1 Water Services National Training Group Water Services Strategic Plans 2 Water Services Strategic Plans Grellan McGrath, Operations Director Kevin Power, Director RPS Consulting Engineers Course Outline • Session 1 – Introduction, Plan Layout & Procedure • Session 2 – Legal Background • Session 3 – Synchronisation with other Plans • Session 4 – Levels of Service and Design Standards • Session 5 – Demand Forecasting • Session 6 – Asset Data (Condition & Performance) • Session 7 – Asset Data (Valuation) 3 Course Outline • Session 8 – Asset Capacity Assessment & Option Selection • Session 9 – SEA • Session 10 – Asset Management • Session 11 – Financial Planning • Session 12 – Plan Review 4 5 Session 1 Introduction, Plan Layout and Procedure Volume 1 6 Introduction Purpose – “better forward planning is vital if we are to maintain and improve water quality in Ireland” Water Services Act 2007 – comprehensive legal & regulatory framework to ensure planning management & delivery of water services – Requires water services authorities to prepare a water services strategic plan with regard to the provision of water services. Vol 1 Section 1., Page 1-1/3 7 Introduction Objectives – Protect human health and the environment – Facilitate the provision of sufficient water services – Support proper planning and sustainable development Vol 1 Section 1., Page 1-1/3 8 Introduction Guidance – provides practical guidance and procedural direction on the preparation of water services strategic plans. – sets out recommended contents of plan. – explains the procedural obligations in making a plan. – does not prescribe “best practice” or methodologies for emergency/operational planning. Vol 1 Section 1., Page 1-1/3 9 Introduction Guidance Structure – Volume 1 – Introduction & Summary Guidance Introduction, Preparing a Water Services Strategic Plan, Guidance on Procedure – Volume 2 – Legal Background Document Background/Introduction, Main Legislation, Other Relevant Legislation – Volume 3 – Synchronisation with other Plans Background/ Introduction, Planning & Development Plans, Water Quality Plans, Waste Management Plans, Consultation with Adjoining Authorities Vol 1 Section 1., Page 1-1/3 10 Introduction Guidance Structure – Volume 4 – Guidance on Content of Technical Reports • Executive Summary • Levels of Service • Demand for Water Services • Asset Assessment & Options • Strategic Environmental Assessment • Asset Management • Financial Planning • Strategic Plan Review Vol 1 Section 1., Page 1-1/3 11 Preparing a Plan What is a water services strategic plan? – A document outlining the broad strategy for delivering water services over a 6-year planning horizon. – Executive summary – setting out the main objectives over the period of the plan. – Core strategic plan – setting out in more detail the objectives under the following headings:- Vol 1 Section 2., Page 1-4/13 Preparing a Plan 12 Plan Approval & Review Define / Review Levels of Service Financial Plan • Existing Legislative Demand – Water Audits (Water in = water out) •Operational Options to reduce consumption/leakage • Water • Drinking Conservation • Water To be No. made and 2(Location, Demand Regulations, by Elected Management Members 2007 Review • Physical Parameters Size, Age, Material, Issues etc.) • Design / Actual Capacity of Each Asset •Options for Asset Renewal/Rehab to Design Capacity • Review • Ww Discharge Local/ • Issue Regional (Authorisation) to Minister Development Regulations, Planning 2007 Documents • Asset Condition –• Source how is condition assessed and monitored / Asset Receiving Water Capacity Assessment • Maintenance Plan • Cash Flow Projections – maintenance, renewals new Capacity works • Options for New Assets to Increaseand Design • Review •Water Population Framework Periodic Review Directive / life Forecasts (< 6criteria, Years)Services • Asset Valuation –•Trends Design depreciation, replacement value Water Asset Current•Utilisation Asset Renewal/Rehab Plan - DeferredDemand • Risk Assessment (Asset Sweating Capex) Management Plan • Customer Funding Strategy – Local / Central Funding (PPP) Strategic Plan Assessment • Review Other • Review per of Capita Actual Consumption versus Forecast • Historical Data – •Operational and Capital Expenditure Historical Performance Records • New/Upgrades Asset Plan • Strategic Environmerntal Assessment • Assess • Service •Pressures Review Demand Changes for Water in Levels Services of Service Requirements • Future Asset Valuation (Current and Forecast) • Supporting information models, calculations etc.) • Asset Disposal(network Plan • Leakage/Infiltration • Review Demand Forecasts • Treatment • Prepare Capacity Revised Plan and Submit Strategic StrategicOptions Options Collect Strategic Asset Data Strategic Capacity Assessment Vol 1 Section 2., Page 1-4/13 Document Hierarchy 13 Executive Summary Strategic Plan Technical Reports Support Data & Documentation Vol 1 Section 2., Page 1-4/13 14 Document Hierarchy Water Services Strategic Plan TIER 1 Executive Summary Strategic Plan TIER 2 Technical Reports TIER 3 Support Data & Documentation TIER 4 Vol 1 Section 2., Page 1-4/13 15 Procedural Guidance Legislative Requirements Establish Plan Framework Water Services Authority to make water services strategic plan by prescribed date - WSA Section 36(2) & (5) Establish date by which the Authority has