4 Stages
These are the 4 Stages to
a relocation project
SPACE ANALYSIS
SPACE PLANNING,
INTERIOR DESIGN,
IT AND M&E
BUILDING APPRAISAL
STAGE 1
STAGE 2
STAGE 3
 Your future office space
needs
 The image for your new
offices
 The programme for the
project
 Specific technical
requirements
 A space plan to show fit for
shortlisted buildings
 Information on flexibility for
each building
 Report & validation of A/C
and Elecs
 Technical Support for your
Agent in negotiating the
lease





OAS EDUCATION
INTERACTIVE WORKING
Construction drawings
Specifications of work
Design coordination
Budget control
Tender process
CONSTRUCTION AND
RELOCATION
STAGE 4
 Fitting Out the new Space
 Working drawing packages
Approvals
 Quality assurance,
 CDM
 The MOVE
TRADITIONAL ROUTE
TEAM STRUCTURE
Client
Main Board
or CEO
CLIENT STEERING
GROUP
PROJECT MANAGER
(Contract Administrator)
&
MAIN CONTRACTOR
COST CONSULTANT
M & E Engineers
OAS EDUCATION
INTERACTIVE WORKING
DESIGN TEAM
DESIGN & BUILD
TEAM STRUCTURE
Client
Main Board
or CEO
CLIENT STEERING
GROUP
PROJECT MANAGER?
(Contract Administrator)
&
D&B CONTRACTOR
COST CONSULTANT?
M & E Engineers
Or subcontractors
OAS EDUCATION
INTERACTIVE WORKING
DESIGN TEAM
OFFICE RELOCATION
/ REORGANISATION
Business
Issues
Factors the Client needs to
consider
Reduce
costs
Location
benefits
Property
Issues
Market
conditions
Quantity of
space
Team
working
Image and
Style
Lease end
Lease &
Rental
levels
Budget
Overheads
IT strategy
Workplace
Communications
INTERACTIVE WORKING
Growth &
Change
Acquisition
Recruit &
retain staff
Dilapidations
OAS EDUCATION
Flexible
working
Image
and
Culture
Issues
HOW DO WE DEFINE
YOUR PROJECT?
WHO
By understanding your
business
We need to get to know you in
order to understand how you work,
what processes you use and what
your future plans are.
WHAT
BUSINESS
PLATFORM
There is an optimum quantity
and type of office space that will
allow your company to function
efficiently.
It is our role to define that space.
OAS EDUCATION
INTERACTIVE WORKING
WHERE
HOW
PROJECT OBJECTIVES
/ BRIEF
The overall objective is for
us to assist you in
developing a Project
Strategy for the new space
that will identify:
•
•
•
•
•
•
•
OAS EDUCATION
Space standards, i.e. how much space each person will need for each
job function
Your future office space needs i.e. exactly how many square feet your
company will need, including expansion or contraction
An idealised model of your organization showing the most effective
adjacencies for your teams / departments
Suggestions and ideas on the future use of space and new ways of
working
Specific technical requirements such as IT, power, air conditioning and
ventilation
The image you wish to portray to your Clients and Staff in a new
building
Timescales to show when the key decisions have to be made
INTERACTIVE WORKING
NEW WAYS
OF WORKING
Culture
Hot desking
Touchdown
Hotelling
New technologies:
IT strategy
Voice strategy
“Video conferencing will be replaced
by hologram 3D projection technology”
OAS EDUCATION
INTERACTIVE WORKING
SPACE
FORECASTING
seats
70
277
Visitor Meeting Spaces
Workspace
Internal Meeting Spaces
Support Spaces
Net Usable Area
20% Circulation
Net Internal Area
10% additional open plan desks over 5 years
Open Plan Desks
Staff Coats
Additional Net Usable Area
20% Circulation
Additional Net Internal Area
OAS EDUCATION
seats
25
25
INTERACTIVE WORKING
sqm
sqm
5.0
0.1
area
284.0
1,517.0
160.0
413.7
2,374.7
474.9
2,849.6 s qm
30,662 s qft
Notes
area
125.0
2.5
127.5
25.5
153.0 s qm
1,646 s qft
Notes
10.3 s qm per pers on
111 s qft per pers on
10.0 s qm per pers on total
107 s qft per pers on total
If a Space Audit saves you
5,000 sq ft, over a 10 year
lease period the financial
savings are significant:
Saving in rent @ 55 per sq ft: 275,000 pa
Service Charge @ 12 per sq ft: 60,000 pa
Rates @ 28 per sq ft: 140,000 pa
Total Saving over 10 years: £4,750,000
Excluding fees, fit out, maintenance,
cleaning, dilapidations
3-person Office
Open Plan
Separate Open Plan
Hot Desk
9.0
9.0
7.5
7.5
5.0
1
18.0
21.6
PA
1
7.5
9.0
Directors
3
15.0
18.0
HR
1
5.0
6.0
Facilities (incl recep)
3
22.5
27.0
Marketing
4
36.0
43.2
4
Compliance
2
18.0
21.6
2
Internal Audit
2
18.0
21.6
2
Underwriting
4
36.0
43.2
4
IT
3
17.5
21.0
1
1
3
1
3
1
PC1 Reinsurance
2
18.0
21.6
PC2 Motor Fleet
22
186.0
223.2
2
20
PC4 BEIB
3
33.0
39.6
1
2
PC6 Media
6
45.0
54.0
PC7 Sport & Travel
18
145.5
174.6
1
17
PC8 Speciality Markets
14
108.0
129.6
2
PC9 North America
59
457.5
549.0
4
PC10 Direct
3
22.5
27.0
3
Expansion
9
67.5
81.0
