Global Positioning Systems Directorate MGUE Briefing to Southern CA ION Chapter 23 June 2011 Colonel Jon Anderson Chief, GPS User Equipment Division Recent Accomplishments Modernized User Equipment (MUE): • All GB-GRAM Cards completed FQT and delivered to the government • Began independent government testing at SPAWAR (in progress) • Began anti-tamper testing at Sandia and Aerospace (in progress) Military GPS User Equipment (MGUE): • Technology Development Strategy (TDS) approved by SAF – in coordination with OSD (AT&L) • Completed Service Cost Position (SCP) and Independent Cost Estimate (ICE): 2366a certification imminent • Technical Requirements Document (TRD) baselined at 31 Mar 11 CCB 2 Modernized GPS Capabilities M-Code Access M-Code Power Operate closer to jammer, under trees New, more secure signal Anti-Tamper Designed for Foreign use More effective coalition ops Anti-Spoof Detect and reject false signals Blue Force Electronic Attack External Augmentation Systems Operate near friendly jamming Enhance GPS accuracy and availability Acquisition in Jamming Fast secure time-tofirst-fix 16 32 31 23 20 Red: False SV Signals 16 4 3 MGUE Architecture External Augmentation Systems Ground Embedded GPS Space Segment L1 SIS Lead Platforms & Host Applications MGUE Products SIS Data (GB-GRAM-M ) Ground--RQ-11B, Raven USA : PM-UAS-SUAV L2 SIS Aviation Data Aviation – F-15E USAF: 912 AESG Data Maritime- Arleigh Burke Class Destroyer (DDG) USN: PMW/A 170 GRAM SEM-E-M (GRAM S/M) SIS GPS Control Segment Maritime (GRAM-M-PMC) Master Control Station Common GPS Module Data Handheld and other applications (CGM) Ground Antenna Monitor Station 4 New Business Approach for GPS User Equipment Division Migrate from end user products To Common GPS Module (CGM) and Support Tools 5 What is the MGUE Overarching Strategy? • May 2010 ADM by USD(AT&L) directed us to deliver capability ASAP • Deliver a usable capability as close as possible to FY13 • We’re completing a successful Technology Demonstration Program • Achieved M-Code Crypto, SAASM, C/A-code, AT and AS capability • Implemented several new policies, programs, and requirements • GPS User Equipment Information Assurance Program • USD(AT&L) Anti-Tamper program • Trusted Foundry program • ICDs 703, 722, 723, etc…. • 3 prototype contracts 2 development contracts maintains industrial base • Implement DoD policies on efficiencies and affordability Leverage technology developed under MUE Finish Discovery Mature the technology and move into EMD 6 Contract Strategy Overview Material Solution Analysis Production & Deployment Engineering & Manufacturing Development Technology Development Supports TRA MS A MS B MUE Program • L-3 Communication • Rockwell Collins • Raytheon Source Selection Contract A Contract B Tech Samples MGUE will Leverage Technology MS C LRIP Options Exercised After MS-C approval EMD Options Exercised After MS B approval Ground & CGM Tech Development Ground & CGM EMD Ground & CGM LRIP Aviation / Maritime Tech Development Aviation / Maritime EMD Aviation / Maritime LRIP Ground & CGM Tech Development Ground & CGM EMD Ground & CGM LRIP PDR CDR Functional Qualification Report MGUE TDS Development Contracts FRP will be subject of separate Acquisition Strategy 7 Program Acquisition Schedule Decision Points MS A MS B MS C FRP MS Technology Development Engr & Mfg Development Production & Deployment Source Selection Material Solution Analysis As of 21 Apr 11 8 CGM Business Model Increment 1: Industry Defined Increment 2: Government Standard Specific Instantiation TBD + SDK Ground Embedded Aviation (GB-GRAM-M ) GRAM SEM-E-M (GRAM S/M) 32 nm ASIC, or S/W Defined Radio, or Network-based device, or … Maritime (GRAM-M-PMC) Third Party Developers Common GPS Module (CGM) Handheld Demo + S/W Developer Kit (SDK) Munitions Demo Many Applications 9 CGM Signal Support “On the Board” CGM & MGUE receiver cards will include C/A, P(Y), and M-Code CGM C/A, P(Y), M-Code COTS L5 COTS Galileo Upgraded receivers may add L5, Galileo, and other signals by integrating COTS chips on the receivers cards How to incorporate additional civil signals Opportunity On Ramp C/A, P(Y), M-Code Increment 1 Increment 2 Current CGM Potential to Add – L5, L1C, Galileo Use “On the Board” approach C/A, L1Y, L2Y, L1M, L2M, L1C, L2C, L5, E1, E2, E5 Can design into future CGMs with enough lead time 10 Key Challenges • Trusted Foundry • Information Assurance/Security Certification • Performance Certification • Transitioning to Fixed-Price Development • Increment 2 11 Advanced Technology MGUE Increment 2 Technology Maturation • GPS Directorate Technology Priorities • • • • Reduced SWAP & C NetCentricity / Comm/Nav Integration Software Defined Radio – Structured IP, IA/AT Solutions, CGM Alternative PNT Robustness – Focused on Sensor Integration and Disadvantaged User • MGUE Delta/Objective CDD Requirements • Advanced BFEA Compatibility, Anti-Spoof, Integrity, M-Code External Augmentation System, Reprogrammability, Multiple Signals • Support the GPS Enterprise Modernization and PNT Assurance AoA Mature Critical Technology Element (CTEs) to support Increment 2 Technology Readiness Assessment 12 Questions? 13