1 C1806 EWIP UK Site Induction

advertisement
Construction
site induction
construction
site induction
• Welcome to the site
East West Interconnector Project
EWIP
• Your site manager & Safety Rep is
David Shelton – Project Construction Manager (Wales)
• Other key personnel are
Miles Crossley – Site Supervisor
construction
site induction
EirGrid plc has been tasked with arranging the construction of a High
Voltage Direct Current (HVDC) electricity interconnector with 500
MW transmission capacity linking the British and Irish Electricity
markets (the East West Interconnector Project [“EWIP”]).
The EWIP shall comprise a 185 km undersea cable and circa 45 km
of land cable in Ireland and 30 km of land cable in Britain connecting
two converter stations, one in Ireland and the other in Britain which
convert the power from AC to DC and back again from DC to AC
when landed on the receiving side.
construction
site induction
The Client (Employer)
The CDM Co-ordinator (UK)
Planning Supervisor Design Phase (PSDP) (IR)
The Employers Representative (Project Manager)
The Contractor (Principal Contractor)
ABB
The Sub-Contractor
construction
site induction
Health and Safety Targets
 NO INJURIES
 NO ILL HEALTH
 NO DAMAGE
 NO ENVIRONMENTAL INCIDENTS
 Reporting and investigation of Near-Misses and Safety Observations
 NO breaches of security at the work site.
 Effective “Lessons Learnt” sessions are held and recorded in detail.
 All formal meetings between Client, Principal Contractor, ‘Prime’
Contractors and sub Contractors (or any combination thereof) will
commence with a Health, Safety and Environment Topic/H&S Continuous
Improvement topic.
construction
site induction
This Project is run according to Construction
(Design and Management) regulations 2007
(CDM)
 All actions must be carried out in accordance
with all relevant UK regulations and the local
laws and licences agreed for this project.
 EGRID & ABB have further specific rules which
must be observed
construction
site induction
Woking Area
Gwespyr
Glan-y-Don
Prestatyn
Ffynnonsroyw
Llannerch-y-Mor
construction
site induction
Woking Area (cont)
Greenfield
Bagillt
Flint
Shotton
Oakenholt
construction
site induction
You need to know where the following:
 First Aid Kits/Post,
 Fire Extinguishers,
 Assembly Point,
 Spill Kit Locations
As you will understand this part of the project is a selection of mobile sites along
the length of its 30 kilometres, with Excavation, Duct Laying, Reinstatement gangs,
Jointing and Cable pulling crews.
Each team will have an appointed competent Person dedicated to controlling the
above
construction
site induction
Site Access
 Routes to all Sites are agreed upon with local residents and/or local Council.
 The main site compound and VolkerInfra site office is located at Bryn Thomas’s
yard
 Access/Egress to the site compound is via Bryn Thomas’s entrance gate
located directly off the A548.
 Please be aware that this is a shared yard and some very heavy equipment is
operating on a daily basis. Make sure to make yourself known whilst travelling
through the yard.
 Due to the residential nature of the area, all truck deliveries to site must be
coordinated with the Construction Site Manager, David Shelton to avoid busy
times and school arrival/departure times.
construction
site induction
Site Access cont
 When collecting/delivering materials to the site compound, please advise
VolkerInfra staff who will record any material movement.
 Designated parking areas are outside the site office for light vehicles and on
the other side of the orange barriers for all work vehicles. Please ensure to
reverse park in a safe and orderly fashion.
 No vehicles are to park on the adjacent residential roads at any time.
 Do not use un-authorized routes to access the Site.
construction
site induction
 Welfare arrangements can be found at the
Main site office, & canteen within the site compound
 Further mobile welfare units will be available along the route,
their locations will be identified at the daily briefings
 The site compound speed limit (is 5mph)
 All other national speed limits along the route must be observed
at all times
 AS STATED NO ACCESS WILL BE ALLOWED ON ANY OF
THE RESTRICTED ROADS
construction
site induction
First aid arrangement
 At the VolkerInfra Site office & canteen
 Also at all mobile welfare units and in each site works van
 First Aider Dave Shelton 0796 9027006
 First Aider Miles Crossley 0780 1617522
 As well as the first aiders available in your gangs or the appointed person
 See also the site emergency information posters around the site
construction
site induction
Fire prevention and fire fighting procedures
 Extinguishers are placed at the Site office /canteen & welfare unit.
