Ø 160Ø 244 450 4212 4362 4086 B.O.D:240 C104 UC356*406*235 S 992 HI GHLINE WH12CH (RH) 653 225 300X150 Z318 2301-WB05 32Ø 1710 677 1720 2 2MB 10 5 BOU : 3 00 H TG MAN IFO LD 1591838 B.O.U: 345 B.O.C 460 903 1223 1348 795 Z320 2301-WB05 C.L.P: 400 D U110 PFC-200*90*30 PFC-200*90*30 32Ø Z322 S D FTT B.O.T: 460 600mm SUBMAINS TRAY B.O.C 460 SU 75mm 32Ø 00*90*41 B406 UB457*191*67 01SG105 32Ø 32Ø 150Ø 1775 150Ø 32 FCU 116 HIGHLINE WH6CH (RH) 32 FCU 117 HIGHLINE WH6CH (RH) 01SG105 B403 UB457*191*67 32Ø 169 3882 1777 C.L.D: 225 250Ø 01SG128 SD 350x150 01SG128 818 C.L.D: 205 225Ø 150Ø VCD 2532 VCD 150Ø B.O.U: 345 01SG128 15 0Ø SPRINKL ER PIPE C.L.P: 300 VCD 211 299 150Ø 225 286 358 Z107 2301-WB04 0 LV 50x50 TRUNKING B115 UB203*133*30 E303 RSA150*150*10 C309 UC305*305*118 EXISTING 4"x3" RWP FA & TB. INTERACTIVE WORKING 20 *1 B329 PFC-200*75*23 1754 2977 2827 2528 2381 B. O. D:3 75 B302 01SG1 17 UB C308 UC305*305*118 *1 B.O.D:450 450x200 200mm LV BASKET 150Ø 450 01S G118 921 160Ø 300 419 1817 1642 1284 897 1147 1297 B.O.T: 250 B.O.C: 460 2724 774 1083 1243 624 150mm ELV BASKET UB203*133*25 B104 150 1104 150 B102 UB203*133*25 B.O.C 460 2299 80Ø CHW F Z309 2301-WB02 140 150Ø S U 783 B.O .U: 34 5 32Ø B409 UB203*133*2 01SG124 1065 1315 1465 32 FCU 133 HI GHLINE WH12CH (RH) 2805 10 0Ø SPRINKL ER 01SG127 1000mm SUBMAIN LADDER RACK 100x100 LV TRUNKING PFC-150*90*24 PLUS PLATE VCD C.L.P: 300 U111 PFC-200*75*23 401 40Ø CHW R 40Ø CHW F 150Ø 1116 Z404 2301-WB05 161 1400x450 GENERAL / PFC-150*90*24 SMOKE PLUS EXTRACT PLATE (FIRE RATED) BOD: 510 Z103 2301-WB02 1101 B.O.C 460 180 0x450 BELLM OUTH OPENING (F IRE RAT ED) 15 0Ø SPRINKL ER PIPE C.L.P: 4 00 SU 360 492 1134 623 150Ø SPRINKLER U112 PIPE SD 544 VCD VCD S S U C.L.P: 400 200ØS @4 A 12 5° 0 SU T1 D 0SU 2R SD B.O.C 460 32Ø LTHW F 200x100 1704 1259 1554 150Ø 374 1569 1777 VCD VCD 32Ø 1391 01SG108 B.O.U: 345 VCD 2412 1319692 01S G118 OAS EDUCATION 2066 2213 FOR DETAILS OF SERVICES WITHIN CORE AREA REFER TO DRG. Nos. 6059-M-5301RD-1&2 TO WVP, WITH HEPVO TYPE DRY TRAP. 150Ø 2301-W B03 VCD (R H) 150Ø 4"x3" RWP(5) FA & TB. AV media PFC-150*90*24 PLUS PLATE 419 816 1589 Z125 2301-WB05 294 555 150 1403 475 550x 250 SD 75mm WH18 CH U 105 VCD 22 MB1 D 02 BO U: 3 00 32 FC HTG MAN IFOL HIGH LINE VCD B457 01S *191* G118 106 B.O.T: 460 450 01S B312G118 UK HI GHLINE WH9CH (LH) 32Ø 01SG108 VCD 32 FCU??? 32FCU 118 340 01SG128 150mm ELV BASKET 150Ø 19 57 C205 UC356*368*177 251 450x200 B.O.D:300 451 311 C.L.P: 245 B.O.C 46 0 1224 C.L.P: 240 B.O.U: 