9
532.8
639.4
Support Facilities
Total Area
Area per person
Total Area
Area per person
INTERACTIVE WORKING
18.0
CEO
Total
OAS EDUCATION
2-person Office
Space Standards
Single Office
Required Area
(incl 20% expansion)
Required Area
(Net)
Division
Headcount
THE VALUE OF
A SPACE AUDIT
2
2
6
160
1,810.0
2,172.0
sq m
11.3
13.6
sq m
19,476
23,371
sq ft
122
146
sq ft
12
6
40
9
5
20
6
114
9
6
90.0
180.0
54.0
855.0
67.5
30.0
BUILDING
SEARCH CRITERIA
Agent will advise on:
The Client needs to know:
• How much space
• Location
• Number of floors
• Length of tenure
• Flexibility – subletting / expansion space
• Rent and rates
• Image of building
• Service charge
• Budget for fit out
• Incentives – rent free
OAS EDUCATION
INTERACTIVE WORKING
• Technical needs: IT, M&E
STAGE 2
SPACE ANALYSIS
SPACE PLANNING,
INTERIOR DESIGN,
IT AND M&E
BUILDING APPRAISAL
STAGE 1
STAGE 2
STAGE 3
 Your future office space
needs
 The image for your new
offices
 The programme for the
project
 Specific technical
requirements
 A space plan to show fit for
shortlisted buildings
 Information on flexibility for
each building
 Report & validation of A/C
and Elecs
 Technical Support for your
Agent in negotiating the
lease





OAS EDUCATION
INTERACTIVE WORKING
Construction drawings
Specifications of work
Design coordination
Budget control
Tender process
CONSTRUCTION AND
RELOCATION
STAGE 4
 Fitting Out the new Space
 Working drawing packages
Approvals
 Quality assurance,
 CDM
 The MOVE
VIEW SUITABLE BUILDINGS
- THEN SHORTLIST
OAS EDUCATION
INTERACTIVE WORKING
OBJECTIVE AND STRUCTURED
COMPARISON OF BUILDINGS
Floorplate
Efficiency
OAS EDUCATION
Daylight
Penetration
Cellularisation
Potential
INTERACTIVE WORKING
Fit Factor
Column-free
Space
Sub-let
Potential
ONCE HEADS OF TERMS
HAVE BEEN AGREED - DUE DILIGENCE
SURVEYS AND THE EXCHANGE CONTRACTS:

Measured survey

M&E surveys and
validations of systems

Engineer or
Subcontractor??

Building survey

Structural survey

Specialist reports – IT,
telecoms, lifts
OAS EDUCATION
INTERACTIVE WORKING
When should the Client decide on his
procurement route?
SPACE ANALYSIS
SPACE PLANNING,
INTERIOR DESIGN,
IT AND M&E
BUILDING APPRAISAL
STAGE 1
STAGE 2
STAGE 3
 Your future office space
needs
 The image for your new
offices
 The programme for the
project
 Specific technical
requirements
 A space plan to show fit for
shortlisted buildings
 Information on flexibility for
each building
 Report & validation of A/C
and Elecs
 Technical Support for your
Agent in negotiating the
lease





OAS EDUCATION
INTERACTIVE WORKING
Construction drawings
Specifications of work
Design coordination
Budget control
Tender process
CONSTRUCTION AND
RELOCATION
STAGE 4
 Fitting Out the new Space
 Working drawing packages
Approvals
 Quality assurance,
 CDM
 The MOVE
TRADITIONAL ROUTE
TEAM STRUCTURE
Client
Main Board
or CEO
CLIENT STEERING
GROUP
PROJECT MANAGER
(Contract Administrator)
&
MAIN CONTRACTOR
COST CONSULTANT
M & E Engineers
OAS EDUCATION
INTERACTIVE WORKING
DESIGN TEAM
Pros and Cons
Traditional
• The Client has complete control over the design
and the quality of design
 Single set of construction drawings and single
specification of works enabling a more transparent
evaluation of like for like pricing at tender stage
 Cost certainty at key stages and overall costs are
lower
• Achievement of the most competitive price for the
works
• Transparent audit trail and demonstration of value
for money
 Projects are fully designed and specified before
tender = less risk to the Client and more control
over the design
OAS EDUCATION
INTERACTIVE WORKING
 Lack of contractor involvement at design stage for
advice on buildability and value engineering
 The Contractor may claim for works that are not
included in the drawings or specification
 The Client may enter into many different contracts
(PM, QS, Architect, M&E, CDM, Contractor, other
Specialists…….)
TRADITIONAL METHOD OF PROCUREMENT
- Traditional
OAS EDUCATION
INTERACTIVE WORKING
DESIGN & BUILD
TEAM STRUCTURE
Client
Main Board
or CEO
CLIENT STEERING
GROUP
PROJECT MANAGER?
(Contract Administrator)
&
D&B CONTRACTOR
COST CONSULTANT?
M & E Engineers
Or subcontractors
OAS EDUCATION
INTERACTIVE WORKING
DESIGN TEAM
Pros and Cons
Design & Build
 Excellent for smaller projects and
smaller Clients eg below 5k. Design
risk is with the contractor
 Choice of designs via a number of
companies pitching
 Design to a margin? Uncertainty over
end product
 Engineers or subcontractors (PI
insurance)?
 Time consuming at the brief and tender
stages.
