water services strategic plan

advertisement
1
Water Services National
Training Group
Water Services Strategic Plans
2
Water Services Strategic
Plans
Grellan McGrath, Operations Director
Kevin Power, Director
RPS Consulting Engineers
Course Outline •
Session 1 – Introduction, Plan Layout & Procedure
•
Session 2 – Legal Background
•
Session 3 – Synchronisation with other Plans
•
Session 4 – Levels of Service and Design Standards
•
Session 5 – Demand Forecasting
•
Session 6 – Asset Data (Condition & Performance)
•
Session 7 – Asset Data (Valuation)
3
Course Outline •
Session 8 – Asset Capacity Assessment & Option Selection
•
Session 9 – SEA
•
Session 10 – Asset Management
•
Session 11 – Financial Planning
•
Session 12 – Plan Review
4
5
Session 1
Introduction, Plan Layout and
Procedure
Volume 1
6
Introduction
Purpose
–
“better forward planning is vital if we are to maintain and
improve water quality in Ireland”
Water Services Act 2007
–
comprehensive legal & regulatory framework to ensure
planning management & delivery of water services
–
Requires water services authorities to prepare a water
services strategic plan with regard to the provision of
water services.
Vol 1 Section 1., Page 1-1/3
7
Introduction
Objectives
–
Protect human health and the environment
–
Facilitate the provision of sufficient water services
–
Support proper planning and sustainable development
Vol 1 Section 1., Page 1-1/3
8
Introduction
Guidance
–
provides practical guidance and procedural direction on
the preparation of water services strategic plans.
–
sets out recommended contents of plan.
–
explains the procedural obligations in making a plan.
–
does not prescribe “best practice” or methodologies for
emergency/operational planning.
Vol 1 Section 1., Page 1-1/3
9
Introduction
Guidance Structure
–
Volume 1 – Introduction & Summary Guidance
Introduction, Preparing a Water Services Strategic Plan, Guidance on
Procedure
–
Volume 2 – Legal Background Document
Background/Introduction, Main Legislation, Other Relevant Legislation
–
Volume 3 – Synchronisation with other Plans
Background/ Introduction, Planning & Development Plans, Water Quality
Plans, Waste Management Plans, Consultation with Adjoining Authorities
Vol 1 Section 1., Page 1-1/3
10
Introduction
Guidance Structure
–
Volume 4 – Guidance on Content of Technical Reports
•
Executive Summary
•
Levels of Service
•
Demand for Water Services
•
Asset Assessment & Options
•
Strategic Environmental Assessment
•
Asset Management
•
Financial Planning
•
Strategic Plan Review
Vol 1 Section 1., Page 1-1/3
11
Preparing a Plan
What is a water services strategic plan?
–
A document outlining the broad strategy for delivering
water services over a 6-year planning horizon.
–
Executive summary – setting out the main objectives over
the period of the plan.
–
Core strategic plan – setting out in more detail the
objectives under the following headings:-
Vol 1 Section 2., Page 1-4/13
Preparing a Plan
12
Plan Approval &
Review
Define / Review
Levels of Service
Financial Plan
• Existing
Legislative
Demand – Water Audits (Water in = water out)
•Operational Options to reduce consumption/leakage
• Water
•
Drinking
Conservation
•
Water
To
be
No.
made
and
2(Location,
Demand
Regulations,
by Elected
Management
Members
2007
Review
• Physical Parameters
Size,
Age,
Material,
Issues etc.)
• Design / Actual Capacity of Each Asset
•Options for Asset Renewal/Rehab to Design Capacity
• Review
•
Ww
Discharge
Local/
•
Issue
Regional
(Authorisation)
to
Minister
Development
Regulations,
Planning 2007
Documents
• Asset Condition –• Source
how
is condition
assessed
and
monitored
/ Asset
Receiving
Water Capacity
Assessment
•
Maintenance
Plan
• Cash Flow Projections
–
maintenance,
renewals
new Capacity
works
• Options for New Assets to Increaseand
Design
• Review
•Water
Population
Framework
Periodic
Review
Directive
/ life
Forecasts
(< 6criteria,
Years)Services
• Asset
Valuation
–•Trends
Design
depreciation, replacement value
Water
Asset
Current•Utilisation
Asset
Renewal/Rehab
Plan - DeferredDemand
•
Risk
Assessment
(Asset
Sweating
Capex)
Management
Plan
• Customer
Funding
Strategy
– Local
/ Central
Funding (PPP)
Strategic
Plan
Assessment
• Review
Other
•
Review
per
of
Capita
Actual
Consumption
versus
Forecast
• Historical Data – •Operational
and Capital Expenditure
Historical
Performance
Records
•
New/Upgrades
Asset
Plan
• Strategic Environmerntal
Assessment
• Assess
• Service
•Pressures
Review
Demand
Changes
for
Water
in Levels
Services
of Service Requirements
• Future
Asset
Valuation
(Current
and
Forecast)
• Supporting
information
models, calculations etc.)
• Asset
Disposal(network
Plan
• Leakage/Infiltration
• Review Demand Forecasts
• Treatment
• Prepare
Capacity
Revised Plan and Submit
Strategic
StrategicOptions
Options
Collect Strategic
Asset Data
Strategic Capacity
Assessment
Vol 1 Section 2., Page 1-4/13
Document Hierarchy
13
Executive
Summary
Strategic Plan
Technical Reports
Support Data & Documentation
Vol 1 Section 2., Page 1-4/13
14
Document Hierarchy
Water
Services
Strategic
Plan
TIER 1
Executive
Summary
Strategic Plan
TIER 2
Technical Reports
TIER 3
Support Data & Documentation
TIER 4
Vol 1 Section 2., Page 1-4/13
15
Procedural Guidance
Legislative Requirements
Establish Plan Framework
Water Services Authority to make
water services strategic plan by
prescribed date - WSA Section 36(2)
& (5)
Establish date by which the
Authority has to make a water
services strategic plan.
Water Services Authorities to decide
whether to make a joint plans or subplan with other authoritie(s) - WSA
Section 36(4)
Is the Authority going to make a
joint plan or sub-plan with other
Authorities
Yes
No
Minister may require Authorities to
make joint plans - WSA Section
37(a&b)
Does the Minister require the
Authority to make a joint plan or
sub-plan with other
Yes
Has the Minister
specified how the joint
plan or sub-plan is to be
co-ordinated
No
Minister may make regulations
relating to the content, notification
and consultation requirements and
procedures associated with time
limits - WSA Section 36(9)
Refer to any Regulations made by
the Minister as to how particular
issues are dealt with in the plan,
notification or consultation
requirements and procedures
associated with time limits
Refer to any pro-forma
notices on notification or
consultation process
Vol 1 Section 3, Page 1-14/22
Prepare Plan
16
Procedural Guidance
Legislative Requirements
Establish Plan Framework
Prepare Plan - 1/3
Make Initial Draft Water Services
Strategic Plan
An SEA shall be carried out for all
plans and programmes which are
prepared for water management Section 9(5) of SI435 of 2004 (SEA
Regs)
Draft and issue SEA scoping report
to prescribed Environmental
Authorities (4 week comment
period)
Refer to pro-forma notice
for SEA Scoping
(Appendix A)
Complete Draft Water Services
Strategic Plan and Environmental
Report taking into account
comments received
Complete consultation process on
relevant elements of draft plan and
environmental report. (8 week
consultation period)
Refer to pro-forma
notices for SEA
(Appendix A)
Vol 1 Section 3, Page 1-14/22
17
Procedural Guidance
Prepare Plan - 2/3
Legislative Requirements
Complete Draft Water Services
Strategic Plan and Environmental
Report
Refer to pro-forma Notice
of Motion for presentation
to Elected Members
(Appendix A)
Present Draft Plan (including
environmental report) to Elected
Members for approval
Yes
Manager to warn Members of likely
failure to make a Plan before the due
date - WSA Section 36(12)
Are Members likely to fail to make a
plan by the due date
No
Manager to notify
members of
consequence of failure to
make plan by due date
and advise of entitlement
to apply for extension to
the due date
Vol 1 Section 3, Page 1-14/22
18
Procedural Guidance
Prepare Plan - 3/3
Legislative Requirements
Do Members require an extension
to the due date for making the plan.
Authority may apply to the Minister
for an extension of up to 3 months WSA Section 36(10)
No
Yes
If Members fail to make a plan by the
due date the function of the making
of the Plan is transferred to the
Manager - WSA Section 36(13)
Apply to the Minister for
an extension (not greater
than 3 months)
Have members failed to make a
plan by the due date
No
No
Members revise Plan
Is plan approved by Elected
Members
The making of a plan or replacement
plan is a reserved function - WSA
Section 36(3)/14
If Managers is of opinion that
proposed plan would not be
appropriate he must inform the
members of such and advised that
should they proceed to make the
plan the Minister may require the
plan to be revised or replaced and
inform them of their right to apply for
an extension to the due date - WSA
Section 36(11)
Yes
Yes
Is the Manager of the opinion that
the proposed plan is appropriate
Yes
Manager proceeds
with Plan
No
Inform the members of
such and advise that the
Minister may require the
plan to be revised or
replaced and of option to
extend due date.
Members proceed with
Plan
Vol 1 Section 3, Page 1-14/22
19
Procedural Guidance
Legislative Requirements
Prepare Plan
The plan comes into force once the
members (or Manager) approve it WSA Section 36(17)
Manager
makes
Plan
Members make Plan
A copy of the plan to be forwarded to
the Minister and other persons as
may be prescribed and notification of
the making of the plan published in
the prescribed manner - WSA
Section 38(1)
Forward Plan to the Minister, other
prescribed bodies and
environmental authorities and
publish notification of the making
of the plan
Once the plan is made the Water
Services Authority should implement
it - WSA Section 38(2)
Implement Plan, including
environmental monitoring
requirements
The Minister may require the
Authority to revise or replace the
Plan - WSA Section 37(c)
Minister may require Plan to be
revised or replaced
Adopt Plan
Refer to pro-forma Notice
of making of a water
services strategic plan
(Appendix A)
Vol 1 Section 3, Page 1-14/22
20
Session 1
Introduction, Plan Layout and
Procedure
Volume 1
21
Session 2
Legal Background
Volume 2
22
Impacting Legislation
Other Relevant
Legislation
Main Legislation
Shellfish Diirective
Diirective
Shellfish Directive
Water Services Act 2007
Groundwater Directive
Groundwater
Groundwater Directive
Directive
Urban Ww Treatment Directive
Urban Ww Treatment Directive
Nitrates
Directive
Bio Diversity
Directives
Bio Diversity Directives
Bio Diversity Directives
Drinking Water Directive
Drinking
Drinking Water
Water Directive
Directive
Bathing Water Directive
Bathing Water Directive
Freshwater
Fish Directive
Freshwater
Freshwater Fish
Fish Directive
Directive
Water Pollution Acts & Regs
Water Pollution Acts & Regs
Waste
Waste Management
Management Acts
Acts
Waste Management Acts
Phosphorous
Regulations
Phosphorous
Phosphorous Regulations
Regulations
Water Framework
Directive
Water Services
Strategic Plans
Planning & Development
Act 2000
Strategic Environmental
Assessment
Vol 2 Section 2, Page 2-2 to 2-5
23
Water Services Act 2007
Relevant Sections
Section 36 - Water Services Strategic Plans
Section 37 - Functions of the Minister
Section 38 - Implementation
Section 77 - Rural Water Services Strategic Plans
Vol 2 Section 2, Page 2-6 to 2-10
24
Water Services Act 2007
Water Services Strategic Plans
“each water services authority shall, not later than such date
as may be prescribed, make a water services strategic
plan with regard to the provision of water services in its
functional area”.
Subsection 36 (2)
Indicative Dates:Individual Plans
-
22nd December 2010
Joint Plans or Sub-Plans
-
22nd March 2011
Vol 2 Section 2, Page 2-6 to 2-10
25
Water Services Act 2007
Power to make a Plan
The making of a plan is a reserved function of the members
of the authority
Subsection 36 (3)
If the members fail to make a plan by the due date then the
function to make the plan is transferred to the manager.
Subsection 36 (13)
Vol 2 Section 2, Page 2-6 to 2-10
26
Water Services Act 2007
Joint Plans
Two or more authorities may prepare joint plans or sub-plans
for specified water services in all or part of their functional
area.
Subsection 36 (4)
The Minister may require 2 or more authorities to make a
joint plan co-ordinated in such a manner as the Minister may
specify.
Subsection 37 (a&b)
Vol 2 Section 2, Page 2-6 to 2-10
27
Water Services Act 2007
Plan Review
Water services authorities shall review water services
strategic plans at least every 6 years or at lesser intervals as
may be directed by the Minister
Subsection 36 (5)(a)
The Minister for stated reasons may require a plan to be
revised or replaced within a specified period (not less than 3
months).
Subsection 37(a)
Vol 2 Section 2, Page 2-6 to 2-10
28
Water Services Act 2007
Extension Of Time
A water services authority may apply to the Minister for an
extension of up to 3 months after the latest date for the making
of a plan – reserved function.
Subsection 36 (5)(a)
Such an extension is not available where the Minister refers the
plan back for revision or replacement under Section 37(c).
Vol 2 Section 2, Page 2-6 to 2-10
29
Water Services Act 2007
Plan Not Appropriate
If the manager is of the opinion that the proposed plan would
not be appropriate then he/she shall:(a) Inform the members and advise that the Minister may
require them to revise or replace the plan.
(b) Advise that the members may apply for an extension of time
Subsection 36(11)
Vol 2 Section 2, Page 2-6 to 2-10
30
Water Services Act 2007
Rural Water Services Strategic Plans
A water services authority may, and if directed by the
Minister shall, make or review rural water services strategic
plans with regard to the provision of water services to all
rural areas within its functional area.
Section 77
Vol 2 Section 2, Page 2-6 to 2-10
31
Water Services Act 2007
Plan Implementation
Once a plan is made
•
Copies shall be issued to the Minister and prescribed bodies and a
notice of the making of the plan shall be published.
•
The water services authority implement the plan.
•
Certified copies or extracts issued upon request.
Subsection 36(6)
Vol 2 Section 2, Page 2-6 to 2-10
32
Water Services Act 2007
Cognisance of Other Plans
Plans to have regard to the provisions of:•
Development plans
•
Water quality management plans
•
Waste management plans
•
River basin management plans
•
Other plans, strategies and guidelines as may be prescribed
•
Other matters as may be directed by the Minister
Subsection 36(6)
Vol 2 Section 2, Page 2-6 to 2-10
33
Water Services Act 2007
Plans Primary Objectives
•
Protection of Human Health and the Environment
•
Provision of sufficient Water Services
•
Support proper Planning and Sustainable Development
Subsection 36(7)
Vol 2 Section 2, Page 2-6 to 2-10
34
Water Services Act 2007
Plans to have regard to
•
Drinking Water Quality
•
Prevention of risk to Human Health and the Environment
•
Current and Projected Demand for Water Services
•
Existing and Planned Arrangements for the Provision of Water Services
•
Shortfalls in the provision of Water Services
•
Water Conservation Measures in Place or Planned
•
Monitoring Arrangements
•
Asset Management Planning
•
Income and Expenditure
Subsection 36(8)
Vol 2 Section 2, Page 2-6 to 2-10
35
Water Framework
Directive
Framework for the protection of all waters with the objective of
of achieving good status by 2015
Water quality objectives set out in River Basin Management
Plans (RBMPs)
Objectives achieved through Programmes of Measures (PoMs)
Vol 2 Section 2, Page 2-11 to 2-12
36
Water Framework
Directive
Impacts on
Water Abstractions – waters used for abstraction are
protected
Discharges – PoMs will set controls on point and diffuse
discharges
Recovery of Costs – obligation to recover costs using the
polluter pays principle
Water Conservation – PoMs will promote sustainable water
use
Vol 2 Section 2, Page 2-11 to 2-12
37
Planning & Development
Act 2000
Have Regard to
Regional or Spatial Planning Guidelines
County/City Development Plans
Guides
demand
projections.
Local Area Plans
Special Amenity Area Orders
Strategic Development Zones
Set objectives
for the
provision of
water services.
Vol 2 Section 2, Page 2-13
38
Strategic Environmental
Assessment
Purpose
To ensure that the environmental consequences of certain
plans and programmes are identified and assessed before
adoption. (includes plans prepared for “water management”)
Applies to the elements of the plan that are likely to have a
significant environmental impact.
Vol 2 Section 2, Page 2-14
Strategic Environmental
Assessment
39
SEA Scope will depend on the extent of the SEA prepared for
the relevant development plan(s) and RBMPs
Vol 2 Section 2, Page 2-14
40
Other Relevant
Legislation
Impact on Abstractions
Shellfish Directive
Groundwater Directive
Urban Ww Treatment Directive
•
Groundwater Directive
•
Nitrates Directive
•
Bio Diversity (Habitats, Birds) Directives
•
Freshwater Fish Directive
Nitrates Directive
Bio Diversity Directives
Drinking Water Directive
Bathing Water Directive
Freshwater Fish Directive
Water Pollution Acts & Regs
Waste Management Acts
Phosphorous Regulations
Vol 2 Section 2, Page 2-15 to 2-21
41
Other Relevant
Legislation
Impact on Discharges
Shellfish Directive
Groundwater Directive
Urban Ww Treatment Directive
Nitrates Directive
Bio Diversity Directives
Drinking Water Directive
Bathing Water Directive
Freshwater Fish Directive
Water Pollution Acts & Regs
Waste Management Acts
•
Shellfish Directive
•
Groundwater Directive
•
Urban Ww Treatment Directive
•
Bio Diversity (Habitats, Birds) Directives
•
Freshwater Fish Directive
•
Bathing Water Directive
•
Water Pollution Acts & Regulations
•
Phosphorus Regulations
Phosphorous Regulations
Vol 2 Section 2, Page 2-15 to 2-21
42
Other Relevant
Legislation
Impact on Sludge Disposal
Shellfish Directive
Groundwater Directive
Urban Ww Treatment Directive
•
Nitrates Directive
•
Waste Management Acts
Nitrates Directive
Bio Diversity Directives
Drinking Water Directive
Bathing Water Directive
Freshwater Fish Directive
Water Pollution Acts & Regs
Waste Management Acts
Phosphorous Regulations
Vol 2 Section 2, Page 2-15 to 2-21
43
Other Relevant
Legislation
Impact on Potable Water Quality
Shellfish Directive
Groundwater Directive
Urban Ww Treatment Directive
•
Drinking Water Directive
- Drinking Water (No. 2) Regs 2007
Nitrates Directive
Bio Diversity Directives
Drinking Water Directive
Bathing Water Directive
Freshwater Fish Directive
Water Pollution Acts & Regs
Waste Management Acts
Phosphorous Regulations
Vol 2 Section 2, Page 2-15 to 2-21
44
Session 2
Legal Background
Volume 2
45
Session 3
Synchronisation with other Plans
Volume 3
46
Introduction
Section 36(6) - Water services authorities to have
regard to proper planning and sustainable development &
in particular:–
Development Plans, Guidelines and Strategies.
–
Water Quality Management Plans.
–
Waste Management Plans
–
River Basin Management Plans and PoMs.
–
Other Plans, Strategies or Guidelines.
–
Any other matter as may be directed by the Minister.
Vol 3 Section 2, Page 3-2 to 3-3
47
Synchronisation with Other Plans
National Development Plan
National
Exchequer Funding
Regional
EU Water
River Basin
Framework
Management
Directive
Plans and related
Integrated Spatial Local
programmes
Planning
Water Quality
of measures
Frameworks
Management Plans
County/City
and related
Development Plans
programmes of
Water /
measures
& Local Area Plans
National Spatial
Strategy
Regional Planning
Guidelines
Planning
Development
Plans
in
eas
o
vel
g le
r
Inc
f co
de
nsi
rat
Water Services
Strategic Plans
ion
Sludge
Management Plans
Local Waste
Management Plans
Environment
Quality Plans
Inc
r ea
s in
g le
ve l
of c
on s
ide
r ati
on
Waste Management
Plans
Regional Waste
Management Plans
European Union
Local Authority Funding
Vol 3 Section 2, Page 3-3
48
Water Quality Plans
–
Water Quality Management Plans
Will be superseded by River Basin
Local Government
(Water Pollution)Plans
Acts 1977 & 1990 –
Management
Plan to set out objectives for the prevention and
abatement of pollution of waters.
River Basin Management Plans
–
Water Framework Directive – Plans to set out water quality
objectives and associated programme of measures to
achieve the objectives.
Vol 3 Section 4, Page 3-11 to 3-16
Water Quality Plans
49
Vol 3 Section 4, Page 3-12
50
Water Quality Plans
Table 4.1
Plan and Programme
River Basin
Management Plans
and Associated
Programmes of
Measures under the
WFD
Element to be considered
Summary of significant
pressures and impacts of
human activity on surface
and groundwater
A summary of the economic
analysis of water use
required by Article 5 & Annex
III
Relevance of consideration
This element will identify the point and diffuse sources of pollution (e.g. waste
water treatment and CSO discharges) and pressures on the quantitative status
of waters, including abstractions. This information should be verified and
updated where necessary when preparing or reviewing a water services
strategic plan to ensure that any subsequent controls on abstractions and
discharges are based on correct information.
The economic analysis of water use will provide details of the unit cost of water
services, long-term demand forecasts and associated infrastructural investment
estimates, which are a fundamental part of water services strategic planning.
Vol 3 Section 4, Page 3-13
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
51
Water Quality Plans
Table 4.1
Plan and Programme
River Basin
Management Plans
and Associated
Programmes of
Measures under the
WFD
Element to be considered
Summary of significant
pressures and impacts of
human activity on surface
and groundwater
A summary of the economic
analysis of water use
required by Article 5 & Annex
III
Relevance of consideration
This element will identify the point and diffuse sources of pollution (e.g. waste
water treatment and CSO discharges) and pressures on the quantitative status
of waters, including abstractions. This information should be verified and
updated where necessary when preparing or reviewing a water services
strategic plan to ensure that any subsequent controls on abstractions and
discharges are based on correct information.
The economic analysis of water use will provide details of the unit cost of water
services, long-term demand forecasts and associated infrastructural investment
estimates, which are a fundamental part of water services strategic planning.
Vol 3 Section 4, Page 3-13
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
52
Water Quality Plans
Table 4.1
Plan and Programme
River Basin
Management Plans
and Associated
Programmes of
Measures under the
WFD
Element to be considered
Summary of significant
pressures and impacts of
human activity on surface
and groundwater
A summary of the economic
analysis of water use
required by Article 5 & Annex
III
Relevance of consideration
This element will identify the point and diffuse sources of pollution (e.g. waste
water treatment and CSO discharges) and pressures on the quantitative status
of waters, including abstractions. This information should be verified and
updated where necessary when preparing or reviewing a water services
strategic plan to ensure that any subsequent controls on abstractions and
discharges are based on correct information.
The economic analysis of water use will provide details of the unit cost of water
services, long-term demand forecasts and associated infrastructural investment
estimates, which are a fundamental part of water services strategic planning.
Vol 3 Section 4, Page 3-13
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
53
Water Quality Plans
Table 4.1
Plan and Programme
River Basin
Management Plans
and Associated
Programmes of
Measures under the
WFD
Element to be considered
Summary of significant
pressures and impacts of
human activity on surface
and groundwater
A summary of the economic
analysis of water use
required by Article 5 & Annex
III
Relevance of consideration
This element will identify the point and diffuse sources of pollution (e.g. waste
water treatment and CSO discharges) and pressures on the quantitative status
of waters, including abstractions. This information should be verified and
updated where necessary when preparing or reviewing a water services
strategic plan to ensure that any subsequent controls on abstractions and
discharges are based on correct information.
The economic analysis of water use will provide details of the unit cost of water
services, long-term demand forecasts and associated infrastructural investment
estimates, which are a fundamental part of water services strategic planning.
Vol 3 Section 4, Page 3-13
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
54
Water Quality Plans
Table 4.1
Plan and Programme
River Basin
Management Plans
and Associated
Programmes of
Measures under the
WFD
Element to be considered
Summary of significant
pressures and impacts of
human activity on surface
and groundwater
A summary of the economic
analysis of water use
required by Article 5 & Annex
III
Relevance of consideration
This element will identify the point and diffuse sources of pollution (e.g. waste
water treatment and CSO discharges) and pressures on the quantitative status
of waters, including abstractions. This information should be verified and
updated where necessary when preparing or reviewing a water services
strategic plan to ensure that any subsequent controls on abstractions and
discharges are based on correct information.
The economic analysis of water use will provide details of the unit cost of water
services, long-term demand forecasts and associated infrastructural investment
estimates, which are a fundamental part of water services strategic planning.
Vol 3 Section 4, Page 3-13
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
55
Water Quality Plans
Table 4.1
Plan and Programme
River Basin
Management Plans
and Associated
Programmes of
Measures under the
WFD
Element to be considered
Summary of significant
pressures and impacts of
human activity on surface
and groundwater
A summary of the economic
analysis of water use
required by Article 5 & Annex
III
Relevance of consideration
This element will identify the point and diffuse sources of pollution (e.g. waste
water treatment and CSO discharges) and pressures on the quantitative status
of waters, including abstractions. This information should be verified and
updated where necessary when preparing or reviewing a water services
strategic plan to ensure that any subsequent controls on abstractions and
discharges are based on correct information.
The economic analysis of water use will provide details of the unit cost of water
services, long-term demand forecasts and associated infrastructural investment
estimates, which are a fundamental part of water services strategic planning.
Vol 3 Section 4, Page 3-13
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
56
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
A summary of the measures taken
to meet the requirements of Article
7
Relevance of consideration
Member States are required under Article 7 to:
“ ensure the necessary protection for the water bodies identified with the aim of avoiding
deterioration in their quality in order to reduce the level of purification treatment required in
the production of drinking water.
The RBMP will identify the source protection zones in respect of each water abstraction
(surface and groundwater) and the associated measures necessary to ensure compliance
with Article 7 of the WFD.
Controls on the abstraction or impoundment of water will have a significant impact on the
sourcing of adequate quantities of water for the provision of water services.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Controls on abstraction and
impoundment of water.
Controls adopted for point source
discharges
Measures taken to apply the
principle of recovery of the costs of
water use in accordance with
Article 9.
A water services authority will have to identify in the strategic plan where it intends to
source water to meet projected demands across it’s functional area. Such controls may
also apply to existing abstractions, which may have to be reduced or physically modified to
meet RBMP objectives.
Controls on point source discharges will impact on the siting of discharges from treatment
plants and stormwater & emergency overflows.
In addition, these controls may limit the quantity and quality of discharges, which may
require water services authorities to provide additional treatment processes or storage
capacity for both existing and planned facilities. The cumulative impact of existing and
proposed discharges will also have to be considered, to ensure that the quality objectives
for receiving waters set in the RBMP continue to be met.
The recovery of the cost of water services in accordance with Government policy will form
the cornerstone of the financial plan for their delivery. Projected income and expenditure
will have to be reconciled as part of water services strategic plans.
Vol 3 Section 4, Page 3-14
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
57
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
A summary of the measures taken
to meet the requirements of Article
7
Relevance of consideration
Member States are required under Article 7 to:
“ ensure the necessary protection for the water bodies identified with the aim of avoiding
deterioration in their quality in order to reduce the level of purification treatment required in
the production of drinking water.
The RBMP will identify the source protection zones in respect of each water abstraction
(surface and groundwater) and the associated measures necessary to ensure compliance
with Article 7 of the WFD.
Controls on the abstraction or impoundment of water will have a significant impact on the
sourcing of adequate quantities of water for the provision of water services.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Controls on abstraction and
impoundment of water.
Controls adopted for point source
discharges
Measures taken to apply the
principle of recovery of the costs of
water use in accordance with
Article 9.
A water services authority will have to identify in the strategic plan where it intends to
source water to meet projected demands across it’s functional area. Such controls may
also apply to existing abstractions, which may have to be reduced or physically modified to
meet RBMP objectives.
Controls on point source discharges will impact on the siting of discharges from treatment
plants and stormwater & emergency overflows.
In addition, these controls may limit the quantity and quality of discharges, which may
require water services authorities to provide additional treatment processes or storage
capacity for both existing and planned facilities. The cumulative impact of existing and
proposed discharges will also have to be considered, to ensure that the quality objectives
for receiving waters set in the RBMP continue to be met.
The recovery of the cost of water services in accordance with Government policy will form
the cornerstone of the financial plan for their delivery. Projected income and expenditure
will have to be reconciled as part of water services strategic plans.
Vol 3 Section 4, Page 3-14
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
58
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
A summary of the measures taken
to meet the requirements of Article
7
Relevance of consideration
Member States are required under Article 7 to:
“ ensure the necessary protection for the water bodies identified with the aim of avoiding
deterioration in their quality in order to reduce the level of purification treatment required in
the production of drinking water.
The RBMP will identify the source protection zones in respect of each water abstraction
(surface and groundwater) and the associated measures necessary to ensure compliance
with Article 7 of the WFD.
Controls on the abstraction or impoundment of water will have a significant impact on the
sourcing of adequate quantities of water for the provision of water services.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Controls on abstraction and
impoundment of water.
Controls adopted for point source
discharges
Measures taken to apply the
principle of recovery of the costs of
water use in accordance with
Article 9.
A water services authority will have to identify in the strategic plan where it intends to
source water to meet projected demands across it’s functional area. Such controls may
also apply to existing abstractions, which may have to be reduced or physically modified to
meet RBMP objectives.
Controls on point source discharges will impact on the siting of discharges from treatment
plants and stormwater & emergency overflows.
In addition, these controls may limit the quantity and quality of discharges, which may
require water services authorities to provide additional treatment processes or storage
capacity for both existing and planned facilities. The cumulative impact of existing and
proposed discharges will also have to be considered, to ensure that the quality objectives
for receiving waters set in the RBMP continue to be met.
The recovery of the cost of water services in accordance with Government policy will form
the cornerstone of the financial plan for their delivery. Projected income and expenditure
will have to be reconciled as part of water services strategic plans.
Vol 3 Section 4, Page 3-14
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
59
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
A summary of the measures taken
to meet the requirements of Article
7
Relevance of consideration
Member States are required under Article 7 to:
“ ensure the necessary protection for the water bodies identified with the aim of avoiding
deterioration in their quality in order to reduce the level of purification treatment required in
the production of drinking water.
The RBMP will identify the source protection zones in respect of each water abstraction
(surface and groundwater) and the associated measures necessary to ensure compliance
with Article 7 of the WFD.
Controls on the abstraction or impoundment of water will have a significant impact on the
sourcing of adequate quantities of water for the provision of water services.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Controls on abstraction and
impoundment of water.
Controls adopted for point source
discharges
Measures taken to apply the
principle of recovery of the costs of
water use in accordance with
Article 9.
A water services authority will have to identify in the strategic plan where it intends to