345 1090 450 9 32Ø CONDENSATE UB203*133*25 FROM FCU's RUNS 15 0Ø SPRINKL ERC.L.P: PIPE 3 00 S U 20Ø LTHW R 20Ø LTHW F CH IL MAN LED 32 IFOL MB1 D 02 BO U: 3 00 11 917 460 01-W B01 SG B124 B.O.C 145 B. O. FTT D:37 55 5 0x 250 S U 920 S U B.O .T: B.O .U: 34 5 150Ø VCD VCD 150Ø B.O.C 200 150Ø 447 B.O.T: 460 VCD 2125 0Ø 150mm F/A BASKET VCD 1111 0 05 150Ø 31 Z303 23 VC D 15 B.O.C 145 (RH ) 01SG108 1205 SD C.L.D: 200 1651 1801 679 1015 C.L.P: 245 0Ø 01-W B01 CH B.O.D:285 40 6 Z30 4 23 VC D WH 12 10 5 INE VC D 01SG108 80Ø CHW R :2 FC U 9 VCD FOR DETAILS OF SERVICES WITHIN RISER REFER TO DRG. No. 6059-M-5323RD 01SG133300 .P 11 0 20*1 20*1 RS A1 SG B.O .U: 34 HIG HL 32 01 445 32Ø VCD 32 FCU 134 32Ø LTHW R 200 20Ø LTHW R 20Ø LTHW F 50Ø CHW R 50Ø CHW F C.L.P: 420 01SG108 0 *1 12 SU SA VCD FOR DETAILS OF SERVICES WITHIN RISER REFER TO DRG. No. 6059-M-5323RD 01SG133 C.L 32 Ø S B.O.D: U 250 450x200 B.O.D:300 E114 RSA150*150*10 E116 RSA150*150*10 B.O.D:450 SD 20 0 HI GHLINE WH12CH (RH) E120 RSA150*150*10 377 B.O.D:375 150 171 SU 561 839 01SG129 B.O.D:300 350x200 189 SD 439 589 2096 2346 2496 65 B.O0x 175 .D:5 00 *10 B.O.C 460 50 0Ø 16 B.O .T: 46 823 1124 1449 450 450 2326 SD@45° 1685 300 B.O.T: 460 671 120 *120 VC D 150Ø 9 :4 0x 20 T308 RSA 30 1-W B0 7 11 1343 SG .P R 01 T1 C305 UC305*305*97 B304 UKB457*191*106 CLP: 130 SD@45° SU .L C 50 0 T3 09 33 20 16 Z2 22 2 01 *1 0x 0 01 Lighting strategy 0B. O.D :300 879 150Ø S D 32 FCU 125 *191 B.O .T: 46 7 B0 1 20 Ø 20 LTHW Ø 50 LTHW R Ø 50 CHW F Ø CH R W F 1852 10 -W VCD SU S 507 D *1 20 3 2MB 10 5 BOU : 3 00 836 B.O.T: 460 Z115 2301-WB06 AD 624 550x250 SD B.O.D:500 S D C HW MAN IFO LD 450 DASHED LINE INDICATES REVISED LINEAR GRILLE LOCATION C105 UC356*368*153 Z115 UB203*133*25 FD S D 25Ø LTHW R 25Ø LTHW F 65Ø CHW R 65Ø CHW F SD@90° 300 FC U 2399 B2 01SG11 14 9 U KB4 57 SU 0Ø 16 (RH ) 32 B. O.D :300 40 VC D HLIN E WH 1 2CH 48 Z114 2301-WB06 300 350 B.O.C 14 5 01 300 16 32Ø HIG 13 123 64 5 B06 B.O.T: 460 32Ø CHW F 32Ø CHW R 20Ø LTHW F 20Ø LTHW R C.L.P: 260 C.L.P: 430 SU HI GHLINE WH12CH (LH) C204 UC356*368*202 SU B.O.C 145 27 67 VC D 0 Z2 20 2 12 B.O .U: 345 150Ø 32 Ø SU 01SG132 B.O.T: 460 200mm LIGHTING/ POWER BASKET 100mm FA BASKET 200mm LIGHTING/ POWER BASKET 100mm FA BASKET B.O.C 460 VC D 8 SG 1555 0 ) 294 150Ø Z2107 2301-WB05 71 01SG132 .D :3 Z2 10 3 C.L 687 1214 B0 5 15 .D :2 20 0Ø 0x 419 40 T CH 15 0Ø 01 10 B0 3 5 34 0 U VC D B.O .U: 12 15 0Ø SG 12 ( RH FC 30 1-W 15 0Ø Z2 2 01 VC D HIG HLI NE WH 32 S U 1000x250 VCD SUPPLY