 Overlap of design and construction and
contractors expertise at design stage
 One company to deal with and good
communications between designers
and contractors
 Hard to evaluate costs and value for
money at pitch stage
 More expensive. Overheads of Fit Out
contractors are usually 15-20% lower
than Design & Build contractors.
 D&B Contractor may present a less
detailed specification and may claim for
items of work not included for.
OAS EDUCATION
INTERACTIVE WORKING
C404 UC152*152*30
C402 UC203*203*46
C407(?) RHS150*100*5.0
B415 UB305*165*46
5
B411 UB203*133*25
B.O.C 460
01SG109
150Ø
32 FCU 119
01SG109
01SG109
150Ø
01SG109
32 FCU 120
35Ø
01SG115
01SG115
32Ø
01SG115
01SG115
B305 UB457*191*67
100Ø
RWP(7) FA
& TB.
C306 UC356*368*177
01SG115
01SG115
32Ø
01SG115
01SG109
01SG109
01SG109
01SG109
32Ø
2081
VCD
01SG109
150Ø
150Ø
32 FCU 101
VCD
150Ø
300
B.O.T: 460
150Ø
150Ø
01SG115
B316 UB305*165*46
01SG109
150Ø
01SG109
86
B.O.U: 345
HI GHLINE WH12CH (RH)
2235
VCD
Z307 2301-WB02
150Ø
32Ø
32Ø
32 FCU 102
01SG109
1955
150Ø
2739
200mm LIGHTING/POWER
BASKET
100mm
FA BASKET
B.O.C 460
250x100
B.O.D:300
B.O.D:300
HI GHLINE WH12CH (RH)
VCD
C302 UC305*305*137
01SG109
250x100
SU
Z305 2301-WB02
32Ø
40Ø CHW F
40Ø CHW R
20Ø LTHW F
20Ø LTHW R
C.L.P: 240
B.O.U: 345
50Ø CHW F
50Ø CHW R
20Ø LTHW F
20Ø LTHW R
C.L.P: 240
B.O.D:300
2025
B.O.U: 345
150Ø
VCD
150Ø
Z308 2301-WB02
305*1
65 *46
32 FCU 103
VCD
150Ø
HI GHLINE WH12CH (RH)
B.O.D:300
VCD
150Ø
VCD
WH6C
104
B314 UB457*191*67
32 FCU 121
32 FCU 123
150Ø
VCD
2067
32Ø
B.O.T:
5269 460
B.O.D:475
1041
SU
300
SU
B315 UKB457*191*106
450
4180
VCD
01SG109 01SG109
4353
B.O.D:300
B318 UB457*191*67
986
HIGHLINE WH6CH (RH)
B.O.U:
345
4727
4577
4203
VCD
SU
SD
VCD
01SG109
1200
SD
1687
SD
250x100
2739
450
SD
250x100
1463
150Ø
B322 UB203*133*30
300x200B.O.D:325
B.O.D:475
T3
0
2R
802
C.L.D:225225Ø
955
321
1050
B.O.C 460
SU
5499
200mm
LIGHTING/
POWER
BASKET
B.O.C 460
100mm FA
BASKET
150Ø
B.O.T: 460
L TH W 2 2MB 10 1
MAN IFOLBOU : 3 00
D
1692
01SG135
200Ø
3647
3500
B.O.U: 345
01SG135
5727
FTT
250x100
1312
1670
1520
32Ø
225Ø
B.O.D:475
225
700
150Ø
2267
HI GHLINE WH12CH (RH)
VCD
S
U
400x200B.O.D:325
2063
450
SD
C.L.P: 240
150Ø
C.L.P: 200VCD
4120
3970
B.O.U: 345
2343 730
32Ø
5631
300
VCD
137
3 2MB 10 1
C HW
MAN IFOLBOU : 3 00
D
795
541
942
40Ø CHW F
40Ø CHW R
20Ø LTHW F
20Ø LTHW R
VCD
32 FCU 124
B.O.D:475
SU 1737
VCD
H (RH)
FCU
150Ø
285 GRID 6
22Ø
450
HIGHL
I NE
32
VCD
01SG135
C303 UC356*368*153
150Ø
VCD
VCD
B.O
.T: 460
1293
01S
G117
SD
1546
2063
B.O.U: 405
SA
HI GHLINE WH9CH (RH)
12
0*1
20
*132 FCU 122
0
200mm BASKET
LIGHTING/
POWER TRAY
100mm460
FA BASKET
B.O.C
32Ø
15 0Ø SPRINKL ERC.L.P:
PIPE 3 00
1590
32Ø CHW F
32Ø CHW R
VCD
01SG134
150Ø
150Ø
VCD
150Ø
B.O.T: 460
1572
160Ø
VCD
32Ø
150Ø
150Ø
VCD
932
250x100
B.O.D:475
1694
779
629
VCD
VCD
VCD
01SG134
SD
01SG133
1371
200Ø
B.O.U: 345
946
200Ø
VCD
VCD
500x250
B.O.D:375
203
150Ø
180Ø
32Ø
450
1637
98
450
1341
150Ø
32Ø
3 2MB 10 6
C HW
MAN IFOLBOU : 3 00
D
B.O.C 145
450
2833
2583
B.O.T: 460
889
639
VCD
01SG134
32 FCU 126
B.O.C 460
B328 PFC-200*90*30
3360
B.O.T: 460
839
HI GHLINE WH9CH (RH)
01SG135
155
1963
B.O.T: 460
VCD
Z315 2301-WB04
1501
1626
B.O.C 460
32Ø B.O.C 145
B327
PFC-200*90*30
HI GHLINE WH9CH (RH)
B332 UB203*133*30
VCD
32Ø
Z313 2301-WB02
B.O.C 145
HI GHLINE WH9CH (RH)
S
D
15 0Ø SPRINKL ERC.L.P:
PIPE 3 00
B326 PFC-200*90*30
PFC-150*90*24
PLUS PLATE
E105 RSA150*150*10
01SG134
B320 UB457*191*67
2265
180Ø
2439
32Ø
E301 RSA150*150*10
E102 RSA150*150*10
E104 RSA150*150*10
B.O.U: 345
81
E305 RSA150*150*10
B323 PFC-200*90*30
TOWER CRANE
150Ø
150Ø
Z111 2301-WB05
E117 RSA150*150*10
SERVICES WITHIN
THIS AREA TO BE
INSTALLED AFTER
REMOVAL OF
C304 UC305*305*118
200mm LIGHTING/POWER
BASKET
100mm DATA BASKET/
SECURITY
B.O.C 460 TRAY
100mm FA BASKET
Z328 2301-WB04
100mm ELV BASKET
600mm SUBMAIN TRAY
200mm LV BASKET
3334
3209
100mm F/A BASKET
E122 RSA150*150*10
32Ø
32Ø
32Ø
VCD
480
730
B106 UB203*133*30
B111 UB203*133*30
32Ø
FCU's RUNS TO WVP,
WITH HEPVO TYPE DRY
TRAP.