to make a water services strategic plan. Water Services Authorities to decide whether to make a joint plans or subplan with other authoritie(s) - WSA Section 36(4) Is the Authority going to make a joint plan or sub-plan with other Authorities Yes No Minister may require Authorities to make joint plans - WSA Section 37(a&b) Does the Minister require the Authority to make a joint plan or sub-plan with other Yes Has the Minister specified how the joint plan or sub-plan is to be co-ordinated No Minister may make regulations relating to the content, notification and consultation requirements and procedures associated with time limits - WSA Section 36(9) Refer to any Regulations made by the Minister as to how particular issues are dealt with in the plan, notification or consultation requirements and procedures associated with time limits Refer to any pro-forma notices on notification or consultation process Vol 1 Section 3, Page 1-14/22 Prepare Plan 16 Procedural Guidance Legislative Requirements Establish Plan Framework Prepare Plan - 1/3 Make Initial Draft Water Services Strategic Plan An SEA shall be carried out for all plans and programmes which are prepared for water management Section 9(5) of SI435 of 2004 (SEA Regs) Draft and issue SEA scoping report to prescribed Environmental Authorities (4 week comment period) Refer to pro-forma notice for SEA Scoping (Appendix A) Complete Draft Water Services Strategic Plan and Environmental Report taking into account comments received Complete consultation process on relevant elements of draft plan and environmental report. (8 week consultation period) Refer to pro-forma notices for SEA (Appendix A) Vol 1 Section 3, Page 1-14/22 17 Procedural Guidance Prepare Plan - 2/3 Legislative Requirements Complete Draft Water Services Strategic Plan and Environmental Report Refer to pro-forma Notice of Motion for presentation to Elected Members (Appendix A) Present Draft Plan (including environmental report) to Elected Members for approval Yes Manager to warn Members of likely failure to make a Plan before the due date - WSA Section 36(12) Are Members likely to fail to make a plan by the due date No Manager to notify members of consequence of failure to make plan by due date and advise of entitlement to apply for extension to the due date Vol 1 Section 3, Page 1-14/22 18 Procedural Guidance Prepare Plan - 3/3 Legislative Requirements Do Members require an extension to the due date for making the plan. Authority may apply to the Minister for an extension of up to 3 months WSA Section 36(10) No Yes If Members fail to make a plan by the due date the function of the making of the Plan is transferred to the Manager - WSA Section 36(13) Apply to the Minister for an extension (not greater than 3 months) Have members failed to make a plan by the due date No No Members revise Plan Is plan approved by Elected Members The making of a plan or replacement plan is a reserved function - WSA Section 36(3)/14 If Managers is of opinion that proposed plan would not be appropriate he must inform the members of such and advised that should they proceed to make the plan the Minister may require the plan to be revised or replaced and inform them of their right to apply for an extension to the due date - WSA Section 36(11) Yes Yes Is the Manager of the opinion that the proposed plan is appropriate Yes Manager proceeds with Plan No Inform the members of such and advise that the Minister may require the plan to be revised or replaced and of option to extend due date. Members proceed with Plan Vol 1 Section 3, Page 1-14/22 19 Procedural Guidance Legislative Requirements Prepare Plan The plan comes into force once the members (or Manager) approve it WSA Section 36(17) Manager makes Plan Members make Plan A copy of the plan to be forwarded to the Minister and other persons as may be prescribed and notification of the making of the plan published in the prescribed manner - WSA Section 38(1) Forward Plan to the Minister, other prescribed bodies and environmental authorities and publish notification of the making of the plan Once the plan is made the Water Services Authority should implement it - WSA Section 38(2) Implement Plan, including environmental monitoring requirements The Minister may require the Authority to revise or replace the Plan - WSA Section 37(c) Minister may require Plan to be revised or replaced Adopt Plan Refer to pro-forma Notice of making of a water services strategic plan (Appendix A) Vol 1 Section 3, Page 1-14/22 20 Session 1 Introduction, Plan Layout and Procedure Volume 1 21 Session 2 Legal Background Volume 2 22 Impacting Legislation Other Relevant Legislation Main Legislation Shellfish Diirective Diirective Shellfish Directive Water Services Act 2007 Groundwater Directive Groundwater Groundwater Directive Directive Urban Ww Treatment Directive Urban Ww Treatment Directive Nitrates Directive Bio Diversity Directives Bio Diversity Directives Bio Diversity Directives Drinking Water Directive Drinking Drinking Water Water Directive Directive Bathing Water Directive Bathing Water Directive Freshwater Fish Directive Freshwater Freshwater Fish Fish Directive Directive Water Pollution Acts & Regs Water Pollution Acts & Regs Waste Waste Management Management Acts Acts Waste Management Acts Phosphorous Regulations Phosphorous Phosphorous Regulations Regulations Water