B.O.D:350 FTT 2 32 Ø -W 2231 881 S D C.L.P: 130 01SG131 3053 VCD C.L.P: 240 01 01SG133 424 450 0 *1 20 0*1 12 SA FT 0 SD 21 5 32 5 Z2 0 B.O.C 46 0 01 SG 12 12 23 01SG131 15 41 C. L. P: 3453 3303 726 579 01SG105 741 B.O.T: 460 1131 C.L.P: 400 450x200 2123 1923 B.O.D:450 SD B.O.D:350 200mm LIGHTING/ POWER BASKET 100mm DATA / SECURITY BASKETB.O.C 310 100mm FA BASKET 1196 1046 50Ø CHW F 50Ø CHW R 20Ø LTHW F 20Ø LTHW R C.L.P: 430 1249 B.O.C 200 SU 1R VC D 1090 63 450 Z216 2301-WB05 200Ø 777 627 502 300 B.O.U: 345 22Ø 768 425 75 150 32 FCU 127 1811 B.O.U: 345 200Ø VCD01SG132 Z1 450 32 Ø 32 CH Ø W C. L. CHW F P: 33 R 0 900x250FD S U 500x200 B.O.D:300 C106 UC356*406*340 20 09 14 42 C. L. 1394 P: 24 SD 200x100 40 0 Ø CH B.O.D:450 40Ø CH W W R F VCD 01SG131 991 1141 0Ø 25 350 225 40Ø CHW B.O.C: 460F 40Ø CHW R C.L.P: 300 VCD 1448 VCD 01SG105 B SD314 0 T3 C.L .D :225 150Ø 150Ø 150Ø SD@45° SU 13 09 3416 VCD 01SG132 HI GHLINE WH9CH (RH) 5 34 VC D 3 2MB 10 7 C HW MAN IFOLD BOU : 3 00 .D :2 C.L 939 15 23 01 -W 6496 MA CHW NIF OL 32M B1 D 03 BO U: 300 451 0Ø 16 200x100 B.O.D:450 SD 0 01SG132 32Ø 22 33 21 5 01SG131 2918 20* 10 A12 0*1 KB 45 7*1 91 *1 49 B.O .U: 9 VC D 46 0 0Ø B0 7 10 25 VC D 30 1-W U VCD 2076 450 683 352 20Ø LTHW F 20Ø LTHW R MD S D S D B.O.C 200 MD A 32 FCU 130 2 15 0Ø CH ( RH ) FC SU@45° 1469 S U 930x225 B.O.D:275 10 0Ø SPRINKL ER PIPE Z106 2301-WB04 200Ø S U E123 RSA150*150*10 C.L.P: 245 VCD HI GHLINE WH9CH (RH) 10 0Ø SPRINKL ER PIPE C.L.P: 3 00 C. L. P: 4936 VCD 150Ø SU@45° 21 59 S D B.O.C 46 0 23 B2 01S 13 G12 U 0 WH 12 32 12 14 82 32 Ø 1694 163 8 -W B0 1 HIG HLI NE 30 1 Z2 03 2 12 2 B0 3 VCD C.L.P: 400 C.L.P: 300 10 0Ø SPRINKL ER PIPE -W SD@45° 85 1 SU C.L.D:225 S U RS T307 C202 UC356*368*202 G 1862 C. L. P: 27 5 820 B. O. T: B.O 0 01S SD 1038 22M B1 03 BO U: 300 1536 HT MA G FO NI LD 11 01SG130 0Ø 20 CU 96 6 01SG130 B.O.C 46 0 Ø (RH ) 12 2 0Ø 32 : 46 0 450 B0 4 0Ø 16 30 1-W 92 .T VC D 12 CH F B.O 19 18 205 300 Z2 1 00 VC D 16 25 WH 32 0 H) 1437 129 7 HIG HL INE 75 (R 01S G 150 Ø VC D 01 2806 50Ø CHW F 50Ø CHW R 20Ø LTHW F 20Ø LTHW R 5311 C.L.P:5061 430 15 0Ø SPRINKL ER PIPE B.O.D:300 450x200 S D SU 32Ø 980 C.L.P: 40050Ø CHW F 50Ø CHW R 528 20 Ø LTHW F & R VCD 250Ø 916 1235 150Ø 204 388 19 23 B.O.T: 460 A 791 300 VCD VCD Z2 1 S D .D :3 H : 46 0 VCD 1219 SU 01SG129C203 UC356*368*202 C.L 9C Z2 0 01SG129 300 WH B2 03 *1 33 *3 B.O.T: 460 1350 VCD 150Ø B0 150Ø 5 B.O.D:200 4347 2790 2640 VCD 160Ø B.O.C 460 584 450 01SG127 S U 478 1249 8481471 32Ø SU@45° VCD 400X150 