Company Overview - McLendon Enterprises

advertisement
MCLENDON
ENTERPRISES
FOOTPRINT
IN GA.
Main Office
2365 Aimwell Road
Vidalia, GA 30474
(912) 537-7887
Savannah Office
9 Chatham Pkwy. S. Dr.
Suite B-2
Savannah, GA 31405
(912) 349-0677
McLendon Enterprises Inc. and its employees share the same goals of integrity,
quality, teamwork, safety and continuous improvement in each and every project.
President
Secretary / Treasure
General Manager
Office Manager
Chief Engineer
Lead Estimator
Construction Manager
Senior Project Manager
Business Development
Benny D. Mclendon
Jennifer Hollis
Tim Adams
Anne Roller
Sean Scott P.E.
Shane Holland
Rusty Williams
Adam Lee
Bill Boies
Email Us
jennifer@mclendonenterprises.com
tim@mclendonenterprises.com
anne@mclendonenterprises.com
sean@mclendonenterprises.com
shane@mclendonenterprises.com
rusty@mclendonenterprises.com
adam@mclendonenterprises.com
bill@mclendonenterprises.com
McLendon Enterprises was incorporated in 1979 at which time the leadership role
was then taken over by current President / Owner, Benny McLendon
Contract Revenue Earned
2011: $ 33,457,474.00
2012: $ 46,660,631.00
*Number Of Permanent Employees*
2010: 93 2011: 112 2012: 130 2013: 140
Transportation Projects
Georgia Department of Transportation
CDBG Projects
City Streets / Roadway
Utility Installations
Water
Storm
Sewer / Force main / Pump stations
Other Projects
Subdivisions
Treatment Plants
Design Builds
NAME
Dean Forest Road
Widening
Fort Stewart
Elementary
GA DOT
CSSTP-0007000(190)
Multi-Purpose
Machine Gun Range
GA DOT
EDS00-0545-00(014)
GA DOT
B145143-13-000-00
GA DOT
Screven County
Bridge
Hwy 80 & Pine
Barren / Old
Louisville Road
ACREAGE CITY / STATE GENERAL CONTRACTOR GC REFERENCE COTRACT COST
4480
Savannah, GA.
Chatham County
50
Fort Stewart,
GA.
Sauers Constr.
1200
Savannah, GA.
GA DOT
420
Fort Stewart,
GA.
Trend Constr.
9600
Vidalia, GA.
GA DOT
1500
Bryan /
Effingham
GA DOT
1200
Sylvania, GA.
GA DOT
800
Pooler, GA.
City of Pooler
Russ Abolt
$7,895,231.00
(County Manager)
Darren Harrell
$2,546,200.00
(305) 306-0205
Will Murphey
$2,001,921.00
(912) 427-5754
Bill Cooke
$3,509,212.00
(910) 436-3426
Will Murphey
$24,040,300.00
(912) 427-5754
Will Murphey
$4,023,000.00
(912) 427-5754
Edwin
Thompson
$3,900,000.00
(478) 552-4603
Robert Bryd
(912) 748-7261
$2,000,120.00
NAME
CITY / STATE
GENERAL CONTRACTOR OR ENGINEER CONTRACT COST
North Aviation Expansion
MLP 00-0030-(081) Evans
County
ESS00-0545-00(028)
Savannah, GA.
North Aviation
$24,371,531.00
Claxton, GA.
GA DOT
$18,934,256.00
Baxley, GA.
GA DOT
$31,000,789.00
Appling
County
WWTP
Improvements
City of Uvalda
Hofstadter & Assoc.
$415,019.00
South Hunter Housing
Savannah, GA.
Balfour Beaty
$3,047,079.00
Hazlehurst Airport
Hazlehurst, GA.
Hofstadter & Assoc.
$2,087,801.00
Swift Creek Bridge
Toombs County
GA DOT
$2,952,926.00
Vidalia Cancer Center
Vidalia, GA.
Little Jon Engineering
$1,097,626.00
CCA Correctional Facility
Millen, GA.
Flint Constr
$588,628.00
JD Dickerson School
Vidalia, GA.
McDonald Construction
$385,144.00
Aspen Heights
Statesboro, GA.
The Aspen Group
$2,569,941.00
Bleckley Middle School
Cochran, GA.