Framework Directive Water Services Strategic Plans Planning & Development Act 2000 Strategic Environmental Assessment Vol 2 Section 2, Page 2-2 to 2-5 23 Water Services Act 2007 Relevant Sections Section 36 - Water Services Strategic Plans Section 37 - Functions of the Minister Section 38 - Implementation Section 77 - Rural Water Services Strategic Plans Vol 2 Section 2, Page 2-6 to 2-10 24 Water Services Act 2007 Water Services Strategic Plans “each water services authority shall, not later than such date as may be prescribed, make a water services strategic plan with regard to the provision of water services in its functional area”. Subsection 36 (2) Indicative Dates:Individual Plans - 22nd December 2010 Joint Plans or Sub-Plans - 22nd March 2011 Vol 2 Section 2, Page 2-6 to 2-10 25 Water Services Act 2007 Power to make a Plan The making of a plan is a reserved function of the members of the authority Subsection 36 (3) If the members fail to make a plan by the due date then the function to make the plan is transferred to the manager. Subsection 36 (13) Vol 2 Section 2, Page 2-6 to 2-10 26 Water Services Act 2007 Joint Plans Two or more authorities may prepare joint plans or sub-plans for specified water services in all or part of their functional area. Subsection 36 (4) The Minister may require 2 or more authorities to make a joint plan co-ordinated in such a manner as the Minister may specify. Subsection 37 (a&b) Vol 2 Section 2, Page 2-6 to 2-10 27 Water Services Act 2007 Plan Review Water services authorities shall review water services strategic plans at least every 6 years or at lesser intervals as may be directed by the Minister Subsection 36 (5)(a) The Minister for stated reasons may require a plan to be revised or replaced within a specified period (not less than 3 months). Subsection 37(a) Vol 2 Section 2, Page 2-6 to 2-10 28 Water Services Act 2007 Extension Of Time A water services authority may apply to the Minister for an extension of up to 3 months after the latest date for the making of a plan – reserved function. Subsection 36 (5)(a) Such an extension is not available where the Minister refers the plan back for revision or replacement under Section 37(c). Vol 2 Section 2, Page 2-6 to 2-10 29 Water Services Act 2007 Plan Not Appropriate If the manager is of the opinion that the proposed plan would not be appropriate then he/she shall:(a) Inform the members and advise that the Minister may require them to revise or replace the plan. (b) Advise that the members may apply for an extension of time Subsection 36(11) Vol 2 Section 2, Page 2-6 to 2-10 30 Water Services Act 2007 Rural Water Services Strategic Plans A water services authority may, and if directed by the Minister shall, make or review rural water services strategic plans with regard to the provision of water services to all rural areas within its functional area. Section 77 Vol 2 Section 2, Page 2-6 to 2-10 31 Water Services Act 2007 Plan Implementation Once a plan is made • Copies shall be issued to the Minister and prescribed bodies and a notice of the making of the plan shall be published. • The water services authority implement the plan. • Certified copies or extracts issued upon request. Subsection 36(6) Vol 2 Section 2, Page 2-6 to 2-10 32 Water Services Act 2007 Cognisance of Other Plans Plans to have regard to the provisions of:• Development plans • Water quality management plans • Waste management plans • River basin management plans • Other plans, strategies and guidelines as may be prescribed • Other matters as may be directed by the Minister Subsection 36(6) Vol 2 Section 2, Page 2-6 to 2-10 33 Water Services Act 2007 Plans Primary Objectives • Protection of Human Health and the Environment • Provision of sufficient Water Services • Support proper Planning and Sustainable Development Subsection 36(7) Vol 2 Section 2, Page 2-6 to 2-10 34 Water Services Act 2007 Plans to have regard to • Drinking Water Quality • Prevention of risk to Human Health and the Environment • Current and Projected Demand for Water Services • Existing and Planned Arrangements for the Provision of Water Services • Shortfalls in the provision of Water Services • Water Conservation Measures in Place or Planned • Monitoring Arrangements • Asset Management Planning • Income and Expenditure Subsection 36(8) Vol 2 Section 2, Page 2-6 to 2-10 35 Water Framework Directive Framework for the protection of all waters with the objective of of achieving good status by 2015 Water quality objectives set out in River Basin Management Plans (RBMPs) Objectives achieved through Programmes of Measures (PoMs) Vol 2 Section 2, Page 2-11 to 2-12 36 Water Framework Directive Impacts on Water Abstractions – waters used for abstraction are protected Discharges – PoMs will set controls on point and diffuse discharges Recovery of Costs – obligation to recover costs using the polluter pays principle Water Conservation – PoMs will promote sustainable water use Vol 2 Section 2, Page 2-11 to 2-12 37 Planning & Development Act 2000 Have Regard to Regional or Spatial Planning Guidelines County/City Development Plans Guides demand projections. Local Area Plans Special Amenity Area Orders Strategic Development Zones Set objectives for the provision of water services. Vol 2 Section 2, Page 2-13 38 Strategic Environmental Assessment Purpose To ensure that the