150Ø
VCD 2532
VCD
32Ø
B337 UB203*133*30
B106 RSA150*90*10
32ØRSA150*150*10
CONDENSATE FROM
E109
15 0Ø SPRINKL ERC.L.P:
PIPE 3 00
Z124 2301-WB03
RSA150*150*10
E112
Z126 2301-WB05
E110 RSA150*150*10
Z101 2301-WB07
E113 RSA150*150*10
Z324 2301-WB03
B113 UB203*133*30
2611
B.O.U: 345
450
150Ø
160Ø
160Ø
244
450
4212
4362
4086
B.O.D:240
C104
UC356*406*235
S
992
HI GHLINE WH12CH (RH)
653
225
300X150
Z318 2301-WB05
32Ø
1710
677
1720
2 2MB 10 5
BOU : 3 00
H TG
MAN IFO
LD
1591838
B.O.U: 345
B.O.C 460
903
1223
1348
795
Z320 2301-WB05
C.L.P: 400
D
U110 PFC-200*90*30
PFC-200*90*30
32Ø
Z322
S
D
FTT
B.O.T: 460
600mm SUBMAINS TRAY
B.O.C 460
SU
75mm
32Ø
00*90*41
B406 UB457*191*67
01SG105
32Ø
32Ø
150Ø
1775
150Ø
32 FCU 116
HIGHLINE WH6CH (RH)
32 FCU 117
HIGHLINE WH6CH (RH)
01SG105
B403 UB457*191*67
32Ø
169
3882
1777
C.L.D: 225
250Ø
01SG128
SD
350x150
01SG128
818
C.L.D: 205
225Ø
150Ø
VCD 2532
VCD
150Ø
B.O.U: 345
01SG128
15 0Ø SPRINKL ER PIPE
C.L.P: 300
VCD
211
299
150Ø
225
286
358
Z107 2301-WB04
0
LV 50x50 TRUNKING
B115 UB203*133*30
E303 RSA150*150*10
C309 UC305*305*118
EXISTING
4"x3" RWP FA
& TB.
INTERACTIVE WORKING
20
*1
B329 PFC-200*75*23
1754
2977
2827
2528
2381
B. O.
D:3
75
B302 01SG1
17
UB
C308 UC305*305*118
*1
B.O.D:450
450x200
200mm LV BASKET
150Ø
450
01S
G118
921
160Ø
300
419
1817
1642
1284
897
1147
1297
B.O.T: 250
B.O.C: 460
2724
774
1083
1243
624
150mm ELV BASKET
UB203*133*25
B104
150
1104
150
B102 UB203*133*25
B.O.C 460
2299
80Ø CHW F
Z309 2301-WB02
140
150Ø
S
U
783
B.O
.U: 34
5
32Ø
B409 UB203*133*2
01SG124
1065
1315
1465
32 FCU 133
HI GHLINE WH12CH (RH)
2805
10 0Ø SPRINKL ER
01SG127
1000mm SUBMAIN LADDER
RACK
100x100 LV TRUNKING
PFC-150*90*24
PLUS PLATE
VCD
C.L.P: 300
U111
PFC-200*75*23
401
40Ø CHW R
40Ø CHW F
150Ø
1116
Z404 2301-WB05
161
1400x450
GENERAL /
PFC-150*90*24
SMOKE
PLUS
EXTRACT
PLATE
(FIRE RATED)
BOD: 510
Z103 2301-WB02
1101
B.O.C 460
180 0x450 BELLM OUTH
OPENING
(F IRE RAT ED)
15 0Ø SPRINKL ER PIPE
C.L.P: 4 00
SU
360
492
1134
623
150Ø
SPRINKLER
U112
PIPE
SD
544
VCD
VCD
S
S
U
C.L.P: 400
200ØS
@4
A 12
5°
0 SU
T1 D
0SU
2R
SD
B.O.C 460
32Ø LTHW F
200x100
1704
1259
1554
150Ø
374
1569
1777
VCD
VCD
32Ø
1391
01SG108
B.O.U: 345
VCD
2412
1319692
01S
G118
OAS EDUCATION
2066
2213
FOR DETAILS OF
SERVICES WITHIN CORE
AREA REFER TO DRG.