source water to meet projected demands across it’s functional area. Such controls may
also apply to existing abstractions, which may have to be reduced or physically modified to
meet RBMP objectives.
Controls on point source discharges will impact on the siting of discharges from treatment
plants and stormwater & emergency overflows.
In addition, these controls may limit the quantity and quality of discharges, which may
require water services authorities to provide additional treatment processes or storage
capacity for both existing and planned facilities. The cumulative impact of existing and
proposed discharges will also have to be considered, to ensure that the quality objectives
for receiving waters set in the RBMP continue to be met.
The recovery of the cost of water services in accordance with Government policy will form
the cornerstone of the financial plan for their delivery. Projected income and expenditure
will have to be reconciled as part of water services strategic plans.
Vol 3 Section 4, Page 3-14
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
60
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
A summary of the measures taken
to meet the requirements of Article
7
Relevance of consideration
Member States are required under Article 7 to:
“ ensure the necessary protection for the water bodies identified with the aim of avoiding
deterioration in their quality in order to reduce the level of purification treatment required in
the production of drinking water.
The RBMP will identify the source protection zones in respect of each water abstraction
(surface and groundwater) and the associated measures necessary to ensure compliance
with Article 7 of the WFD.
Controls on the abstraction or impoundment of water will have a significant impact on the
sourcing of adequate quantities of water for the provision of water services.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Controls on abstraction and
impoundment of water.
Controls adopted for point source
discharges
Measures taken to apply the
principle of recovery of the costs of
water use in accordance with
Article 9.
A water services authority will have to identify in the strategic plan where it intends to
source water to meet projected demands across it’s functional area. Such controls may
also apply to existing abstractions, which may have to be reduced or physically modified to
meet RBMP objectives.
Controls on point source discharges will impact on the siting of discharges from treatment
plants and stormwater & emergency overflows.
In addition, these controls may limit the quantity and quality of discharges, which may
require water services authorities to provide additional treatment processes or storage
capacity for both existing and planned facilities. The cumulative impact of existing and
proposed discharges will also have to be considered, to ensure that the quality objectives
for receiving waters set in the RBMP continue to be met.
The recovery of the cost of water services in accordance with Government policy will form
the cornerstone of the financial plan for their delivery. Projected income and expenditure
will have to be reconciled as part of water services strategic plans.
Vol 3 Section 4, Page 3-14
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
61
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
A summary of the measures taken
to meet the requirements of Article
7
Relevance of consideration
Member States are required under Article 7 to:
“ ensure the necessary protection for the water bodies identified with the aim of avoiding
deterioration in their quality in order to reduce the level of purification treatment required in
the production of drinking water.
The RBMP will identify the source protection zones in respect of each water abstraction
(surface and groundwater) and the associated measures necessary to ensure compliance
with Article 7 of the WFD.
Controls on the abstraction or impoundment of water will have a significant impact on the
sourcing of adequate quantities of water for the provision of water services.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Controls on abstraction and
impoundment of water.
Controls adopted for point source
discharges
Measures taken to apply the
principle of recovery of the costs of
water use in accordance with
Article 9.
A water services authority will have to identify in the strategic plan where it intends to
source water to meet projected demands across it’s functional area. Such controls may
also apply to existing abstractions, which may have to be reduced or physically modified to
meet RBMP objectives.
Controls on point source discharges will impact on the siting of discharges from treatment
plants and stormwater & emergency overflows.
In addition, these controls may limit the quantity and quality of discharges, which may
require water services authorities to provide additional treatment processes or storage
capacity for both existing and planned facilities. The cumulative impact of existing and
proposed discharges will also have to be considered, to ensure that the quality objectives
for receiving waters set in the RBMP continue to be met.
The recovery of the cost of water services in accordance with Government policy will form
the cornerstone of the financial plan for their delivery. Projected income and expenditure
will have to be reconciled as part of water services strategic plans.
Vol 3 Section 4, Page 3-14
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
62
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
A summary of the measures taken
to meet the requirements of Article
7
Relevance of consideration
Member States are required under Article 7 to:
“ ensure the necessary protection for the water bodies identified with the aim of avoiding
deterioration in their quality in order to reduce the level of purification treatment required in
the production of drinking water.
The RBMP will identify the source protection zones in respect of each water abstraction
(surface and groundwater) and the associated measures necessary to ensure compliance
with Article 7 of the WFD.
Controls on the abstraction or impoundment of water will have a significant impact on the
sourcing of adequate quantities of water for the provision of water services.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Controls on abstraction and
impoundment of water.
Controls adopted for point source
discharges
Measures taken to apply the
principle of recovery of the costs of
water use in accordance with
Article 9.
A water services authority will have to identify in the strategic plan where it intends to
source water to meet projected demands across it’s functional area. Such controls may
also apply to existing abstractions, which may have to be reduced or physically modified to
meet RBMP objectives.
Controls on point source discharges will impact on the siting of discharges from treatment
plants and stormwater & emergency overflows.
In addition, these controls may limit the quantity and quality of discharges, which may
require water services authorities to provide additional treatment processes or storage
capacity for both existing and planned facilities. The cumulative impact of existing and
proposed discharges will also have to be considered, to ensure that the quality objectives
for receiving waters set in the RBMP continue to be met.
The recovery of the cost of water services in accordance with Government policy will form
the cornerstone of the financial plan for their delivery. Projected income and expenditure
will have to be reconciled as part of water services strategic plans.
Vol 3 Section 4, Page 3-14
Table 4.1:
Water Quality - Consideration to be given to Plans and Programmes
63
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
A summary of the measures taken
to meet the requirements of Article
7
Relevance of consideration
Member States are required under Article 7 to:
“ ensure the necessary protection for the water bodies identified with the aim of avoiding
deterioration in their quality in order to reduce the level of purification treatment required in
the production of drinking water.
The RBMP will identify the source protection zones in respect of each water abstraction
(surface and groundwater) and the associated measures necessary to ensure compliance
with Article 7 of the WFD.
Controls on the abstraction or impoundment of water will have a significant impact on the
sourcing of adequate quantities of water for the provision of water services.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Controls on abstraction and
impoundment of water.
Controls adopted for point source
discharges
Measures taken to apply the
principle of recovery of the costs of
water use in accordance with
Article 9.
A water services authority will have to identify in the strategic plan where it intends to
source water to meet projected demands across it’s functional area. Such controls may
also apply to existing abstractions, which may have to be reduced or physically modified to
meet RBMP objectives.
Controls on point source discharges will impact on the siting of discharges from treatment
plants and stormwater & emergency overflows.
In addition, these controls may limit the quantity and quality of discharges, which may
require water services authorities to provide additional treatment processes or storage
capacity for both existing and planned facilities. The cumulative impact of existing and
proposed discharges will also have to be considered, to ensure that the quality objectives
for receiving waters set in the RBMP continue to be met.
The recovery of the cost of water services in accordance with Government policy will form
the cornerstone of the financial plan for their delivery. Projected income and expenditure
will have to be reconciled as part of water services strategic plans.
Vol 3 Section 4, Page 3-14
64
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
Relevance of consideration
Such measures should be achievable, affordable and compatible with the provisions of the overall
Measures to promote an efficient
and sustainable water use, demand water services strategic plan.
The measures will assist in determining future demand profiles for water services.
management measures and
efficiency & re-use measures
Compliance with the various directives dealing with urban water-water treatment, nitrates, habitats,
drinking water, birds, bathing waters, sewage sludge and integrated pollution prevention control
will ensure the water environment is protected.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Measures required under Directives
listed in Annex VI of the WFD
The Urban Waste Water Treatment Directive dictates compliance criteria in agglomerations
>2,000 population by specific dates and set standards in relation to the final effluent discharges
after treatment.
For agglomerations < 2,000 population the level of appropriate treatment required by the directive
will be set on an evidential basis by the RBMP and PoM.
Measures required under the Habitats and Birds Directives may limit the siting of water services
infrastructure or restrict abstractions from or discharges to water bodies within designated areas.
Measures required under the Drinking Water Directive regulate the quality and monitoring of
drinking water intended for human consumption.
Measure required under the Bathing Water Directive may place limits on discharges from water
services infrastructure (treatment plants and overflows) that discharge directly to or impact on
designated bathing waters.
Vol 3 Section 4, Page 3-15
65
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
Measures to promote an efficient
and sustainable water use, demand
management measures and
efficiency & re-use measures
Relevance of consideration
Such measures should be achievable, affordable and compatible with the provisions of the
overall water services strategic plan.
The measures will assist in determining future demand profiles for water services.
Compliance with the various directives dealing with urban water-water treatment, nitrates,
habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution
prevention control will ensure the water environment is protected.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Measures required under Directives
listed in Annex VI of the WFD
The Urban Waste Water Treatment Directive dictates compliance criteria in
agglomerations >2,000 population by specific dates and set standards in relation to the
final effluent discharges after treatment.
For agglomerations < 2,000 population the level of appropriate treatment required by the
directive will be set on an evidential basis by the RBMP and PoM.
Measures required under the Habitats and Birds Directives may limit the siting of water
services infrastructure or restrict abstractions from or discharges to water bodies within
designated areas.
Measures required under the Drinking Water Directive regulate the quality and
monitoring of drinking water intended for human consumption.
Measure required under the Bathing Water Directive may place limits on discharges from
water services infrastructure (treatment plants and overflows) that discharge directly to or
impact on designated bathing waters.
Vol 3 Section 4, Page 3-15
66
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
Measures to promote an efficient
and sustainable water use, demand
management measures and
efficiency & re-use measures
Relevance of consideration
Such measures should be achievable, affordable and compatible with the provisions of the
overall water services strategic plan.
The measures will assist in determining future demand profiles for water services.
Compliance with the various directives dealing with urban water-water treatment, nitrates,
habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution
prevention control will ensure the water environment is protected.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Measures required under Directives
listed in Annex VI of the WFD
The Urban Waste Water Treatment Directive dictates compliance criteria in
agglomerations >2,000 population by specific dates and set standards in relation to the
final effluent discharges after treatment.
For agglomerations < 2,000 population the level of appropriate treatment required by the
directive will be set on an evidential basis by the RBMP and PoM.
Measures required under the Habitats and Birds Directives may limit the siting of water
services infrastructure or restrict abstractions from or discharges to water bodies within
designated areas.
Measures required under the Drinking Water Directive regulate the quality and
monitoring of drinking water intended for human consumption.
Measure required under the Bathing Water Directive may place limits on discharges from
water services infrastructure (treatment plants and overflows) that discharge directly to or
impact on designated bathing waters.
Vol 3 Section 4, Page 3-15
67
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
Measures to promote an efficient
and sustainable water use, demand
management measures and
efficiency & re-use measures
Relevance of consideration
Such measures should be achievable, affordable and compatible with the provisions of the
overall water services strategic plan.
The measures will assist in determining future demand profiles for water services.
Compliance with the various directives dealing with urban water-water treatment, nitrates,
habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution
prevention control will ensure the water environment is protected.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Measures required under Directives
listed in Annex VI of the WFD
The Urban Waste Water Treatment Directive dictates compliance criteria in
agglomerations >2,000 population by specific dates and set standards in relation to the
final effluent discharges after treatment.
For agglomerations < 2,000 population the level of appropriate treatment required by the
directive will be set on an evidential basis by the RBMP and PoM.
Measures required under the Habitats and Birds Directives may limit the siting of water
services infrastructure or restrict abstractions from or discharges to water bodies within
designated areas.
Measures required under the Drinking Water Directive regulate the quality and
monitoring of drinking water intended for human consumption.
Measure required under the Bathing Water Directive may place limits on discharges from
water services infrastructure (treatment plants and overflows) that discharge directly to or
impact on designated bathing waters.
Vol 3 Section 4, Page 3-15
68
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
Measures to promote an efficient
and sustainable water use, demand
management measures and
efficiency & re-use measures
Relevance of consideration
Such measures should be achievable, affordable and compatible with the provisions of the
overall water services strategic plan.
The measures will assist in determining future demand profiles for water services.
Compliance with the various directives dealing with urban water-water treatment, nitrates,
habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution
prevention control will ensure the water environment is protected.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Measures required under Directives
listed in Annex VI of the WFD
The Urban Waste Water Treatment Directive dictates compliance criteria in
agglomerations >2,000 population by specific dates and set standards in relation to the
final effluent discharges after treatment.
For agglomerations < 2,000 population the level of appropriate treatment required by the
directive will be set on an evidential basis by the RBMP and PoM.
Measures required under the Habitats and Birds Directives may limit the siting of water
services infrastructure or restrict abstractions from or discharges to water bodies within
designated areas.
Measures required under the Drinking Water Directive regulate the quality and
monitoring of drinking water intended for human consumption.
Measure required under the Bathing Water Directive may place limits on discharges from
water services infrastructure (treatment plants and overflows) that discharge directly to or
impact on designated bathing waters.
Vol 3 Section 4, Page 3-15
69
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
Measures to promote an efficient
and sustainable water use, demand
management measures and
efficiency & re-use measures
Relevance of consideration
Such measures should be achievable, affordable and compatible with the provisions of the
overall water services strategic plan.
The measures will assist in determining future demand profiles for water services.
Compliance with the various directives dealing with urban water-water treatment, nitrates,
habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution
prevention control will ensure the water environment is protected.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Measures required under Directives
listed in Annex VI of the WFD
The Urban Waste Water Treatment Directive dictates compliance criteria in
agglomerations >2,000 population by specific dates and set standards in relation to the
final effluent discharges after treatment.
For agglomerations < 2,000 population the level of appropriate treatment required by the
directive will be set on an evidential basis by the RBMP and PoM.
Measures required under the Habitats and Birds Directives may limit the siting of water
services infrastructure or restrict abstractions from or discharges to water bodies within
designated areas.
Measures required under the Drinking Water Directive regulate the quality and
monitoring of drinking water intended for human consumption.
Measure required under the Bathing Water Directive may place limits on discharges from
water services infrastructure (treatment plants and overflows) that discharge directly to or
impact on designated bathing waters.
Vol 3 Section 4, Page 3-15
70
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
Measures to promote an efficient
and sustainable water use, demand
management measures and
efficiency & re-use measures
Relevance of consideration
Such measures should be achievable, affordable and compatible with the provisions of the
overall water services strategic plan.
The measures will assist in determining future demand profiles for water services.
Compliance with the various directives dealing with urban water-water treatment, nitrates,
habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution
prevention control will ensure the water environment is protected.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Measures required under Directives
listed in Annex VI of the WFD
The Urban Waste Water Treatment Directive dictates compliance criteria in
agglomerations >2,000 population by specific dates and set standards in relation to the
final effluent discharges after treatment.
For agglomerations < 2,000 population the level of appropriate treatment required by the
directive will be set on an evidential basis by the RBMP and PoM.
Measures required under the Habitats and Birds Directives may limit the siting of water
services infrastructure or restrict abstractions from or discharges to water bodies within
designated areas.
Measures required under the Drinking Water Directive regulate the quality and
monitoring of drinking water intended for human consumption.
Measure required under the Bathing Water Directive may place limits on discharges from
water services infrastructure (treatment plants and overflows) that discharge directly to or
impact on designated bathing waters.
Vol 3 Section 4, Page 3-15
71
Water Quality Plans
Table 4.1
Plan and
Programme
Element to be considered
Measures to promote an efficient
and sustainable water use, demand
management measures and
efficiency & re-use measures
Relevance of consideration
Such measures should be achievable, affordable and compatible with the provisions of the
overall water services strategic plan.
The measures will assist in determining future demand profiles for water services.
Compliance with the various directives dealing with urban water-water treatment, nitrates,
habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution
prevention control will ensure the water environment is protected.
River Basin
Management
Plans and
Associated
Programmes of
Measures under
the WFD
Measures required under Directives
listed in Annex VI of the WFD
The Urban Waste Water Treatment Directive dictates compliance criteria in
agglomerations >2,000 population by specific dates and set standards in relation to the
final effluent discharges after treatment.
For agglomerations < 2,000 population the level of appropriate treatment required by the
directive will be set on an evidential basis by the RBMP and PoM.
Measures required under the Habitats and Birds Directives may limit the siting of water
services infrastructure or restrict abstractions from or discharges to water bodies within
designated areas.
Measures required under the Drinking Water Directive regulate the quality and
monitoring of drinking water intended for human consumption.
Measure required under the Bathing Water Directive may place limits on discharges from
water services infrastructure (treatment plants and overflows) that discharge directly to or
impact on designated bathing waters.
Vol 3 Section 4, Page 3-15
72
Water Quality Plans
Table 4.1
Plan and
Programme
River Basin
Management
Plans and
Associated
Programmes of
Measures of
WFD
Element to be considered
Relevance of consideration
Measures required under Directives
listed in Annex VI of the WFD
Measures required under the Nitrates & Sewage Sludge Directives may impact on the
reuse of sewage sludge in agriculture and therefore will provide some guidance to a Water
Services Authority as to the most appropriate means of dealing with waste sludges from
treatment processes.
Protected Areas
Measures required under EU directives listed in Annex VI relating to the designation and
protection of protected areas must be implemented by 2015.
•
•
•
Other elements that should be
considered when preparing a water
services strategic plan
(Annex VII of WFD)
•
•
Authorisations of direct discharges to groundwater (Article 11(3)(j) of the
WFD).
Measures taken to reduce the risk of pollution of water bodies by priority
substances under Article 16 of the WFD
Summary of measures taken to prevent or reduce the impact of accidental
pollution.
Details of supplementary measures identified as necessary in order to meet
the environmental objectives established.
Register of more detailed programmes and management plans for the river
basin district dealing with particular sub-basins, sectors, issues or water types.
Where such programmes and plans exist, a water services authority should
give them the same level of consideration as the main river basin management
plan when preparing a water services strategic plan.
Vol 3 Section 4, Page 3-16
73
Water Quality Plans
Table 4.1
Plan and
Programme
River Basin
Management
Plans and
Associated
Programmes of
Measures of
WFD
Element to be considered
Relevance of consideration
Measures required under Directives
listed in Annex VI of the WFD
Measures required under the Nitrates & Sewage Sludge Directives may impact on the
reuse of sewage sludge in agriculture and therefore will provide some guidance to a Water
Services Authority as to the most appropriate means of dealing with waste sludges from
treatment processes.
Protected Areas
Measures required under EU directives listed in Annex VI relating to the designation and
protection of protected areas must be implemented by 2015.
•
•
•
Other elements that should be
considered when preparing a water
services strategic plan
(Annex VII of WFD)
•
•
Authorisations of direct discharges to groundwater (Article 11(3)(j) of the
WFD).
Measures taken to reduce the risk of pollution of water bodies by priority
substances under Article 16 of the WFD
Summary of measures taken to prevent or reduce the impact of accidental
pollution.
Details of supplementary measures identified as necessary in order to meet
the environmental objectives established.
Register of more detailed programmes and management plans for the river
basin district dealing with particular sub-basins, sectors, issues or water types.
Where such programmes and plans exist, a water services authority should
give them the same level of consideration as the main river basin management
plan when preparing a water services strategic plan.
Vol 3 Section 4, Page 3-16
74
Water Quality Plans
Table 4.1
Plan and
Programme
River Basin
Management
Plans and
Associated
Programmes of
Measures of
WFD
Element to be considered
Relevance of consideration
Measures required under Directives
listed in Annex VI of the WFD
Measures required under the Nitrates & Sewage Sludge Directives may impact on the
reuse of sewage sludge in agriculture and therefore will provide some guidance to a Water
Services Authority as to the most appropriate means of dealing with waste sludges from
treatment processes.
Protected Areas
Measures required under EU directives listed in Annex VI relating to the designation and
protection of protected areas must be implemented by 2015.
•
•
•
Other elements that should be
considered when preparing a water
services strategic plan
(Annex VII of WFD)
•
•
Authorisations of direct discharges to groundwater (Article 11(3)(j) of the
WFD).
Measures taken to reduce the risk of pollution of water bodies by priority
substances under Article 16 of the WFD
Summary of measures taken to prevent or reduce the impact of accidental
pollution.
Details of supplementary measures identified as necessary in order to meet
the environmental objectives established.
Register of more detailed programmes and management plans for the river
basin district dealing with particular sub-basins, sectors, issues or water types.
Where such programmes and plans exist, a water services authority should
give them the same level of consideration as the main river basin management
plan when preparing a water services strategic plan.
Vol 3 Section 4, Page 3-16
75
Water Quality Plans
Table 4.1
Plan and
Programme
River Basin
Management
Plans and
Associated
Programmes of
Measures of
WFD
Element to be considered
Relevance of consideration
Measures required under Directives
listed in Annex VI of the WFD
Measures required under the Nitrates & Sewage Sludge Directives may impact on the
reuse of sewage sludge in agriculture and therefore will provide some guidance to a Water
Services Authority as to the most appropriate means of dealing with waste sludges from
treatment processes.
Protected Areas
Measures required under EU directives listed in Annex VI relating to the designation and
protection of protected areas must be implemented by 2015.
•
•
•
Other elements that should be
considered when preparing a water
services strategic plan
(Annex VII of WFD)
•
•
Authorisations of direct discharges to groundwater (Article 11(3)(j) of the
WFD).
Measures taken to reduce the risk of pollution of water bodies by priority
substances under Article 16 of the WFD
Summary of measures taken to prevent or reduce the impact of accidental
pollution.
Details of supplementary measures identified as necessary in order to meet
the environmental objectives established.
Register of more detailed programmes and management plans for the river
basin district dealing with particular sub-basins, sectors, issues or water types.
Where such programmes and plans exist, a water services authority should
give them the same level of consideration as the main river basin management
plan when preparing a water services strategic plan.
Vol 3 Section 4, Page 3-16
76
Water Quality Plans
Table 4.1
Plan and
Programme
River Basin
Management
Plans and
Associated
Programmes of
Measures of
WFD
Element to be considered
Relevance of consideration
Measures required under Directives
listed in Annex VI of the WFD
Measures required under the Nitrates & Sewage Sludge Directives may impact on the
reuse of sewage sludge in agriculture and therefore will provide some guidance to a Water
Services Authority as to the most appropriate means of dealing with waste sludges from
treatment processes.
Protected Areas
Measures required under EU directives listed in Annex VI relating to the designation and
protection of protected areas must be implemented by 2015.
•
•
•
Other elements that should be
considered when preparing a water
services strategic plan
(Annex VII of WFD)
•
•
Authorisations of direct discharges to groundwater (Article 11(3)(j) of the
WFD).
Measures taken to reduce the risk of pollution of water bodies by priority
substances under Article 16 of the WFD
Summary of measures taken to prevent or reduce the impact of accidental
pollution.
Details of supplementary measures identified as necessary in order to meet
the environmental objectives established.
Register of more detailed programmes and management plans for the river
basin district dealing with particular sub-basins, sectors, issues or water types.
Where such programmes and plans exist, a water services authority should
give them the same level of consideration as the main river basin management
plan when preparing a water services strategic plan.
Vol 3 Section 4, Page 3-16
77
Water Quality Plans
Table 4.1
Plan and
Programme
River Basin
Management
Plans and
Associated
Programmes of
Measures of
WFD
Element to be considered
Relevance of consideration
Measures required under Directives
listed in Annex VI of the WFD
Measures required under the Nitrates & Sewage Sludge Directives may impact on the
reuse of sewage sludge in agriculture and therefore will provide some guidance to a Water
Services Authority as to the most appropriate means of dealing with waste sludges from
treatment processes.
Protected Areas
Measures required under EU directives listed in Annex VI relating to the designation and
protection of protected areas must be implemented by 2015.
•
•
•
Other elements that should be
considered when preparing a water
services strategic plan
(Annex VII of WFD)
•
•
Authorisations of direct discharges to groundwater (Article 11(3)(j) of the
WFD).
Measures taken to reduce the risk of pollution of water bodies by priority
substances under Article 16 of the WFD
Summary of measures taken to prevent or reduce the impact of accidental
pollution.
Details of supplementary measures identified as necessary in order to meet
the environmental objectives established.
Register of more detailed programmes and management plans for the river
basin district dealing with particular sub-basins, sectors, issues or water types.
Where such programmes and plans exist, a water services authority should
give them the same level of consideration as the main river basin management
plan when preparing a water services strategic plan.
Vol 3 Section 4, Page 3-16
78
Consultation With Adjoining Authorities
Level of consultation depends on:-–
Degree to which infrastructure is shared or planned to be
shared.
–
Extent of shared planning and development objectives.
–
Extent of shared environmental objectives (e.g. RBMP).
Maximise the use of shared resources and
expertise – use existing structures
Vol 3 Section 6, Page 3-19
79
Consultation With Adjoining Authorities
Consultation to include:-–
Review of planning and development objectives.
–
Assessment of technical and economic feasibility.
–
Consideration of common level of service delivery.
–
Examination of potential to share and optimise resources.
–
e.g. Single water abstraction or effluent discharge to a shared
water body.
Vol 3 Section 6, Page 3-18
80
Session 3
Synchronisation with other Plans
Volume 3
81
Session 4
Levels of Service and Design
Standards
Volume 4 – Section 2
Levels of Service
82
Plan Approval &
Review
Financial Plan
Specific
– clearly defined
Define / Review
Levels of Service
Measurable – for comparison purposes.
Asset
Management Plan
Achievable – to
Relevant
Water Services
ensure
Strategic targets
Plan
Demand
can me met
Assessment
– to strategic goals and customers
Collect
Strategic
Timebound
–
to
ensure
progress
is
made
Strategic Options
Asset Data
Strategic Capacity
Assessment
Vol 1 Section 2., Page 1-4/13
83
Levels of Service - Statutory
Standard
Water Quality
Recommended Target
Description & Definition
Compliance with European
Communities (Drinking
Water) (No. 2) Regulations
2007. – SI No. 278 of 2007.
Water supplied is wholesome and clean in that
–