environmental consequences of certain plans and programmes are identified and assessed before adoption. (includes plans prepared for “water management”) Applies to the elements of the plan that are likely to have a significant environmental impact. Vol 2 Section 2, Page 2-14 Strategic Environmental Assessment 39 SEA Scope will depend on the extent of the SEA prepared for the relevant development plan(s) and RBMPs Vol 2 Section 2, Page 2-14 40 Other Relevant Legislation Impact on Abstractions Shellfish Directive Groundwater Directive Urban Ww Treatment Directive • Groundwater Directive • Nitrates Directive • Bio Diversity (Habitats, Birds) Directives • Freshwater Fish Directive Nitrates Directive Bio Diversity Directives Drinking Water Directive Bathing Water Directive Freshwater Fish Directive Water Pollution Acts & Regs Waste Management Acts Phosphorous Regulations Vol 2 Section 2, Page 2-15 to 2-21 41 Other Relevant Legislation Impact on Discharges Shellfish Directive Groundwater Directive Urban Ww Treatment Directive Nitrates Directive Bio Diversity Directives Drinking Water Directive Bathing Water Directive Freshwater Fish Directive Water Pollution Acts & Regs Waste Management Acts • Shellfish Directive • Groundwater Directive • Urban Ww Treatment Directive • Bio Diversity (Habitats, Birds) Directives • Freshwater Fish Directive • Bathing Water Directive • Water Pollution Acts & Regulations • Phosphorus Regulations Phosphorous Regulations Vol 2 Section 2, Page 2-15 to 2-21 42 Other Relevant Legislation Impact on Sludge Disposal Shellfish Directive Groundwater Directive Urban Ww Treatment Directive • Nitrates Directive • Waste Management Acts Nitrates Directive Bio Diversity Directives Drinking Water Directive Bathing Water Directive Freshwater Fish Directive Water Pollution Acts & Regs Waste Management Acts Phosphorous Regulations Vol 2 Section 2, Page 2-15 to 2-21 43 Other Relevant Legislation Impact on Potable Water Quality Shellfish Directive Groundwater Directive Urban Ww Treatment Directive • Drinking Water Directive - Drinking Water (No. 2) Regs 2007 Nitrates Directive Bio Diversity Directives Drinking Water Directive Bathing Water Directive Freshwater Fish Directive Water Pollution Acts & Regs Waste Management Acts Phosphorous Regulations Vol 2 Section 2, Page 2-15 to 2-21 44 Session 2 Legal Background Volume 2 45 Session 3 Synchronisation with other Plans Volume 3 46 Introduction Section 36(6) - Water services authorities to have regard to proper planning and sustainable development & in particular:– Development Plans, Guidelines and Strategies. – Water Quality Management Plans. – Waste Management Plans – River Basin Management Plans and PoMs. – Other Plans, Strategies or Guidelines. – Any other matter as may be directed by the Minister. Vol 3 Section 2, Page 3-2 to 3-3 47 Synchronisation with Other Plans National Development Plan National Exchequer Funding Regional EU Water River Basin Framework Management Directive Plans and related Integrated Spatial Local programmes Planning Water Quality of measures Frameworks Management Plans County/City and related Development Plans programmes of Water / measures & Local Area Plans National Spatial Strategy Regional Planning Guidelines Planning Development Plans in eas o vel g le r Inc f co de nsi rat Water Services Strategic Plans ion Sludge Management Plans Local Waste Management Plans Environment Quality Plans Inc r ea s in g le ve l of c on s ide r ati on Waste Management Plans Regional Waste Management Plans European Union Local Authority Funding Vol 3 Section 2, Page 3-3 48 Water Quality Plans – Water Quality Management Plans Will be superseded by River Basin Local Government (Water Pollution)Plans Acts 1977 & 1990 – Management Plan to set out objectives for the prevention and abatement of pollution of waters. River Basin Management Plans – Water Framework Directive – Plans to set out water quality objectives and associated programme of measures to achieve the objectives. Vol 3 Section 4, Page 3-11 to 3-16 Water Quality Plans 49 Vol 3 Section 4, Page 3-12 50 Water Quality Plans Table 4.1 Plan and Programme River Basin Management Plans and Associated Programmes of Measures under the WFD Element to be considered Summary of significant pressures and impacts of human activity on surface and groundwater A summary of the economic analysis of water use required by Article 5 & Annex III Relevance of consideration This element will identify the point and diffuse sources of pollution (e.g. waste water treatment and CSO discharges) and pressures on the quantitative status of waters, including abstractions. This information should be verified and updated where necessary when preparing or reviewing a water services strategic plan to ensure that any subsequent controls on abstractions and discharges are based on correct information. The economic analysis of water use will provide details of the unit cost of water services, long-term demand forecasts and associated infrastructural investment estimates, which are a fundamental part of water services strategic planning. Vol 3 Section 4, Page 3-13 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 51 Water Quality Plans Table 4.1 Plan and Programme River Basin Management Plans and Associated Programmes of Measures under the WFD Element to be considered Summary of significant pressures and