Nos. 6059-M-5301RD-1&2
TO WVP, WITH
HEPVO TYPE DRY
TRAP.
150Ø
2301-W
B03
VCD
(R H)
150Ø
4"x3"
RWP(5) FA
& TB.
AV media
PFC-150*90*24
PLUS PLATE
419
816
1589
Z125 2301-WB05
294
555
150
1403
475
550x
250
SD
75mm
WH18
CH
U 105
VCD
22 MB1
D
02
BO
U: 3
00
32 FC
HTG
MAN
IFOL
HIGH
LINE
VCD
B457
01S
*191* G118
106
B.O.T:
460
450
01S
B312G118
UK
HI GHLINE WH9CH
(LH)
32Ø
01SG108
VCD
32 FCU???
32FCU
118
340
01SG128
150mm ELV BASKET
150Ø
19
57
C205 UC356*368*177
251
450x200
B.O.D:300 451
311
C.L.P: 245
B.O.C 46 0
1224
C.L.P: 240
B.O.U: 345
1090
450
9
32Ø CONDENSATE
UB203*133*25
FROM FCU's RUNS
15 0Ø SPRINKL ERC.L.P:
PIPE 3 00
S
U
20Ø LTHW R
20Ø LTHW F
CH IL
MAN LED 32
IFOL
MB1
D
02
BO
U: 3
00
11
917
460
01-W
B01
SG
B124
B.O.C 145
B. O.
FTT
D:37
55
5 0x
250
S
U
920
S
U
B.O
.T:
B.O
.U: 34
5
150Ø
VCD VCD
150Ø
B.O.C 200
150Ø 447
B.O.T: 460
VCD
2125
0Ø
150mm F/A BASKET
VCD
1111
0
05
150Ø
31
Z303
23
VC
D
15
B.O.C 145
(RH
)
01SG108
1205
SD
C.L.D: 200
1651
1801
679
1015
C.L.P: 245
0Ø
01-W
B01
CH
B.O.D:285
40
6
Z30
4 23
VC
D
WH
12
10
5
INE
VC
D
01SG108
80Ø CHW R
:2
FC
U
9
VCD
FOR DETAILS OF
SERVICES WITHIN RISER
REFER TO DRG. No.
6059-M-5323RD
01SG133300
.P
11
0
20*1
20*1
RS A1
SG
B.O
.U:
34
HIG
HL
32
01
445
32Ø
VCD
32 FCU 134
32Ø LTHW R
200
20Ø LTHW R
20Ø LTHW F
50Ø CHW R
50Ø CHW F
C.L.P: 420
01SG108
0 *1
12
SU
SA
VCD
FOR DETAILS OF
SERVICES WITHIN RISER
REFER TO DRG. No.
6059-M-5323RD
01SG133
C.L
32
Ø
S
B.O.D:
U
250
450x200
B.O.D:300
E114 RSA150*150*10
E116 RSA150*150*10
B.O.D:450
SD
20
0
HI GHLINE WH12CH (RH)
E120 RSA150*150*10
377
B.O.D:375
150
171
SU
561
839
01SG129
B.O.D:300
350x200
189 SD
439
589
2096
2346
2496
65
B.O0x 175
.D:5
00
*10
B.O.C 460
50
0Ø
16
B.O
.T:
46
823
1124
1449
450
450
2326
SD@45°
1685
300
B.O.T: 460
671
120 *120
VC
D
150Ø
9
:4
0x 20
T308 RSA
30
1-W
B0
7
11
1343
SG
.P
R
01
T1
C305 UC305*305*97
B304 UKB457*191*106
CLP: 130
SD@45°
SU
.L
C
50
0
T3 09
33
20
16
Z2
22
2
01
*1
0x
0
01
Lighting strategy
0B.
O.D
:300
879
150Ø
S
D
32 FCU 125
*191
B.O
.T:
46
7
B0
1
20
Ø
20 LTHW
Ø
50 LTHW R
Ø
50 CHW F
Ø CH
R
W
F
1852
10
-W
VCD
SU
S
507
D
*1
20
3 2MB 10 5
BOU : 3 00
836
B.O.T: 460
Z115 2301-WB06
AD
624
550x250 SD
B.O.D:500
S
D
C HW
MAN IFO
LD
450
DASHED LINE
INDICATES
REVISED LINEAR
GRILLE
LOCATION
C105 UC356*368*153
Z115 UB203*133*25
FD
S
D
25Ø LTHW R
25Ø LTHW F
65Ø CHW R
65Ø CHW F
SD@90°
300
FC
U
2399
B2 01SG11
14
9
U
KB4
57
SU
0Ø
16
(RH
)
32
B.
O.D
:300
40
VC
D
HLIN
E WH
1 2CH
48
Z114 2301-WB06
300
350
B.O.C 14 5
01
300
16
32Ø
HIG
13
123
64
5
B06
B.O.T: 460
32Ø CHW F
32Ø CHW R
20Ø LTHW F
20Ø LTHW R
C.L.P: 260 C.L.P: 430
SU
HI GHLINE WH12CH
(LH)
C204 UC356*368*202
SU
B.O.C 145
27
67
VC
D
0
Z2
20
2
12
B.O
.U:
345
150Ø
32
Ø
SU
01SG132
B.O.T: 460
200mm LIGHTING/
POWER BASKET
100mm FA BASKET
200mm LIGHTING/
POWER BASKET
100mm FA BASKET
B.O.C 460
VC
D
8
SG
1555
0
)
294
150Ø
Z2107 2301-WB05
71
01SG132
.D
:3
Z2
10
3
C.L
687
1214
B0
5
15
.D
:2
20
0Ø
0x
419
40
T
CH
15
0Ø
01
10
B0
3
5
34
0
U
VC
D
B.O
.U:
12
15
0Ø
SG
12
( RH
FC
30
1-W
15
0Ø
Z2
2
01
VC
D
HIG
HLI
NE
WH
32
S
U
1000x250 VCD
SUPPLY
B.O.D:350
FTT
2
32
Ø
-W
2231
881
S
D
C.L.P: 130
01SG131
3053
VCD
C.L.P: 240
01
01SG133
424 450
0
*1
20
0*1
12
SA
FT
0
SD
21
5
32
5
Z2
0
B.O.C 46 0
01
SG
12
12
23
01SG131
15
41
C. L.
P:
3453
3303
726
579
01SG105
741
B.O.T: 460
1131
C.L.P: 400
450x200
2123
1923 B.O.D:450
SD
B.O.D:350
200mm
LIGHTING/
POWER
BASKET
100mm DATA /
SECURITY
BASKETB.O.C 310
100mm FA
BASKET
1196
1046
50Ø CHW F
50Ø CHW R
20Ø LTHW F
20Ø LTHW R
C.L.P: 430
1249
B.O.C 200
SU
1R
VC
D
1090
63
450
Z216 2301-WB05
200Ø
777
627
502
300
B.O.U: 345
22Ø
768
425
75
150
32 FCU 127
1811
B.O.U: 345
200Ø
VCD01SG132
Z1
450
32
Ø
32 CH
Ø
W
C. L. CHW F
P:
33 R
0
900x250FD
S
U
500x200
B.O.D:300
C106 UC356*406*340
20
09
14
42
C. L.
1394
P:
24
SD 200x100
40
0
Ø CH
B.O.D:450 40Ø CH
W
W R
F
VCD
01SG131
991
1141
0Ø
25
350
225
40Ø
CHW
B.O.C:
460F
40Ø CHW R
C.L.P: 300
VCD
1448
VCD
01SG105
B
SD314
0
T3
C.L
.D
:225
150Ø
150Ø
150Ø
SD@45°
SU
13
09
3416
VCD 01SG132
HI GHLINE WH9CH (RH)
5
34
VC
D
3 2MB 10 7
C HW
MAN IFOLD BOU : 3 00
.D
:2
C.L
939
15
23
01
-W
6496
MA CHW
NIF
OL 32M B1
D
03
BO
U: 300
451
0Ø
16
200x100
B.O.D:450 SD
0
01SG132
32Ø
22
33
21
5
01SG131
2918
20* 10
A12 0*1
KB
45
7*1
91
*1
49
B.O
.U:
9
VC
D
46
0
0Ø
B0
7
10
25
VC
D
30
1-W
U
VCD
2076
450
683
352
20Ø LTHW F
20Ø LTHW R
MD
S
D
S
D
B.O.C 200
MD
A
32 FCU 130
2
15
0Ø
CH
( RH
)
FC
SU@45°
1469
S
U
930x225
B.O.D:275
10 0Ø SPRINKL ER PIPE
Z106 2301-WB04
200Ø
S
U
E123 RSA150*150*10
C.L.P: 245
VCD
HI GHLINE WH9CH (RH)
10 0Ø SPRINKL ER PIPE
C.L.P: 3 00
C. L.
P:
4936
VCD
150Ø
SU@45°
21
59
S
D
B.O.C 46 0
23
B2 01S
13 G12
U 0
WH
12
32
12
14
82
32
Ø
1694
163
8
-W
B0
1
HIG
HLI
NE
30
1
Z2
03
2
12
2
B0
3
VCD
C.L.P: 400
C.L.P: 300
10 0Ø SPRINKL ER PIPE
-W
SD@45°
85
1
SU
C.L.D:225
S
U
RS
T307
C202 UC356*368*202
G
1862
C. L.
P: 27
5
820
B. O.
T:
B.O
0
01S
SD
1038
22M
B1
03
BO
U: 300
1536
HT
MA G
FO NI
LD
11
01SG130
0Ø
20
CU
96
6
01SG130
B.O.C 46 0
Ø
(RH
)
12
2
0Ø
32
: 46
0
450
B0
4
0Ø
16
30
1-W
92
.T
VC
D
12
CH
F
B.O
19
18
205
300
Z2
1
00
VC
D
16
25
WH
32
0
H)
1437
129
7
HIG
HL
INE
75
(R
01S
G
150
Ø
VC
D
01
2806
50Ø CHW F
50Ø CHW R
20Ø LTHW F
20Ø LTHW R
5311
C.L.P:5061
430
15 0Ø SPRINKL ER PIPE
B.O.D:300
450x200
S
D
SU
32Ø
980
C.L.P: 40050Ø CHW F
50Ø CHW R
528
20 Ø LTHW F & R
VCD
250Ø
916
1235
150Ø
204
388
19
23
B.O.T: 460
A
791
300
VCD
VCD
Z2
1
S
D
.D
:3
H
: 46
0
VCD
1219
SU
01SG129C203 UC356*368*202
C.L
9C
Z2
0
01SG129
300
WH
B2
03
*1
33
*3
B.O.T: 460
1350
VCD
150Ø
B0 150Ø
5
B.O.D:200
4347
2790
2640
VCD
160Ø
B.O.C 460
584
450
01SG127
S
U
478
1249
8481471
32Ø
SU@45°
VCD
400X150
200Ø
32 Ø CHW F & R
BOU : 3 00
HI GHLINE WH12CH (RH)
160Ø
SD
150Ø
1718
680
830
01SG130
3192
8
13
5478
1808
B.O.C 145
E
.T
.U
: 34
5
WH
01SG130
(RH
)
18
CH
IN
42
U
00
HL
8
12
B.O
12
2
1U
C206 UC356*368*177
S
NI
F
O
L
D
Z122 2301-WB05
VCD B.O.U: 345
959
Z212 2301-WB05
32Ø
B234 UB203*133*25
VCD
Z208 2301-WB04
:4
B2
3
45
32Ø
VC
D
Electrical power / data distribution
200mm LIGHTING/POWER
BASKET
100mm DATA / SECURITY
BASKET
B.O.C 460
100mm FA BASKETC.L.D:215
225Ø
160Ø
.P
:3
.U
.O
HIG
B
01S
G
Comms room design
HI GHLINE WH12CH (RH)
C.L
22Ø
U
FC
4"x3"
RWP(6) FA
& TB.