It is free from any micro-organisms and
parasites and from any substance in
concentrations that constitute a potential
danger to human health.

It meets the 2 microbiological (Table A)
and 26 chemical (Table B) water quality
parametric value standards in Part 1 of
the Schedule to the Regulations.
% of Schemes in the
functional area of the WSA
fully compliant.
% of consumers in the
functional area of the WSA
supplied from a scheme that
is fully compliant.
Compliance with conditions
attaching to licences and
certificates issued under the
Waste Water Discharge
(Authorisation) Regulations
2007 – SI No. 684 of 2007
or the Programme of
Measures included in the
River Basin Management
Plan for the RBD in which
the discharge is or is
planned to be.
Discharge
Standards
Waste Water
Schemes
- WTP/
Stormwater
% of waste water schemes
requiring a licence/certificate
fully compliant with
licence/certificate conditions.
% of the p.e. in the
functional area of the WSA
served by a waste water
scheme that is fully
compliant with its
licence/certificate conditions.
% of discharges from WTP’s
and stormwater systems
which have conditions
attached to them in the
PoMs fully compliant with
such conditions.
Ref
S1
Parameters to be analysed and minimum
frequency of check and audit monitoring for
each supply to be carried out in accordance
with provisions of Tables A & B in Part 2 of the
Schedule.
The conditions attaching to a waste water
discharge licence (agglomerations with a p.e.
greater than 500) or certificate
(agglomerations with a p.e. less than 500) will
vary for each discharge depending on the
overall impact on and the designation of the
water body into which the waste water
discharge is or will be made.
The Licensing Authority will set emission limits
for pollutants likely to be present in the
wastewater concerned and a timeframe within
which these are to be achieved with the overall
objective of achieving good surface or
nd
groundwater status by 22 December 2015.
For discharges that don’t require a licence or
certificate (i.e. from water treatment plants and
stormwater systems) conditions may attach
arising out of the programme of measures
included in the relevant river basin
management plan with the overall objective of
achieving good surface or groundwater status
nd
by 22 December 2015.
The emission limits set will depend on the
nature and impact of other pressures on the
water body (e.g. other discharges and diffuse
sources of pollution) and whether or not the
water body is in an area that is protected
under EU and/or national legislation (e.g.
protected areas under the Water Framework
Directive)
Vol 4 Section 2, Page 4-7
S2
84
Levels of Service
Plan Approval &
Review
Define // Review
Review
Define
Levels of
of Service
Service
Levels
Financial Plan
Statutory 

Water Quality – SI 278/2007
Discharge Standards – SI 684 of 2007
Asset
Management Plan
Customer –
Water Services
Strategic Plan
Demand
Assessment
Service Pressures
 Adequate Capacity – treatment & storage
Collect Strategic
 Leakage/Infiltration
Strategic Options
Asset Data
 Fireflows
Strategic Capacity

Assessment
Vol 4 Section 2, Page 4-5
85
Levels of Service - Statutory
Standard
Standard S1
Water Quality
Recommended Target
Description & Definition
Compliance with European
Communities (Drinking
Water) (No. 2) Regulations
2007. – SI No. 278 of 2007.
Water supplied is wholesome and clean in that
–

It is free from any micro-organisms and
parasites and from any substance in
concentrations that constitute a potential
danger to human health.

It meets the 2 microbiological (Table A)
and 26 chemical (Table B) water quality
parametric value standards in Part 1 of
the Schedule to the Regulations.
% of Schemes in the
functional area of the WSA
fully compliant.
% of consumers in the
functional area of the WSA
supplied from a scheme that
is fully compliant.
Water Quality
Compliance with conditions
attaching to licences and
certificates issued under the
Waste Water Discharge
(Authorisation) Regulations
2007 – SI No. 684 of 2007
or the Programme of
Measures included in the
River Basin Management
Plan for the RBD in which
the discharge is or is
planned to be.
Discharge
Standards
Waste Water
Schemes
- WTP/
Stormwater
% of waste water schemes
requiring a licence/certificate
fully compliant with
licence/certificate conditions.
% of the p.e. in the
functional area of the WSA
served by a waste water
scheme that is fully
compliant with its
licence/certificate conditions.
% of discharges from WTP’s
and stormwater systems
which have conditions
attached to them in the
PoMs fully compliant with
such conditions.
Ref
S1
Parameters to be analysed and minimum
frequency of check and audit monitoring for
each supply to be carried out in accordance
with provisions of Tables A & B in Part 2 of the
Schedule.
The conditions attaching to a waste water
discharge licence (agglomerations with a p.e.
greater than 500) or certificate
(agglomerations with a p.e. less than 500) will
vary for each discharge depending on the
overall impact on and the designation of the
water body into which the waste water
discharge is or will be made.
The Licensing Authority will set emission limits
for pollutants likely to be present in the
wastewater concerned and a timeframe within
which these are to be achieved with the overall
objective of achieving good surface or
nd
groundwater status by 22 December 2015.
For discharges that don’t require a licence or
certificate (i.e. from water treatment plants and
stormwater systems) conditions may attach
arising out of the programme of measures
included in the relevant river basin
management plan with the overall objective of
achieving good surface or groundwater status
nd
by 22 December 2015.
The emission limits set will depend on the
nature and impact of other pressures on the
water body (e.g. other discharges and diffuse
sources of pollution) and whether or not the
water body is in an area that is protected
under EU and/or national legislation (e.g.
protected areas under the Water Framework
Directive)
Vol 4 Section 2, Page 4-7
S2
86
Levels of Service - Statutory
Standard
Recommended Target
Compliance with European
Communities (Drinking
Water) (No. 2) Regulations
2007. – SI No. 278 of 2007.
Water Quality
Description & Definition
Compliance with European
Communities (Drinking
Water) (No. 2) Regulations
2007. – SI No. 278 of 2007.
Water supplied is wholesome and clean in that
–

It is free from any micro-organisms and
parasites and from any substance in
concentrations that constitute a potential
danger to human health.

It meets the 2 microbiological (Table A)
and 26 chemical (Table B) water quality
parametric value standards in Part 1 of
the Schedule to the Regulations.
% of Schemes in the
functional area of the WSA
fully compliant.
% of consumers in the
functional area of the WSA
supplied from a scheme that
is fully compliant.
Compliance with conditions
attaching to licences and
certificates issued under the
Waste Water Discharge
(Authorisation) Regulations
2007 – SI No. 684 of 2007
or the Programme of
Measures included in the
River Basin Management
Plan for the RBD in which
the discharge is or is
planned to be.
% of Schemes in the
functional area of the WSA
fully compliant.
% of consumers in the
functional area of the WSA
supplied from a scheme that
is fully compliant.
Recommended Target
Discharge
Standards
Waste Water
Schemes
- WTP/
Stormwater
% of waste water schemes
requiring a licence/certificate
fully compliant with
licence/certificate conditions.
% of the p.e. in the
functional area of the WSA
served by a waste water
scheme that is fully
compliant with its
licence/certificate conditions.
% of discharges from WTP’s
and stormwater systems
which have conditions
attached to them in the
PoMs fully compliant with
such conditions.
Ref
S1
Parameters to be analysed and minimum
frequency of check and audit monitoring for
each supply to be carried out in accordance
with provisions of Tables A & B in Part 2 of the
Schedule.
The conditions attaching to a waste water
discharge licence (agglomerations with a p.e.
greater than 500) or certificate
(agglomerations with a p.e. less than 500) will
vary for each discharge depending on the
overall impact on and the designation of the
water body into which the waste water
discharge is or will be made.
The Licensing Authority will set emission limits
for pollutants likely to be present in the
wastewater concerned and a timeframe within
which these are to be achieved with the overall
objective of achieving good surface or
nd
groundwater status by 22 December 2015.
For discharges that don’t require a licence or
certificate (i.e. from water treatment plants and
stormwater systems) conditions may attach
arising out of the programme of measures
included in the relevant river basin
management plan with the overall objective of
achieving good surface or groundwater status
nd
by 22 December 2015.
The emission limits set will depend on the
nature and impact of other pressures on the
water body (e.g. other discharges and diffuse
sources of pollution) and whether or not the
water body is in an area that is protected
under EU and/or national legislation (e.g.
protected areas under the Water Framework
Directive)
Vol 4 Section 2, Page 4-7
S2
87
Levels of Service - Statutory
Description & Definition
Standard
Water supplied is wholesome and clean in
that
Statutory -
Water Quality
Description & Definition
Compliance with European
Communities (Drinking
Water) (No. 2) Regulations
2007. – SI No. 278 of 2007.
Water supplied is wholesome and clean in that
–

It is free from any micro-organisms and
parasites and from any substance in
concentrations that constitute a potential
danger to human health.

It meets the 2 microbiological (Table A)
and 26 chemical (Table B) water quality
parametric value standards in Part 1 of
the Schedule to the Regulations.
% of Schemes in the
functional area of the WSA
fully compliant.
% of consumers in the
functional area of the WSA
supplied from a scheme that
is fully compliant.
- It is free from any micro-organisms and
parasites and from any substance in
concentrations that constitute a potential
danger to human health.
It meets the 2 microbiological (Table A)
and 26 chemical (Table B) water quality
parametric value standards in Part 1 of
The Schedule to the Regulations.
- Parameters to be analysed and minimum
frequency of check and audit monitoring
for each supply to be carried out in
accordance with provisions of Tables A &
B in Part 2 of the Schedule.
Recommended Target
Compliance with conditions
attaching to licences and
certificates issued under the
Waste Water Discharge
(Authorisation) Regulations
2007 – SI No. 684 of 2007
or the Programme of
Measures included in the
River Basin Management
Plan for the RBD in which
the discharge is or is
planned to be.
Discharge
Standards
Waste Water
Schemes
- WTP/
Stormwater
% of waste water schemes
requiring a licence/certificate
fully compliant with
licence/certificate conditions.
% of the p.e. in the
functional area of the WSA
served by a waste water
scheme that is fully
compliant with its
licence/certificate conditions.
% of discharges from WTP’s
and stormwater systems
which have conditions
attached to them in the
PoMs fully compliant with
such conditions.
Ref
S1
Parameters to be analysed and minimum
frequency of check and audit monitoring for
each supply to be carried out in accordance
with provisions of Tables A & B in Part 2 of the
Schedule.
The conditions attaching to a waste water
discharge licence (agglomerations with a p.e.
greater than 500) or certificate
(agglomerations with a p.e. less than 500) will
vary for each discharge depending on the
overall impact on and the designation of the
water body into which the waste water
discharge is or will be made.
The Licensing Authority will set emission limits
for pollutants likely to be present in the
wastewater concerned and a timeframe within
which these are to be achieved with the overall
objective of achieving good surface or
nd
groundwater status by 22 December 2015.
For discharges that don’t require a licence or
certificate (i.e. from water treatment plants and
stormwater systems) conditions may attach
arising out of the programme of measures
included in the relevant river basin
management plan with the overall objective of
achieving good surface or groundwater status
nd
by 22 December 2015.
The emission limits set will depend on the
nature and impact of other pressures on the
water body (e.g. other discharges and diffuse
sources of pollution) and whether or not the
water body is in an area that is protected
under EU and/or national legislation (e.g.
protected areas under the Water Framework
Directive)
Vol 4 Section 2, Page 4-7
S2
88
Levels of Service - Statutory
Standard
Water Quality
Recommended Target
Description & Definition
Compliance with European
Communities (Drinking
Water) (No. 2) Regulations
2007. – SI No. 278 of 2007.
Water supplied is wholesome and clean in that
–

It is free from any micro-organisms and
parasites and from any substance in
concentrations that constitute a potential
danger to human health.

It meets the 2 microbiological (Table A)
and 26 chemical (Table B) water quality
parametric value standards in Part 1 of
the Schedule to the Regulations.
% of Schemes in the
functional area of the WSA
fully compliant.
% of consumers in the
functional area of the WSA
supplied from a scheme that
is fully compliant.
Compliance with conditions
attaching to licences and
certificates issued under the
Waste Water Discharge
(Authorisation) Regulations
2007 – SI No. 684 of 2007
or the Programme of
Measures included in the
River Basin Management
Plan for the RBD in which
the discharge is or is
planned to be.
Standard S2
Discharge
Standards
Discharge
Standards
Waste Water
Schemes
- WTP/
Stormwater
Waste Water
Schemes
-WTP/
Stormwater
% of waste water schemes
requiring a licence/certificate
fully compliant with
licence/certificate conditions.
% of the p.e. in the
functional area of the WSA
served by a waste water
scheme that is fully
compliant with its
licence/certificate conditions.
% of discharges from WTP’s
and stormwater systems
which have conditions
attached to them in the
PoMs fully compliant with
such conditions.
Ref
S1
Parameters to be analysed and minimum
frequency of check and audit monitoring for
each supply to be carried out in accordance
with provisions of Tables A & B in Part 2 of the
Schedule.
The conditions attaching to a waste water
discharge licence (agglomerations with a p.e.
greater than 500) or certificate
(agglomerations with a p.e. less than 500) will
vary for each discharge depending on the
overall impact on and the designation of the
water body into which the waste water
discharge is or will be made.
The Licensing Authority will set emission limits
for pollutants likely to be present in the
wastewater concerned and a timeframe within
which these are to be achieved with the overall
objective of achieving good surface or
nd
groundwater status by 22 December 2015.
For discharges that don’t require a licence or
certificate (i.e. from water treatment plants and
stormwater systems) conditions may attach
arising out of the programme of measures
included in the relevant river basin
management plan with the overall objective of
achieving good surface or groundwater status
nd
by 22 December 2015.
The emission limits set will depend on the
nature and impact of other pressures on the
water body (e.g. other discharges and diffuse
sources of pollution) and whether or not the
water body is in an area that is protected
under EU and/or national legislation (e.g.
protected areas under the Water Framework
Directive)
Vol 4 Section 2, Page 4-7
S2
89
Levels of Service - Statutory
Standard
Recommended Target
Compliance with conditions attaching to
licences and certificates issued under the
Waste Water Discharge (Authorisation)
Regulations 2007 – SI No. 684 of 2007 or
the PoMs included in the RBMP.
Water Quality
% of discharges from WTP’s and
stormwater systems which have
conditions attached to them in the PoMs
fully compliant with such conditions.
Description & Definition
Compliance with European
Communities (Drinking
Water) (No. 2) Regulations
2007. – SI No. 278 of 2007.
Water supplied is wholesome and clean in that
–

It is free from any micro-organisms and
parasites and from any substance in
concentrations that constitute a potential
danger to human health.

It meets the 2 microbiological (Table A)
and 26 chemical (Table B) water quality
parametric value standards in Part 1 of
the Schedule to the Regulations.
% of Schemes in the
functional area of the WSA
fully compliant.
% of consumers in the
functional area of the WSA
supplied from a scheme that
is fully compliant.
Compliance with conditions
attaching to licences and
certificates issued under the
Waste Water Discharge
(Authorisation) Regulations
2007 – SI No. 684 of 2007
or the Programme of
Measures included in the
River Basin Management
Plan for the RBD in which
the discharge is or is
planned to be.
% of waste water schemes requiring a
licence/certificate fully compliant with
licence/certificate conditions.
% of the p.e. in the functional area of the
WSA served by a waste water scheme
that is fully compliant with its
licence/certificate conditions.
Recommended Target
Discharge
Standards
Waste Water
Schemes
- WTP/
Stormwater
% of waste water schemes
requiring a licence/certificate
fully compliant with
licence/certificate conditions.
% of the p.e. in the
functional area of the WSA
served by a waste water
scheme that is fully
compliant with its
licence/certificate conditions.
% of discharges from WTP’s
and stormwater systems
which have conditions
attached to them in the
PoMs fully compliant with
such conditions.
Ref
S1
Parameters to be analysed and minimum
frequency of check and audit monitoring for
each supply to be carried out in accordance
with provisions of Tables A & B in Part 2 of the
Schedule.
The conditions attaching to a waste water
discharge licence (agglomerations with a p.e.
greater than 500) or certificate
(agglomerations with a p.e. less than 500) will
vary for each discharge depending on the
overall impact on and the designation of the
water body into which the waste water
discharge is or will be made.
The Licensing Authority will set emission limits
for pollutants likely to be present in the
wastewater concerned and a timeframe within
which these are to be achieved with the overall
objective of achieving good surface or
nd
groundwater status by 22 December 2015.
For discharges that don’t require a licence or
certificate (i.e. from water treatment plants and
stormwater systems) conditions may attach
arising out of the programme of measures
included in the relevant river basin
management plan with the overall objective of
achieving good surface or groundwater status
nd
by 22 December 2015.
The emission limits set will depend on the
nature and impact of other pressures on the
water body (e.g. other discharges and diffuse
sources of pollution) and whether or not the
water body is in an area that is protected
under EU and/or national legislation (e.g.
protected areas under the Water Framework
Directive)
Vol 4 Section 2, Page 4-7
S2
90
Levels of Service - Statutory
Standard
Description & Definition
Conditions will vary depending on
the overall impact on and the
designation of the water body.
Water Quality
Description & Definition
Compliance with European
Communities (Drinking
Water) (No. 2) Regulations
2007. – SI No. 278 of 2007.
Water supplied is wholesome and clean in that
–

It is free from any micro-organisms and
parasites and from any substance in
concentrations that constitute a potential
danger to human health.

It meets the 2 microbiological (Table A)
and 26 chemical (Table B) water quality
parametric value standards in Part 1 of
the Schedule to the Regulations.
% of Schemes in the
functional area of the WSA
fully compliant.
% of consumers in the
functional area of the WSA
supplied from a scheme that
is fully compliant.
The Licensing Authority will set
emission limits for pollutants and a
timeframe within which these are to
be achieved
For discharges that don’t require a
licence or certificate (i.e. from WTPs
plants and stormwater systems)
conditions may attach arising out of
the PoMs included in the relevant
RBMP.
Recommended Target
Compliance with conditions
attaching to licences and
certificates issued under the
Waste Water Discharge
(Authorisation) Regulations
2007 – SI No. 684 of 2007
or the Programme of
Measures included in the
River Basin Management
Plan for the RBD in which
the discharge is or is
planned to be.
Discharge
Standards
Waste Water
Schemes
- WTP/
Stormwater
% of waste water schemes
requiring a licence/certificate
fully compliant with
licence/certificate conditions.
% of the p.e. in the
functional area of the WSA
served by a waste water
scheme that is fully
compliant with its
licence/certificate conditions.
% of discharges from WTP’s
and stormwater systems
which have conditions
attached to them in the
PoMs fully compliant with
such conditions.
Ref
S1
Parameters to be analysed and minimum
frequency of check and audit monitoring for
each supply to be carried out in accordance
with provisions of Tables A & B in Part 2 of the
Schedule.
The conditions attaching to a waste water
discharge licence (agglomerations with a p.e.
greater than 500) or certificate
(agglomerations with a p.e. less than 500) will
vary for each discharge depending on the
overall impact on and the designation of the
water body into which the waste water
discharge is or will be made.
The Licensing Authority will set emission limits
for pollutants likely to be present in the
wastewater concerned and a timeframe within
which these are to be achieved with the overall
objective of achieving good surface or
nd
groundwater status by 22 December 2015.
For discharges that don’t require a licence or
certificate (i.e. from water treatment plants and
stormwater systems) conditions may attach
arising out of the programme of measures
included in the relevant river basin
management plan with the overall objective of
achieving good surface or groundwater status
nd
by 22 December 2015.
The emission limits set will depend on the
nature and impact of other pressures on the
water body (e.g. other discharges and diffuse
sources of pollution) and whether or not the
water body is in an area that is protected
under EU and/or national legislation (e.g.
protected areas under the Water Framework
Directive)
Vol 4 Section 2, Page 4-7
S2
91
Levels of Service - Customer
Standard
Recommended Target
Description & Definition
(value to be set by WSA)
Ref
Customer Service Standards
Number and % of
properties with between
15m and 40m head
above ground level at
any time when the zonal
demand is equal to the
normal daily peak
demand
Minimum
/Maximum
Pressure
This indicator identifies the number of
properties that are at risk of having a water
pressure below and above reference levels
due to deficiencies of the supply and
distribution system under normal operating
conditions.
The identification of properties for this indicator
has two separate but related elements:

Number and % of
properties with less than
15m head above ground
level.
Number and % of
properties with more
than 40m head above
ground level.