impacts of human activity on surface and groundwater A summary of the economic analysis of water use required by Article 5 & Annex III Relevance of consideration This element will identify the point and diffuse sources of pollution (e.g. waste water treatment and CSO discharges) and pressures on the quantitative status of waters, including abstractions. This information should be verified and updated where necessary when preparing or reviewing a water services strategic plan to ensure that any subsequent controls on abstractions and discharges are based on correct information. The economic analysis of water use will provide details of the unit cost of water services, long-term demand forecasts and associated infrastructural investment estimates, which are a fundamental part of water services strategic planning. Vol 3 Section 4, Page 3-13 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 52 Water Quality Plans Table 4.1 Plan and Programme River Basin Management Plans and Associated Programmes of Measures under the WFD Element to be considered Summary of significant pressures and impacts of human activity on surface and groundwater A summary of the economic analysis of water use required by Article 5 & Annex III Relevance of consideration This element will identify the point and diffuse sources of pollution (e.g. waste water treatment and CSO discharges) and pressures on the quantitative status of waters, including abstractions. This information should be verified and updated where necessary when preparing or reviewing a water services strategic plan to ensure that any subsequent controls on abstractions and discharges are based on correct information. The economic analysis of water use will provide details of the unit cost of water services, long-term demand forecasts and associated infrastructural investment estimates, which are a fundamental part of water services strategic planning. Vol 3 Section 4, Page 3-13 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 53 Water Quality Plans Table 4.1 Plan and Programme River Basin Management Plans and Associated Programmes of Measures under the WFD Element to be considered Summary of significant pressures and impacts of human activity on surface and groundwater A summary of the economic analysis of water use required by Article 5 & Annex III Relevance of consideration This element will identify the point and diffuse sources of pollution (e.g. waste water treatment and CSO discharges) and pressures on the quantitative status of waters, including abstractions. This information should be verified and updated where necessary when preparing or reviewing a water services strategic plan to ensure that any subsequent controls on abstractions and discharges are based on correct information. The economic analysis of water use will provide details of the unit cost of water services, long-term demand forecasts and associated infrastructural investment estimates, which are a fundamental part of water services strategic planning. Vol 3 Section 4, Page 3-13 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 54 Water Quality Plans Table 4.1 Plan and Programme River Basin Management Plans and Associated Programmes of Measures under the WFD Element to be considered Summary of significant pressures and impacts of human activity on surface and groundwater A summary of the economic analysis of water use required by Article 5 & Annex III Relevance of consideration This element will identify the point and diffuse sources of pollution (e.g. waste water treatment and CSO discharges) and pressures on the quantitative status of waters, including abstractions. This information should be verified and updated where necessary when preparing or reviewing a water services strategic plan to ensure that any subsequent controls on abstractions and discharges are based on correct information. The economic analysis of water use will provide details of the unit cost of water services, long-term demand forecasts and associated infrastructural investment estimates, which are a fundamental part of water services strategic planning. Vol 3 Section 4, Page 3-13 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 55 Water Quality Plans Table 4.1 Plan and Programme River Basin Management Plans and Associated Programmes of Measures under the WFD Element to be considered Summary of significant pressures and impacts of human activity on surface and groundwater A summary of the economic analysis of water use required by Article 5 & Annex III Relevance of consideration This element will identify the point and diffuse sources of pollution (e.g. waste water treatment and CSO discharges) and pressures on the quantitative status of waters, including abstractions. This information should be verified and updated where necessary when preparing or reviewing a water services strategic plan to ensure that any subsequent controls on abstractions and discharges are based on correct information. The economic analysis of water use will provide details of the unit cost of water services, long-term demand forecasts and associated infrastructural investment estimates, which are a fundamental part of water services strategic planning. Vol 3 Section 4, Page 3-13 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 56 Water Quality Plans Table 4.1 Plan and Programme Element to be considered A summary