B.O.C 460
0Ø
32
16
115
3
0Ø
*10
150
Ø
S
U
527
VCD
32 FCU 113
1766
B.O.U: 345
VCD
30
1-W
C.L.P: 300
10 0Ø SPRINKL ER PIPE
15
120 *120
91 0
*1 1S
06 G1
2
2
IT Strategy
1024VCD
VCD
B232 UB203*133*30
Z2
01SG129
18
2
300
69
319
469
10 0Ø SPRINKL ER PIPE
C.L.P: 2 40
11
1
VC
D
509
300
430
B210 UB457*191*98
B.O.C 460
32Ø
1404
VCD
C.L.P: 430
3 2MB 10 4
C HW
H
MAN IFOLD BOU : 3 00
T
G
M
2 2MB 10 4
A
01SG101
B.O.T: 460
32 FCU 112
C.L
693
0
T201 RSA
KB
45
7*1
01SG101
FTT
AD
3
*3
33
*1
03
B2
.L U
SD
.D
20 :3 7 1
5
50
B2
Ø
B2SD 1
22 50Ø
U
FC
U
12
SG
C
M&E design and engineering
VCD
670
C208 UC254*254*89
Design to the budget
200mm LIGHTING/POWER
BASKET
100mm DATA / SECURITY
BASKET
B.O.C 460
100mm FA BASKET
C201 UC305*305*97
01SG101
B.O.T: 460
1311
B224 UB457*191*67
*3
0
01
33
233
1
*1
32
03
C207 UC305*305*158
32Ø
3
U
B2
12
SG
Integrated design
RISER 14
01SG101
RISER 13
FOR DETAILS OF
SERVICES WITHIN
RISER REFER TO
DRG. No.
6059-M-5334RD
SERVICES WITHIN
THIS AREA TO BE
INSTALLED AFTER
REMOVAL OF
TOWER CRANE
01
B2
02
32Ø CONDENSATE
FROM FCUs RUNS TO
RWP WITH HEPVO
TYPE DRY TRAP.
C207 UC203*203*86
B206 UB305*165*46
C210 UC254*254*89
B.O.T: 460
UKB457*191*133
B208TRAP.
01SG101
FOR DETAILS OF
SERVICES WITHIN
RISER REFER TO
DRG. No.
6059-M-5331RD
VC
D
0
HIG
HL
INE
*3
150
Ø
33
30
1-W B.O
B0 .U: 34
5 5
*1
B228 UB203*133*30
03
B226 UB203*133*30
B198 UB203*133*30
U
B2
171
225
738
1947
VCD
HI GHLINE WH12CH (RH)
32Ø
350x200
1826
B.O.D:300
1976
32Ø CONDENSATE
FROM FCU's RUNS
TO WVP, WITH
HEPVO TYPE DRY
C209 UC305*305*137
B218 UB203*133*30
B2
16
32Ø
451
C101 UC356*406*235
1951
32 FCU 129
Specification of works
C213 UC305*305*97
B236 UC203*203*86
HI GHLINE WH9CH (RH)
Landlord and Local Authority approvals
4"x3" RWP
FA & TB.
B
32 FCU 131
VCD
B.O.T: 460
Z105 2301-WB04
C212
UC203*203*86
EXISTING
C.L.P: 300
C.L.P: 300
4830
4472
B.O.U:VCD
345
4347
01SG127
B.O.C: 460
450
FTT
511
C HW
3 2MB 10 8
MAN IFO BOU : 3 00
LD
958
250ØC.L.D: 225
160Ø
VCD
1337
225Ø
160Ø
300
B.O.C: 200
1107
450
B.O.T: 410
SU
B.O.U: 345
151
Z102 2301-WB02
2538
HI GHLINE WH12CH (RH)
B.O.C: 460
1916
32 FCU 114
01SG103
B108 UB457*191*67
450
01SG103
VCD
646
01SG126
683 01SG126
C102SUC356*368*202
D
902
S
1367 D
VCD
1651
SU
S
D
1191
VCD
B.O.T: 460
B.O.C: 460
200Ø
B.O.U: 345
C409 RHS150*100*5.0
150Ø
C400(?) TEE203*102*23
RWP(8) FA
& TB.
C800(?) TEE203*102*23
C406 UC254*254*107
32Ø CONDENSATE
FROM FCUs RUNS TO
RWP WITH HEPVO
TYPE DRY TRAP.
