Basic scientific idea of eROSITA …. to extend the ROSAT all-sky survey up to 10 keV with an XMM-Newton type sensitivity eROSITA: ready for launch …. fall of 2011 2009 2010 2014 Mission scenario & Instrument specification • 3 month calibration & science verification phase • 4 yrs all-sky survey (8 sky coverages) • 2.7 yrs pointed observations • Energy range ~ 0.2 - 10 keV • FOV: 1 degree • All-sky survey sensitivity ~ 6 x10-14 erg cm-2 s-1 ~ (10 – 30) x ROSAT ~ 100 x HEAO/RXTE (hard band) • Deep survey field(s) (~100 sqdeg) with 5×10-15 erg cm-2 s-1 • Temporal resolution ~ 50 ms • Energy resolution ~ 130 ev @ 6 keV / 80 ev @ 1.5 keV • Angular resolution ~ 15” (20” survey) eROSITA on Spectrum-RG ART-XC ( IKI ) eROSITA ( MPE ) Navigator (NPO Lavochkin) Launch from Baikonur with Zenit-Fregat, fall of 2014 Zenit-Fregat-Navigator = standard configuration, also used for Elektro-L (Jan 2011) and Radiastron (Jul 2011). eROSITA: Navigator and Booster Navigator Fregat Booster eROSITA Telescope Array Mirror Systems • 7 aligned X-ray mirror modules • 54 nested gold-coated nickel-shells • Aeff ~ 2400 cm2 (1 keV, on-axis) • 7 pn-CCD Cameras eROSITA: effective area 2400 cm2 @ 1keV eROSITA: Grasp @ 1keV eROSITA: Advanced XMM pn-CCD 384 amplifiers Frame store Imaging – 7 individual cameras • 256 × 256 pixel, 75µm • frame store area • faster read-out eROSITA pn-CCD flight devices • 40% reduced out-oftime events • temporal res. 50 ms eROSITA Status: Cameras eROSITA: Telescope eROSITA: Mission geometry during all-sky survey eROSITA L2 halo-orbit SRG is continuously rotating around the z-axis which always points to the earth - during the survey ~4 hr / revolution -- 6 scans per day - 4 years all-sky survey (8 sky passages), 3 yrs pointings eROSITA: Exposure Map ~ 2.5 ksec in the plane eROSITA: Sky division …. IKI/Ru MPE/D How many pulsars will be detected in the all sky survey? Crab-like pulsars (< 104 yrs) Cooling neutron stars Old pulsars (106 - 108 yrs) ( ~105 - 106 yrs) Simulations: • for pulsars detected in X-rays we adopted their observed spectral parameters • for pulsars not detected by now we used: 1. Pulsar parameters (e.g. age, distance, E ) from the ATNF-Catalog (Manchster & Hobbs) 2. Thermal surface component: Neutron star cooling model (Tsuruta et al 2007) 3. Thermal hot-spot component : Polar cap model from Harding (2002) 4. Non-thermal component: assuming Lx = 10-3 E+ power-law spectrum with a=1.8 How many pulsars will be detected in the all sky survey? those pulsars will be detected with a photon statistics sufficient to perform a detailed spectral and timing analysis ! Fermi: Currently 600 unidentified gamma-ray sources eROSITA will be fundamental to cover all Fermi error boxes in an identification campaign Temperature upper limits for all neutron stars in the survey Becker et al. 1995 eROSITA on Supernova Remnants? eROSITA: Supernova research see the poster by Prinz & Becker ~270 known Galactic SNRs RASS: 215 SNR candidates Supernova research with eROSITA: G296.7-0.9 Supernova remnant candidates in the RASS eROSITA: on extended supernova remnants … eROSITA: Data Rights and Policies (MPE) “Policy Document” • German eROSITA data will be made public after a 2 yr proprietary period • Periodic data releases envisaged (e.g. 24, 30, 36,42, 48 months) • Access to proprietary data via eROSITA_DE collaboration (consortium) • Projects/Papers regulated by Working Groups • Individual External Collaborations • Group External Collaborations eROSITA: Data Rights and Policies (MPE) „Science Working Groups“: Chairs Clusters and Cosmology AGN, Blazars Normal Galaxies H. Böhringer, J. Mohr, T. Reiprich K. Nandra F. Haberl Compact Objects A. Schwope, A. Santangelo Diffuse Emission, SNR W. Becker, M. Freyberg, M. Sasaki Stars Solar System J. Robrade, J. Schmitt K. Dennerl „Infrastructure Working Groups“: Time Domain Astrophysics Data analysis, source extraction, catalogs Multi-wavelength follow-up Calibration Background J. Wilms, I. Kreykenbohm H. Brunner J. Mohr K. Dennerl M. Freyberg eROSITA Collaboration Core Institutes (DLR funding): MPE, Garching/D Universität Erlangen-Nürnberg/D IAAT (Universät Tübingen)/D SB (Universität Hamburg)/D Astrophysikalisches Institut Potsdam/D Associated Institutes: MPA, Garching/D IKI, Moscow/Ru USM (Universität München)/D AIA (Universität Bonn)/D Industry: Media Lario/I Mirrors, Mandrels Kayser-Threde/D Mirror Structures Carl Zeiss/D ABRIXAS-Mandrels Invent/D Telescope Structure pnSensor/D CCDs IberEspacio/E Heatpipes RUAG/A Mechanisms HPS/D,P MLI Moog/USA Valves MAP/F Painting Laserjob/D X-ray Baffles NPOL/Ru Spacecraft, Mission + many other (small) companies MPE: Scientific Lead Institute, Project Management K. Nandra, A. Merloni, P.P. Instrument Design, Manufacturing, Integration & Test Data Handling & Processing, Archive etc.