of the measures taken to meet the requirements of Article 7 Relevance of consideration Member States are required under Article 7 to: “ ensure the necessary protection for the water bodies identified with the aim of avoiding deterioration in their quality in order to reduce the level of purification treatment required in the production of drinking water. The RBMP will identify the source protection zones in respect of each water abstraction (surface and groundwater) and the associated measures necessary to ensure compliance with Article 7 of the WFD. Controls on the abstraction or impoundment of water will have a significant impact on the sourcing of adequate quantities of water for the provision of water services. River Basin Management Plans and Associated Programmes of Measures under the WFD Controls on abstraction and impoundment of water. Controls adopted for point source discharges Measures taken to apply the principle of recovery of the costs of water use in accordance with Article 9. A water services authority will have to identify in the strategic plan where it intends to source water to meet projected demands across it’s functional area. Such controls may also apply to existing abstractions, which may have to be reduced or physically modified to meet RBMP objectives. Controls on point source discharges will impact on the siting of discharges from treatment plants and stormwater & emergency overflows. In addition, these controls may limit the quantity and quality of discharges, which may require water services authorities to provide additional treatment processes or storage capacity for both existing and planned facilities. The cumulative impact of existing and proposed discharges will also have to be considered, to ensure that the quality objectives for receiving waters set in the RBMP continue to be met. The recovery of the cost of water services in accordance with Government policy will form the cornerstone of the financial plan for their delivery. Projected income and expenditure will have to be reconciled as part of water services strategic plans. Vol 3 Section 4, Page 3-14 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 57 Water Quality Plans Table 4.1 Plan and Programme Element to be considered A summary of the measures taken to meet the requirements of Article 7 Relevance of consideration Member States are required under Article 7 to: “ ensure the necessary protection for the water bodies identified with the aim of avoiding deterioration in their quality in order to reduce the level of purification treatment required in the production of drinking water. The RBMP will identify the source protection zones in respect of each water abstraction (surface and groundwater) and the associated measures necessary to ensure compliance with Article 7 of the WFD. Controls on the abstraction or impoundment of water will have a significant impact on the sourcing of adequate quantities of water for the provision of water services. River Basin Management Plans and Associated Programmes of Measures under the WFD Controls on abstraction and impoundment of water. Controls adopted for point source discharges Measures taken to apply the principle of recovery of the costs of water use in accordance with Article 9. A water services authority will have to identify in the strategic plan where it intends to source water to meet projected demands across it’s functional area. Such controls may also apply to existing abstractions, which may have to be reduced or physically modified to meet RBMP objectives. Controls on point source discharges will impact on the siting of discharges from treatment plants and stormwater & emergency overflows. In addition, these controls may limit the quantity and quality of discharges, which may require water services authorities to provide additional treatment processes or storage capacity for both existing and planned facilities. The cumulative impact of existing and proposed discharges will also have to be considered, to ensure that the quality objectives for receiving waters set in the RBMP continue to be met. The recovery of the cost of water services in accordance with Government policy will form the cornerstone of the financial plan for their delivery. Projected income and expenditure will have to be reconciled as part of water services strategic plans. Vol 3 Section 4, Page 3-14 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 58 Water Quality Plans Table 4.1 Plan and Programme Element to be considered A summary of the measures taken to meet the requirements of Article 7 Relevance of consideration Member States are required under Article 7 to: “ ensure the necessary protection for the water bodies identified with the aim of avoiding deterioration in their quality in order to reduce the level of purification treatment required in the production of drinking water. The RBMP will identify the source protection zones in respect of each water abstraction (surface and groundwater) and the associated measures necessary to ensure compliance with Article 7 of the WFD. Controls on the abstraction or impoundment of water will have a significant impact on the sourcing of adequate quantities of water for the provision of water services. River Basin Management Plans and Associated Programmes of Measures under the WFD Controls on abstraction and impoundment of