MCLENDON ENTERPRISES FOOTPRINT IN GA. Main Office 2365 Aimwell Road Vidalia, GA 30474 (912) 537-7887 Savannah Office 9 Chatham Pkwy. S. Dr. Suite B-2 Savannah, GA 31405 (912) 349-0677 McLendon Enterprises Inc. and its employees share the same goals of integrity, quality, teamwork, safety and continuous improvement in each and every project. President Secretary / Treasure General Manager Office Manager Chief Engineer Lead Estimator Construction Manager Senior Project Manager Business Development Benny D. Mclendon Jennifer Hollis Tim Adams Anne Roller Sean Scott P.E. Shane Holland Rusty Williams Adam Lee Bill Boies Email Us jennifer@mclendonenterprises.com tim@mclendonenterprises.com anne@mclendonenterprises.com sean@mclendonenterprises.com shane@mclendonenterprises.com rusty@mclendonenterprises.com adam@mclendonenterprises.com bill@mclendonenterprises.com McLendon Enterprises was incorporated in 1979 at which time the leadership role was then taken over by current President / Owner, Benny McLendon Contract Revenue Earned 2011: $ 33,457,474.00 2012: $ 46,660,631.00 *Number Of Permanent Employees* 2010: 93 2011: 112 2012: 130 2013: 140 Transportation Projects Georgia Department of Transportation CDBG Projects City Streets / Roadway Utility Installations Water Storm Sewer / Force main / Pump stations Other Projects Subdivisions Treatment Plants Design Builds NAME Dean Forest Road Widening Fort Stewart Elementary GA DOT CSSTP-0007000(190) Multi-Purpose Machine Gun Range GA DOT EDS00-0545-00(014) GA DOT B145143-13-000-00 GA DOT Screven County Bridge Hwy 80 & Pine Barren / Old Louisville Road ACREAGE CITY / STATE GENERAL CONTRACTOR GC REFERENCE COTRACT COST 4480 Savannah, GA. Chatham County 50 Fort Stewart, GA. Sauers Constr. 1200 Savannah, GA. GA DOT 420 Fort Stewart, GA. Trend Constr. 9600 Vidalia, GA. GA DOT 1500 Bryan / Effingham GA DOT 1200 Sylvania, GA. GA DOT 800 Pooler, GA. City of Pooler Russ Abolt $7,895,231.00 (County Manager) Darren Harrell $2,546,200.00 (305) 306-0205 Will Murphey $2,001,921.00 (912) 427-5754 Bill Cooke $3,509,212.00 (910) 436-3426 Will Murphey $24,040,300.00 (912) 427-5754 Will Murphey $4,023,000.00 (912) 427-5754 Edwin Thompson $3,900,000.00 (478) 552-4603 Robert Bryd (912) 748-7261 $2,000,120.00 NAME CITY / STATE GENERAL CONTRACTOR OR ENGINEER CONTRACT COST North Aviation Expansion MLP 00-0030-(081) Evans County ESS00-0545-00(028) Savannah, GA. North Aviation $24,371,531.00 Claxton, GA. GA DOT $18,934,256.00 Baxley, GA. GA DOT $31,000,789.00 Appling County WWTP Improvements City of Uvalda Hofstadter & Assoc. $415,019.00 South Hunter Housing Savannah, GA. Balfour Beaty $3,047,079.00 Hazlehurst Airport Hazlehurst, GA. Hofstadter & Assoc. $2,087,801.00 Swift Creek Bridge Toombs County GA DOT $2,952,926.00 