Essex County Transportation Services Department Essex County Highways 2013 Construction Program Peter Bziuk P. Eng. Manager Construction Services Essex County Highways • 2013 Construction Program Highlights – $25,872,500 expenditure level – Includes approx. $1,100,000 from 2012 – Rehabilitation Program – Capacity Improvement Program – CWATS Implementation Rehabilitation Program • 27 Planned Projects – 6 Bridges ( 2 Engineering, 4 Construction ) – 12 Roads – 5 Maintenance – 4 Culverts ( 2 Engineering, 2 Construction ) Capacity Improvement Program • County is continuing a multi year capacity improvement program for the network • County funding is being utilized, Senior level funding is being pursued • 10 Planned Projects for 2013 – 7 Construction, 3 Engineering Essex County Highways • Bridge Projects ($5,725,000) – 4 - Structure Rehabilitations: • • • • CR 14 @ Silver Creek CR 2 @ Ruscom River CR 31 @ Ruscom River CR 42 @ Moisson Creek – 1 - Structure Rehab / Expansion: • CR 22 @ Puce River – 2 - Engineering for 2014 construction: • CR 8 @ Belle River • CR 18 @ Big Creek Essex County Highways • Culvert / Drainage ( $1,100,000 ) – – – – CR 43 @ Gzowski Drain culvert replacement CR 50 @ Beaudoin Drain culvert replacement CR 34 – Drain Improvement – Kingsville 2 - Culvert Engineering projects for 2014 • CR 31 @ Ruscom River • CR 43 @ Sullivan Creek Essex County Highways • Road Projects ($4,820,000) – Recycling/Resurfacing: • CR 19 - Tecumseh/Lakeshore – 6.2 km • CR 12 - Essex – 2.0 km • CR 7 - LaSalle – 1.5 km • CR 29 - Kingsville – 2.6 km • CR 34 - Leamington – 1.5 km • CR 5 - Amherstburg – 1.8 km • CR 8 - Lakeshore/Leamington – 7.0 km • CR 10 - Amherstburg – 2.7 km • CR 14 - Leamington – 1.8 km Essex County Highways • Pavement Preservation ( $495,000 ) – Route and Seal – various locations – Surface Treatment – various locations - 8 km – Slurry Seal – CR50 – 5.5 km • Bridge / Culvert Preservation ($855,000) – 8 - deck/expansion joint repairs – Various guiderail repairs / upgrades • Estimated Quantities – 35,000 tonnes of Hot Mix Asphalt – 127,000 sm. of Pavement Recycling – 19,750 tonnes of Granular A Essex County Highways • Capacity Projects ( $5,600,000 ) – CR 23/46 – Intersection Improvements – LS – CR 22 Phase 5 - Contract A – LS – CR 19/22 Improvements - Engineering – Various Connecting Link projects with Towns • • • • CR 19 – Tecumseh CR 6 – LaSalle CR 20 – Amherstburg CR 34 – Leamington Essex County Highways • EA’s / Engineering: – CR 19 / CR 22 with MTO Prelim. Design ($200M) – CR 22 Ph 5b – CR 2 to Puce Detailed Design ($7.0M) – CR 42 EA – CoW to CR 25 ($30M) – Lauzon Parkway Extension – MTO/CoW /CoE – Active Transportation System ($52M) • Annual expenditure @ $1,200,000 Essex County Highways • Thank you for your interest, • Thank you for your support in delivering our annual programs, • Looking forward to another successful construction season.