An appropriate technical assessment
of the properties that the Water
Services Authority considers are at
risk of receiving a service pressure
below or above the reference levels.
The basis of this assessment should
be detailed. It should also identify the
location of the properties affected for
cross-referencing to the incident
records.
S3
An incident based recording system.
The information should be collated
from the telemetry data, network data
and network analysis supplemented
with monitoring by data loggers at
strategic locations, operational data
and customer reactions and should be
summarised and reported on a
monthly basis.
Vol 4 Section 2, Page 4-9
92
Levels of Service - Customer
Standard
Recommended Target
Description & Definition
(value to be set by WSA)
Ref
Customer Service Standards
Number and % of
properties with between
15m and 40m head
above ground level at
any time when the zonal
demand is equal to the
normal daily peak
demand
Standard S3
Minimum
/Maximum
Pressure
Minimum
/Maximum
Pressure
This indicator identifies the number of
properties that are at risk of having a water
pressure below and above reference levels
due to deficiencies of the supply and
distribution system under normal operating
conditions.
The identification of properties for this indicator
has two separate but related elements:

Number and % of
properties with less than
15m head above ground
level.
Number and % of
properties with more
than 40m head above
ground level.

An appropriate technical assessment
of the properties that the Water
Services Authority considers are at
risk of receiving a service pressure
below or above the reference levels.
The basis of this assessment should
be detailed. It should also identify the
location of the properties affected for
cross-referencing to the incident
records.
S3
An incident based recording system.
The information should be collated
from the telemetry data, network data
and network analysis supplemented
with monitoring by data loggers at
strategic locations, operational data
and customer reactions and should be
summarised and reported on a
monthly basis.
Vol 4 Section 2, Page 4-9
93
Levels of Service - Customer
Standard
Recommended Target
Number and % of properties
with between 15m and 40m
head above ground level at any
time when the zonal demand
is equal to the normal daily
peak demand
Number and % of properties
with less than 15m head
above ground level.
Number and % of properties
with more than 40m head
above ground level.
Recommended Target
Description & Definition
(value to be set by WSA)
Ref
Customer Service Standards
Number and % of
properties with between
15m and 40m head
above ground level at
any time when the zonal
demand is equal to the
normal daily peak
demand
Minimum
/Maximum
Pressure
This indicator identifies the number of
properties that are at risk of having a water
pressure below and above reference levels
due to deficiencies of the supply and
distribution system under normal operating
conditions.
The identification of properties for this indicator
has two separate but related elements:

Number and % of
properties with less than
15m head above ground
level.
Number and % of
properties with more
than 40m head above
ground level.

An appropriate technical assessment
of the properties that the Water
Services Authority considers are at
risk of receiving a service pressure
below or above the reference levels.
The basis of this assessment should
be detailed. It should also identify the
location of the properties affected for
cross-referencing to the incident
records.
S3
An incident based recording system.
The information should be collated
from the telemetry data, network data
and network analysis supplemented
with monitoring by data loggers at
strategic locations, operational data
and customer reactions and should be
summarised and reported on a
monthly basis.
Vol 4 Section 2, Page 4-9
94
Levels of Service - Customer
Description & Definition
Standard
Recommended Target
Description & Definition
(value to be set by WSA)
Ref
Customer Service Standards
This indicator identifies the number
of properties that are at risk of
having a water pressure below and
above reference levels.
The identification of properties for
this indicator has two separate but
related elements:
- An appropriate technical
assessment of the properties that
the WSA considers are at risk of
receiving a service pressure below
or above the reference levels.
Number and % of
properties with between
15m and 40m head
above ground level at
any time when the zonal
demand is equal to the
normal daily peak
demand
Minimum
/Maximum
Pressure
This indicator identifies the number of
properties that are at risk of having a water
pressure below and above reference levels
due to deficiencies of the supply and
distribution system under normal operating
conditions.
The identification of properties for this indicator
has two separate but related elements:

Number and % of
properties with less than
15m head above ground
level.
Number and % of
properties with more
than 40m head above
ground level.

An appropriate technical assessment
of the properties that the Water
Services Authority considers are at
risk of receiving a service pressure
below or above the reference levels.
The basis of this assessment should
be detailed. It should also identify the
location of the properties affected for
cross-referencing to the incident
records.
S3
An incident based recording system.
The information should be collated
from the telemetry data, network data
and network analysis supplemented
with monitoring by data loggers at
strategic locations, operational data
and customer reactions and should be
summarised and reported on a
monthly basis.
- An incident based recording
system.
Vol 4 Section 2, Page 4-9
95
Levels of Service - Other
Other Service Standards
Fire-fighting minimum
desired capability for
new or rehabilitated
facilities:
[8] l/s in residential areas
not more than two
stories (urban and
village),
[15] l/s to village halls
and small community
facilities
[20] l/s to primary
schools and single story
health centres
[25] l/s to lorry/truck
parks and multi storey
car parks
Standard S4
Fireflows
Fireflows
[20-35] l/s to multioccupancy and multistory residential
Note: Achievement of desired fire flows may
not be achievable under existing network
conditions and high leakage levels. This is
particularly the case in rural networks. It is
likely that in order to achieve recommended
fire flows significant boosting of supplies
would be required which would lead to
oversized mains for general operation. This
may give rise to water quality issues. A
reasoned approach should be adopted
involving liaison with the Fire Officer to
achieve practical solutions suited to local
environments.
In assessing network capacities for fireflows
the recommended fireflow should be applied
to the network hydraulic model during the
peak diurnal demand periods while ensuring
that the minimum pressure anywhere on the
network does not drop below 5m head.
S4
[35] l/s to secondary
schools, colleges, large
health and community
facilities
[20 - 75] l/s to
commercial
developments (shopping,
offices, recreation &
tourism)
[20] l/s to Industrial
estates up to 1 Ha
[35] l/s to Industrial
estates of 1 to 2 Ha
[50] l/s to Industrial
estates of 2 to 3 Ha
[75] l/s to Industrial
estates over 3 Ha
Vol 4 Section 2, Page 4-9 & 4-10
96
Levels of Service - Other
Recommended Target (1 of 2)
Other Service Standards
Fire-fighting minimum
desired capability for
new or rehabilitated
facilities:
[8] l/s in residential areas
not more than two
stories (urban and
village),
Fire-fighting minimum desired capability for
new or rehabilitated facilities where it is
economically practicable and the mains
network is the sole solution to meeting
fire-fighting requirements:
[15] l/s to village halls
and small community
facilities
[20] l/s to primary
schools and single story
health centres
[8] l/s in residential areas not more than
two stories (urban and village)
[15] l/s to village halls and small community
facilities
[20] l/s to primary schools and single story
health centres
[25] l/s to lorry/truck parks and multi storey
car parks
[20-35] l/s to multi-occupancy and multi-story
residential
[25] l/s to lorry/truck
parks and multi storey
car parks
Fireflows
[20-35] l/s to multioccupancy and multistory residential
Note: Achievement of desired fire flows may
not be achievable under existing network
conditions and high leakage levels. This is
particularly the case in rural networks. It is
likely that in order to achieve recommended
fire flows significant boosting of supplies
would be required which would lead to
oversized mains for general operation. This
may give rise to water quality issues. A
reasoned approach should be adopted
involving liaison with the Fire Officer to
achieve practical solutions suited to local
environments.
In assessing network capacities for fireflows
the recommended fireflow should be applied
to the network hydraulic model during the
peak diurnal demand periods while ensuring
that the minimum pressure anywhere on the
network does not drop below 5m head.
S4
[35] l/s to secondary
schools, colleges, large
health and community
facilities
[20 - 75] l/s to
commercial
developments (shopping,
offices, recreation &
tourism)
[20] l/s to Industrial
estates up to 1 Ha
[35] l/s to Industrial
estates of 1 to 2 Ha
[50] l/s to Industrial
estates of 2 to 3 Ha
[75] l/s to Industrial
estates over 3 Ha
Vol 4 Section 2, Page 4-9 & 4-10
97
Levels of Service - Other
Recommended Target (2 of 2)
Other Service Standards
Fire-fighting minimum
desired capability for
new or rehabilitated
facilities:
[8] l/s in residential areas
not more than two
stories (urban and
village),
Fire-fighting minimum desired capability
for new or rehabilitated facilities where it is
economically practicable and the mains
network is the sole solution to meeting
fire-fighting requirements:
[15] l/s to village halls
and small community
facilities
[20] l/s to primary
schools and single story
health centres
[35] l/s to secondary schools, colleges, large
health and community facilities
[20 - 75] l/s to commercial developments
(shopping, offices, recreation & tourism)
[20] l/s to Industrial estates up to 1 Ha
[35] l/s to Industrial estates of 1 to 2 Ha
[50] l/s to Industrial estates of 2 to 3 Ha
[25] l/s to lorry/truck
parks and multi storey
car parks
Fireflows
[20-35] l/s to multioccupancy and multistory residential
Note: Achievement of desired fire flows may
not be achievable under existing network
conditions and high leakage levels. This is
particularly the case in rural networks. It is
likely that in order to achieve recommended
fire flows significant boosting of supplies
would be required which would lead to
oversized mains for general operation. This
may give rise to water quality issues. A
reasoned approach should be adopted
involving liaison with the Fire Officer to
achieve practical solutions suited to local
environments.
In assessing network capacities for fireflows
the recommended fireflow should be applied
to the network hydraulic model during the
peak diurnal demand periods while ensuring
that the minimum pressure anywhere on the
network does not drop below 5m head.
S4
[35] l/s to secondary
schools, colleges, large
health and community
facilities
[20 - 75] l/s to
commercial
developments (shopping,
offices, recreation &
tourism)
[20] l/s to Industrial
estates up to 1 Ha
[35] l/s to Industrial
estates of 1 to 2 Ha
[50] l/s to Industrial
estates of 2 to 3 Ha
[75] l/s to Industrial estates over 3 Ha
[75] l/s to Industrial
estates over 3 Ha
Vol 4 Section 2, Page 4-9 & 4-10
98
Levels of Service - Other
Other Service Standards
Fire-fighting minimum
desired capability for
new or rehabilitated
facilities:
[8] l/s in residential areas
not more than two
stories (urban and
village),
Description & Definition
Desired fire flows may not be achievable
under existing network conditions.
[15] l/s to village halls
and small community
facilities
It may require significant boosting of supplies
leading to oversized mains for general
operation.
Reasoned approach required involving
liaison with Fire Officer to achieve practical
solutions.
In assessing network capacities the
recommended fireflow should be applied
to the network hydraulic model during the
peak diurnal demand periods while ensuring
that the minimum pressure anywhere on
the network does not drop below 5m head.
[20] l/s to primary
schools and single story
health centres
[25] l/s to lorry/truck
parks and multi storey
car parks
Fireflows
[20-35] l/s to multioccupancy and multistory residential
Note: Achievement of desired fire flows may
not be achievable under existing network
conditions and high leakage levels. This is
particularly the case in rural networks. It is
likely that in order to achieve recommended
fire flows significant boosting of supplies
would be required which would lead to
oversized mains for general operation. This
may give rise to water quality issues. A
reasoned approach should be adopted
involving liaison with the Fire Officer to
achieve practical solutions suited to local
environments.
In assessing network capacities for fireflows
the recommended fireflow should be applied
to the network hydraulic model during the
peak diurnal demand periods while ensuring
that the minimum pressure anywhere on the
network does not drop below 5m head.
S4
[35] l/s to secondary
schools, colleges, large
health and community
facilities
[20 - 75] l/s to
commercial
developments (shopping,
offices, recreation &
tourism)
[20] l/s to Industrial
estates up to 1 Ha
[35] l/s to Industrial
estates of 1 to 2 Ha
[50] l/s to Industrial
estates of 2 to 3 Ha
[75] l/s to Industrial
estates over 3 Ha
Vol 4 Section 2, Page 4-9 & 4-10
99
Levels of Service - Other
Sufficient to cater for the
average day in the peak
week plus a minimum
headroom of 10 % above
this.
WTP Capacity
Standard S5a
% of schemes with target
10% headroom
Water Services Authorities should assess the
demand for water services for each scheme
and review on a yearly basis against the
available supply. The ratio between the
reliable daily capacity of the WTP and the
average daily demand in the peak week
should not be less than 1.1.
S5a
% of population served
by a scheme with target
10% headroom.
Sufficient to cater for the
average day in the peak
week flow and load plus
a minimum headroom of
10 %.
WTP Capacity
WwTP
Capacity
% of schemes with target
10% headroom
S5b
% of p.e. served by a
scheme with target 10%
headroom.
Storage
A minimum of [24] hours
storage capacity at
average day demand in
the peak week to allow
for a full days service.
Consideration to be given to providing
greater than 24 hours storage volume for
strategic storage facilities where there is a
risk of a significant interruption to supply in
the event of a failure in the trunk system (e.g.
the estimated time taken to isolate, drain
down, repair and re-commission a burst on a
trunk main feeding the reservoir is greater
than 24 hours).
Vol 4 Section 2, Page 4-10
S6
100
Levels of Service - Other
Sufficient to cater for the
average day in the peak
week plus a minimum
headroom of 10 % above
this.
Recommended Target
Sufficient to cater for the
average day in the peak
week plus a minimum
headroom of 10 % above
this.
% of schemes with target
10% headroom
WTP Capacity
% of schemes with target
10% headroom
Water Services Authorities should assess the
demand for water services for each scheme
and review on a yearly basis against the
available supply. The ratio between the
reliable daily capacity of the WTP and the
average daily demand in the peak week
should not be less than 1.1.
S5a
% of population served
by a scheme with target
10% headroom.
Sufficient to cater for the
average day in the peak
week flow and load plus
a minimum headroom of
10 %.
WwTP
Capacity
% of schemes with target
10% headroom
S5b
% of p.e. served by a
scheme with target 10%
headroom.
% of population served
by a scheme with target
10% headroom.
Storage
A minimum of [24] hours
storage capacity at
average day demand in
the peak week to allow
for a full days service.
Consideration to be given to providing
greater than 24 hours storage volume for
strategic storage facilities where there is a
risk of a significant interruption to supply in
the event of a failure in the trunk system (e.g.
the estimated time taken to isolate, drain
down, repair and re-commission a burst on a
trunk main feeding the reservoir is greater
than 24 hours).
Vol 4 Section 2, Page 4-10
S6
101
Levels of Service - Other
Sufficient to cater for the
average day in the peak
week plus a minimum
headroom of 10 % above
this.
Description & Definition
Water Services Authorities should
assess the demand for water
services for each scheme and
review on a yearly basis against
the available supply.
The ratio between the reliable
daily capacity of the WTP and
the average daily demand in the
peak week should not be less
than 1.1.
WTP Capacity
% of schemes with target
10% headroom
Water Services Authorities should assess the
demand for water services for each scheme
and review on a yearly basis against the
available supply. The ratio between the
reliable daily capacity of the WTP and the
average daily demand in the peak week
should not be less than 1.1.
S5a
% of population served
by a scheme with target
10% headroom.
Sufficient to cater for the
average day in the peak
week flow and load plus
a minimum headroom of
10 %.
WwTP
Capacity
% of schemes with target
10% headroom
S5b
% of p.e. served by a
scheme with target 10%
headroom.
Storage
A minimum of [24] hours
storage capacity at
average day demand in
the peak week to allow
for a full days service.
Consideration to be given to providing
greater than 24 hours storage volume for
strategic storage facilities where there is a
risk of a significant interruption to supply in
the event of a failure in the trunk system (e.g.
the estimated time taken to isolate, drain
down, repair and re-commission a burst on a
trunk main feeding the reservoir is greater
than 24 hours).
Vol 4 Section 2, Page 4-10
S6
102
Levels of Service - Other
Sufficient to cater for the
average day in the peak
week plus a minimum
headroom of 10 % above
this.
WTP Capacity
% of schemes with target
10% headroom
Water Services Authorities should assess the
demand for water services for each scheme
and review on a yearly basis against the
available supply. The ratio between the
reliable daily capacity of the WTP and the
average daily demand in the peak week
should not be less than 1.1.
S5a
% of population served
by a scheme with target
10% headroom.
Sufficient to cater for the
average day in the peak
week flow and load plus
a minimum headroom of
10 %.
Standard S5b
WwTP
Capacity
WwTP Capacity
% of schemes with target
10% headroom
S5b
% of p.e. served by a
scheme with target 10%
headroom.
Storage
A minimum of [24] hours
storage capacity at
average day demand in
the peak week to allow
for a full days service.
Consideration to be given to providing
greater than 24 hours storage volume for
strategic storage facilities where there is a
risk of a significant interruption to supply in
the event of a failure in the trunk system (e.g.
the estimated time taken to isolate, drain
down, repair and re-commission a burst on a
trunk main feeding the reservoir is greater
than 24 hours).
Vol 4 Section 2, Page 4-10
S6
103
Levels of Service - Other
Sufficient to cater for the
average day in the peak
week plus a minimum
headroom of 10 % above
this.
Recommended Target
Sufficient to cater for the
average day in the peak
week flow and load plus
a minimum headroom of
10 %.
% of schemes with target
10% headroom
% of p.e. served by a
scheme with target 10%
headroom.
WTP Capacity
% of schemes with target
10% headroom
Water Services Authorities should assess the
demand for water services for each scheme
and review on a yearly basis against the
available supply. The ratio between the
reliable daily capacity of the WTP and the
average daily demand in the peak week
should not be less than 1.1.
S5a
% of population served
by a scheme with target
10% headroom.
Sufficient to cater for the
average day in the peak
week flow and load plus
a minimum headroom of
10 %.
WwTP
Capacity
% of schemes with target
10% headroom
S5b
% of p.e. served by a
scheme with target 10%
headroom.
Storage
A minimum of [24] hours
storage capacity at
average day demand in
the peak week to allow
for a full days service.
Consideration to be given to providing
greater than 24 hours storage volume for
strategic storage facilities where there is a
risk of a significant interruption to supply in
the event of a failure in the trunk system (e.g.
the estimated time taken to isolate, drain
down, repair and re-commission a burst on a
trunk main feeding the reservoir is greater
than 24 hours).
Vol 4 Section 2, Page 4-10
S6
104
Levels of Service - Other
Sufficient to cater for the
average day in the peak
week plus a minimum
headroom of 10 % above
this.
WTP Capacity
% of schemes with target
10% headroom
Water Services Authorities should assess the
demand for water services for each scheme
and review on a yearly basis against the
available supply. The ratio between the
reliable daily capacity of the WTP and the
average daily demand in the peak week
should not be less than 1.1.
S5a
% of population served
by a scheme with target
10% headroom.
Sufficient to cater for the
average day in the peak
week flow and load plus
a minimum headroom of
10 %.
Standard S6
WwTP
Capacity
% of schemes with target
10% headroom
S5b
% of p.e. served by a
scheme with target 10%
headroom.
Storage
Storage
A minimum of [24] hours
storage capacity at
average day demand in
the peak week to allow
for a full days service.
Consideration to be given to providing
greater than 24 hours storage volume for
strategic storage facilities where there is a
risk of a significant interruption to supply in
the event of a failure in the trunk system (e.g.
the estimated time taken to isolate, drain
down, repair and re-commission a burst on a
trunk main feeding the reservoir is greater
than 24 hours).
Vol 4 Section 2, Page 4-11
S6
105
Levels of Service - Other
Sufficient to cater for the
average day in the peak
week plus a minimum
headroom of 10 % above
this.
WTP Capacity
% of schemes with target
10% headroom
Water Services Authorities should assess the
demand for water services for each scheme
and review on a yearly basis against the
available supply. The ratio between the
reliable daily capacity of the WTP and the
average daily demand in the peak week
should not be less than 1.1.
S5a
% of population served
by a scheme with target
10% headroom.
Sufficient to cater for the
average day in the peak
week flow and load plus
a minimum headroom of
10 %.
Recommended Target
A minimum of [24] hours
storage capacity at
average day demand in
the peak week to allow
for a full days service.
WwTP
Capacity
% of schemes with target
10% headroom
S5b
% of p.e. served by a
scheme with target 10%
headroom.
Storage
A minimum of [24] hours
storage capacity at
average day demand in
the peak week to allow
for a full days service.
Consideration to be given to providing
greater than 24 hours storage volume for
strategic storage facilities where there is a
risk of a significant interruption to supply in
the event of a failure in the trunk system (e.g.
the estimated time taken to isolate, drain
down, repair and re-commission a burst on a
trunk main feeding the reservoir is greater
than 24 hours).
Vol 4 Section 2, Page 4-11
S6
106
Levels of Service - Other
Sufficient to cater for the
average day in the peak
week plus a minimum
headroom of 10 % above
this.
WTP Capacity
% of schemes with target
10% headroom
Water Services Authorities should assess the
demand for water services for each scheme
and review on a yearly basis against the
available supply. The ratio between the
reliable daily capacity of the WTP and the
average daily demand in the peak week
should not be less than 1.1.
S5a
% of population served
by a scheme with target
10% headroom.
Sufficient to cater for the
average day in the peak
week flow and load plus
a minimum headroom of
10 %.
Description & Definition
Consideration to be given to
providing greater than 24 hours
storage volume for strategic
storage facilities where there is a
risk of a significant interruption to
supply in the event of a failure in
the trunk system.
WwTP
Capacity
% of schemes with target
10% headroom
S5b
% of p.e. served by a
scheme with target 10%
headroom.
Storage
A minimum of [24] hours
storage capacity at
average day demand in
the peak week to allow
for a full days service.
Consideration to be given to providing
greater than 24 hours storage volume for
strategic storage facilities where there is a
risk of a significant interruption to supply in
the event of a failure in the trunk system (e.g.
the estimated time taken to isolate, drain
down, repair and re-commission a burst on a
trunk main feeding the reservoir is greater
than 24 hours).
Vol 4 Section 2, Page 4-11
S6
107
Levels of Service - Other
Distribution Network
Economic Level of
Leakage (ELL) to be
achieved within [10]
years provided sufficient
water resources are
available to meet
demands.
Standard S7
Leakage
Targets
Leakage Targets
% of domestic
consumers supplied by
the Water Services
Authority that are
supplied from a scheme
that is achieving the ELL
target or better.
Target levels of leakage should be set based
on economic assessment. The economic
level of leakage (ELL) effectively compares
the cost of leak detection and repair with the
variable costs of water production (primarily
power and chemical costs) to arrive at a level
of leakage that is most economical to
maintain (i.e. the combined cost of active
leakage control and variable production costs
is lowest).
S7
% of the total accounted
for water (AFW) of all
schemes run by or on
behalf of the Water
Services Authority that is
from a scheme that is
achieving the ELL target
or better.
Sewer
Infiltration
% of the average
measured Dry Weather
Flow (DWF) for all
schemes run by or on
behalf of the Water
Services Authority that is
infiltration.
By measuring the inflow to a WwTP during a
24-hour “dry period” a comparison of the
minimum night flow with the average flow over
the 24-hour period will indicate the level of
infiltration in the collection system.
S8
The minimum night flow is the lowest hourly
night flow recorded less an allowance for
domestic (toilet flushing etc.) and nondomestic (based on metered “water in”) flow
during that particular hour
Vol 4 Section 2, Page 4-11
108
Levels of Service - Other
Distribution Network
Economic Level of
Leakage (ELL) to be
achieved within [10]
years provided sufficient
water resources are
available to meet
demands.
Recommended Target
Economic Level of Leakage (ELL)
to be achieved within [10] years
provided sufficient water
resources are available to meet
demands.
Leakage
Targets
S7
% of the total accounted
for water (AFW) of all
schemes run by or on
behalf of the Water
Services Authority that is
from a scheme that is
achieving the ELL target
or better.
% of domestic consumers
Supplied by the WSA that are
supplied from a scheme that is
achieving the ELL target or better.
% of the total accounted for water
(AFW) of all schemes run by or on
behalf of the WSA that is from a
scheme that is achieving the ELL
target or better.
% of domestic
consumers supplied by
the Water Services
Authority that are
supplied from a scheme
that is achieving the ELL
target or better.
Target levels of leakage should be set based
on economic assessment. The economic
level of leakage (ELL) effectively compares
the cost of leak detection and repair with the
variable costs of water production (primarily
power and chemical costs) to arrive at a level
of leakage that is most economical to
maintain (i.e. the combined cost of active
leakage control and variable production costs
is lowest).
Sewer
Infiltration
% of the average
measured Dry Weather
Flow (DWF) for all
schemes run by or on
behalf of the Water
Services Authority that is
infiltration.
By measuring the inflow to a WwTP during a
24-hour “dry period” a comparison of the
minimum night flow with the average flow over
the 24-hour period will indicate the level of
infiltration in the collection system.
S8
The minimum night flow is the lowest hourly
night flow recorded less an allowance for
domestic (toilet flushing etc.) and nondomestic (based on metered “water in”) flow
during that particular hour
Vol 4 Section 2, Page 4-11
109
Levels of Service - Other
Distribution Network
Economic Level of
Leakage (ELL) to be
achieved within [10]
years provided sufficient
water resources are
available to meet
demands.
Description & Definition
Target levels of leakage should
be set based on economic
assessment.
Leakage
Targets
The economic level of leakage
(ELL) effectively compares the
cost of leak detection and repair
with the variable costs of water
production (primarily power and
chemical costs) to arrive at a
level of leakage that is most
economical to maintain (i.e. the
combined cost of active leakage
control and variable production
costs is lowest).
% of domestic
consumers supplied by
the Water Services
Authority that are
supplied from a scheme
that is achieving the ELL
target or better.
Target levels of leakage should be set based
on economic assessment. The economic
level of leakage (ELL) effectively compares
the cost of leak detection and repair with the
variable costs of water production (primarily
power and chemical costs) to arrive at a level
of leakage that is most economical to
maintain (i.e. the combined cost of active
leakage control and variable production costs
is lowest).
S7
% of the total accounted
for water (AFW) of all
schemes run by or on
behalf of the Water
Services Authority that is
from a scheme that is
achieving the ELL target
or better.
Sewer
Infiltration
% of the average
measured Dry Weather
Flow (DWF) for all
schemes run by or on
behalf of the Water
Services Authority that is
infiltration.
By measuring the inflow to a WwTP during a
24-hour “dry period” a comparison of the
minimum night flow with the average flow over
the 24-hour period will indicate the level of
infiltration in the collection system.
S8
The minimum night flow is the lowest hourly
night flow recorded less an allowance for
domestic (toilet flushing etc.) and nondomestic (based on metered “water in”) flow
during that particular hour
Vol 4 Section 2, Page 4-11
110
Levels of Service - Other
Distribution Network
Economic Level of
Leakage (ELL) to be
achieved within [10]
years provided sufficient
water resources are
available to meet
demands.
Leakage
Targets
% of domestic
consumers supplied by
the Water Services
Authority that are
supplied from a scheme
that is achieving the ELL
target or better.
Target levels of leakage should be set based
on economic assessment. The economic
level of leakage (ELL) effectively compares
the cost of leak detection and repair with the
variable costs of water production (primarily
power and chemical costs) to arrive at a level
of leakage that is most economical to
maintain (i.e. the combined cost of active
leakage control and variable production costs
is lowest).
S7
% of the total accounted
for water (AFW) of all
schemes run by or on
behalf of the Water
Services Authority that is
from a scheme that is
achieving the ELL target
or better.
Standard S9
Sewer
Infiltration
Sewer
Infiltration
% of the average
measured Dry Weather
Flow (DWF) for all
schemes run by or on
behalf of the Water
Services Authority that is
infiltration.
By measuring the inflow to a WwTP during a
24-hour “dry period” a comparison of the
minimum night flow with the average flow over
the 24-hour period will indicate the level of
infiltration in the collection system.
S8
The minimum night flow is the lowest hourly
night flow recorded less an allowance for
domestic (toilet flushing etc.) and nondomestic (based on metered “water in”) flow
during that particular hour
Vol 4 Section 2, Page 4-11
111
Levels of Service - Other
Distribution Network
Economic Level of
Leakage (ELL) to be
achieved within [10]
years provided sufficient
water resources are
available to meet
demands.
Leakage
Targets
Recommended Target
% of domestic
consumers supplied by
the Water Services
Authority that are
supplied from a scheme
that is achieving the ELL
target or better.
Target levels of leakage should be set based
on economic assessment. The economic
level of leakage (ELL) effectively compares
the cost of leak detection and repair with the
variable costs of water production (primarily
power and chemical costs) to arrive at a level
of leakage that is most economical to
maintain (i.e. the combined cost of active
leakage control and variable production costs
is lowest).
S7
% of the total accounted
for water (AFW) of all
schemes run by or on
behalf of the Water
Services Authority that is
from a scheme that is
achieving the ELL target
or better.
% of the average measured Dry
Weather Flow (DWF) for all
schemes run by or on behalf
of the WSA that is infiltration.
Sewer
Infiltration
% of the average
measured Dry Weather
Flow (DWF) for all
schemes run by or on
behalf of the Water
Services Authority that is
infiltration.
By measuring the inflow to a WwTP during a
24-hour “dry period” a comparison of the
minimum night flow with the average flow over
the 24-hour period will indicate the level of
infiltration in the collection system.
S8
The minimum night flow is the lowest hourly
night flow recorded less an allowance for
domestic (toilet flushing etc.) and nondomestic (based on metered “water in”) flow
during that particular hour
Vol 4 Section 2, Page 4-11
112
Levels of Service - Other
Description & Definition
By measuring the inflow to a
WwTP during a 24-hour
“dry period” a comparison of
the minimum night flow with the
average flow over the 24-hour
period will indicate the level of
infiltration in the collection system.
The minimum night flow is the
lowest hourly night flow recorded
less an allowance for domestic
(toilet flushing etc.) and
non-domestic (based on metered
“water in”) flow during that
particular hour
Distribution Network
Economic Level of
Leakage (ELL) to be
achieved within [10]
years provided sufficient
water resources are
available to meet
demands.
Leakage
Targets
% of domestic
consumers supplied by
the Water Services
Authority that are
supplied from a scheme
that is achieving the ELL
target or better.
Target levels of leakage should be set based
on economic assessment. The economic
level of leakage (ELL) effectively compares
the cost of leak detection and repair with the
variable costs of water production (primarily
power and chemical costs) to arrive at a level
of leakage that is most economical to
maintain (i.e. the combined cost of active
leakage control and variable production costs
is lowest).
S7
% of the total accounted
for water (AFW) of all
schemes run by or on
behalf of the Water
Services Authority that is
from a scheme that is
achieving the ELL target
or better.
Sewer
Infiltration
% of the average
measured Dry Weather
Flow (DWF) for all
schemes run by or on
behalf of the Water
Services Authority that is
infiltration.
By measuring the inflow to a WwTP during a
24-hour “dry period” a comparison of the
minimum night flow with the average flow over
the 24-hour period will indicate the level of
infiltration in the collection system.
S8
The minimum night flow is the lowest hourly
night flow recorded less an allowance for
domestic (toilet flushing etc.) and nondomestic (based on metered “water in”) flow
during that particular hour
Vol 4 Section 2, Page 4-11
113
Performance Indicators
Example - Water Quality