200Ø 32 Ø CHW F & R BOU : 3 00 HI GHLINE WH12CH (RH) 160Ø SD 150Ø 1718 680 830 01SG130 3192 8 13 5478 1808 B.O.C 145 E .T .U : 34 5 WH 01SG130 (RH ) 18 CH IN 42 U 00 HL 8 12 B.O 12 2 1U C206 UC356*368*177 S NI F O L D Z122 2301-WB05 VCD B.O.U: 345 959 Z212 2301-WB05 32Ø B234 UB203*133*25 VCD Z208 2301-WB04 :4 B2 3 45 32Ø VC D Electrical power / data distribution 200mm LIGHTING/POWER BASKET 100mm DATA / SECURITY BASKET B.O.C 460 100mm FA BASKETC.L.D:215 225Ø 160Ø .P :3 .U .O HIG B 01S G Comms room design HI GHLINE WH12CH (RH) C.L 22Ø U FC 4"x3" RWP(6) FA & TB. B.O.C 460 0Ø 32 16 115 3 0Ø *10 150 Ø S U 527 VCD 32 FCU 113 1766 B.O.U: 345 VCD 30 1-W C.L.P: 300 10 0Ø SPRINKL ER PIPE 15 120 *120 91 0 *1 1S 06 G1 2 2 IT Strategy 1024VCD VCD B232 UB203*133*30 Z2 01SG129 18 2 300 69 319 469 10 0Ø SPRINKL ER PIPE C.L.P: 2 40 11 1 VC D 509 300 430 B210 UB457*191*98 B.O.C 460 32Ø 1404 VCD C.L.P: 430 3 2MB 10 4 C HW H MAN IFOLD BOU : 3 00 T G M 2 2MB 10 4 A 01SG101 B.O.T: 460 32 FCU 112 C.L 693 0 T201 RSA KB 45 7*1 01SG101 FTT AD 3 *3 33 *1 03 B2 .L U SD .D 20 :3 7 1 5 50 B2 Ø B2SD 1 22 50Ø U FC U 12 SG C M&E design and engineering VCD 670 C208 UC254*254*89 Design to the budget 200mm LIGHTING/POWER BASKET 100mm DATA / SECURITY BASKET B.O.C 460 100mm FA BASKET C201 UC305*305*97 01SG101 B.O.T: 460 1311 B224 UB457*191*67 *3 0 01 33 233 1 *1 32 03 C207 UC305*305*158 32Ø 3 U B2 12 SG Integrated design RISER 14 01SG101 RISER 13 FOR DETAILS OF SERVICES WITHIN RISER REFER TO DRG. No. 6059-M-5334RD SERVICES WITHIN THIS AREA TO BE INSTALLED AFTER REMOVAL OF TOWER CRANE 01 B2 02 32Ø CONDENSATE FROM FCUs RUNS TO RWP WITH HEPVO TYPE DRY TRAP. C207 UC203*203*86 B206 UB305*165*46 C210 UC254*254*89 B.O.T: 460 UKB457*191*133 B208TRAP. 01SG101 FOR DETAILS OF SERVICES WITHIN RISER REFER TO DRG. No. 6059-M-5331RD VC D 0 HIG HL INE *3 150 Ø 33 30 1-W B.O B0 .U: 34 5 5 *1 B228 UB203*133*30 03 B226 UB203*133*30 B198 UB203*133*30 U B2 171 225 738 1947 VCD HI GHLINE WH12CH (RH) 32Ø 350x200 1826 B.O.D:300 1976 32Ø CONDENSATE FROM FCU's RUNS TO WVP, WITH HEPVO TYPE DRY C209 UC305*305*137 B218 UB203*133*30 B2 16 32Ø 451 C101 UC356*406*235 1951 32 FCU 129 Specification of works C213 UC305*305*97 B236 UC203*203*86 HI GHLINE WH9CH (RH) Landlord and Local Authority approvals 4"x3" RWP FA & TB. B 32 FCU 131 VCD B.O.T: 460 Z105 2301-WB04 C212 UC203*203*86 EXISTING C.L.P: 300 C.L.P: 300 4830 4472 B.O.U:VCD 345 4347 01SG127 B.O.C: 460 450 FTT 511 C HW 3 2MB 10 8 MAN IFO BOU : 3 00 LD 958 250ØC.L.D: 225 