Restructuring of Keene
Elementary Schools
1, 3 & 4 School Model Options
April 9, 2013
Where We Are Now
 Over the winter, the Board of Education decided to
move toward a 4-school, wide grade span model, with
Daniels housing the Preschool program
 Following this, we received a Board request to provide
a more detailed evaluation of several variations of 1, 3
and 4-school models
 Today, we will be answering those questions
4/13/2015
KES restructuring – Marinace Architects
2
School Board Questions
 Provide cost analysis of creating 3 EQUALLYsized K-5 schools, including Fuller & Symonds,
with long-term expandability
 Provide breakout cost of Preschool in that option
 Provide cost to close Daniels, Franklin, OR
Wheelock in the 4-school, wide grade span model
 Provide cost of building one large elementary
school and closing all existing schools
4/13/2015
KES restructuring – Marinace Architects
3
Scope of This Presentation
 Option 1A: 1-School, 1,200 student option
 Options 3A & 3B: 3-School, wide grade span
options
 Options 4A, 4B, 4C, 4D: 4-School, wide grade
span options, each with a different combination of
closed and expanded schools
4/13/2015
KES restructuring – Marinace Architects
4
Location of Keene Elementary Schools
4/13/2015
KES restructuring – Marinace Architects
5
Option 1A
 Construct a new 1,200 student, 198,000 square
foot P-5 school at the Daniels site
 Existing Daniels school demolished
 Other 4 existing schools closed and sold
4/13/2015
KES restructuring – Marinace Architects
6
Option 1A
Class distribution – Total Capacity: 1,188 Students
School
Typical no. of sections per grade
K
1
2
3
4
5
Daniels
11
Franklin
0
Fuller
0
Symonds 0
Wheelock 0
Total
11
4/13/2015
11
0
0
0
0
11
11
0
0
0
0
11
11
0
0
0
0
11
9
0
0
0
0
9
KES restructuring – Marinace Architects
9
0
0
0
0
9
Total
sections /
school
62 + P
0
0
0
0
62
7
Option 1A – Daniels Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
8
Option 1A – Site Plan
4/13/2015
KES restructuring – Marinace Architects
9
Option 1A – Summary
4/13/2015
KES restructuring – Marinace Architects
10
Option 1A – Pros & Cons
 Significant operating cost savings, but a large capital
investment is required
 New, state-of-the-art space for all students
 High performance building heated from wood chip plant,
with low long-term maintenance costs
 Neighborhood schools replaced by one large school
 Maple Street site maxed out with 2,200 students on site,
creates traffic and access issues, congestion
 Another site needed for possible long-term expansion
4/13/2015
KES restructuring – Marinace Architects
11
Option 3A
 Fuller & Symonds expanded from 3-section to
4/3-section schools. Capacity of each rises from
324 to 426 students
 Daniels expanded from a 2-section to 3-section
school. Capacity rises from 216 to 324 students
 Preschool moves to Daniels
 Franklin & Wheelock closed and sold
 Total district capacity of 1,188 students K-5
4/13/2015
KES restructuring – Marinace Architects
12
Option 3A
Class distribution – Total Capacity: 1,188 Students
School
Typical no. of sections per grade
K
1
2
3
4
5
Daniels
3
Franklin
0
Fuller
4
Symonds 4
Wheelock 0
Total
11
4/13/2015
3
0
4
4
0
11
3
0
4
4
0
11
3
0
4
4
0
11
3
0
3
3
0
9
KES restructuring – Marinace Architects
3
0
3
3
0
9
Total
sections /
school
18 + P
0
22
22
0
62
13
Option 3A – Daniels Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
14
Option 3A – Daniels Site Plan
4/13/2015
KES Restructuring - Marinace Architects
15
Option 3A – Fuller Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
16
Option 3A – Symonds Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
17
Option 3A – Summary
4/13/2015
KES Restructuring - Marinace Architects
18
Option 3A – Pros & Cons
 Significant staff operating cost savings, but a large