Number of (& population served by) Water Supply Schemes in functional
area of Water Services Authority (A)

Number (& population) with the correct frequency of check and audit
monitoring required by S.I. 278 of 2007. (A1)

% of (& % population served by) Schemes with the correct frequency of
check and audit required by S.I. 278 of 2007. (A2 = A1/A x 100)

Number (& population) with the correct frequency of monitoring that are
compliant with the water quality standards set out in SI 278 of 2007. (A3)

% of (& % population served by) Schemes with the correct frequency of
monitoring that are compliant with the water quality standards set out in
SI 278 of 2007. (A4 = A3/A x 100)
Vol 4 Section 2, Page 4-13
114
Performance Indicators
Cost of Water Services – Potable Water

Total annual cost of the provision of potable water. (J)

Total annual volume (in m3) of AFW delivered to customers. (J2)

Total population supplied with potable water. (J4)

Average cost of provision of potable water services per m3 (J6 = J/J2)

Average cost of provision of potable water services per head of
population served (J7 = J/J4)
Vol 4 Section 2, Page 4-15 & 4-16
115
Design Standards
Demand Assessment –




Design Horizon -
25 years
Household Occupancy Rates – Current - from CSO Census data.
Future - from projections in the National
Water Study 2000 (or as updated).
Per Capita Consumption (pcc) - from projections included in the National
Water Study 2000 (or as updated)
Household losses (losses at
consumer side of stop-cock)
- Current (2008) 60l/household/d
- Design Horizon 40l/household/d
Vol 4 Section 2, Page 4-16 & 4-17
116
Design Standards
Demand Assessment –


Domestic Waste Water Load -
60 g of BOD/day - one p.e.
Non-Domestic Waste Water Load - Based on the recommended
(in the absence of specific
loadings given in Table 3 of the EPA
allowable or reserved loads)
“Treatment Systems for Small
Communities, Business, Leisure
Centres, and Hotels” manual.
Vol 4 Section 2, Page 4-17
117
Design Standards
Demand Assessment –

Unaccounted For Water (UFW) - Current - from Prelim Water Audit
Future - based on ELL Target.

Water for Operational Use -
2% of accounted for water (AFW)

Peaking Factor -
Derived from historic distribution input
records for previous 3 to 5 years.
Industrial Water Consumption –
(in the absence of specific
supply agreements)
Light =14m³/ha/day
Medium = 28m³/ha/day
Heavy = 56m³/ha/day

Vol 4 Section 2, Page 4-17
118
Design Standards
Infrastructural Capacity – (i) Water Treatment and Supply


Water Treatment Plant (WTP) Capacity -
110% of average day in the
peak week demand .
WTP Balancing Storage Capacity - 2 hours storage of WTP throughput
plus 24 hours storage of demand of
any area served.

Service Reservoir Capacity -
24 hours storage of the average
day/peak week demand for area that is
directly served from the reservoir.

Trunk mains -
1.2 x the average day/peak week
demand of the area served.
Vol 4 Section 2, Page 4-18
119
Design Standards
Infrastructural Capacity – (i) Water Treatment and Supply


Pumping stations -
1.2 x the average day/peak week demand of
the area served (equivalent to pumping
demand over 20 hours)
Distribution mains -
1.6 to 2.5 x the average day/peak week
demand depending on the demand profile of
the consumers served. A hydraulic model with
the relevant consumer demand profiles will
give a more accurate capacity requirement for
distribution mains.
Vol 4 Section 2, Page 4-18
120
Design Standards
Infrastructural Capacity – (ii) Ww Collection and Treatment

Combined Sewers –
No surcharge under 2 x DWF plus runoff from
storm with 2 year return period.
No surface flooding in residential and
commercial areas at the 1 in 20 and 1 in 30
storm events respectively, plus 2 x DWF



Foul Sewers –
6 x DWF
Foul/combined Sewer
self cleansing velocity
0.7 m/s (minimum at 2 x DWF)
Pumping Stations/
Continuation flow at
cSOs
Formula A :
Q = DWF + 1360P + 2E
Vol 4 Section 2, Page 4-18 & 4-19
121
Design Standards
Infrastructural Capacity – (ii) Ww Collection and Treatment



Foul Only Trunk Sewers - Between 3 and 6 x DWF depending on the
area of the catchment. Hydraulic model will
give a more accurate capacity requirement.
Combined Trunk Sewers - No surcharge under 2 x DWF from subcatchments with combined sewers, 6 x DWF
from sub-catchments with foul only sewers
and runoff under the 2-year design storm.
No surface flooding under the 1 in 20 and 1 in
30 year storm events for residential and
commercial areas respectively.
Waste Water Treatment Plant
(WwTP) Capacity - (p.e.)
2 to 3 x DWF depending on p.e.,
catchment and receiving waters.
Vol 4 Section 2, Page 4-19
122
Session 4
Levels of Service and Design
Standards
Volume 4 – Section 2
123
Session 5
Demand Forecasting
Volume 4 – Section 3
124
Demand for Water Services
Plan Approval &
Review
Define / Review
Levels of Service
Financial Plan
Asset
Management Plan
Water Services
Strategic Plan
Demand
Assessment
Collect Strategic
Asset Data
Strategic Options
Strategic Capacity
Assessment
Vol 1 Section 2., Page 1-4/13
125
Demand for Water Services
Current Demand
-
Water Audit of existing usage required to assess the
basic units of demand and to give an accurate base on
which to predict future growth.
Demand Management
-
Demand
Assessment
policy for managing demand (usage and
leakage) impacts on predicting future growth.
Future Demand
-
Realistic and accurate assessment is required to ensure
the necessary infrastructure can be put in place.
Vol 4 Section 3, Page 4-20
126
Demand for Water Services
Current Demand - Water Audit
Accounted
for
Water
Distribution
Input
(DI)
Domestic
Demand
Households x
Occupancy x pcc
Permanent
Domestic
Seasonal
Domestic
(AFW)
Non-Domestic Demand
Measured or
assessed
lergitimate
water use
Metered consumption
Demand
Assessment
Operational Use – 2% of DI
Unaccounted for
Water
(UFW) = DI - AFW
Peaking Factor – Average Day/Peak Week
Vol 4 Section 3, Page 4-21 to 4-24
127
Demand for Water Services
Current Demand – Distribution Input
Distribution
Input
Average daily amount of
water entering the
distribution network during
the year.
Demand
Assessment
(DI)
Typically yearly bulk meter
flow leaving WTP divided
by 365.
Vol 4 Section 3, Page 4-25
128
Demand for Water Services
Current Demand – Accounted for Water
Accounted
for
Water
(AFW)
Measured or
assessed
lergitimate
water use
Portion of DI
that can be
accounted for
as legitimate
use by the
WSA or its
customers.
Demand
Assessment
Vol 4 Section 3, Page 4-25
129
Demand for Water Services
Current Demand – Domestic Demand
Domestic
Demand
Households x
Occupancy x pcc
Permanent
Domestic
Seasonal
Domestic
Domestic properties served - Geodirectory / CIS
Permanent – proportion occupied on census night
Seasonal - proportion unoccupied on census night
Demand
Assessment
Occupancy Rates - CSO census data (county, borough, & towns)
Seasonal – assume occupancy rate of 4 for 3 months of the year
Per capita consumption (pcc) - National Water Study 2000 (Vol 2, Table 11)
Vol 4 Section 3, Page 4-25 to 4-29
130
Demand for Water Services
Current Demand – Non-Domestic Demand
Non-Domestic Demand
Metered consumption
Demand
Assessment
Divide total yearly non-domestic metered consumption by the number of
days in the year
For combined domestic/non-domestic properties deduct “domestic
allowance”
Vol 4 Section 3, Page 4-29
131
Demand for Water Services
Current Demand – Unaccounted for Water (UFW)
Real Losses – leakage from trunk mains,
reservoirs, distribution mains, customer service
pipes, fittings and plumbing.
Apparent Losses – unauthorised or illegal
consumption and customer meter inaccuracies.
Demand
Assessment
Unaccounted for
Water
(UFW) = DI - AFW
Vol 4 Section 3, Page 4-30
Demand for Water Services
132
Current Demand – Peaking Factor
Average day in the peak week demand (allows for seasonal variations)
1. Assess daily DI records for previous 3 to 5 years.
2. For each year determine the 7-day period with
the highest DI – peak week.
Demand
Assessment
3. Divide by 7 to get the average day in the peak
week.
4. Peaking Factor = Average day / peak week demand
Average daily demand for the year
Peaking Factor – Average Day/Peak Week
Vol 4 Section 3, Page 4-30 & 4-31
133
Demand for Water Services
Current Demand – Water Audit Calculation Summary
Demand
Assessment
Vol 4 Section 3, Page 4-32
134
Demand for Water Services
Current Demand – Waste Water Assessment
Accounted
for
DWF
Dry Weather
Flow
(DWF)
Measured or
assessed
legitimate
Waste water flow
and load
Domestic
DWF
Flow = Households
x Occupancy x per
capita flow
Permanent
Domestic
Load = population x
per capita load
Seasonal
Domestic
Demand
Assessment
Non-Domestic DWF
Flow based on water in = water out
Load based on EPA Guidance
Unaccounted for DWF
Flow = Min night flow – metered flow – domestic allowance
Load = Measured load less accounted for domestic and nondomestic load
Peaking Factor – 10% Headroom
Vol 4 Section 3, Page 4-33 to 4-35
135
Demand for Water Services
Current Demand – Dry Weather Flow (DWF)
Dry Weather
Flow
(DWF)
Average daily amount of
wastewater discharged from
a collection system arising
from all foul discharges - plus
infiltration.
Demand
Assessment
Flow measured during a 7day “dry” period – defined by
EPA.
Vol 4 Section 3, Page 4-36
136
Demand for Water Services
Current Demand – Accounted for DWF
Accounted
for
DWF
Measured or
assessed
legitimate
Waste water flow
and load
Portion of DWF
that can be
accounted for
as legitimate
use by the
WSA or its
customers.
Demand
Assessment
Vol 4 Section 3, Page 4-36
137
Demand for Water Services
Current Demand – Domestic DWF
Domestic flow
Same as the methodology
used for domestic water
demand with a per capita
flow equivalent to the pcc
(water in = water out)
Domestic
DWF
Flow = Households
x Occupancy x per
capita flow
Load = population x
per capita load
Permanent
Domestic
Seasonal
Domestic
Demand
Assessment
Domestic Load - National Urban Wastewater Study 2004.
BOD5 - 60g/c/d (taken as one population equivalent - p.e.)
Suspended Solids (SS) - 75g/c/d
Phosphorus (P) – 10mg/l
Nitrogen (N) – 50mg/l
Ammonia (NH3) – 25 mg/l
Vol 4 Section 3, Page 4-36 & 4-37
138
Demand for Water Services
Current Demand – Non-Domestic DWF
Three categories of non-domestic waste water service customers.
1.
2.
3.
Those regulated by EPA IPPC licences (flow and load taken as the
maximum allowed under the licence)
Those receiving water and waste water services.
Demand
Assessment
(flow based on metered
Non-Domestic DWF
water in & load derived
Flow based on water in = water out
Load based on EPA Guidance
from EPA guidance
manual)
Those receiving waste water services only (flow and load derived from
EPA guidance manual)
Vol 4 Section 3, Page 4-37 & 4-38
139
Demand for Water Services
Current Demand – Unaccounted for DWF
Minimum hourly night flow during a “dry” period less metered
consumption less allowance for domestic discharge (1.7 litres per
property)
Cross check against guideline infiltration levels (National Urban
Waste Water Study 2004) to establish extent of unknown or illegal
discharges.
Where flow records are not available / reliable use guideline
infiltration levels given in the NUWWS
Unaccounted for DWF
Flow = Min night flow – metered flow – domestic allowance
Load = Measured load less accounted for domestic and nondomestic load
Vol 4 Section 3, Page 4-38 to 4-40
140
Demand for Water Services
Current Demand – DWF Calculation Summary
Vol 4 Section 3, Page 4-41
141
Demand for Water Services
Current Demand
Demand Management

Reduce water losses and
infiltration
Demand
Assessment

Reduce water consumption
and associated waste
water production
Vol 4 Section 3, Page 4-43
142
Demand for Water Services
Demand Management – Reduce losses/infiltration
Water Conservation programme
- Phase 1 Monitoring (modelling, DMA set-up, metering etc.)
- Phase 2 Active Leakage Control (Leak detection & repair)
- Phase 3 Rehabilitation / Replacement
Demand
Assessment
Economic Model
- Economic level of leagake (ELL)
- Short Run ELL, balance between cost of leakage reduction and
marginal cost of water lost
- Long Run ELL – also takes into account the deferral of capital
expenditure that would otherwise be needed to increase supply
Vol 4 Section 3, Page 4-43 & 4-44
143
Demand for Water Services
Demand Management – Reduce losses/infiltration
Typical SRELL
400
Euro NPV ('000)
350
300
Value of water lost Demand
250
ALC Detection
Assessment
Total Costs
200
BLL
150
ELL
Potential Savings
100
621 m3/day
€31/day or
€11,333/year
50
0
0
1 2
3 4
5 6
7 8
9 10 11 12 13 14 15 16 17 18 19 20
Target Leakage (m3/km/d)
Vol 4 Section 3, Page 4-43 & 4-44
144
Demand for Water Services
Demand Management – Reduced Consumption
Domestic consumption
- National Water Study projections – trend is for increase in pcc
- some success in promoting water conservation on a voluntary basis
or through regulation.
Demand
Assessment
Non- Domestic consumption
- Universal metering should encourage a reduction in consumption.
Customer side Losses
- Currently estimated at 60 l/property/day.
- Target reduction of 1% per annum over 20 years.
Vol 4 Section 3, Page 4-44 & 4-45
145
Demand for Water Services
Current Demand
Demand Management
Future Demand

Population growth (25-Year Horizon)
Demand
Assessment
- Top Down: Planning guidelines, CSO
- Bottom Up: Availability of zoned land

Water & Waste Water
– Domestic demand as per audit using projected pcc, losses etc.
- Non-domestic demand growth in line with domestic
- UFW/Infiltration in line with level of service objectives.
Vol 4 Section 3, Page 4-46
146
Demand for Water Services
Future Demand – Population Growth

Planning and Development Guidelines
- National Spatial Strategy
- Regional Planning Guidelines
- County/City Development Plans

Demand
Assessment
CSO Projections
- 30-year population & labour force – 6 growth scenarios
- 15-year regional projections – good correlation with RPG.
Vol 4 Section 3, Page 4-46 to 4-49
147
Demand for Water Services
Future Demand – Population Growth & Distribution

Top-down Methodology
Population
Adopted Projected Pouplation Range
Demand
Assessment
Base Year Population
RPG Projected Pouplation Range
Time
RPG Horizon
25-Year Design Horizon
Vol 4 Section 3, Page 4-49
148
Demand for Water Services
Future Demand – Population Growth & Distribution

Top-down Methodology – Population Distribution
Demand
Assessment
Vol 4 Section 3, Page 4-50
149
Demand for Water Services
Future Demand – Population Growth & Distribution

Bottom-up Review – Assess potential population growth
assuming full development of zoned lands.
- Area of residentially zoned lands (CDP, LAP etc.)
- Projected housing density (CDP, LAP or “Residential
Density – Guidelines for Planning Authorities, 1999”
- Projected occupancy rate (Planning Authority or
projections in NWS 2004).
Vol 4 Section 3, Page 4-51 & 4-52
150
Demand for Water Services
Future Demand – Water Supply
Domestic Consumption

Permanent Domestic Demand
= (design population) x (pcc derived from NWS or updated assessment)

Seasonal Domestic Demand
= (current seasonal demand) x (design permanent domestic demand)
(current permanent domestic demand)

Household Losses – reducing @ 1% pa (49l/p/d at 25 years)
Vol 4 Section 3, Page 4-52 to 4-54
151
Demand for Water Services
Future Demand – Water Supply
Non-Domestic Consumption

Increase in line with domestic demand growth.