160Ø VCD 1337 225Ø 160Ø 300 B.O.C: 200 1107 450 B.O.T: 410 SU B.O.U: 345 151 Z102 2301-WB02 2538 HI GHLINE WH12CH (RH) B.O.C: 460 1916 32 FCU 114 01SG103 B108 UB457*191*67 450 01SG103 VCD 646 01SG126 683 01SG126 C102SUC356*368*202 D 902 S 1367 D VCD 1651 SU S D 1191 VCD B.O.T: 460 B.O.C: 460 200Ø B.O.U: 345 C409 RHS150*100*5.0 150Ø C400(?) TEE203*102*23 RWP(8) FA & TB. C800(?) TEE203*102*23 C406 UC254*254*107 32Ø CONDENSATE FROM FCUs RUNS TO RWP WITH HEPVO TYPE DRY TRAP. VCD VCD 2440 B.O.U: 345 32Ø B.O.T: 460 VCD VCD 2441 6535 C103 UC254*254*107 150Ø 3884 B.O.T: 460 Z401 2301-WB02 HI GHLINE WH9CH (RH) 2546 B.O.C: 460 150Ø 32 FCU 115 01SG103B401 1902 375 150Ø VCD 10 0Ø SPRINKL ER PIPE 587 253 VCD 32Ø 150Ø 160Ø VCD B.O.C 460 189 150Ø 150Ø B.O.T: 460 1456 150Ø 225 01SG124 6495 Z108 2301-WB04 Construction drawing package (50 to 150) 4335 4485 Z405 2301-WB034830 160Ø VCD B.O.U: 345 B.O.C 460 687 300 VCD 617 537 C408(?) RHS150*100*5.0 00*90*41 U406 PFC-300*90*41 32Ø B.O.U: 345 200Ø 150Ø 01SG103 UB457*191*67 Z403 2301-WB05 Scheme design development 2749 VCD'S 3877 4002 4360 U408 PFC-3 150Ø 32Ø 01SG126 32 FCU 132 VCD VCD Z406 2301-WB03 B414 UB305*165*46 HI GHLINE WH12CH (RH) 32Ø 100mm FA BASKET C40501SG126 UC305*305*97 VCD B.O.U: 345 01SG103 C403 UC203*203*86 3*133*25 57*19 1*67 01SG125 282 200mm LIGHTING/POWER BASKET 100mm DATA / SECURITY BASKET B.O.C 460 100mm FA BASKET B408 UB20 46 B407 UB203*133*25 B405 UB4 439 589 B413 UB305*165*46 150Ø Z402 2301-WB04 01SG124 C211 UC203*203*60 B416 UB305*165* C401 UC203*203*60 B.O.T: 460 2235 300 57*19 1*67 150Ø Z110 2301-WB05 B402 UB4 01SG124 U402 PFC-3 57*191*67 Z310 2301-WB02 FULLY INTEGRATED DESIGN SOLUTIONS B404 UB4 01SG115 B306 UB457*191*67 01SG115 C307 UC356*368*177 C301 UC254*254*89 DESIGNING THE NEW OFFICES OAS EDUCATION INTERACTIVE WORKING DESIGNING THE NEW OFFICES OAS EDUCATION INTERACTIVE WORKING When should the Client decide on his procurement route? SPACE ANALYSIS SPACE PLANNING, INTERIOR DESIGN, IT AND M&E BUILDING APPRAISAL STAGE 1 STAGE 2 STAGE 3 Your future office space needs The image for your new offices The programme for the project Specific technical requirements A space plan to show fit for shortlisted buildings Information on flexibility for each building Report & validation of A/C and Elecs Technical Support for your Agent in negotiating the lease OAS EDUCATION INTERACTIVE WORKING Construction drawings Specifications of work Design coordination Budget control Tender process CONSTRUCTION AND RELOCATION STAGE 