Pope Construction
$1,819,523.00
East Dublin WWTP
East Dulin, GA.
Hofstadter & Assoc.
$2,776,066.00
Bundy Officer Housing
Ft. Stewart, GA.
Balfour Beaty
$2,727,139.00
New Meadows Hospital
Hardin Canal Bridge
Culvert
Vidalia, GA.
Brasfield & Gorrie
$4,183,202.00
Savannah, GA.
Chatham County
$4,248,657.00
BUILDING TODAY'S INFRASTRUCTURE WITH
TOMORROWS TECHNOLOGY
3D-GPS, 3D-MILLIMETER GPS, LPS
--
INCREASE GRADING PRODUCTIVITY SIGNIFICANTLY
-- REDUCE STAKING ON JOBSITE ALMOST ENTIRELY
-- CONTROLLING OF MATERIAL
--
-- UP TO 300% MORE ACCURATE THAN STANDARD GPS
INCREASED PRODUCTIVITY – FEWER PASSES NEEDED TO REACH FINISH GRADE
-- GRADE TO TIGHTER TOLERANCES
-- HIGH ACCURACY FOR TIGHT TOLERANCES PROJECTS
-- USED WHEN THE JOBSITE DOES NOT HAVE VISIBILITY TO OPEN SKY
I.E. WORKING BETWEEN BUILDINGS OR IN HEAVY TREE COVERAGE
MCLENDON ENTERPRISES INC. FOOTPRINT IN GA.
CURRENT PROJECTS AS OF AUGUST 1, 2013
NORTH AVIATION EXPANSION
--
LENGTH OF TAXI WAY = 6,800 FEET
--
LENGTH OF TUNNEL =1,200 FEET
--
--
PILES DRIVEN = 688
CUBIC YARDS OF DIRT MOVED = 850, 000
--
COST OF PROJECT = $ 24,371,531.00
PLANT VOGTLE “21” DAY EMERGENCY RAIL REPAIR
- 15,000 CYDS. OF DIRT REMOVED
--
THREE RUNS OF 72” RCP 180’ LONG EACH REPLACED
--
50 CYD. CONCRETE WEEP WALL INSTALLED
--
--
20,000 CYDS. OF DIRT REPLACED
130,000 LBS. OF SAND AND CONCRETE BAGS
--
REPLACED 300’ OF RAILROAD
DEAN FOREST ROAD WIDENING
---
LENGTH OF PROJECT = 2.5 MILES
TOTAL UNDERGROUND UTILITIES INSTALLED = 9,750 FEET
--
CUBIC YARDS OF DIRT MOVED = 60, 000
--
COST OF PROJECT = $ 7,895,231.00
GA DOT MLP OO-0030-(081)
EVANS COUNTY
---
CYDS. OF CONCRETE POURED FOR RETAINING WALL
-=
--
LENGTH OF PROJECT = 1.58 MILES
THREE FOOTBALL FIELDS x THREE FT. DEEP
TOTAL UNDERGROUND UTILITIES INSTALLED = 84,480 FEET
--
COST OF PROJECT = $ 18,934,256.00
NEW MEADOWS HOPISTAL
VIDALIA, GA
COST OF PROJECT = $ 4,183,202.00
ASPEN HEIGHTS
APARTMENT COMPLEX
STATESBORO, GA
COST OF PROJECT = $ 2,569,941.00
MCLENDON ENTERPRISES INC. WORKING HAND IN HAND
BUDGETING
--
CREATING MAXIMUM VALUE FOR EVERYONE
--
WAYS TO MAINTAIN PROJECT SCHEDULES
--
HIGH QUALITY PROJECT RESULTS
ON SITE MEETINGS
--
PLANNING AND PREPARING
-- PROJECTS PROGRESSION
-- EXECUTION OF PLANNING
-- PROJECT COST ANALYSING
COMPLETION OF PROJECTS
--
--
DID WE MAINTAIN A GOOD QUALITY PRODUCT ?
-- DID WE FINISH UNDER BUDGET ?
-- DID WE FINISH PROJECT EARLY ?
-- WHAT DID WE LEARN ?
THE
WAY !
ITEMS TO DISCUSS:
- MCLENDON ENTERPRISES HISTORY: PAST, PRESENT, AND FUTURE
Download