Redistribute a portion of the increase (30 to 50%) to
significant commercial/employment centres

Strategic industrial allowance
(specific supply agreements or
strategic zoned land x demand per hectare)
Vol 4 Section 3, Page 4-55
152
Demand for Water Services
Future Demand – Water Supply
Operational Use – 2%
Unaccounted for Water – as per UFW targets
Demand
Assessment
Peak Day Demand – as per current peak factors
Headroom & Outage – 10% of AFW
Vol 4 Section 3, Page 4-56 to 4-59
153
Demand for Water Services
Future Demand – Waste Water Services
Same methodology as for Water Services (Water in = Water out)
Domestic DFW & Load
DWF = projected population x per capita flow (as per pcc projections in NWS)
Load = as per recommendation of NUWWS
Demand
Assessment
Non-Domestic DFW & Load
DWF = equivalent to growth in non-domestic water demand
Load = as current average pollution load - increasing in proportion to flow
Unaccounted for DFW (Infiltration) – as per target or recommended
levels in NUWWS
Peaking Factor – as per contributing water supply scheme
Vol 4 Section 3, Page 4-60 to 4--64
154
Session 5
Demand Forecasting
Volume 4 – Section 3
155
Session 6
Asset Condition & Performance
Volume 4 – Section 4
Asset Data
Define / Review
Levels of Service
Financial Plan
Asset
Management Plan
156
Plan Approval &
Review
Water Services
Strategic Plan
Demand
Assessment
Collect
CollectStrategic
Strategic
Asset
AssetData
Data
Strategic Options
Strategic Capacity
Assessment
Vol 1 Section 2., Page 1-4/13
157
Asset Assessment
Has each scheme the necessary key
assets to deliver demands?
Elements of asset assessment –
 Asset data collection
 Identify scheme shortfalls
 Identify scheme options
Collect Strategic
Asset Data
Vol 4 Section 3, Page 4-67
158
Asset Data Collection
Key asset data
 Condition
 Performance
 Capacity
 Value
Collect Strategic
Asset Data
159
Data Collection Templates
Water
Data Collection Templates
Waste Water
NWS, Volume 2, "Database Requirement"
Appendix B3
Table 1
Underground Sourceworks
Section 2.1
Table 2
Surface Sourceworks
Section 2.2
Table 3
Dams
Table 3.10
Table 4
Raw Water Aqueducts
Table 3.11
Table 5
Pumping Stations
Table 3.12
Table 6
Water Treatment Works
Table 3.13
Table 7
Trunk Mains
Table 3.14
Service Reservoirs & Water
Table 8
Table 3.16
Towers
Table 9
Distribution Mains
Table 3.17
Table 10
Operational Control
Table 3.18
Table 3.19
Table 4.2
Table 6.1
Table 6.2
Table 6.3
Table 6.4
NUWWS, Volume 2, Part A
Treatment Plant Questionnaire, Parts 1-4
Sewerage Network Questionnaire, Parts 3 & 4
Foul Gravity Sewers
Storm Gravity Sewers
Combined Gravity Sewers
Sewer Rising Mains
Trunk Sewers leading to WwTP
Combined Storm Overflows
Watercourse Pollution
Pumping Stations
Other Ancillaries
Operational Control
Hydrology
Sewer Flooding
Sewer Structural Failures
Other Failures
Vol 4 Section 3, Page 4-68
160
River Source Data Template
Collect Strategic
Asset Data
161
Water Treatment Works
Collect Strategic
Asset Data
Distribution Mains Template
162
Sewer Network
163
164
Guidance on Template Completion
Guidance on Completion of Data Collection Templates
Water
Waste Water
NWS, Volume 2, "Database Requirement"
Section 6.0
NUWWS, Volume 2, Part A, Section 2.3
Guidance on Data Confidence
Water
Waste Water
NWS, Volume 2, "Database Requirement"
Section 3.3.2
Table
Data Confidence Indicators
3.2
Key asset data
NUWWS, Volume 2, Part A, Section 2.3
Table 1.1
Data Source Code
Collect Strategic
Asset Data
Vol 4 Section 3, Page 4-68
165
Asset Groupings
Water
Source/Intake
Raw Water Conveyance
Pumping Stations
Water Treatment
Trunk Network
Storage Reservoirs
Distribution Network
Management Systems
Waste Water
Sewers
Sewer Structures
Sewage Pumping Stations
Rising Mains
Waste Water Treatment Plants, including
outfalls (excluding sea outfalls)
Sea Outfalls
Sludge Treatment
Management Systems
Collect Strategic
Asset Data
Vol 4 Section 3, Page 4-69
General Condition Grading
Collect Strategic
Asset Data
Table 3.1: “Database Requirements”: Volume 2
166
167
Condition Grades
Water
NWS, Volume 2, "Obligations, Policies,
& Indicators", Appendix D
Table 1 Buildings
Table 2 Civil Works
Electro-Mechanical
Table 3 Equipment
Table 4 Other Above Ground Assets
Table 5 Underground Assets
Waste Water
NUWWS, Volume 2, Part A, Section 2.3
Table 1.2 Gravity Sewers
Table 1.3 Pumping Mains
Table 1.4 Above Ground Assets
Collect Strategic
Asset Data
Vol 4 Section 3, Page 4-70
168
Civil Works Condition Grades
Grade Description
General Meaning
1
Good
Sound modern structure, well maintained
2
Fair
As 1, but showing minor wear and tear. Needs to be reinspected in the medium term.
3
Adequate
Functionally sound structure but appearance affected by
minor cracking, staining, vegetation, or minor leakage.
Poor
Structure functioning but with problems due to significant
leakage, cracking, spalling, loss of stability of deformation,
corrosion substantially reducing size of structural members
or, strong possibility of regular contamination of potable
water. Needs almost immediate action within 1-2 years.
Decrepit
Beyond economic repair because unsafe to use. Corrosion
such that significant reduction in size of structural member
likely to cause overstressing, or contamination of potable
water has been known to occur on more than one occasion.
Requires immediate action.
4
5
Table 2, Appendix D; “Obligations, Policies and Indicators” Volume 2
Vol 4 Section 3, Page 4-70
Condition / Performance Grade
Predictive Asset Decay Curve
169
1
2
3
4
5
15%
35%
55%
75%
Collect Strategic
Asset Data
95%
Percentage Effective Life Expended
Vol 4 Section 3, Page 4-71
170
Condition Assessment Input
Collect Strategic
Asset Data
Data Confidence
Table 3.2; “Database Requirements” ; Volune 2
171
172
Data Confidence
Collect Strategic
Asset Data
173
Asset Performance
Quality of output – compliance with
standards
Efficiency – against its design capacity
Rated asset capacity – based on
operational experience, review or
original design
Adequacy – rated/current
Collect Strategic
Asset Data
requirement
Vol 4 Section 3, Page 4-71 to 4-73
174
Performance Grading
Sample Performance Grading Criteria established for WTP (Source – NWS)
Grade
Description
General Meaning
1
Good
Sound modern components, with no operational problems. 100%
standby capacity (if applicable)
2
Fair
As 1, but with minor operational problems
Adequate
All components operable but with some operational problems. Limited
standby capacity. Some reduction in performance compared to an
equivalent asset in good condition
4
Poor
Function affected by significant operational problems. Significant
operational constraints. Limited standby capacity. Reliable
performance significantly reduced from design value.
5
Decrepit
Beyond economical repair due to major components inoperable or
unsafe to use.
3
The full suite of performance grade descriptions for water supply assets is included in
Volume 2 of the NWS ("Obligations, Policies, & Indicators", Appendix E).
Vol 4 Section 3, Page 4-73
Performance Considerations
175
O&M optimisation > improvement
Capability to achieve standard
Current v rated capacity
Influent parameters differ from design
Performance grading & rehab costs of
components
Collect Strategic
Asset Data
Vol 4 Section 3, Page 4-71 to 4-73
176
Wastewater Performance Grading
Not included in NUWWS however
Data templates include adequacy fields
Collect Strategic
Asset Data
Vol 4 Section 3, Page 4-73
177
Wastewater Performance Grading
Adequacy of WW System
Vol 4 Section 3, Page 4-73
Performance Grading Summary
178
Supported by measured performance
data:








Water supply outages & interruptions
Flooding incidents
Maximum, minimum, average values
Raw and final water quality results
Influent and final effluent quality
Burst information
Collect Strategic
Asset Data
Customer complaints
Leakage/infiltration levels (estimated if necessary)
Vol 4 Section 3, Page 4-74
179
Overall Asset Assessment
Condition/performance guides
replacement/upgrading decision
NWS recommends performance



Grade 4/5 – replace/refurbish within 5 years
Grade 3 – replace/refurbish within 10 years
Grade 1 or 2 –replacement/refurbishment not
required unless in poor condition
Condition/performance linked
Collect Strategic
Asset Data
Vol 4 Section 3, Page 4-75
Condition/Performance Matrix
180
Condition Grade
Performance Grade
1
2
3
4
5
1
0 - 20%
20 - 40%
40 - 60%
75 - 98%
90 - 100%
2
20 - 40%
30 - 50%
50 - 70%
75 - 98%
90 - 100%
3
40 - 60%
50 - 70%
60 - 75%
75 - 98%
90 - 100%
4
65 - 80%
70 - 80%
75 - 90%
75 - 98%
90 - 100%
5
75 - 98%
75 - 98%
75 - 98%
90 - 100%
90 - 100%
Indicative Age Only - Reassess Condition periodically
Replace within 10 Years - Reassess Condition annually
Replace within 5 Years
Collect Strategic
Asset Data
Replace within 2 Years
Vol 4 Section 4 Page 4-76
181
Session 6
Asset Condition & Performance
Volume 4 – Section 4
182
Session 7
Asset Valuation
Volume 4 – Section 4.2.2
183
Asset Classification
Required for determining funding/replacement cost,
assessing change in service potential, managing risk
Vol 4 Section 4, Page 4-78
184
Asset Valuation
Infrastructural assets:


Gross modern equivalent asset (MEA) value –
replacement value of new asset
Allow for any O&M & quality differences
Non-infrastructural assets:

Net MEA value – cost of replacement depreciated
to take into account remaining service life of
existing asset
Vol 4 Section 4, Page 4-78
185
Water Supply Asset Classification
(Ref NWS Volume 2, “Asset Valuation Methodology”, Section 4.2).
Vol 4 Section 4, Page 4-78 & 4-79
186
Valuation Problem
Lack of reliable unit cost data
Develop central database of unit costs
 DEHLG or CCMA
 Unit costs includes design fees

187
Wastewater Asset Classification
Vol 4 Section 4, Page 4-80
188
Depreciated Asset Value
Condition / Performance Grade
Possible to use predictive decay curves
1
2
3
4
5
15%
35%
55%
75%
95%
Percentage Effective Life Expended
Use typical design life and straight line
depreciation
Vol 4 Section 4, Page 4-71
189
Typical Asset Design Lives
Vol 4 Section 4, Page 4-82
Cost (€)
Straight Line Depreciation
190
Replacement Value (MEA)
Current Value (Based on Asset Condition)
Age
Remaining Life
Time
Economic Life
Design Life
Current Value = MEA (Replacement Value) x
Remaining Life
Economic Life
Vol 4 Section 4, Page 4-83
Asset Condition Unknown?
191
Banding on materials/age may indicate
significant unnecessary investment
Budget to replace % of MEA value
- 0.5% typically used in UK
- Increase if lack of historical investment
Asset budget renewal based on
demonstrated need
Vol 4 Section 4, Page 4-84
O&M Expenditure Capture
192
Required for annual budgeting
Operational:

Utilising & managing asset; no impact on asset
condition
Maintenance:


Routine activities to keep asset operating at specified
levels of service
Replacement of minor assets of less than 1 years
design life
Vol 4 Section 4, Page 4-84 & 4-85
193
Typical Asset Summary (Water Supply Scheme)
Vol 4 Section 4, Page 4-87
194
Typical Asset Summary (Water Supply Scheme)
Vol 4 Section 4, Page 4-88
195
Typical Asset Summary (Waste Water Scheme)
Vol 4 Section 4, Page 4-89
196
Typical Asset Summary (Waste Water Scheme)
Vol 4 Section 4, Page 4-90
197
Authority Level Summary
(Water Supply)
Vol 4 Section 4, Page 4-85
Authority Level Summary
198
(Waste Water)
Vol 4 Section 4, Page 4-86
199
Authority Level Financial Summary
200
Session 7
Asset Valuation
Volume 4 – Section 4.2.2
201
Session 8
Asset Assessment and Options
Volume 4 – Section 4
202
Asset Capacity Assessment
Plan Approval &
Review
Define / Review
Levels of Service
Financial Plan
Asset
Management Plan
Water Services
Strategic Plan
Demand
Assessment
Collect Strategic
Asset Data
Strategic Options
Strategic
Strategic Capacity
Capacity
Assessment
Assessment
Vol 1 Section 2., Page 1-4/13
Asset Capacity Assessment
Potable Water
Waste Water
-
-
Source & Intake
Raw Water Mains
Treatment Plants
Pumping Stations
Trunk/Rising Mains
Storage Reservoirs
203
Trunk Sewers/Rising Mains
Pumping Stations
Storm Balancing Tanks
Treatment Plants
Sludge Treatment
Sea Outfalls
Strategic Capacity
Assessment
Vol 4 Section 4, Page 4-91
204
Asset Capacity Assessment
Demand / Capacity
Projected Demand Range
Capacity Shortfall
Rated Asset Capacity
Expected Time Range of Deficit
0 - 5 Yrs
5 - 10 Yrs
10 - 15 Yrs
15 - 20 Yrs
20 - 25 Yrs
Design Horizon
Strategic Capacity
Assessment
Vol 4 Section 4, Page 4-92
Asset Capacity Assessment
205
Demand / Capacity
Increased Asset Capacity
Rated Asset Capacity
Expected Time Range of Deficit
0 - 5 Yrs
5 - 10 Yrs
10 - 15 Yrs
15 - 20 Yrs
20 - 25 Yrs
Design Horizon
Strategic Capacity
Assessment
Vol 4 Section 4, Page 4-92
206
Asset Capacity Assessment
Typical Water Supply Capacity Shortfall
Scheme
Name
Current
Capacity
Source/Intake
River A
40 Ml/d
Raw Water
600mm to WTP
20 Ml/d
Treatment
WTP A
17 Ml/d
Raw Water
20 Ml/d
To Res A
15 Ml/d
300mm to Res A
15 Ml/d
450 mm to Res B
9 Ml/d
A
10 Ml
B
7Ml
0 – 5 Yrs
5 - 10 Yrs 10 - 15 Yrs 15 - 20 Yrs 20 - 25 Yrs
2 to 5 Ml/d
3 to 8 Ml/d
2 to 5 Ml/d
Pumping Station
Trunk/Rising
Mains
2 Ml
2 to 5 Ml/d
Reservoirs
1 to 3 Ml/d
Strategic Capacity
Assessment
Vol 4 Section 4, Page 4-93
207
Asset Capacity Assessment
Typical Waste Water Supply Capacity
Shortfall
Scheme
Name
Current
Capacity
Outfall
600mm from WwTP X 10 Ml/d
Treatment
WwTP X
10,000 pe
PH A to WwTP
3.75 Ml/d
PH B to WwTP
9.8 Ml/d
0 – 5 Yrs
5 - 10 Yrs 10 - 15 Yrs 15 - 20 Yrs 20 - 25 Yrs
0 to 1.5Ml/d
5,000 to 7,000 pe
3.0 to 9.0 Ml/d
Pumphouse
Trunk Sewers 150mm from PH A
/Rising Mains 350mm from PH B
3.75 Ml/d
3.0 to 9.0 Ml/d
9.8 Ml/d
Strategic Capacity
Assessment
Vol 4 Section 4, Page 4-93
208
Asset Capacity Assessment
Other Shortfalls
-
Future Legislative Changes
e.g. more stringent DWR or discharge limits which may trigger
a plan review
-
Customer Expectations
e.g. Higher level of service expectation – can be postponed until
next plan review.
Strategic Capacity
Assessment
Vol 4 Section 4, Page 4-93
Identifying Scheme Options


209
Existing arrangements in place – Arrangements already planned or in
place for meeting scheme deficits.
Operational Options – Reduction in demand through demand
management or leakage through active leakage control.

Rehabilitation/Renewal Options – Increasing capacity when renewing
or replacing assets that have reached the end of their useful life.

Augmentation Options – Increasing scheme capacity by augmenting
from an adjacent scheme that has surplus capacity.

Replacement/Upgrade Options – Increasing capacity to meet scheme
deficits by adding new infrastructure.
Strategic Options
Vol 4 Section 4, Page 4-94 to 4-102
Identifying Scheme Options
210
Existing Arrangements
Existing feasibility or preliminary reports



Critical assets may have extra capacity
Plants may be designed for extension
Old recommendations need critical review
Existing WSIP

Approved project may provide shortfall
Strategic Options
Vol 4 Section 4, Page 4-94 & 4-95
211
Identifying Scheme Options
Operational Options
Active Leakage Control


Economic Level of Leakage (ELL) – short run ELL is cost effective
Long Run ELL may defer capital spend
Infiltration Reduction

Reduction in pumping and treatment cost and deferment of capital spend
Demand Management

Water saving appliances.
Strategic Options
Vol 4 Section 4, Page 4-95 & 4-96
212
Identifying Scheme Options
Rehab/Renewal Options
Increase capacity when renewing assets


Upsize pipe/sewer during rehab/replacement work
Replace M&E plant with plant of higher capacity or improved efficiency
Consider only marginal cost in economic assessment
Strategic Options
Vol 4 Section 4, Page 4-96
213
Identifying Scheme Options
Augmentation Options
Import service from adjoining scheme



Environmentally/economically attractive
Additional security due to shared resources
Reduction in unit operating cost.- monitoring, management, O&M.
Strategic links between schemes for improved
security of supply
Strategic Options
Vol 4 Section 4, Page 4-97
214
Identifying Scheme Options
Replacement/Upgrade Options
Replace asset with one of higher capacity/improved
performance.
Provide additional asset to increase capacity/performance
May be only option available
Strategic Options
Vol 4 Section 4, Page 4-97
Water Supply Options
215
Strategic Options
Vol 4 Section 4, Page 4-98
Waste Water Options
216
Strategic Options
Vol 4 Section 4, Page 4-98
217
Option Selection Criteria
Economic - Discounted whole life unit cost.
Environmental - Least negative (or most positive)
impact.
Social - Compatible with current thinking.
Risk - Likely failure probability and impact.
Strategic Options
Vol 4 Section 4, Page 4-98 & 4-99
Risk Assessment Matrix
218
Strategic Options
Vol 4 Section 4, Page 4-99
Option Selection – Decision Tree
219
Assess Capacity
Requirement
Can it be satisfied by
Operational Optimisation?
Yes
No
Can it be satisfied by
Rehab/renewal option?
Yes
No
Can it be satisfied by
Augmentation Option?
Yes
No
Can it be satisfied by
Upgrade/Replacement?
Yes
Strategic Options
Proceed with selected option
Vol 4 Section 4, Page 4-100
220
Prioritisation for Investment NUWWS: Volume 2; part C
Justification headings (in priority order)
Statutory – compliance with EU/national legislation
Developmental – cater for additional demand
Maintenance – maintain existing levels of service
Strategic Options
Vol 4 Section 4, Page 4-101
Prioritisation Matrix
221
Strategic Options
Vol 4 Section 4, Page 4-102
222
Session 8
Asset Assessment and Options
Volume 4 – Section 4
223
Session 9
Strategic Environmental
Assessment
Volume 4 – Section 5
224
Introduction/Background
Only elements that are likely to have a
significant effect on the environment
Required under SEA Directive, SEA
Regs (435/2004) and WSA
Not required for elements subjected to
the SEA process in a previous plan
Vol 4 Section 5.1, Page 4-103
225
Process Summary
Screening plan to identify elements likely to
have a significant effect on the environment
Checking for elements previously processed
Statutory scoping consultation on remaining
elements
EA on remaining elements
Environmental Report
Consultation on relevant elements
SEA statement
Vol 4 Section 5.1, Page 4-103 & 4-104
226
Elements previously processed
Examined in other plans – higher level
Not necessary to examine again
Impacts, mitigation measures, etc to be
restated in ER and SEA
Cannot modify aspects of previous SEA
Vol 4 Section 5.1, Page 4-103 & 4-104
227
Elements subject to SEA
Baseline data from SEAs for existing
plans
RBMPs & PoMs likely sources
RBMP & WSSP parallel processes
SEAs for both likely to run concurrently
Vol 4 Section 5.1,.3 Page 4-106
228
Screening and Checking
Draft Plan sufficient to identify elements
likely to have a significant effect
Screening identifies these elements
Check if any have been previously
subjected to the SEA process


Water quality standards in RBMPs
Population growth impact in CDP
Vol 4 Section 5..2 , Page 4-109
229
Scoping
Elements that require SEA identifed
Consultation on EIA level of detail
Prescribed Environmental Authorities



EPA
Minister DEHLG – architectural, archeological
heritage or nature conservation
Minister(s) responsible for fisheries & marine
where plan is likely to have a significant effect on
same
Vol 4 Section 5..2 , Page 4-111
Proforma Notice
230
Vol 1, Appendix A
Scoping Report Contents
231
Introduction
Outline of draft plan & map of area
Elements likely to have significant effect
Subset previously subjected to SEA
SEA elements & methodology
Reasonable alternatives
Environmental issues to be considered
Vol 4 Section 5..2 , Page 4-111 to 4-115
Scoping Report Contents
232
Plans, objectives that might impact
Draft environmental issues for elements
Interaction with other plans
Conclusion on proposed scope
Sources of data
Contact point for comment
Vol 4 Section 5..2 , Page 4-111 to 4-115
Sources of Baseline Data
Environmental Issue
Biodiversity including Flora & Fauna
Population
Human Health
233
Primary Information Source /
Secondary Source
DEHLG; DCENR: EPA
Central Statistics Office; EPA
Public
Health
Authorities;
EPA;
Radiological Protection Institute of Ireland;
Department of Health; Health & Safety
Authority
Soil
Teagasc; EPA; GSI.
Water
EPA; Marine Institute
Air
EPA
Climatic Factors
EPA
Material Assets
Water Service Authority
Cultural Heritage including Architectural DEHLG
and Archaeological
Landscape
Water Service Authority
Interrelationship between the above See above information sources
factors
Source: Strategic Environmental Assessment –
Environmental Protection Agency Customer Service
published by EPA
Vol 4 Section 5..2 , Page 4-113 & 4-114
234
Habitats & Birds Directives
European Court (4/8/04/EC)
Habitats & Birds Directives not fully
implemented
 Plans prepared by LA to consider
appropriate assessment of any element
that might impinge on Natura 2000 site
 Possible legislation to transpose Directives
 Reasonable measures to conserve bird
areas

Vol 4 Section 5..2 , Page 4-114
Appropriate Assessment
235
Potential impact on conservation objectives
of site by particular element
Sites & objectives detailed in land use plans
Scoping report
Identify elements likely to impact on such areas
 Record management & conservation objectives
 Consult with DEHLG on requirement

Vol 4 Section 5..2 , Page 4-114
236
SEA Process
Establish baseline environment
Predict implementation impact
Evaluate significance
Mitigation measures & monitoring
programme
Element justification taking into account
feasible alternatives
Vol 4 Section 5..2 , Page 4-115 to 4-124
237
Baseline Environment
Aspects that are likely to be significantly
affected:
Bio-diversity – flora and fauna
 Water – surface, ground, estuarine,coastal
 Soil, landscape, cultural heritage
 Population, human health, material assets
 Air, climatic factors
 Interrelationships between the above

Vol 4 Section 5..2 , Page 4-116 to 4-119
238
Predicting the Impacts
Nature and extent of change
Geographic location
Frequency & duration of impact
Temporary or permanent
Probability of occurrence
Cumulative impact
Potential for transboundary effects
Vol 4 Section 5..2 , Page 4-119 & 4-120
239
Evaluating Significance of Impacts
Breach of environmental standard?
Failure to achieve policies or targets?
Effect on resource that are protected?
Effect of valuable resources?
Vol 4 Section 5..2 , Page 4-120 & 4-122
240
Matrix Compilation
Significant beneficial impact

Uncertain impact
?
Significant adverse impact
X
Neutral or insignificant
0
Explanation of impact grading
Scale of occurrence – local, regional,
national
Vol 4 Section 5..2 , Page 4-121
241
Matrix
Element under assessment
Any Element
Environmental Receptor
Biodiversity, flora & fauna
Water (surface, ground,
estuarine & coastal)
Impact
Comment
Soil
Landscape
Cultural heritage (architectural
& archaeological heritage)
Population
Human Health
Air
Climatic Factors
Material Assets
Interrelationships
Other
Vol 4 Section 5..2 , Page 4-121 & 4-122
242
Significant Impacts
Preventing impacts
Reducing their magnitude
Reducing probability of occurrence
Remediation measures after occurrence
Compensation by benefits elsewhere
Monitoring programme

Existing where possible
Vol 4 Section 5..2 , Page 4-122
243
Justification
Demonstrate that alternatives considered
Environmental considerations taken into
account in selection of preferred option
Outline environmental, social, economic
balance in choice
Benchmark choices against “do nothing”
scenario
Vol 4 Section 5..2 , Page 4-123
244
Environmental Report
Content & main objectives of strategic
plan & relationship with other plans
Current state of environment & likely
evolution without implementation
Environmental characteristics of area
Existing relevant environmental problems
List of established protection objectives
Vol 4 Section 5..2 , Page 4-123 & 4-124
245
Environmental Report
Likely significant effects
Mitigation measures
Selection reasoning
Assessment description & any
difficulties
Proposed monitoring measures
Non-technical summary
Vol 4 Section 5..2 , Page 4-123 & 4-124
246
Statutory Consultation
On ER & elements of Plan likely to have
a significant effect on environment
EPA, DEHLG, Fisheries & Marine
Proforma, ER and relevant elements
Public notice inviting written submissions
Reaching Out Guidelines – 8 weeks
Vol 4 Section 5..2 , Page 4-125
247
Transboundary Consultation
Art14 – NI – after consultation with
Minister or where NI requests
ER with elements of plan & letter inviting
consultation to NI Environment
Letter should include
Elements likely to have transboundary
environmental effect
 8 week timeframe expected for initial reply

Vol 4 Section 5..2 , Page 4-125
248
Final Plan & SEA Statement
Art 15 –

All submissions/observations (incl.
Transboundary) to be taken into account
Options are:
No action
 Revise the environmental assessment
 Revise the particular element

Check to ensure no new negative impacts
Vol 4 Section 5..2 , Page 4-126
249
SEA Statement Contents
How environmental issues integrated
How submissions taken into account
Why particular alternatives chosen
Monitoring measures
Vol 4 Section 5..2 , Page 4-127
250
Publication
Article 16 of Regulations
Copy Plan & SEA to Environmental
Authorities
 Newspaper notice – Plan & SEA available
for inspection at specified locations