 Fire extinguisher will also be placed at any hot work operations and in
work shop containers.
 Contact the Site Manager, Site Supervisor or your Site Appointed
person who will contact the Fire Brigade.
 Do not tackle a fire unless you have been trained to do so.
construction
site induction
Accident Reporting
 All accidents must be reported to the Construction Manager
 Entered into the site First Aid Book
 Any three day accident will be reportable under RIDDOR
 Any accident will be reported to the Volker Wessels call centre.
 Call centre 0800 169 6150
 All accidents will be reported to the Client
construction
site induction
Hazards specific to this site
include the following activities being
undertaken.
 Excavations
 Working on busy roads
 Working near the General Public
 The site will have more than
One activity being carried out
at any one time, look to see who
is working in or adjacent to
your work area.
 All plant movements will carried out under the
instruction of a Banksman.
construction
site induction
Raising health, safety
or welfare concerns
 A representative from each department and from each subcontractor
will be present at regular meetings along with the Construction
Manager to openly discuss any concerns on an informal bases.
construction
site induction
What are you on site to do?

Only carry out work that you have been trained for and are
competent to carry out
What hazards are you bringing onto site?

Do not misuse any Plant and Equipment that you are
given to carry out your task,
 Do not attend site under the influence ALCOHOL or DRUGS.
 A strict zero tolerance policy on Alcohol & Drugs is in place.
 Anyone found to be under the influence of Alcohol & Drugs will be
removed from site immediately.
construction
site induction
General site rules

Follow the Method Statement or Task Plan that you are
working too.
 Follow the Risk assessments that relates to your task.
 Carry out or ask for further Risk assessments to be
carried out if think the existing one is inadequate or that
the way you need to carry your task has changed.
 Observe others, if you feel that they are not carrying a
task safely please inform your supervisor so that we can
avoid any accidents.
construction
site induction
 Please report any near misses to the Site
Construction Manager or your
Supervisor/Foreman, also through the Volker
Wessles Call Centre 0800 169 6150
 The aim is not to reprimand any one,
but understand why and how things
happen/go wrong.
 Your attention is drawn to the fact that
neighbours are in close proximity to the site. As a
result it is to be kept tidy AT ALL TIMES. No tools,
keys to plant to be left onsite unattended. All keys
and tools to be removed from the plant/vehicles
and site outside Working Hours to deter any
trespassers.
More site rules…
construction
site induction
Site specifics EWIP
 Follow ALL speed limits
 Wear the correct PPE. (if you do not have it ask)
 Follow the Method Statement, Task Plans and any
Permits to work.
 Do not get involved with horse play.
 Do not work under the influence of DRINK or
DRUGS.
 Use the welfare
facilities provided (do not urinate
on the site)
 Wash you hands before eating and only eat your
food in the welfare units provided.
 Sign in, in the site register each day.
construction
site induction
Handling
Equipment
 Do not use any Plant that you have not been
trained on and carry the correct CPCS card
for.
 Do not use any tools unless you have been
trained and are competent to use them.
 Only use plant, tools & lifting equipment
that carries the correct & current
certification.
 Do not forget to carry out or have a Risk
assessment carried out, for, Lifting
operations, Manual Handling, Working at
Height, Excavations, ie any work task that
carries a potential risk to you or others
around you.
construction
site induction
Housekeeping and the environment
 Good house keeping is the start to a happy site.
 One it shows that we can control our working
environment.
 Two is makes for a better working environment.
 And Thirdly is makes for a safer working
environment.
 Please use the skips provided for your rubbish, do
not litter the site, the canteen or your working area.
If you see others dropping litter or working untidily
tell them or your supervisor.
construction
site induction
Site Rules
Strict compliance with the conditions of the Principal Contractor’s and the VolkerInfra
“Construction Phase Health and Safety Plan” is required at all times.
1. No unauthorised person shall be allowed access to the site. All visitors shall report to
the Site Manager/Supervisor. All personnel shall carry some form of identification at
all times, proof of identity will be required before allowing access to site.
