VOTERS Outreach and Impact Ralf Birken Northeastern University This work was performed under the support of the U.S. Department of Commerce, National Institute of Standards and Technology, Technology Innovation Program, Cooperative Agreement Number 70NANB9H9012 Apr. 5th, 2013 | 1 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Education/Scholarship Outreach/Collaboration VOTERS Outreach Conferences Apr. 5th, 2013 | 2 | 4th NIST Site Visit New R&D projects PROPRIETARY www.neu.edu/voters EDUCATION/SCHOLARSHIP Apr. 5th, 2013 | 3 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters NEU GRADUATE STUDENTS 10 Ph.D., at least partially funded by VOTERS Yu Liu RA Yifeng Lu RA Yubo Zhao RA David Vines-Cavanaugh RA Yiying Zhang RA Nicole Martino RA Wenjun Zhang RA Qi Wang RA Ming Li RA Sindhu Ghanta RA PhD ECE PhD Interdisciplinary PhD Interdisciplinary PhD CEE PhD Interdisciplinary PhD CEE PhD Interdisciplinary PhD ECE PhD ECE PhD ECE 2012 2013 2014 2014 2014 2013 2014 2013 2013 2014 9 M.S., at least partially funded by VOTERS Jason Durant RA Hao Liu RA Vitaliy Saykin RA David Vines-Cavanaugh RA Kyle Anstey RA Bo LI RA Reid Vilbig RA Xin Ma RA Salar Shahini Shamsabadi RA MS ECE MS CE MS CE MS CE MS ECE MS ECE MS CE MS ECE MS CE 2010 UML(2012) 2011 2011 2010 2010 2013 2013 2014 Apr. 5th, 2013 | 4 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters UML GRADUATE STUDENTS Total: 6 M.S. and 6 B.S. at least partially funded by VOTERS • • • • • • • • • • • • Burak Boyaci (2010), M.S. Sam Talbot (2010), B.S. Ibrahim C. Solak (2011), M.S. Alice Chao (2012), M.S. Carlos Jaquez (2013), M.S. Hao Liu (2013), M.S. Justin Wilson (2013), M.S. Ross Gladstone (2013), B.S. Sarah Kurtzer (2014), B.S. Othman Belgrini (2014), B.S. David Perloff (2015), B.S. Steven Vaughan (2015), B.S. Apr. 5th, 2013 | 5 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters UVM GRADUATE STUDENTS Total: 1 B.S., 5 M.S., 1 Visiting Ph.D. and 1 Postdoctoral Fellow at least partially funded or otherwise supported by VOTERS • • • • • • • • Mohamed Metwally B.S. Anbu Venkatachalam M.S. Earl Lawyer M.S. Ken Ngai M.S. Andrew O’Brien M.S. Yu Zhang M.S. Xianlei Xu Visiting PhD student from China University Mining and Technology Beijing Dylan Burns Postdoctoral Fellow Apr. 5th, 2013 | 6 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Patents – 4 pending • NEU 1. Real-Time Wireless Dynamic Tire Pressure Sensors and Energy Harvesting System. Filed on May 21, 2012. Ming L. Wang, Qi Wang and Greg McDaniel. Patent pending. 2. Real Time Pavement Profile Sensing System Using Air-coupled Surface Wave, Yinghong Cao and Ming L. Wang, Filed in January 20, 2012, No. 61/434,522, PCT/US12/022016 Patent Pending. 3. Conformal and configurable millimeter-wave integrated array radar in a compact package, Dan Busuioc and Ralf Birken, and Ming L. Wang, Filed on March 23, 2013. PCT/US13/33538. Patent Pending. 4. Roaming Mobile Sensor Platform Collection Geo-Referenced Sensor Data and Creating Thematic Maps, R. Birken., Ming L. Wang, and Sara Wadia Fascetti, No. 61/315,571, March 21, 2012. Patent Pending. • Tire Excited Acoustic Sensing System. With Greg. McDaniel, 61/434,559, Merged into 4 above. • Real Time DGPS Correction Approach Through Cellular Network, With Y. Zhang, J. Zhang and R. Birken, Sep., 2010, No. 61/434,548, Provisional filed, now abandoned. • UVM • Highway speed GPR system (in preparation) Apr. 5th, 2013 | 7 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Journal papers • Over 40 publications and counting • http://www.northeastern.edu/voters/researc h/publications/journal_articles/ Apr. 5th, 2013 | 8 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Book and Book Chapters • Sensor Technologies for civil infrastructures: Performance assessment & health monitoring, M. Wang, J. Lynch, and Sohn (eds.), Woodhead Publishing, 2013. • 5 chapters from VOTERS authors will appear in book above • http://www.northeastern.edu/voters/research/publications/b ook_chapters/ Apr. 5th, 2013 | 9 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Education/Scholarship Collaboration • Over 40 Students involved, at least partially funded, at all levels • 4 Patents pending • Over 40 Publications • 5 book chapters VOTERS Outreach Conferences Apr. 5th, 2013 | 10 | 4th NIST Site Visit New R&D projects PROPRIETARY www.neu.edu/voters CONFERENCES Apr. 5th, 2013 | 11 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Hosting Major Workshops and Conferences 1. ASCE Engineering Mechanics Institute Annual Meeting, June 1-4, 2011, http://www.neu.edu/emi2011/, NEU, Boston, USA. Chair and Co-chairs M. Wang with J. Hajjar and D. Bernal. 450 participants from 22 countries. 2. (ANCRISST) on Advanced Smart Materials and Smart Structures Technology (140 from 10 countries), July, 2009, http://www.neu.edu/ancrisst2009 , M. Wang, Organizer and Chairman at NEU, Boston, USA. 3. US-Taiwan Workshop on Bio-inspired Sensor and Actuating Technology, April 2009 (95 from 10 countries), http://nuweb7.neu.edu/us_taiwan_workshop/index.php, Taipei, Taiwan. Co-chair M. Wang with C. H. Loh of National Taiwan University. Apr. 5th, 2013 | 12 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Chaired at Major Conferences • SPIE Smart Structures/NDE Symposium 2013, San Diego, CA, March 10-14, 2013 – Tzu-Yang Yu - Conference Chair for Nondestructive Characterization for Composite Materials, Aerospace Engineering, Civil Infrastructure, and Homeland Security VI Conference – Ming Wang – Session Co-Chair for Corrosion and Health Monitoring of Civil Infrastructures – Ming Wang – Session Co-Chair for SHM/NDE for Bridges – Dryver Huston – Session Co-Chair for Remote Sensing – 6 presentations from VOTERS • Symposium on the Application of Geophysics to Engineering & Environmental Problems (SAGEEP), Denver, CO, March 17-21, 2013 – Ralf Birken – Session Chair for Advances and recent applications of GPR: Civil Infrastructure – Ralf Birken – Session Chair for Advances and recent applications of GPR – 6 presentations from VOTERS Apr. 5th, 2013 | 13 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Conference Proceedings • Over 50 poster or oral presentations at relevant conferences • http://www.northeastern.edu/voters/research/publi cations/conference_proceedings/ Apr. 5th, 2013 | 14 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Education/Scholarship Collaboration • Over 40 Students involved, at least partially funded, at all levels • 4 Patents pending • Over 40 Publications VOTERS Outreach Conferences New R&D projects • Hosted 3 Major Ones • Chaired 6 Sessions this year alone • Over 50 Proceedings (Posters and Presentations) Apr. 5th, 2013 | 15 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters COLLABORATION Apr. 5th, 2013 | 16 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Collaborations • Federal Highway Administration • State Highway Departments – – – – Minnesota Washington State Massachusetts Pennsylvania • Federal Aviation Administration Supporting Organizations Apr. 5th, 2013 | 17 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Collaborations • UVM – Ongoing discussions with Vermont Agency of Transportation on bridge maintenance – Attended FHWA Workshop on