4 Fitting Out the new Space Working drawing packages Approvals Quality assurance, CDM The MOVE OAS EDUCATION INTERACTIVE WORKING MONEX EUROPE 60 3 month programme: traditional route 70% open plan INTERACTIVE WORKING OAS EDUCATION INTERACTIVE WORKING Costs of fit out What are the variables? • • • • • • • Number of meeting rooms and offices Partitions Feature ceilings Feature lighting Cooling and ventilation Flooring Joinery OAS EDUCATION INTERACTIVE WORKING AAT 43 INTERACTIVE WORKING OAS EDUCATION INTERACTIVE WORKING EMO / THE REAL ADVENTURE 59 INTERACTIVE WORKING OAS EDUCATION INTERACTIVE WORKING RENESAS 58 Cody Technology Park, Farnborough, Hampshire, GU14 OLZ THE PROJECT Project Manage and design the upgrade of building A3 on Cody Technology park, which consists of 33,800 sq ft over ground and first floor levels. To create a mixture of new office space, reception area, meeting rooms, breakout areas, electrical test laboratory, screen rooms and computer room. CLIENT OBJECTIVES Renesas needed to relocate their entire business operations within a three month period. It was therefore business critical to find a suitable building and design new facilities that fully supported their requirements. As a technology based company they are high voice and data users and a critical part of this project was to ensure that all services were installed, tested and commissioned so they could be fully operational prior to their relocation. KEY FACTS Relocate entire business operations within three month period. Project Manage & design new facilities to meet the demands of the business needs. Design & install new building services (mechanical, electrical, voice & data). Relocate screen rooms to new location Specify and install new office and lab furniture To provide a fully functional facility that will inspire Staff and create an environment in where Staff enjoy coming to work. 3 2 OAS EDUCATION INTERACTIVE WORKING Synergy Vision 24 OAS EDUCATION INTERACTIVE WORKING ROBERT HALF 30 INTERACTIVE WORKING OAS EDUCATION INTERACTIVE WORKING Interactive Space OAS EDUCATION INTERACTIVE WORKING WE CREATE WORKING ENVIRONMENTS THAT WORK .... with the right types of space for all job functions to reduce costs and increase margin in order to recruit & retain staff with best use of space in your image OAS EDUCATION INTERACTIVE WORKING for you and your staff to improve communications & productivity with best use of technology THANK YOU!! interactivespace.net OAS EDUCATION INTERACTIVE WORKING