2. All persons shall receive site safety induction training before being allowed onsite.
3. All persons shall record the time of their arrival and departure from site.
construction
site induction
Site Rules
4 All site personnel & visitors to site shall wear:•
safety helmets to EN 397, with chin strap if working at height
•
lace-up type safety boots with toe and sole protection - EN 345 offering adequate ankle support,
and mid-sole protection. Riggers boots will not be allowed.
•
suitable eye protection –minimum EN166F,
•
suitable hand protection – (Gloves) - EN 388 for the task being carried out. NB Gloves may be
“carried” when not working
•
Overalls coveralls or other suitable work wear must be worn that protect an operatives arms,
body and legs .
•
and yellow high visibility waistcoat or jacket – EN 471.
•
The Banksman directing traffic or lifting operations shall wear an orange high visibility waistcoat
or jacket.
construction
site induction
Site Rules
5 Site fencing shall be kept closed at all times except briefly to allow the passage of
vehicles or personnel when they shall be supervised by a person authorised to do so.
6
Safety harnesses will be used –
a. where employees are working at a height where they could fall a distance that could
result in injury ( unless “fall restraint” is being employed other means of preventing or
mitigating the consequences of a fall must be employed)
b. in circumstances other than a & b above where there is a risk of falling a suitable and
sufficient risk assessment shall be carried out and adequate controls established and
implemented.
construction
site induction
Site Rules
7
Compliance with Principal Contractors Safety Rules as applicable is required at all
times
8
The use of Cable Avoidance Tools (CAT) are mandatory, even though you may
have used cable locators for many years, please have a look at the following.
9
construction
site induction
construction
site induction
construction
site induction
construction
site induction
10 No smoking in any site buildings, cabins, the working area(s) or within 5 metres of any
flammable products e.g. diesel fuel tanks .gas cylinders etc. Smoking materials shall
only be discarded via the receptacles provided for that purpose. Disposal via any
other means will not be tolerated. Smoking is only permitted in the designated
smoking area(s)
11 The drinking of alcohol and drug abuse will not be permitted on the construction site.
construction
site induction
12
No persons under the influence of alcohol or drugs shall attend or be allowed to
enter the construction site.
13
Use of Welding and Flame Cutting equipment is not permitted, unless specifically
agreed in advance by the Principal Contractor and only under a Hot Works
Permit..
14
No waste shall be allowed to leave site without completion of a Waste Transfer
Note (non hazardous waste) or a Waste Consignment Note (hazardous waste)
Waste shall be placed in suitable receptacles. All waste leaving site must be
entered into the Site Waste Management Plan (SWMP)
15
No plant, equipment lifting tackle etc. shall be put to work without current
certification available on site.
16
Plant shall only be operated by trained and competent personnel authorised to do
so.
construction
site induction
17 No work shall commence unless a Risk Assessment has been carried out and a
Method Statement detailing the safe system of work to be adopted has been
accepted by the Principal Contractor and explained to all persons engaged in the
works.
18 No deviation from Method Statements, which have been accepted, will be tolerated.
Any changes must be submitted to the Principal Contractor and must be agreed by all
interested parties before being accepted by the Principal Contractor and
implementation allowed to proceed.
19 Lifting Operations shall be planned by an “Appointed Person”. All lifting Operations
shall be carried out by competent slingers & banksmen.
20 All personnel shall follow the designated routes giving safe access/egress to/from the
work place and shall keep the site of their work clean, tidy and clear of obstructions.
All floors and walkways shall be kept clear of materials, in order that a secure footing
can be maintained.
construction
site induction
Site Rules
21 All personnel shall at all times ensure precautions are taken so as not to pollute the
atmosphere, ground or waters.
22 The lighting of fires is strictly prohibited.
23 No excavation/ground penetration works shall be allowed without a permit to dig .
24 All Accidents/Incidents/Near misses shall be reported immediately to the Volker
Wessels Call Centre 0800 169 6150
construction
site induction
Site Rules
25
The use of mobile telephones other than “company supplied” mobile telephones in
the work area is prohibited. The use of any mobile telephone whilst operating any
mobile plant or other equipment is strictly prohibited.