Virtual NDE Laboratory, Dec. 2011, McLean, VA • Trilion – Working with the PA DOT to expand the VOTERS project • UML – MassDOT – Air Force Research Laboratory (AFRL) • NEU – UPS, Fedex, Walleye – Sky Research – Technical University Delft Apr. 5th, 2013 | 18 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Technology Transfer • Licensing agreement between ESS and NEU to sell NEU designed GPR antennas together with the ESSGPR, in final preparation Apr. 5th, 2013 | 19 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Education/Scholarship Collaboration • Over 40 Students involved, at least partially funded, at all levels • 4 Patents pending • Over 40 Publications • • • • Industry Federal and State Local Communities Technology Transfer VOTERS Outreach Conferences New R&D projects • Hosted 3 Major Ones • Chaired 6 Sessions this year alone • Over 50 Proceedings (Posters and Presentations) Apr. 5th, 2013 | 20 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters NEW R&D PROJECTS Apr. 5th, 2013 | 21 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters New Projects UVM • • Source: NASA EPSCoR Title: Prediction and Monitoring of Ablation of Thermal Protective Systems Under Atmospheric Reentry Conditions – – – – • • Source: NASA VSCG Title: Hydrogen Flame Imaging – – – – • • Role on Project: D Huston Co-I Entire Project: 9/1/11 - 8/31/14 Total Costs : $1,500,000 ($750,000 federal and $750,000 non-federal match) Specific Aims: to monitor ablation of thermal protection systems Role on Project: D Huston PI Entire Project: 9/1/10 - 12/31/11 Total Costs : $5,000 Specific Aims: to image UV hydrogen flames with passive collimated optics Source: US Army STTR Phase I with Performance Lasers Title: Compact, Rugged, and Low-Cost Wavelength-Versatile Burst Laser – – – – Role on Project: D Huston University PI, with Harry Rieger of Performance Lasers as Prime PI Entire Project: 9/1/11 - 02/29/12 Total Costs : $30,000 Specific Aims: to develop hand held eye safe burst lasers Apr. 5th, 2013 | 22 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters New Projects (cont.) UVM • • Source: Vermont Agency of Transportation and Transportation Research Center Title: Prediction and Mitigation of Scour for Vermont Bridges – – – • • Source: National Park Service Title: Fort Bowie – – – – • • Role on Project: D Huston Co-I Entire Project: 10/11 – 09/14Total Costs : $310,478 Specific Aims: to develop scour sensing and remediation Role on Project: D Huston Co-I Entire Project: 07/11 – 03/14 Total Costs : $205,000 Specific Aims: to examine preservation of adobe walls at historic fort Source: US Army STTR Phase II with Performance Laser Title: Compact, Rugged, and Low-Cost Wavelength-Versatile Burst Laser – – – – Role on Project: University PI, with Harry Rieger of Performance Lasers as Prime PI Entire Project: 9/1/12 - 08/31/14 Total Costs : $225,000 (UVM subcontract) Specific Aims: to develop hand held eye safe burst lasers Apr. 5th, 2013 | 23 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters New Projects (cont.) UVM • • Source: AFOSR STTR Phase II with Industrial Measurement Systems Inc. Title: Novel Materials for In-Situ Ablation Sensing – Role on Project: Co-I, with D Fletcher as University PI, and Donald Yuhas of Industrial Measurement Systems Inc. as Prime PI – Entire Project: 9/1/12 - 08/31/14 – Total Costs : $250,000 (UVM subcontract) – Specific Aims: to develop ablation sensors for hypersonic vehicles • • Source: NASA VSGC Title: Ultraviolet Flame Imaging with Quantum Dot Collimated Optics – – – – Role on Project: PI Entire Project: 09/01/2013 – 