Vol 4 Section 5..2 , Page 4-127
251
Audit Trail Records
Scoping consultation
ER quality review
ER consultation
Comments received
Transboundary consultation
Integration of observations into final plan
Publication of SEA and relevant elements
Monitoring programme
Vol 4 Section 5..2 , Page 4-128
252
Session 9
Strategic Environmental
Assessment
Volume 4 – Section 5
253
Session 10
Asset Management
Volume 4 – Section 6
254
Asset Management Planning
Plan Approval &
Review
Define / Review
Levels of Service
Financial Plan
Asset
Management Plan
Water Services
Strategic Plan
Demand
Assessment
Collect Strategic
Asset Data
Strategic Options
Strategic Capacity
Assessment
Vol 1 Section 2., Page 1-4/13
National Picture
255
Water Infrastructure is aging
Status quo will result in increased risk to
public health and the environment
Failure to manage assets based on least life
cycle cost strategies will result in increased
cost over the long term to achieve service
objectives.
Changing Business Environment
Demands do more with what you have
Better focused capital and O&M budgets
Move from reactive to planned work
Transition from building and operating
assets to managing them to:Extend asset life and reliability
Optimise whole life cost
Develop accurate long term funding models
256
257
Asset Management?
Definition
Integrated process of managing infrastructural
assets to continuously deliver the levels of
services customers desire, at acceptable levels of
risk while minimising the total cost of owning and
operating them
Why?
It is very difficult to run a first class county or city
on second rate infrastructure
Vol 4 Section 6, Page 4-130
Asset Management Definition
258
Asset Management Definition
259
260
Benefits
Enhanced customer satisfaction
Value for money
Evidence to demonstrate compliance
Improved risk management & corporate
governance
Improvement in safety, health,
sustainability & environment
Vol 4 Section 6, Page 4-131 & 4-132
261
Other Benefits
Good business practice
More efficient data management
Better resource allocation reducing O&M costs
Reduced service disruption & collateral costs
More accurate financial planning
More effective internal & external communication
Clear consistent decision criteria
Vol 4 Section 6, Page 4-131 & 4-132
262
Vol 4 Section 6, Page 4-131
263
Vol 4 Section 6, Page 4-133
264
Current Situation?
Managing
assets
has
always
been part
of water
services
delivery
Typically the approach has been
characterised by :
Unintegrated departmental systems
Decentralised data
Intuitive condition assessments
Unverified information
Basic or non existent tools
Inconsistent metrics
Water services managed by stand alone decisions based
on perceptions and politics rather than facts
Core Questions
1.
2.
3.
4.
5.
6.
265
Levels of service
Demand assessment
Asset inventory
Critical assets
Life cycle costing
Financial planning
Vol 4 Section 6, Page 4-133 & 4-134
266
Asset Management Process
Set Target
LOS
Determine
residual life
Determine
appropriate
CIP
Assess
demand
Replacement
cost & date
Develop
funding
strategy
Assemble
inventory
Assess
condition
Assign rating
(criticality)
Determine
appropriate
maintenance
Prepare or
refine the
AMP
267
Asset Inventory
Collection storage & management of
information on all assets.
Information consistent with
organisational objectives
Location, condition, rated capacity, condition,
performance, trending, remaining life value, O&M
costs.
Vol 4 Section 6, Page 4-134 to 4-136
System Requirements
268
Clear & relevant application
Easy access – web enabled
Structured tiers of detail
Easily updated (system & data)
Self sustaining
Affordable & cost effective
GIS background
Vol 4 Section 6, Page 4-131 & 4-132
269
Asset Hierarchy
If we don’t know what we have, where it is, its condition and performance
and its value, we can’t make the case that “it” is being properly managed
System Requirements
What do I own?
What is it’s condition?
What is it’s performance?
What is it worth?
What is its remaining service life?
What is its O&M costs?
What needs to be done and when?
Capable of interrogation
270
Available software
GIS based
General purpose or asset class specific
MIMS – Sierra Systems
City Works – Azteca Systems
Oracle Water Applications
ESRI – ArcGIS with various templates
CIS – would need some development
Authorities should agree on a common
platform
271
272
Critical Assets
Criticality can vary with time!
Vol 4 Section 6, Page 4-137
273
Criticality Assessment Matrix
Vol 4 Section 6, Page 4-138
274
Life Cycle Costing
All assets deteriorate and eventually fail
The key is minimising the total life cycle
cost
Vol 4 Section 6, Page 4-138
275
Life Cycle Costing
Least cost management of
an asset is about spending
at the right time on the right
thing over the total life cycle
Operational Planning
Standardise operating procedures
Compliance with regulatory monitoring
Risk management – critical assets
Drinking water quality
Source monitoring and protection
Emergency
Demand management
Current & projected operating costs
276
277
Asset Maintenance
Performance
Initial “Design” Capacity
Maintenance
Zone
Minimum “Performance” Level
Time
Vol 4 Section 6, Page 4-140
278
Asset Maintenance
Reliable maintenance data essential for
rehab/renewal decision
Unique identifier for each asset
Start with recommended maintenance
Usage considerations
Optimum regime based on experience
Collected data informs future cost
projections
Vol 4 Section 6, Page 4-140 & 4-141
279
Rehab/Replace/Dispose
Choice depends on NPV of capital and
O&M Costs
Disposal cost has to be factored in
Disruption to public and business
Future demand may require increase in
asset capacity – rehab not viable
Vol 4 Section 6, Page 4-142
280
Expenditure Forecast
€
€
Years
Not Just For Engineering
281
282
Outputs to SWP
Levels of service and demand
Asset inventory & criticality
O&M plans
Rehab/replacement
Financial plan – O&M, CIP and financing
Vol 4 Section 6, Page 4-143 & 4-144
Moving Forward
Extensive existing body of knowledge
History of implementation in many
countries with similar methodologies
Continuous, iterative & evolving process
1- 3 years update
Central funding may require asset
management in place
283
Where Do You Begin
Develop strategy & preliminary objectives
Determine staff & budgetary restrictions
Establish asset management team
Draft programme & budget
Start with what you have & begin building
asset data
284
285
Session 10
Asset Management
Volume 4 – Section 6
286
Session 11
Financial Planning
Volume 4 – Section 7
287
Financial Planning
Plan Approval &
Review
Define / Review
Levels of Service
Financial Plan
Asset
Management Plan
Water Services
Strategic Plan
Demand
Assessment
Collect Strategic
Asset Data
Strategic Options
Strategic Capacity
Assessment
Vol 1 Section 2., Page 1-4/13
288
Financial Planning
Water Services Expenditure Categories

Operational –

Maintenance – day-to-day maintenance of assets to keep them
necessary for utilising and managing assets but which
have no impact on asset condition.
- Variable (Energy & Chemicals) and administration costs.
operating at specified levels of service.
- routine maintenance/repairs (in-house or service contracts).

Replacement/Renewal – restoration or replacement of existing assets
to maintain original capacity and condition.

New Capital – new or ungraded assets to increase capacity or enhance
service (may contain an element of replacement/renewal)

Disposal – disposal and decommissioning of asstes that have reached the end
of their useful life.
Vol 4 Section 7, Page 4-145
289
Financial Planning
Capex
Opex
Water Services Funding Categories
Domestic
Non-Domestic
Local
Government Fund
Water Charges
Water Services
Investment
Programme
Water Charges
SLI
Development
Funding
Levies
(40%)
(60%)
Development Levies
Vol 4 Section 7, Page 4-146
290
Financial Planning
Water Services Expenditure Requirements
Funding for
Loan Repayment
Funding for
System Growth
Sustainable level of
expenditure to
cover future
investment needs
Funding for
Service Enhancement
Funding for
Historic Under-investment
Asset Depreciation
Interest Expenditure
(if any)
Operation and Maintenance
Expenditure
Just
covering
cash costs
Covering cash costs
and providing for
maintaining current
asset condition – no
planning for the
future
Vol 4 Section 7, Page 4-148
291
Financial Planning
Preparing a Financial Plan
Prepare income statement & yearly forecast – Opex.
Vol 4 Section 7, Page 4-154
292
Financial Planning
Preparing a Financial Plan

Prepare income statement & yearly forecast – Capex.
BUDGET CATEGORY
Last
Year
Annual
Inflation
2008
2009
2010
2011
2012
2013
Asset Rehab/Replacement
Mains Replacement*
€
50,000
3.00%
€
51,500
€
53,045
€
54,636
€
56,275
€
57,964
€
59,703
Sewer Replacement*
€
20,000
3.00%
€
20,600
€
21,218
€
21,855
€
22,510
€
23,185
€
23,881
Above ground asset replacement costs
€
40,000
€
10,000
€
25,000
€
23,000
€
15,000
€
9,000
€
9,001
Annual Rehab Costs Sub-Total
€
110,000
€
82,100
€
99,263
€
99,491
€
93,786
€
90,149
€
92,585
Total from Capital Investment Programme € 1,300,000
€ 1,560,000
€
750,000
€
1,250,000
€
500,000
€
2,300,000
€
450,000
€ 1,300,000
€ 1,560,000
€
750,000
€
1,250,000
€
500,000
€
2,300,000
€
450,000
New Assets
Annual New Asset Costs Sub-Total
Summary
Annual Operation Costs Sub-Total
€
548,000
€
566,290
€
585,258
€
604,930
€
625,336
€
646,505
€
668,468
Annual Maintenance Costs Sub-Total
€
85,000
€
86,700
€
88,434
€
90,203
€
92,007
€
93,847
€
95,724
Annual Rehab Costs Sub-Total
€
110,000
€
82,100
€
99,263
€
99,491
€
93,786
€
90,149
€
92,585
Annual New Asset Costs Sub-Total
€ 1,300,000
€ 1,560,000
€
750,000
€
1,250,000
€
500,000
€
2,300,000
€
450,000
Total Budget Projections
€ 2,043,000
€ 2,295,090
€
1,522,955
€
2,044,624
€
1,311,129
€
3,130,501
€
1,306,777
Vol 4 Section 7, Page 4-156
293
Financial Planning
Preparing a Financial Plan

Prepare income statement & yearly forecast.