26
All vehicles using the car park area shall “reverse park”
27
All Traffic Management will follow specific procedures like the Safety at Street
Works and Road Works (Red Book Code of Practice) the Captor 8 Regulations
2008 or any Traffic Management Plan that is approved by the local Highway
Authority.
construction
site induction
Site Rules
28 Failure to comply with any site rules may result in expulsion from site.
29 The Site Rules shall be made available at all work sites. Minor violation (by act or
omission) of Site Rules may be dealt with by caution (to include warning of exclusion
in the event of future violation). Serious violation of Site Rules (by act or omission) will
result in formal warning (and confirmation that repetition would result in immediate
exclusion from site). Gross violation of Site Rules (by act or omission) will result in
immediate exclusion from site. Flagrant breach of any Site Rule is liable to exclusion
from the site. Any exclusion from site shall be permanent.
 Each individual working area is covered by their own individual RAMS i.e.
Method Statement, Task Plan and associated Risk Assessments. These will
need to be read and understood by all site staff prior to works commencing
onsite. You will all need to sign onto these documents. IF YOU DON’T
UNDERSTAND ANYTHING, DO NOT HESITATE TO ASK AS NOT
UNDERSTANDING LATER WILL NOT BE A DEFENCE IN A COURT OF
LAW.
construction
site induction
Self protection
Always wear the correct PPE for the task that you
are carrying out.
If you don’t have it ask your Supervisor or the Site
Manager.
The minimum on this site is:
•
Hard Hat
•
Steel toe cap Boots
•
High Visibility vest/jacket/shirt*
•
Coveralls/overalls
•
Gloves
Other PPE that is available:
•
Eye Protection
•
Ear protection if an assessment demes it as a
requirement
•
Fall arrest system
•
Dust masks
Please ask if you find the need for further
information on the correct PPE/RPE for the task
being carried out.
*Note for Banksman duties an
orange hi vis is required
construction
site induction
Beware there could be unexploded ordinance
If you spot a bomb stop work
and report it...
construction
site induction
Site Security
Some form of Id Card must worn and
showed upon request
ID: 007
AN Other
Site
Mr. Scott Stone
Project Manager VI
Environmental Systems
Help us comply with our ISO14001
Environmental Management systems and
policies...
A copy of the policy statement and environmental details
for site are held with the Project Manager
Environmental Rules
Standards onsite
Environmental standards will help us to comply with our
Environmental Policy. Standards identify the behavioural
requirements necessary to prevent, or minimise, the
consequences of an environmental incident. Violation of
these site standards could be an important contributor
towards pollution. Therefore, management considers the
following standards appropriate. The following standards
apply to all persons on site.
Environment
Standards/ Rules:
• Use the facilities as they were designed 
• Ensure any waste is deposited in the correct bin 
• Where possible use the recycle bins provided 
• Ensure good housekeeping; operate a "clean-as-you-go"
house keeping policy 
• Ensure no burning of waste and no fires onsite 
• No hazardous materials to be used onsite unless
authorised 
Environment
• No substances such as bentonite or fuel are discharged into the
water
• Ensure all spillages are contained and reported 
• Ensure vehicles/ machinery/ engines are not left running and not
over revved 
• Where possible (and safe) turn off lighting 
• Where possible ensure heaters are turned off and ensure doors are
kept closed 
• Report potential pollution issues 
• Report all pollution incidents and near misses; ensure the incident is
recorded 
• Co-operate at all times with us to comply with environmental
legislation 
Environment
Know the location of the spill kits

Spill kits are provided at the point of use...
 Spill kits need to be located at specific points around the site and are
portable
 Spill kits are kept at all site welfare units
 Know how to use them
 If in doubt ask...
Environment
 Fix leaks
Environment
 No fly
tipping
Waste Management
 Stick it in
the right bin
construction
site induction
Site induction register
Now that this site induction has come to an end we would ask that you
complete the Site Induction Register to indicate that you have received
and understood what is expected of you to carry out your work safely
and correctly. You will also be issued a VolkerInfra induction label to
put on your hard hat.
If you have any questions please ask.
construction
site induction
Thank you!
&
Please do not put your lives or others at Risk
on this or any other site that you are asked
to work on
We intend to have an accident free site
Download