08/31/2014 Total Costs: $27,500 Specific Aims: to develop an ultraviolet hydrogen flame imaging system using quantum dots and collimated optics Apr. 5th, 2013 | 24 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Pending Proposals UVM • • Source: DOD Army DURIP Title: Acquisition of a High Resolution 4D X-ray Computed Tomography System to Support Existing and New National Defense-Related Research and Education – – – – • • Source: DOD Army DURIP Title: Adaptive and Cognitive Ground and Wall Penetrating Radar System – – – – • • Role on Project: D Huston Co-I, M. Dewoolkar PI Entire Project: 6/15/13 – 6/14/14 Total Costs : $899,800 Specific Aims: to acquire high resolution x-ray equipment Role on Project: D Huston PI, T Xia Co-I Entire Project: 6/15/13 – 6/14/14 Total Costs : $188,219 Specific Aims: to acquire adaptive and cognitive ground penetrating radar equipment Source: NSF with Dartmouth College Title: Data Managed Cognitive Ground Penetrating for Bridge Safety Inspection – – – – Role on Project: T Xia PI, D Huston Co-PI of UVM Entire Project: 02/01/2014 – 01/31/2017 Total Costs: $328,158 Specific Aims: to develop a novel cognitive ground penetrating radar to leverage inspection accuracy and efficiency of bridge structure safety Apr. 5th, 2013 | 25 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Pending Proposals (cont.) UVM • Source: NSF Title: Wound Closing Mechanics and Control for Structural Healing • Role on Project: PI – Entire Project: 09/01/2013 – 08/31/2015 – Total Costs: $219,287 – Specific Aims: to study the mechanics and control of wound closing in selfhealing structures • Source: US Army STTR Phase I with Superior Technical Ceramics • Title: Self Repairing Antenna Embedded in Composite Structures – – – – Role on Project: D Huston PI, T Xia Co-PI of UVM Entire Project: 09/01/2013 – 02/28/2014 Total Costs: $78,173 Specific Aims: to develop self-repairing composite antennas for ballistic armor Apr. 5th, 2013 | 26 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Pending Proposals (cont.) NEU • • • • • • • SENSOR-BASED EVALUATION OF THE CRITICAL URBAN ROAD-TRANSPORTATION ENVIRONMENT (SECURE) PI: Dr. Ralf Birken (Northeastern University) Co-PI’s: Dr. Auroop Ganguly, Dr. Jennifer Dy, Dr. Ming Wang (Northeastern University), and Prof. Vipin Kumar (University of Minnesota) Sponsor: NSF CyberSEES Proposed Date: September 1, 2013– August 31, 2016 Proposed Funds: $1,200,000 ($1,000,000 NEU) Status: Submitted February 5, 2013 • • • • • • • • UNIVERSITY TRANSPORTATION CENTER FOR Preservation of the Urban Road Environment (PURE) PI: Dr. Ming Wang (Northeastern University) Co-PI’s: Dr. Ralf Birken (Northeastern University) Collaborators: UCLA, AU, CDM, City of Boston, City of Brockton, CDM Smith Sponsor: RITA USDOT Proposed Date: September 30, 2013– September 30, 2016 Proposed Funds: $2,250,000 ($1,250,000 NEU) Status: Submitted March 19, 2013 Apr. 5th, 2013 | 27 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Pending Proposals (cont.) UML • • • • • • • MULTI-MODAL UNMANNED AERIAL VEHICLE SENSING SYSTEM FOR THE REMOTE SENSING OF BRIDGES AND TUNNELS PI: Dr. Tzuyang Yu Co-PI’s: Dr. D. Huston (UVermont), Dr. C. Cao (UConn), Dr. Y. Zhang (GeorgiaTech), Dr. Dr. V. Wang (UML), Dr. A. Gyekenyesi (NASA) Sponsor: USDOT RITA CRS&SI Proposed Date: July 15, 2013– July 14, 2015 Proposed Funds: $2,693,134 Status: Invited for oral presentation (04/03/13) • • • • • • • RAPID REMOTE DEFECT AND DAMAGE DETECTION OF LARGE-AREA COMPOSITE STRUCTURES PI: Dr. Tzuyang Yu Co-PI’s: Dr. J. Chen, Dr. C. Niezrecki, Dr. E. Reynaud Sponsor: NSF SSS Proposed Date: September 1, 2013– August 31, 2016 Proposed Funds: $408,345 Status: Pending review Apr. 5th, 2013 | 28 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Pending Proposals (cont.) UML • • • • • • • • • • • • • • LOW COST RAPID MANUFACTURING OF FIBER OPTIC PRESSURE SENSORS FOR INSPECTION AND MONITORING IN HIGH POWER ENERGY SYSTEMS PI: Dr. David Lai Co-PI’s: Dr. Tzuyang Yu Sponsor: USDOT SBIR Proposed Date: September 1, 2013– August 31, 2014 Proposed Funds: $268,750 Status: Invited for full proposal (04/03/13) LOW COST RAPID MANUFACTURING OF FIBER OPTIC PRESSURE SENSORS FOR INSPECTION AND MONITORING IN HIGH POWER ENERGY SYSTEMS PI: Dr. David Lai Co-PI’s: Dr. Tzuyang Yu Sponsor: DOE SBIR Proposed Date: September 1, 2013– August 31, 2014 Proposed Funds: $150,000 Status: Invited for full proposal (04/03/13) Apr. 5th, 2013 | 29 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Education/Scholarship Collaboration • Over 40 Students involved, at least partially funded, at all levels • 4 Patents pending • Over 40 Publications • • • • Industry Federal and State Local Communities Technology Transfer VOTERS Impact Summary Conferences New R&D projects • Hosted 3 Major Ones • Chaired 6 Sessions this year alone • Over 50 Proceedings (Posters and Presentations) • More than 10 new projects • More than 10 pending proposals • Unfortunately many rejected ones Apr. 5th, 2013 | 30 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters BUSINESS ASPECTS Apr. 5th, 2013 | 31 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Cost Estimates of VOTERS Components UVM-GPR • cost of prototype $55,000 hardware • cost of duplication in low quantities $50,000 hardware • estimated cost for medium and high quantity commercial version maybe under $10,000 ESS-GPR • Estimated cost in low quantities for prototype versions of the ESS Gen3 GPR radar system for GEARS is $3500. This includes the electronics, housing, and acquisition software, but does not include antennas. • Multiply this number time the number of antenna pairs needed for the GEARS array system. For example, a system with 16 antenna pairs would cost about $56k, a third of currently available slower commercial GPR arrays Apr. 5th, 2013 | 32 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters Cost Estimates of VOTERS Components prototype low quantities medium and high quantity DRS $2500 $1200 ~$800 TEASE $3000 $2000 ~$1500 BOSS DTPS MASS $4500 $3000 ~$2000 $6000 $4000 $2000 $5000 $4000 $2500 SLiMR Video MAP-GIS $1250 $350 $200 $4000 $2000 $1000 $30000 $20000 Will depend on server demand Apr. 5th, 2013 | 33 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters How to commercialize? • Reduce equipment cost and outfit many vehicles – Sell hardware and maintain systems – Maintenance and training – MAP-GIS software subscription, data management • Outfit one vehicle per region and survey continuously – By subscription – Whole city gets updated data every x months – Data on demand, recent data collected within 6 months always available, whoever wants it can purchase it – Survey upon request (old model) • Combine with other mobile data collection – Mobile SI platform adaptable, expandable, and scalable Apr. 5th, 2013 | 34 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters This work was performed under the support of the U.S. Department of Commerce, National Institute of Standards and Technology (NIST), Technology Innovation Program (TIP), Cooperative Agreement Number 70NANB9H9012 Thank you! r.birken@neu.edu Supporting Organizations Apr. 5th, 2013 | 35 | 4th NIST Site Visit PROPRIETARY www.neu.edu/voters