Prepare a funding plan – balance of income and expenditure
sufficient to:-
- operate, maintain and repair existing asset base
- replace assets when required
- fund future growth and service enhancements
- account for inflation and changes in technology
Vol 4 Section 7, Page 4-157
Year 0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Year 1
Financial Planning
Operating Transactions
Operating income from
- Water Charges, Operation & Maintenance (OR1)
- Water Charges, Capital Replacement (OR2)
- Water Charges, Capital Acquisition (OR2)
- Local Government Fund, Operation & Maintenance (OR3)
- Local Government Fund, Capital Replacement (OR4)
Total Operating Income (OR =OR1+OR2+OR3+OR4)
operating costs
 for
Operation & Maintenance (OC1)
Capital Replacement (OC2)
Financing Charges (OC3)
Total Operating Costs (OC=OC1+OC2+OC3)
Cash from operating transactions (OT=OR+OC)
430
444
500
Year 2
Year 3
461
500
Year 4
466
500
Preparing a Financial Plan
0
461
0
466
Year 5
Year 6
Year 8
294
Year 9
Year 10
484
500
600
500
610
500
611
500
623
500
647
500
656
500
0
484
225
500
220
515
215
521
210
538
205
567
200
581
430
0
444
500
500
500
500
500
500
500
500
500
500
860
1,887
1,923
1,931
1,969
2,324
2,346
2,348
2,371
2,419
2,437
-1,075
-1,107
-1,140
-1,174
-1,210
40
-1,200
40
-500
32
-1,200
52
-1,000
44
-1,000
-156
-500
-146
-1,000
-116
-1,600
-106
-800
-120
-1,200
-102
-860
-2,087
-1,423
-2,131
-1,969
-2,199
-1,721
-2,223
-2,846
-2,094
-2,512
0
-200
500
-200
0
125
625
125
-475
325
-75
125
125
125
125
125
125
125
Prepare a funding plan -900
– Typical
Funding
Plan
-927
-955
-983
-1,013
-1,043
Capital Transactions
Capital income from
- Development levies (CR1)
- Central Government Funding (CR2)
Total Capital Revenue (CR =CR1+CR2)
Capital Acquisitions Costs (CC)
Cash from capital transactions (CT=CR+CC)
Year 7
4,000
0
0
0
0
4,000
125
125
125
125
125
0
0
0
0
-9,000
0
0
0
0
0
0
0
0
0
0
-5,000
125
125
125
125
125
125
-250
4,500
-250
4,250
-250
4,000
-250
3,750
-250
3,500
Financial Transactions
5,000
17 Proceeds from debt issued (FR)
18 Debt Repayment (FC)
5,000
-250
4,750
0
0
0
0
5,000
-250
-250
-250
-250
-250
-250
0
-200
500
-200
0
0
500
0
-600
200
-200
1,000
1,000
1,000
800
800
1,300
1,300
1,100
1,100
1,100
1,100
1,100
1,100
1,600
1,600
1,600
1,600
1,000
1,000
1,200
1,200
1,000
1,000
50,000
800
50,000
1,300
50,000
1,100
50,000
-3,900
59,000
-3,650
59,000
-2,900
59,000
-2,650
59,000
-3,000
59,000
-2,550
59,000
-2,500
59,000
25,000
50.0%
25,200
50.4%
24,676
49.4%
24,842
49.7%
33,786
57.3%
33,530
56.8%
32,759
55.5%
32,484
55.1%
32,794
55.6%
32,279
54.7%
32,153
54.5%
19 Debt Balance
20 cash applied to finance transactions (FT =FR+FC)
21
22
23
24
25
26
27
Financial Position
Increase/decrease in cash (C = OT+CT+FT)
Cash reserve at beginning of period (CB)
Cash reserve at end of period (CE=CB+C)
Net financial assets (=Cash Reserve - Debt Balance)
MEA Value of Assets
Current Asset Value
Current Asset Value as a % of MEA value
Vol 4 Section 7, Page 4-160
Year 0
Year 1
Financial Planning
Operating Transactions
Operating
Transactions
Operating income from
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
- Water Charges, Operation & Maintenance (OR1)
- Water Charges, Capital Replacement (OR2)
- Water Charges, Capital Acquisition (OR2)
- Local Government Fund, Operation & Maintenance (OR3)
- Local Government Fund, Capital Replacement (OR4)
Total Operating Income (OR =OR1+OR2+OR3+OR4)
operating costs
 for
Operation & Maintenance (OC1)
Capital Replacement (OC2)
Financing Charges (OC3)
Total Operating Costs (OC=OC1+OC2+OC3)
Cash from operating transactions (OT=OR+OC)
Year 2
Year 3
Year
Year 1
1
430
444
500
Year 4
Year 5
Year
Year 2
2
461
500
466
500
Preparing a Financial Plan
0
461
0
466
Year 6
Year 8
295
Year 9
Year 10
Year
Year 3
3
484
500
600
500
610
500
611
500
623
500
647
500
656
500
0
484
225
500
220
515
215
521
210
538
205
567
200
581
430
0
444
500
500
500
500
500
500
500
500
500
500
860
1,887
1,923
1,931
1,969
2,324
2,346
2,348
2,371
2,419
2,437
-1,075
-1,107
-1,140
-1,174
-1,210
40
-1,200
40
-500
32
-1,200
52
-1,000
44
-1,000
-156
-500
-146
-1,000
-116
-1,600
-106
-800
-120
-1,200
-102
-860
-2,087
-1,423
-2,131
-1,969
-2,199
-1,721
-2,223
-2,846
-2,094
-2,512
0
-200
500
-200
0
125
625
125
-475
325
-75
125
125
125
125
125
125
125
Prepare a funding plan -900
– Typical
Funding
Plan
-927
-955
-983
-1,013
-1,043
Capital Transactions
Capital income from
- Development levies (CR1)
- Central Government Funding (CR2)
Total Capital Revenue (CR =CR1+CR2)
Capital Acquisitions Costs (CC)
Cash from capital transactions (CT=CR+CC)
Year 7
4,000
0
0
0
0
4,000
125
125
125
125
125
0
0
0
0
-9,000
0
0
0
0
0
0
0
0
0
0
-5,000
125
125
125
125
125
125
-250
4,500
-250
4,250
-250
4,000
-250
3,750
-250
3,500
Financial Transactions
5,000
17 Proceeds from debt issued (FR)
18 Debt Repayment (FC)
5,000
-250
4,750
0
0
0
0
5,000
-250
-250
-250
-250
-250
-250
0
-200
500
-200
0
0
500
0
-600
200
-200
1,000
1,000
1,000
800
800
1,300
1,300
1,100
1,100
1,100
1,100
1,100
1,100
1,600
1,600
1,600
1,600
1,000
1,000
1,200
1,200
1,000
1,000
50,000
800
50,000
1,300
50,000
1,100
50,000
-3,900
59,000
-3,650
59,000
-2,900
59,000
-2,650
59,000
-3,000
59,000
-2,550
59,000
-2,500
59,000
25,000
50.0%
25,200
50.4%
24,676
49.4%
24,842
49.7%
33,786
57.3%
33,530
56.8%
32,759
55.5%
32,484
55.1%
32,794
55.6%
32,279
54.7%
32,153
54.5%
19 Debt Balance
20 cash applied to finance transactions (FT =FR+FC)
21
22
23
24
25
26
27
Financial Position
Increase/decrease in cash (C = OT+CT+FT)
Cash reserve at beginning of period (CB)
Cash reserve at end of period (CE=CB+C)
Net financial assets (=Cash Reserve - Debt Balance)
MEA Value of Assets
Current Asset Value
Current Asset Value as a % of MEA value
Vol 4 Section 7, Page 4-160
Year 0
Year 1
Financial Planning
Operating Transactions
Operating
Transactions
Operating income from
1
2
- Water Charges, Operation & Maintenance (OR1)
Year 2
Year 3
Year 1
430
444
Year 4
Year 5
Year 2
461
466
Year 6
Year 7
484
600
610
Preparing a Financial Plan
11 Cash from operating transactions (OT=OR+OC)
12
13
14
15
16
Capital Transactions
Capital income from
- Development levies (CR1)
- Central Government Funding (CR2)
Total Capital Revenue (CR =CR1+CR2)
Capital Acquisitions Costs (CC)
Cash from capital transactions (CT=CR+CC)
296
Year 9
Year 10
Year 3
Operating
Income from
500
500
500
500
500
500
- Water Charges, Capital Replacement (OR2)
444
461
466
Water
charges,
O&M
0
0
0
0
225
220
3 - Water Charges, Capital Acquisition (OR2)
430
444
461
466
484
500
515
- Local Government
Fund,
Operation
&
Maintenance
(OR3)
4 Water
500
500
500
charges, Capital Replacement
500
500
500
500
500
500
5 - Local Government Fund, Capital Replacement (OR4)
0
0
0
Water charges, Capital Acquisition
860
1,887
1,923
1,931
1,969
2,324
2,346
6 Total Operating Income (OR =OR1+OR2+OR3+OR4)
444
461
466
Local
Government
Fund,aO&M
operating
costs
 for
Prepare
funding
plan
–
Typical
Funding
Plan
-900
-927 500
-955
-983 500
-1,013
-1,043 500
-1,075
Operation
& Maintenance (OC1)
7 Local
Government
Fund, Capital Replacement
-1,200
-500
-1,200
-1,000
-1,000
-500
8 Capital Replacement (OC2)
Total Operating Income
1,92344 -1561,931
40
401,88732
52
-146
9 Financing Charges (OC3)
10 Total Operating Costs (OC=OC1+OC2+OC3)
Year 8
611
500
623
500
647
500
656
500
215
521
210
538
205
567
200
581
500
500
500
500
2,348
2,371
2,419
2,437
-1,107
-1,140
-1,174
-1,210
-1,000
-116
-1,600
-106
-800
-120
-1,200
-102
-860
-2,087
-1,423
-2,131
-1,969
-2,199
-1,721
-2,223
-2,846
-2,094
-2,512
0
-200
500
-200
0
125
625
125
-475
325
-75
125
125
125
125
125
125
125
4,000
0
0
0
0
4,000
125
125
125
125
125
0
0
0
0
-9,000
0
0
0
0
0
0
0
0
0
0
-5,000
125
125
125
125
125
125
-250
4,500
-250
4,250
-250
4,000
-250
3,750
-250
3,500
Financial Transactions
5,000
17 Proceeds from debt issued (FR)
18 Debt Repayment (FC)
5,000
-250
4,750
0
0
0
0
5,000
-250
-250
-250
-250
-250
-250
0
-200
500
-200
0
0
500
0
-600
200
-200
1,000
1,000
1,000
800
800
1,300
1,300
1,100
1,100
1,100
1,100
1,100
1,100
1,600
1,600
1,600
1,600
1,000
1,000
1,200
1,200
1,000
1,000
50,000
800
50,000
1,300
50,000
1,100
50,000
-3,900
59,000
-3,650
59,000
-2,900
59,000
-2,650
59,000
-3,000
59,000
-2,550
59,000
-2,500
59,000
25,000
50.0%
25,200
50.4%
24,676
49.4%
24,842
49.7%
33,786
57.3%
33,530
56.8%
32,759
55.5%
32,484
55.1%
32,794
55.6%
32,279
54.7%
32,153
54.5%
19 Debt Balance
20 cash applied to finance transactions (FT =FR+FC)
21
22
23
24
25
26
27
Financial Position
Increase/decrease in cash (C = OT+CT+FT)
Cash reserve at beginning of period (CB)
Cash reserve at end of period (CE=CB+C)
Net financial assets (=Cash Reserve - Debt Balance)
MEA Value of Assets
Current Asset Value
Current Asset Value as a % of MEA value
Vol 4 Section 7, Page 4-160
Year 0
Year 1
Financial Planning
Operating Transactions
Operating
Transactions
Operating income from
- Water Charges, Operation & Maintenance (OR1)
1
2
Year 2
Year 3
Year 1
430
444
Year 4
Year 5
Year 2
461
466
Year 6
484
600
610
Preparing a Financial Plan
Operating costs for
-Capital
Operation
and maintenance
Transactions
Capital
income
from
- Capital Replacement
12 - Development levies (CR1)
- Financing Charges
13 - Central Government Funding (CR2)
Operating
Total Capital
RevenueCosts
(CR =CR1+CR2)
14Total
11 Cash from operating transactions (OT=OR+OC)
20
21
22
23
24
25
26
27
623
500
647
500
656
500
215
521
210
538
205
567
200
581
500
500
500
500
2,348
2,371
2,419
2,437
-1,107
-1,140
-1,174
-1,210
-1,000
-116
-1,600
-106
-800
-120
-1,200
-102
-2,131
-1,969
-2,199
-1,721
-2,223
-2,846
-2,094
-2,512
0
-200
500
-200
0
125
625
125
-475
325
-75
125
125
125
125
125
125
125
125
0
0
0
0
125
125
125
125
125
-250
4,500
-250
4,250
-250
4,000
-250
3,750
-250
3,500
-927
-1,200
40
0
0
19
611
500
-1,423
16 Cash from capital transactions (CT=CR+CC)
17
18
Year 10
-2,087
0
Financial Transactions
Proceeds from debt issued (FR)
Debt Repayment (FC)
Debt Balance
cash applied to finance transactions (FT =FR+FC)
Financial Position
Increase/decrease in cash (C = OT+CT+FT)
Cash reserve at beginning of period (CB)
Cash reserve at end of period (CE=CB+C)
Net financial assets (=Cash Reserve - Debt Balance)
MEA Value of Assets
Current Asset Value
Current Asset Value as a % of MEA value
297
Year 9
-860
15 Capital Acquisitions Costs (CC)
Cash from operating transactions
Year 8
Year 3
Operating
Income from
500
500
500
500
500
500
- Water Charges, Capital Replacement (OR2)
444
461
466
Water
charges,
O&M
0
0
0
0
225
220
3 - Water Charges, Capital Acquisition (OR2)
430
444
461
466
484
500
515
- Local Government
Fund,
Operation
&
Maintenance
(OR3)
4 Water
500
500
500
charges, Capital Replacement
500
500
500
500
500
500
5 - Local Government Fund, Capital Replacement (OR4)
0
0
0
Water charges, Capital Acquisition
860
1,887
1,923
1,931
1,969
2,324
2,346
6 Total Operating Income (OR =OR1+OR2+OR3+OR4)
444
461
466
Local
Government
Fund,aO&M
operating
costs
 for
Prepare
funding
plan
–
Typical
Funding
Plan
-900
-927 500
-955
-983 500
-1,013
-1,043 500
-1,075
Operation
& Maintenance (OC1)
7 Local
Government
Fund, Capital Replacement
-1,200
-500
-1,200
-1,000
-1,000
-500
8 Capital Replacement (OC2)
Total Operating Income
1,92344 -1561,931
40
401,88732
52
-146
9 Financing Charges (OC3)
10 Total Operating Costs (OC=OC1+OC2+OC3)
Year 7
-955
-500
32
4,000
0
0
-2,087
0
0
0
-200
0
0
4,000
-1,423
0
-9,000
0
-5,000
500
-983
-1,200
125
125
52
125
125
-2,131
0
0
125
-200
5,000
5,000
-250
4,750
0
0
0
0
5,000
-250
-250
-250
-250
-250
-250
0
-200
500
-200
0
0
500
0
-600
200
-200
1,000
1,000
1,000
800
800
1,300
1,300
1,100
1,100
1,100
1,100
1,100
1,100
1,600
1,600
1,600
1,600
1,000
1,000
1,200
1,200
1,000
1,000
50,000
800
50,000
1,300
50,000
1,100
50,000
-3,900
59,000
-3,650
59,000
-2,900
59,000
-2,650
59,000
-3,000
59,000
-2,550
59,000
-2,500
59,000
25,000
50.0%
25,200
50.4%
24,676
49.4%
24,842
49.7%
33,786
57.3%
33,530
56.8%
32,759
55.5%
32,484
55.1%
32,794
55.6%
32,279
54.7%
32,153
54.5%
Vol 4 Section 7, Page 4-160
Year 0
1
2
3
4
5
6
7
8
9
10
11
Year 1
Financial Planning
Operating Transactions
Operating income from
- Water Charges, Operation & Maintenance (OR1)
- Water Charges, Capital Replacement (OR2)
- Water Charges, Capital Acquisition (OR2)
- Local Government Fund, Operation & Maintenance (OR3)
- Local Government Fund, Capital Replacement (OR4)
Total Operating Income (OR =OR1+OR2+OR3+OR4)
operating costs
 for
Operation & Maintenance (OC1)
Capital Replacement (OC2)
Financing Charges (OC3)
Total Operating Costs (OC=OC1+OC2+OC3)
Cash from operating transactions (OT=OR+OC)
430
444
500
Year 2
Year 3
461
500
Year 4
466
500
Preparing a Financial Plan
0
461
0
466
Year 5
Year 6
Year 8
298
Year 9
Year 10
484
500
600
500
610
500
611
500
623
500
647
500
656
500
0
484
225
500
220
515
215
521
210
538
205
567
200
581
430
0
444
500
500
500
500
500
500
500
500
500
500
860
1,887
1,923
1,931
1,969
2,324
2,346
2,348
2,371
2,419
2,437
-1,075
-1,107
-1,140
-1,174
-1,210
40
-1,200
40
-500
32
-1,200
52
-1,000
44
-1,000
-156
-500
-146
-1,000
-116
-1,600
-106
-800
-120
-1,200
-102
-860
-2,087
-1,423
-2,131
-1,969
-2,199
-1,721
-2,223
-2,846
-2,094
-2,512
0
-200
500
-200
0
125
625
125
-475
325
-75
Prepare a funding plan -900
– Typical
Funding
Plan
-927
-955
-983
-1,013
-1,043
Capital
Transactions
Capital Transactions
Year 7
Year 4
Year 5
Year 6
Capital income from
12 - Development levies (CR1)
125
125
125
125
125
125
125
4,000
13 - Central Government Funding (CR2)
14 Total Capital Revenue (CR =CR1+CR2)
0
0
0
0
4,000
125
125
125
125
125
15 Capital Acquisitions Costs (CC)
0
0
0
0
-9,000
0
0
0
0
0
0
16 Cash from capital transactions (CT=CR+CC)
0
0
0
0
-5,000
125
125
125
125
125
125
-250
4,500
-250
4,250
-250
4,000
-250
3,750
-250
3,500
Financial Transactions
5,000
17 Proceeds from debt issued (FR)
18 Debt Repayment (FC)
5,000
-250
4,750
0
0
0
0
5,000
-250
-250
-250
-250
-250
-250
0
-200
500
-200
0
0
500
0
-600
200
-200
1,000
1,000
1,000
800
800
1,300
1,300
1,100
1,100
1,100
1,100
1,100
1,100
1,600
1,600
1,600
1,600
1,000
1,000
1,200
1,200
1,000
1,000
50,000
800
50,000
1,300
50,000
1,100
50,000
-3,900
59,000
-3,650
59,000
-2,900
59,000
-2,650
59,000
-3,000
59,000
-2,550
59,000
-2,500
59,000
25,000
50.0%
25,200
50.4%
24,676
49.4%
24,842
49.7%
33,786
57.3%
33,530
56.8%
32,759
55.5%
32,484
55.1%
32,794
55.6%
32,279
54.7%
32,153
54.5%
19 Debt Balance
20 cash applied to finance transactions (FT =FR+FC)
21
22
23
24
25
26
27
Financial Position
Increase/decrease in cash (C = OT+CT+FT)
Cash reserve at beginning of period (CB)
Cash reserve at end of period (CE=CB+C)
Net financial assets (=Cash Reserve - Debt Balance)
MEA Value of Assets
Current Asset Value
Current Asset Value as a % of MEA value
Vol 4 Section 7, Page 4-160
Year 0
1
2
3
4
5
6
7
8
9
10
11
Year 1
Financial Planning
Operating Transactions
Operating income from
- Water Charges, Operation & Maintenance (OR1)
- Water Charges, Capital Replacement (OR2)
- Water Charges, Capital Acquisition (OR2)
- Local Government Fund, Operation & Maintenance (OR3)
- Local Government Fund, Capital Replacement (OR4)
Total Operating Income (OR =OR1+OR2+OR3+OR4)
operating costs
 for
Operation & Maintenance (OC1)
Capital Replacement (OC2)
Financing Charges (OC3)
Total Operating Costs (OC=OC1+OC2+OC3)
Cash from operating transactions (OT=OR+OC)
430
444
500
Year 2
Year 3
461
500
Year 4
466
500
Preparing a Financial Plan
0
461
0
466
Year 5
Year 6
Year 8
299
Year 9
Year 10
484
500
600
500
610
500
611
500
623
500
647
500
656
500
0
484
225
500
220
515
215
521
210
538
205
567
200
581
430
0
444
500
500
500
500
500
500
500
500
500
500
860
1,887
1,923
1,931
1,969
2,324
2,346
2,348
2,371
2,419
2,437
-1,075
-1,107
-1,140
-1,174
-1,210
40
-1,200
40
-500
32
-1,200
52
-1,000
44
-1,000
-156
-500
-146
-1,000
-116
-1,600
-106
-800
-120
-1,200
-102
-860
-2,087
-1,423
-2,131
-1,969
-2,199
-1,721
-2,223
-2,846
-2,094
-2,512
0
-200
500
-200
0
125
625
125
-475
325
-75
125
125
125
125
Prepare a funding plan -900
– Typical
Funding
Plan
-927
-955
-983
-1,013
-1,043
Capital
Transactions
Capital Transactions
Year 7
Year 4
Year 5
Year 6
Capital income from
125
12 - Development levies (CR1)
Capital Income from
- Deveplopment Levies
14 Total Capital Revenue (CR =CR1+CR2)
-Central
Government
Funding
Capital Acquisitions
Costs (CC)
15
Cash
from
capital
transactions
16
Total Capital Revenue (CT=CR+CC)
FinancialAcquisition
Transactions Costs
Capital
17 Proceeds from debt issued (FR)
Cash from capital transactions
18 Debt Repayment (FC)
4,000
13 - Central Government Funding (CR2)
0
0
0
0
0
0
0
0
0
0
21
22
23
24
25
26
27
Financial Position
Increase/decrease in cash (C = OT+CT+FT)
Cash reserve at beginning of period (CB)
Cash reserve at end of period (CE=CB+C)
Net financial assets (=Cash Reserve - Debt Balance)
MEA Value of Assets
Current Asset Value
Current Asset Value as a % of MEA value
125
125
4,000
125
125
125
125
125
0
-9,000
4,000
0
4,000-5,000
-9000 5,000
-5,000
0
0
0
0
0
0
125
125
125
125
125
125
-250
3,750
-250
3,500
125
0
125
-250
125
0
125
-250
5,000
4,750
-250
4,500
4,250
-250
4,000
0
0
0
0
5,000
-250
-250
-250
-250
-250
-250
0
-200
500
-200
0
0
500
0
-600
200
-200
1,000
1,000
1,000
800
800
1,300
1,300
1,100
1,100
1,100
1,100
1,100
1,100
1,600
1,600
1,600
1,600
1,000
1,000
1,200
1,200
1,000
1,000
50,000
800
50,000
1,300
50,000
1,100
50,000
-3,900
59,000
-3,650
59,000
-2,900
59,000
-2,650
59,000
-3,000
59,000
-2,550
59,000
-2,500
59,000
25,000
50.0%
25,200
50.4%
24,676
49.4%
24,842
49.7%
33,786
57.3%
33,530
56.8%
32,759
55.5%
32,484
55.1%
32,794
55.6%
32,279
54.7%
32,153
54.5%
19 Debt Balance
20 cash applied to finance transactions (FT =FR+FC)
125
125
Vol 4 Section 7, Page 4-160
Year 0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Financial Planning
Operating Transactions
Operating income from
- Water Charges, Operation & Maintenance (OR1)
- Water Charges, Capital Replacement (OR2)
- Water Charges, Capital Acquisition (OR2)
- Local Government Fund, Operation & Maintenance (OR3)
- Local Government Fund, Capital Replacement (OR4)
Total Operating Income (OR =OR1+OR2+OR3+OR4)
operating costs
 for
Operation & Maintenance (OC1)
Capital Replacement (OC2)
Financing Charges (OC3)
Total Operating Costs (OC=OC1+OC2+OC3)
Cash from operating transactions (OT=OR+OC)
17
18
19
20
21
22
23
24
25
26
27
430
444
500
Year 2
Year 3
461
500
Year 4
466
500
Preparing a Financial Plan
0
461
0
466
Year 5
Year 6
Capital Transactions
Capital income from
- Development levies (CR1)
- Central Government Funding (CR2)
Total Capital Revenue (CR =CR1+CR2)
Capital Acquisitions Costs (CC)
Cash from capital transactions (CT=CR+CC)
Financial Transactions
Proceeds from debt issued (FR)
Debt Repayment (FC)
Debt Balance
cash applied to finance transactions (FT =FR+FC)
Financial Position
Increase/decrease in cash (C = OT+CT+FT)
Cash reserve at beginning of period (CB)
Cash reserve at end of period (CE=CB+C)
Net financial assets (=Cash Reserve - Debt Balance)
MEA Value of Assets
Current Asset Value
Current Asset Value as a % of MEA value
Year 7
Year 8
300
Year 9
Year 10
484
500
600
500
610
500
611
500
623
500
647
500
656
500
0
484
225
500
220
515
215
521
210
538
205
567
200
581
430
0
444
500
500
500
500
500
500
500
500
500
500
860
1,887
1,923
1,931
1,969
2,324
2,346
2,348
2,371
2,419
2,437
-1,075
-1,107
-1,140
-1,174
-1,210
40
-1,200
40
-500
32
-1,200
52
-1,000
44
-1,000
-156
-500
-146
-1,000
-116
-1,600
-106
-800
-120
-1,200
-102
-860
-2,087
-1,423
-2,131
-1,969
-2,199
-1,721
-2,223
-2,846
-2,094
-2,512
0
-200
500
-200
0
125
625
125
-475
325
-75
125
125
125
125
125
125
125
Prepare a funding plan -900
– Typical
Funding
Plan
-927
-955
-983
-1,013
-1,043
Financial Transactions
16
Year 1
4,000
0
0
0
0
4,000
125
125
125
125
125
0
0
0
0
-9,000
0
0
0
0
0
0
0
0
0
125
Year 5
125
125
Year 6
125
125
125
-250
4,500
-250
4,250
-250
4,000
-250
3,750
-250
3,500
Year 4
0
-5,000
5,000
5,000
-250
4,750
0
0
0
0
5,000
-250
-250
-250
-250
-250
-250
0
-200
500
-200
0
0
500
0
-600
200
-200
1,000
1,000
1,000
800
800
1,300
1,300
1,100
1,100
1,100
1,100
1,100
1,100
1,600
1,600
1,600
1,600
1,000
1,000
1,200
1,200
1,000
1,000
50,000
800
50,000
1,300
50,000
1,100
50,000
-3,900
59,000
-3,650
59,000
-2,900
59,000
-2,650
59,000
-3,000
59,000
-2,550
59,000
-2,500
59,000
25,000
50.0%
25,200
50.4%
24,676
49.4%
24,842
49.7%
33,786
57.3%
33,530
56.8%
32,759
55.5%
32,484
55.1%
32,794
55.6%
32,279
54.7%
32,153
54.5%
Vol 4 Section 7, Page 4-160
Year 0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Financial Planning
Operating Transactions
Operating income from
- Water Charges, Operation & Maintenance (OR1)
- Water Charges, Capital Replacement (OR2)
- Water Charges, Capital Acquisition (OR2)
- Local Government Fund, Operation & Maintenance (OR3)
- Local Government Fund, Capital Replacement (OR4)
Total Operating Income (OR =OR1+OR2+OR3+OR4)
operating costs
 for
Operation & Maintenance (OC1)
Capital Replacement (OC2)
Financing Charges (OC3)
Total Operating Costs (OC=OC1+OC2+OC3)
Cash from operating transactions (OT=OR+OC)
430
444
500
Year 2
Year 3
461
500
Year 4
466
500
Preparing a Financial Plan
0
461
0
466
Year 5
Year 6
Capital Transactions
Capital income from
- Development levies (CR1)
- Central Government Funding (CR2)
Total Capital Revenue (CR =CR1+CR2)
Capital Acquisitions Costs (CC)
Cash from capital transactions (CT=CR+CC)
Financial Transactions
17 Proceeds from debt issued (FR)
Proceeds from debt issued
18 Debt Repayment (FC)
Debt Repayment
19 Debt Balance
Debt
cash Balance
applied to finance transactions (FT =FR+FC)
20
Financial
Position
Cash applied
to financial transactions
21 Increase/decrease in cash (C = OT+CT+FT)
22 Cash reserve at beginning of period (CB)
23 Cash reserve at end of period (CE=CB+C)
24 Net financial assets (=Cash Reserve - Debt Balance)
25 MEA Value of Assets
26 Current Asset Value
27 Current Asset Value as a % of MEA value
Year 7
Year 8
301
Year 9
Year 10
484
500
600
500
610
500
611
500
623
500
647
500
656
500
0
484
225
500
220
515
215
521
210
538
205
567
200
581
430
0
444
500
500
500
500
500
500
500
500
500
500
860
1,887
1,923
1,931
1,969
2,324
2,346
2,348
2,371
2,419
2,437
-1,075
-1,107
-1,140
-1,174
-1,210
40
-1,200
40
-500
32
-1,200
52
-1,000
44
-1,000
-156
-500
-146
-1,000
-116
-1,600
-106
-800
-120
-1,200
-102
-860
-2,087
-1,423
-2,131
-1,969
-2,199
-1,721
-2,223
-2,846
-2,094
-2,512
0
-200
500
-200
0
125
625
125
-475
325
-75
125
125
125
125
125
125
125
Prepare a funding plan -900
– Typical
Funding
Plan
-927
-955
-983
-1,013
-1,043
Financial Transactions
16
Year 1
4,000
0
0
0
0
4,000
125
125
125
125
125
0
0
0
0
-9,000
0
0
0
0
0
0
0
0
0
Year 5
125
125
Year 6
125
125
125
-250
4,500
-250
4,250
-250
4,500
-250
-250
-250
4,000
-250
3,750
-250
3,500
-250
-250
-250
0
-600
200
-200
Year 4
0
-5,000
5,000 5,000
5,000
0
0
0
0
-200
500
1,000
1,000
1,000
800
1,000
50,000
25,000
50.0%
5,000
0
5,000
5,000
-200
0
800
1,300
1,300
1,100
800
50,000
1,300
50,000
25,200
50.4%
24,676
49.4%
125
-250
-250
4,750
4,750
-250
-250
-250
0
500
1,100
1,100
1,100
1,100
1,100
1,600
1,600
1,600
1,600
1,000
1,000
1,200
1,200
1,000
1,100
50,000
-3,900
59,000
-3,650
59,000
-2,900
59,000
-2,650
59,000
-3,000
59,000
-2,550
59,000
-2,500
59,000
24,842
49.7%
33,786
57.3%
33,530
56.8%
32,759
55.5%
32,484
55.1%
32,794
55.6%
32,279
54.7%
32,153
54.5%
Vol 4 Section 7, Page 4-160
Year 0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Year 1
Financial Planning
Operating Transactions
Operating income from
- Water Charges, Operation & Maintenance (OR1)
- Water Charges, Capital Replacement (OR2)
- Water Charges, Capital Acquisition (OR2)
- Local Government Fund, Operation & Maintenance (OR3)
- Local Government Fund, Capital Replacement (OR4)
Total Operating Income (OR =OR1+OR2+OR3+OR4)
operating costs
 for
Operation & Maintenance (OC1)
Capital Replacement (OC2)
Financing Charges (OC3)
Total Operating Costs (OC=OC1+OC2+OC3)
Cash from operating transactions (OT=OR+OC)
430
444
500
Year 2
Year 3
461
500
Year 4
466
500
Preparing a Financial Plan
0
461
0
466
Year 5
Year 6
Year 8
302
Year 9
Year 10
484
500
600
500
610
500
611
500
623
500
647
500
656
500
0
484
225
500
220
515
215
521
210
538
205
567
200
581
430
0
444
500
500
500
500
500
500
500
500
500
500
860
1,887
1,923
1,931
1,969
2,324
2,346
2,348
2,371
2,419
2,437
-1,075
-1,107
-1,140
-1,174
-1,210
40
-1,200
40
-500
32
-1,200
52
-1,000
44
-1,000
-156
-500
-146
-1,000
-116
-1,600
-106
-800
-120
-1,200
-102
-860
-2,087
-1,423
-2,131
-1,969
-2,199
-1,721
-2,223
-2,846
-2,094
-2,512
0
-200
500
-200
0
125
625
125
-475
325
-75
125
125
125
125
125
125
125
Prepare a funding plan -900
– Typical
Funding
Plan
-927
-955
-983
-1,013
-1,043
Capital Transactions
Capital income from
- Development levies (CR1)
- Central Government Funding (CR2)
Total Capital Revenue (CR =CR1+CR2)
Capital Acquisitions Costs (CC)
Cash from capital transactions (CT=CR+CC)
Year 7
4,000
0
0
0
0
4,000
125
125
125
125
125
0
0
0
0
-9,000
0
0
0
0
0
0
0
0
0
0
-5,000
125
125
125
125
125
125
-250
3,750
-250
3,500
Financial Transactions
17 Proceeds from debt issued (FR)
18 Debt Repayment (FC)
Financial Position
Year 4
21
22
23
24
25
26
27
Financial Position
Increase/decrease in cash (C = OT+CT+FT)
Cash reserve at beginning of period (CB)
Cash reserve at end of period (CE=CB+C)
Net financial assets (=Cash Reserve - Debt Balance)
MEA Value of Assets
Current Asset Value
Current Asset Value as a % of MEA value
Year-250
5
Year-2506
5,000
4,750
-250
4,500
4,250
-250
4,000
0
0
0
0
5,000
-250
-250
-250
-250
-250
-250
0
-200
500
-200
0
0
500
0
-600
200
-200
1,000
1,000
1,000
800
800
1,300
1,300
1,100
1,100
1,100
1,100
1,100
1,100
1,600
1,600
1,600
1,600
1,000
1,000
1,200
1,200
1,000
1,000
50,000
800
50,000
1,300
50,000
1,100
50,000
-3,900
59,000
-3,650
59,000
-2,900
59,000
-2,650
59,000
-3,000
59,000
-2,550
59,000
-2,500
59,000
25,000
50.0%
25,200
50.4%
24,676
49.4%
24,842
49.7%
33,786
57.3%
33,530
56.8%
32,759
55.5%
32,484
55.1%
32,794
55.6%
32,279
54.7%
32,153
54.5%
19 Debt Balance
20 cash applied to finance transactions (FT =FR+FC)
5,000
Vol 4 Section 7, Page 4-160
Year 0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Year 1
Financial Planning
Operating Transactions
Operating income from
- Water Charges, Operation & Maintenance (OR1)
- Water Charges, Capital Replacement (OR2)
- Water Charges, Capital Acquisition (OR2)
- Local Government Fund, Operation & Maintenance (OR3)
- Local Government Fund, Capital Replacement (OR4)
Total Operating Income (OR =OR1+OR2+OR3+OR4)
operating costs
 for
Operation & Maintenance (OC1)
Capital Replacement (OC2)
Financing Charges (OC3)
Total Operating Costs (OC=OC1+OC2+OC3)
Cash from operating transactions (OT=OR+OC)
430
444
500
Year 2
Year 3
461
500
Year 4
466
500
Preparing a Financial Plan
0
461
0
466
Year 5
Year 6
Year 8
303
Year 9
Year 10
484
500
600
500
610
500
611
500
623
500
647
500
656
500
0
484
225
500
220
515
215
521
210
538
205
567
200
581
430
0
444
500
500
500
500
500
500
500
500
500
500
860
1,887
1,923
1,931
1,969
2,324
2,346
2,348
2,371
2,419
2,437
-1,075
-1,107
-1,140
-1,174
-1,210
40
-1,200
40
-500
32
-1,200
52
-1,000
44
-1,000
-156
-500
-146
-1,000
-116
-1,600
-106
-800
-120
-1,200
-102
-860
-2,087
-1,423
-2,131
-1,969
-2,199
-1,721
-2,223
-2,846
-2,094
-2,512
0
-200
500
-200
0
125
625
125
-475
325
-75
125
125
125
125
125
125
125
Prepare a funding plan -900
– Typical
Funding
Plan
-927
-955
-983
-1,013
-1,043
Capital Transactions
Capital income from
- Development levies (CR1)
- Central Government Funding (CR2)
Total Capital Revenue (CR =CR1+CR2)
Capital Acquisitions Costs (CC)
Cash from capital transactions (CT=CR+CC)
Year 7
4,000
0
0
0
0
4,000
125
125
125
125
125
0
0
0
0
-9,000
0
0
0
0
0
0
0
0
0
0
-5,000
125
125
125
125
125
125
-250
4,000
-250
3,750
-250
3,500
-250
-250
-250
-600
200
-200
1,600
1,000
1,000
1,200
1,200
1,000
-3,000
59,000
-2,550
59,000
-2,500
59,000
32,794
55.6%
32,279
54.7%
32,153
54.5%
Financial Transactions
17 Proceeds from debt issued (FR)
18 Debt Repayment (FC)
Financial Position
Year 4
Increase/Decrease in cash
0
0
Financial
Position
Cash reserve at beginning of period
0
-200
21 Increase/decrease in cash (C = OT+CT+FT)
Cash
reserve
at
end
of
period
22 Cash reserve at beginning of period (CB)
1,000
1,000
Cashfinancial
reserve at end
of
period
(CE=CB+C)
23Net
1,000
position (=cash reserve-Debt Balance) 800
24 Net financial assets (=Cash Reserve - Debt Balance)
1,000
800
MEA Value of Assets
25 MEA Value of Assets
50,000 50,000
Current Asset
ValueValue
26Current
25,000 25,200
Asset
27 Current Asset Value as a % of MEA value
Current Asset Value as a % of MEA Value 50.0% 50.4%
Year-250
5
5,000
19 Debt Balance
20 cash applied to finance transactions (FT =FR+FC)
5,000
0
1,100
500
-200
1,100
800
1,300
1,300 -3,900
1,100
1,300
1,100
50,00059,000
50,000
24,67633,786
24,842
49.4%
49.7%
57.3%
0
0
4,750
0
1,100 0
0
1,1001,100
1,100
1,100
1,100
-3,650
-3,900
-3,650
59,000
59,000
59,000
33,786
33,530
33,530
57.3%
56.8%
56.8%
5,000
-250
Year-2506
-250
4,500
4,250
-250
500
1,1000
500
1,1001,600
1,600
1,600
1,600
-2,900
-2,900
-2,650
59,000
59,000
59,000
32,759
32,484
32,759
55.5%
55.1%
55.5%
-250
Vol 4 Section 7, Page 4-160
Financial Planning
304
Preparing a Financial Plan

Prepare income statement & yearly forecast.

Prepare a funding plan

Review and Set Charges – assessment of the likely funding from:-
- Water Charges – O&M and marginal capital cost of Non-Domestic consumers
- Local Government Fund – O&M cost of domestic consumers
- Central Government Fund – Domestic sector growth and service enhancement
- Development Contributions - Marginal cost of non-domestic and future domestic
- Significant User Contributions - e.g. large industrial reserve

Periodic Review (annual roll-over basis)
- Compare actual against budgeted expenditure under each category and
adjust plan to suit new assumptions
Vol 4 Section 7, Page 4-164
305
Session 11
Financial Planning
Volume 4 – Section 7
306
Session 12
Plan Review
Volume 4 – Section 8
Plan Review
307
PlanApproval
Review &&
Plan
Improvement
Review
(At least every 6 years)
Define / Review
Levels of Service
Financial Plan
Asset
Management Plan
Water Services
Strategic Plan
Demand
Assessment
Collect Strategic
Asset Data
Strategic Options
Strategic Capacity
Assessment
Vol 1 Section 2., Page 1-4/13
Plan Review
308
Plan Review &
Improvement
(At least every 6 years)
Levels of Service
Demand for Water Services
Asset Management Planning
Financial Planning
SEA
Vol 4 Section 8, Page 4-166
Plan Review
309
Plan Review &
Improvement
(At least every 6 years)
Levels of Service

Review and comment on performance with respect to level of service
objectives.

Review changes in legislation relevant to water services planning &
delivery with a view to revising or setting new level of service standards.

Review and revision of design standards where necessary.
Vol 4 Section 8, Page 4-167 & 4-168
Plan Review
310
Plan Review &
Improvement
(At least every 6 years)
Demand for Water Services
Current Demand

Review methodology and assumptions made in existing plan.

Determine current demand for water services (including review of
demand components – Ref: Tables 8.1 & 8.2)

Compare current demand with that projected in existing plan (may assist
in adjusting estimates for future growth).
Vol 4 Section 8, Page 4-169 to 4-171
Plan Review
311
Plan Review &
Improvement
(At least every 6 years)
Demand for Water Services
Demand Management

Review progress on current demand management strategy.

Review current international demand management policies for
consideration for adoption.

Identify the demand management strategy for the period of the
replacement plan.
Vol 4 Section 8, Page 4-172
Plan Review
312
Plan Review &
Improvement
(At least every 6 years)
Demand for Water Services
Future Demand

Review approach to population growth projections and adjust in line with
any changes in planning and development legislation (Ref Table 8.3).

Review methodology and assumptions made in the existing plan with
regard to calculating future demand.

Project future demand for water services (including review of demand
components – Ref: Tables 8.4 & 8.5)
Vol 4 Section 8, Page 4-172 to 4-175
Plan Review
313
Plan Review &
Improvement
(At least every 6 years)
Asset Management Planning

Review and update the current asset inventory, value, condition,
performance, and capacity with respect to levels of service and demand.

Review O&M objectives and budgets for inclusion in the replacement
plan .

Review scheme shortfalls and strategic options, complete with Strategic
Environmental Assessment (SEA) .

Revise Capital Investment Programme (CIP) to reflect capital projects
completed, ongoing, and newly identified .
Vol 4 Section 8, Page 4-176
Plan Review
314
Plan Review &
Improvement
(At least every 6 years)
Financial Planning

Update budget for annual O&M costs and the revised capital investment
programme.

Review the current local and central government funding arrangements
available to the water services authority .

Review current guidance on water pricing policy.

Balance projected expenditure against sources of funding available.
Vol 4 Section 8, Page 4-177
315
Session 12
Plan Review
Volume 4 – Section 8