capital investment is required
 Avoid CIP, maintenance and utility costs by closing two
schools
 Offers long-term expansion potential
 Neighborhood school model diminished
 More pressure placed on larger school cores
4/13/2015
KES restructuring – Marinace Architects
19
Option 3B
 Same as Option 3A except Preschool is
eliminated from Daniels School
 Since Preschool is not accounted for elsewhere in
this option, the difference in cost between Option
3A and Option 3B can be seen as a breakout cost
for the preschool program
4/13/2015
KES restructuring – Marinace Architects
20
Option 3B
Class distribution – Total Capacity: 1,188 Students
School
Typical no. of sections per grade
K
1
2
3
4
5
Daniels
3
Franklin
0
Fuller
4
Symonds 4
Wheelock 0
Total
11
4/13/2015
3
0
4
4
0
11
3
0
4
4
0
11
3
0
4
4
0
11
3
0
3
3
0
9
KES restructuring – Marinace Architects
3
0
3
3
0
9
Total
sections /
school
18 + P
0
22
22
0
62
21
Option 3B – Daniels Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
22
Option 3B – Summary
4/13/2015
KES Restructuring - Marinace Architects
23
Option 4A
 This is the 4-school, wide grade span option
favored up to this point
 Fuller & Symonds remain 3-section, 324 student
schools, and receive small additions
 Franklin expanded from a 2-section to 3-section
school. Capacity rises from 216 to 324 students
 Preschool only at Daniels
 Wheelock remains a 2-section school
 Total district capacity of 1,188 students K-5
4/13/2015
KES restructuring – Marinace Architects
24
Option 4A
Class distribution – Total Capacity: 1,188 Students
School
Typical no. of sections per grade
K
1
2
3
4
5
Daniels
0
Franklin
3
Fuller
3
Symonds 3
Wheelock 2
Total
11
4/13/2015
0
3
3
3
2
11
0
3
3
3
2
11
0
3
3
3
2
11
0
3
3
3
2
9
KES restructuring – Marinace Architects
0
3
3
3
2
9
Total
sections /
school
Preschool
18
18
18
12
66
25
Option 4A – Daniels Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
26
Option 4A – Fuller Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
27
Option 4A – Symonds Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
28
Option 4A – Franklin Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
29
Option 4A – Wheelock Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
30
Option 4A – Summary
4/13/2015
KES Restructuring - Marinace Architects
31
Option 4B
 Similar to Option 4A, except Wheelock closed
instead of Daniels
 Fuller & Symonds remain 3-section, 324 student
schools, and receive small additions
 Franklin remains a 2-section, 216 student school
 Daniels expanded from a 2-section to a 3-section,
324 student school, and receives a large addition.
Preschool moves from Wheelock to Daniels
 Total district capacity of 1,188 students K-5
4/13/2015
KES restructuring – Marinace Architects
32
Option 4B
Class distribution – Total Capacity: 1,188 Students
School
Typical no. of sections per grade
K
1
2
3
4
5
Daniels
3
Franklin
2
Fuller
3
Symonds 3
Wheelock 0
Total
11
4/13/2015
3
2
3
3
0
11
3
2
3
3
0
11
3
2
3
3
0
11
3
2
3
3
0
9
KES restructuring – Marinace Architects
3
2
3
3
0
9
Total
sections /
school
18 + P
12
18
18
0
66
33
Option 4B – Daniels Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
34
Option 4B – Fuller Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
35
Option 4B – Symonds Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
36
Option 4B – Franklin Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
37
Option 4B – Summary
4/13/2015
KES Restructuring - Marinace Architects
38
Option 4C
 Similar to Option 4A, except Franklin closed instead of
Daniels
 Fuller & Symonds remain 3-section, 324 student
schools, and receive small additions
 Wheelock remains a 2-section, 216 student school
 Daniels expanded from a 2-section to a 3-section, 324
student school, and receives a large addition.