VCD VCD
2440
B.O.U: 345
32Ø
B.O.T: 460
VCD
VCD
2441
6535
C103 UC254*254*107
150Ø
3884
B.O.T: 460
Z401 2301-WB02
HI GHLINE WH9CH (RH)
2546
B.O.C: 460
150Ø
32 FCU 115
01SG103B401
1902
375
150Ø
VCD
10 0Ø SPRINKL ER PIPE
587
253
VCD
32Ø
150Ø
160Ø
VCD
B.O.C 460
189
150Ø
150Ø
B.O.T: 460
1456
150Ø
225
01SG124
6495
Z108 2301-WB04
Construction drawing package (50 to 150)
4335
4485
Z405 2301-WB034830
160Ø
VCD
B.O.U: 345
B.O.C 460
687
300
VCD
617
537
C408(?) RHS150*100*5.0
00*90*41
U406 PFC-300*90*41
32Ø
B.O.U: 345
200Ø
150Ø
01SG103
UB457*191*67
Z403 2301-WB05
Scheme design development
2749
VCD'S
3877
4002
4360
U408 PFC-3
150Ø
32Ø
01SG126
32 FCU 132
VCD
VCD
Z406 2301-WB03
B414 UB305*165*46
HI GHLINE WH12CH (RH)
32Ø
100mm FA BASKET
C40501SG126
UC305*305*97
VCD
B.O.U: 345
01SG103
C403 UC203*203*86
3*133*25
57*19 1*67
01SG125
282
200mm LIGHTING/POWER
BASKET
100mm DATA / SECURITY
BASKET
B.O.C 460
100mm FA BASKET
B408 UB20
46
B407 UB203*133*25
B405 UB4
439
589
B413 UB305*165*46
150Ø
Z402 2301-WB04
01SG124
C211 UC203*203*60
B416 UB305*165*
C401 UC203*203*60
B.O.T: 460
2235
300
57*19 1*67
150Ø
Z110 2301-WB05
B402 UB4
01SG124
U402 PFC-3
57*191*67
Z310 2301-WB02
FULLY INTEGRATED
DESIGN SOLUTIONS
B404 UB4
01SG115
B306 UB457*191*67
01SG115
C307 UC356*368*177
C301 UC254*254*89
DESIGNING THE
NEW OFFICES
OAS EDUCATION
INTERACTIVE WORKING
DESIGNING THE
NEW OFFICES
OAS EDUCATION
INTERACTIVE WORKING
When should the Client decide on his
procurement route?
SPACE ANALYSIS
SPACE PLANNING,
INTERIOR DESIGN,
IT AND M&E
BUILDING APPRAISAL
STAGE 1
STAGE 2
STAGE 3
 Your future office space
needs
 The image for your new
offices
 The programme for the
project
 Specific technical
requirements
 A space plan to show fit for
shortlisted buildings
 Information on flexibility for
each building
 Report & validation of A/C
and Elecs
 Technical Support for your
Agent in negotiating the
lease





OAS EDUCATION
INTERACTIVE WORKING
Construction drawings
Specifications of work
Design coordination
Budget control
Tender process
CONSTRUCTION AND
RELOCATION
STAGE 4
 Fitting Out the new Space
 Working drawing packages
Approvals
 Quality assurance,
 CDM
 The MOVE
OAS EDUCATION
INTERACTIVE WORKING
MONEX EUROPE
60
3 month programme:
traditional route
70% open plan
INTERACTIVE WORKING
OAS EDUCATION
INTERACTIVE WORKING
Costs of fit out
What are the
variables?
•
•
•
•
•
•
•
Number of meeting
rooms and offices
Partitions
Feature ceilings
Feature lighting
Cooling and
ventilation
Flooring
Joinery
OAS EDUCATION
INTERACTIVE WORKING
AAT
43
INTERACTIVE WORKING
OAS EDUCATION
INTERACTIVE WORKING
EMO / THE REAL
ADVENTURE
59
INTERACTIVE WORKING
OAS EDUCATION
INTERACTIVE WORKING
RENESAS
58
Cody Technology Park, Farnborough, Hampshire, GU14
OLZ
THE PROJECT
Project Manage and design the upgrade of building A3 on
Cody Technology park, which consists of 33,800 sq ft over
ground and first floor levels. To create a mixture of new
office space, reception area, meeting rooms, breakout
areas, electrical test laboratory, screen rooms and computer
room.
CLIENT OBJECTIVES
Renesas needed to relocate their entire business
operations within a three month period. It was therefore
business critical to find a suitable building and design new
facilities that fully supported their requirements. As a
technology based company they are high voice and data
users and a critical part of this project was to ensure that all
services were installed, tested and commissioned so they
could be fully operational prior to their relocation.
KEY FACTS
Relocate entire business operations within three month
period.
Project Manage & design new facilities to meet the
demands of the business needs.
Design & install new building services (mechanical,
electrical, voice & data).
Relocate screen rooms to new location
Specify and install new office and lab furniture
To provide a fully functional facility that will inspire Staff and
create an environment in where Staff enjoy coming to work.
3
2
OAS EDUCATION
INTERACTIVE WORKING
Synergy Vision
24
OAS EDUCATION
INTERACTIVE WORKING
ROBERT HALF
30
INTERACTIVE WORKING
OAS EDUCATION
INTERACTIVE WORKING
Interactive Space
OAS EDUCATION
INTERACTIVE WORKING
WE CREATE WORKING
ENVIRONMENTS THAT WORK ....
with the right
types of space
for all job
functions
to reduce costs and
increase margin
in order to recruit &
retain staff
with best use of
space
in your image
OAS EDUCATION
INTERACTIVE WORKING
for you and your staff
to improve
communications &
productivity
with best use
of technology
THANK
YOU!!
interactivespace.net
OAS EDUCATION
INTERACTIVE WORKING
Download