Vidalia Cancer Center Vidalia, GA. Little Jon Engineering $1,097,626.00 CCA Correctional Facility Millen, GA. Flint Constr $588,628.00 JD Dickerson School Vidalia, GA. McDonald Construction $385,144.00 Aspen Heights Statesboro, GA. The Aspen Group $2,569,941.00 Bleckley Middle School Cochran, GA. Pope Construction $1,819,523.00 East Dublin WWTP East Dulin, GA. Hofstadter & Assoc. $2,776,066.00 Bundy Officer Housing Ft. Stewart, GA. Balfour Beaty $2,727,139.00 New Meadows Hospital Hardin Canal Bridge Culvert Vidalia, GA. Brasfield & Gorrie $4,183,202.00 Savannah, GA. Chatham County $4,248,657.00 BUILDING TODAY'S INFRASTRUCTURE WITH TOMORROWS TECHNOLOGY 3D-GPS, 3D-MILLIMETER GPS, LPS -- INCREASE GRADING PRODUCTIVITY SIGNIFICANTLY -- REDUCE STAKING ON JOBSITE ALMOST ENTIRELY -- CONTROLLING OF MATERIAL -- -- UP TO 300% MORE ACCURATE THAN STANDARD GPS INCREASED PRODUCTIVITY – FEWER PASSES NEEDED TO REACH FINISH GRADE -- GRADE TO TIGHTER TOLERANCES -- HIGH ACCURACY FOR TIGHT TOLERANCES PROJECTS -- USED WHEN THE JOBSITE DOES NOT HAVE VISIBILITY TO OPEN SKY I.E. WORKING BETWEEN BUILDINGS OR IN HEAVY TREE COVERAGE MCLENDON ENTERPRISES INC. FOOTPRINT IN GA. CURRENT PROJECTS AS OF AUGUST 1, 2013 NORTH AVIATION EXPANSION -- LENGTH OF TAXI WAY = 6,800 FEET -- LENGTH OF TUNNEL =1,200 FEET -- -- PILES DRIVEN = 688 CUBIC YARDS OF DIRT MOVED = 850, 000 -- COST OF PROJECT = $ 24,371,531.00 PLANT VOGTLE “21” DAY EMERGENCY RAIL REPAIR - 15,000 CYDS. OF DIRT REMOVED -- THREE RUNS OF 72” RCP 180’ LONG EACH REPLACED -- 50 CYD. CONCRETE WEEP WALL INSTALLED -- -- 20,000 CYDS. OF DIRT REPLACED 130,000 LBS. OF SAND AND CONCRETE BAGS -- REPLACED 300’ OF RAILROAD DEAN FOREST ROAD WIDENING --- LENGTH OF PROJECT = 2.5 MILES TOTAL UNDERGROUND UTILITIES INSTALLED = 9,750 FEET -- CUBIC YARDS OF DIRT MOVED = 60, 000 -- COST OF PROJECT = $ 7,895,231.00 GA DOT MLP OO-0030-(081) EVANS COUNTY --- CYDS. OF CONCRETE POURED FOR RETAINING WALL -= -- LENGTH OF PROJECT = 1.58 MILES THREE FOOTBALL FIELDS x THREE FT. DEEP TOTAL UNDERGROUND UTILITIES INSTALLED = 84,480 FEET -- COST OF PROJECT = $ 18,934,256.00 NEW MEADOWS HOPISTAL VIDALIA, GA COST OF PROJECT = $ 4,183,202.00 ASPEN HEIGHTS APARTMENT COMPLEX STATESBORO, GA COST OF PROJECT = $ 2,569,941.00 MCLENDON ENTERPRISES INC. WORKING HAND IN HAND BUDGETING -- CREATING MAXIMUM VALUE FOR EVERYONE -- WAYS TO MAINTAIN PROJECT SCHEDULES -- HIGH QUALITY PROJECT RESULTS ON SITE MEETINGS -- PLANNING AND PREPARING -- PROJECTS PROGRESSION -- EXECUTION OF PLANNING -- PROJECT COST ANALYSING COMPLETION OF PROJECTS -- -- DID WE MAINTAIN A GOOD QUALITY PRODUCT ? -- DID WE FINISH UNDER BUDGET ? -- DID WE FINISH PROJECT EARLY ? -- WHAT DID WE LEARN ? THE WAY ! ITEMS TO DISCUSS: - MCLENDON ENTERPRISES HISTORY: PAST, PRESENT, AND FUTURE