Preschool moves from Wheelock to Daniels, and
collaborative programs move from Franklin to Daniels
 Total district capacity of 1,188 students K-5
4/13/2015
KES restructuring – Marinace Architects
39
Option 4C
Class distribution – Total Capacity: 1,188 Students
School
Typical no. of sections per grade
K
1
2
3
4
5
Daniels
3
Franklin
2
Fuller
3
Symonds 3
Wheelock 0
Total
11
4/13/2015
3
2
3
3
0
11
3
2
3
3
0
11
3
2
3
3
0
11
3
2
3
3
0
9
KES restructuring – Marinace Architects
3
2
3
3
0
9
Total
sections /
school
18 + P
12
18
18
0
66
40
Option 4C – Daniels Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
41
Option 4C – Fuller Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
42
Option 4C – Symonds Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
43
Option 4C – Wheelock Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
44
Option 4C – Summary
4/13/2015
KES Restructuring - Marinace Architects
45
Option 4D
 Similar to Option 4B, except Franklin is expanded to a
3-section school instead of Daniels
 Fuller & Symonds remain 3-section, 324 student
schools, and receive small additions
 Wheelock Closed
 Preschool moves from Wheelock to Daniels, and
Daniels received a medium-sized addition
 Total district capacity of 1,188 students K-5
4/13/2015
KES restructuring – Marinace Architects
46
Option 4D
Class distribution – Total Capacity: 1,188 Students
School
Typical no. of sections per grade
K
1
2
3
4
5
Daniels
2
Franklin
3
Fuller
3
Symonds 3
Wheelock 0
Total
11
4/13/2015
2
3
3
3
0
11
2
3
3
3
0
11
2
3
3
3
0
11
2
3
3
3
0
9
KES restructuring – Marinace Architects
2
3
3
3
0
9
Total
sections /
school
12 + P
18
18
18
0
66
47
Option 4D – Daniels Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
48
Option 4D – Fuller Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
49
Option 4D – Symonds Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
50
Option 4D – Franklin Floor Plan
4/13/2015
KES Restructuring - Marinace Architects
51
Option 4D – Summary
4/13/2015
KES Restructuring - Marinace Architects
52
Cost Analysis
 Analysis of staffing requirements for each option.
Increases in staffing efficiencies are the most
important factor in overall savings
 CIP Tabulation for each option
 Budget for each option broken down by Additions,
Renovation, CIP and Operational costs
4/13/2015
KES restructuring – Marinace Architects
53
1-School Staffing Tabulation
4/13/2015
KES restructuring – Marinace Architects
54
3-School Staffing Tabulation (3A Shown)
4/13/2015
KES restructuring – Marinace Architects
55
4-School Staffing Tabulation (4A Shown)
4/13/2015
KES restructuring – Marinace Architects
56
5-School Staffing Tabulation (Existing)
4/13/2015
KES restructuring – Marinace Architects
57
CIP Budgets
Include three categories:
 1. (Shown in red) Items required by building code +
building heat conversion from steam to hot water
included in the project budgets
 2. (Shown in blue) Long-term CIP items that will
need to be done in the next 10-20 years to maintain
the buildings, not included in the project budgets
 3. (Shown in black) Items the school district will
complete outside of the building program not
included in the project budgets
4/13/2015
KES restructuring – Marinace Architects
58
CIP - Daniels
4/13/2015
KES restructuring – Marinace Architects
59
CIP - Fuller
4/13/2015
KES restructuring – Marinace Architects
60
CIP - Wheelock
4/13/2015
KES restructuring – Marinace Architects
61
CIP - Franklin
4/13/2015
KES restructuring – Marinace Architects
62
Overall Project
Budgets
4/13/2015
KES restructuring – Marinace Architects
63
Budgets Notes
 CIP heat conversion is included, at a cost of
$3,386,000 to the budget of 3 and 4-school
options, and reduces the annual savings by up to
$267,000
 1 and 3-school options assume that unused
buildings will be sold at a price of $750,000 each
 Staffing figures and salaries have been updated.
Preschool staffing has increased in all new
configurations by $121,000 (1 teacher, 1 para)
4/13/2015
KES restructuring – Marinace Architects
64
Option 1A - Budget
4/13/2015
KES Restructuring - Marinace Architects
65
Option 3A - Budget
4/13/2015
KES Restructuring - Marinace Architects
66
Option 3B - Budget
4/13/2015
KES Restructuring - Marinace Architects
67
Option 4A - Budget
4/13/2015
KES Restructuring - Marinace Architects
68
Option 4B - Budget
4/13/2015
KES Restructuring - Marinace Architects
69
Option 4C - Budget
4/13/2015
KES Restructuring - Marinace Architects
70
Option 4D - Budget
4/13/2015
KES Restructuring - Marinace Architects
71
Budget Summary
4/13/2015
KES Restructuring - Marinace Architects
72