water. Controls adopted for point source discharges Measures taken to apply the principle of recovery of the costs of water use in accordance with Article 9. A water services authority will have to identify in the strategic plan where it intends to source water to meet projected demands across it’s functional area. Such controls may also apply to existing abstractions, which may have to be reduced or physically modified to meet RBMP objectives. Controls on point source discharges will impact on the siting of discharges from treatment plants and stormwater & emergency overflows. In addition, these controls may limit the quantity and quality of discharges, which may require water services authorities to provide additional treatment processes or storage capacity for both existing and planned facilities. The cumulative impact of existing and proposed discharges will also have to be considered, to ensure that the quality objectives for receiving waters set in the RBMP continue to be met. The recovery of the cost of water services in accordance with Government policy will form the cornerstone of the financial plan for their delivery. Projected income and expenditure will have to be reconciled as part of water services strategic plans. Vol 3 Section 4, Page 3-14 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 59 Water Quality Plans Table 4.1 Plan and Programme Element to be considered A summary of the measures taken to meet the requirements of Article 7 Relevance of consideration Member States are required under Article 7 to: “ ensure the necessary protection for the water bodies identified with the aim of avoiding deterioration in their quality in order to reduce the level of purification treatment required in the production of drinking water. The RBMP will identify the source protection zones in respect of each water abstraction (surface and groundwater) and the associated measures necessary to ensure compliance with Article 7 of the WFD. Controls on the abstraction or impoundment of water will have a significant impact on the sourcing of adequate quantities of water for the provision of water services. River Basin Management Plans and Associated Programmes of Measures under the WFD Controls on abstraction and impoundment of water. Controls adopted for point source discharges Measures taken to apply the principle of recovery of the costs of water use in accordance with Article 9. A water services authority will have to identify in the strategic plan where it intends to source water to meet projected demands across it’s functional area. Such controls may also apply to existing abstractions, which may have to be reduced or physically modified to meet RBMP objectives. Controls on point source discharges will impact on the siting of discharges from treatment plants and stormwater & emergency overflows. In addition, these controls may limit the quantity and quality of discharges, which may require water services authorities to provide additional treatment processes or storage capacity for both existing and planned facilities. The cumulative impact of existing and proposed discharges will also have to be considered, to ensure that the quality objectives for receiving waters set in the RBMP continue to be met. The recovery of the cost of water services in accordance with Government policy will form the cornerstone of the financial plan for their delivery. Projected income and expenditure will have to be reconciled as part of water services strategic plans. Vol 3 Section 4, Page 3-14 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 60 Water Quality Plans Table 4.1 Plan and Programme Element to be considered A summary of the measures taken to meet the requirements of Article 7 Relevance of consideration Member States are required under Article 7 to: “ ensure the necessary protection for the water bodies identified with the aim of avoiding deterioration in their quality in order to reduce the level of purification treatment required in the production of drinking water. The RBMP will identify the source protection zones in respect of each water abstraction (surface and groundwater) and the associated measures necessary to ensure compliance with Article 7 of the WFD. Controls on the abstraction or impoundment of water will have a significant impact on the sourcing of adequate quantities of water for the provision of water services. River Basin Management Plans and Associated Programmes of Measures under the WFD Controls on abstraction and impoundment of water. Controls adopted for point source discharges Measures taken to apply the principle of recovery of the costs of water use in accordance with Article 9. A water services authority will have to identify in the strategic plan where it intends to source water to meet projected demands across it’s functional area. Such controls may also apply to existing abstractions, which may have to be reduced or physically modified to meet RBMP objectives. Controls on point source discharges will impact on the siting of discharges from treatment plants and stormwater & emergency overflows. In addition, these controls may limit the quantity and quality of discharges, which may require water services authorities to provide additional treatment processes or storage capacity for both existing and planned facilities. The cumulative impact of existing and proposed discharges will also have to be considered, to ensure that the quality objectives for receiving waters set in the RBMP continue to be met. The recovery of the cost of water services in accordance with Government policy will form the cornerstone of the financial plan for their delivery. Projected income and expenditure will have to be reconciled as part of water services strategic plans. Vol 3 Section 4, Page 3-14 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 61 Water Quality Plans Table 4.1 Plan and Programme Element to be considered A summary of the measures taken to meet the requirements of Article 7 Relevance of consideration Member States are required under Article 7 to: “ ensure the necessary protection for the water bodies identified with the aim of avoiding deterioration in their quality in order to reduce the level of purification treatment required in the production of drinking water. The RBMP will identify the source protection zones in respect of each water abstraction (surface and groundwater) and the associated measures necessary to ensure compliance with Article 7 of the WFD. Controls on the abstraction or impoundment of water will have a significant impact on the sourcing of adequate quantities of water for the provision of water services. River Basin Management Plans and Associated Programmes of Measures under the WFD Controls on abstraction and impoundment of water. Controls adopted for point source discharges Measures taken to apply the principle of recovery of the costs of water use in accordance with Article 9. A water services authority will have to identify in the strategic plan where it intends to source water to meet projected demands across it’s functional area. Such controls may also apply to existing abstractions, which may have to be reduced or physically modified to meet RBMP objectives. Controls on point source discharges will impact on the siting of discharges from treatment plants and stormwater & emergency overflows. In addition, these controls may limit the quantity and quality of discharges, which may require water services authorities to provide additional treatment processes or storage capacity for both existing and planned facilities. The cumulative impact of existing and proposed discharges will also have to be considered, to ensure that the quality objectives for receiving waters set in the RBMP continue to be met. The recovery of the cost of water services in accordance with Government policy will form the cornerstone of the financial plan for their delivery. Projected income and expenditure will have to be reconciled as part of water services strategic plans. Vol 3 Section 4, Page 3-14 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 62 Water Quality Plans Table 4.1 Plan and Programme Element to be considered A summary of the measures taken to meet the requirements of Article 7 Relevance of consideration Member States are required under Article 7 to: “ ensure the necessary protection for the water bodies identified with the aim of avoiding deterioration in their quality in order to reduce the level of purification treatment required in the production of drinking water. The RBMP will identify the source protection zones in respect of each water abstraction (surface and groundwater) and the associated measures necessary to ensure compliance with Article 7 of the WFD. Controls on the abstraction or impoundment of water will have a significant impact on the sourcing of adequate quantities of water for the provision of water services. River Basin Management Plans and Associated Programmes of Measures under the WFD Controls on abstraction and impoundment of water. Controls adopted for point source discharges Measures taken to apply the principle of recovery of the costs of water use in accordance with Article 9. A water services authority will have to identify in the strategic plan where it intends to source water to meet projected demands across it’s functional area. Such controls may also apply to existing abstractions, which may have to be reduced or physically modified to meet RBMP objectives. Controls on point source discharges will impact on the siting of discharges from treatment plants and stormwater & emergency overflows. In addition, these controls may limit the quantity and quality of discharges, which may require water services authorities to provide additional treatment processes or storage capacity for both existing and planned facilities. The cumulative impact of existing and proposed discharges will also have to be considered, to ensure that the quality objectives for receiving waters set in the RBMP continue to be met. The recovery of the cost of water services in accordance with Government policy will form the cornerstone of the financial plan for their delivery. Projected income and expenditure will have to be reconciled as part of water services strategic plans. Vol 3 Section 4, Page 3-14 Table 4.1: Water Quality - Consideration to be given to Plans and Programmes 63 Water Quality Plans Table 4.1 Plan and Programme Element to be considered A summary of the measures taken to meet the requirements of Article 7 Relevance of consideration Member States are required under Article 7 to: “ ensure the necessary protection for the water bodies identified with the aim of avoiding deterioration in their quality in order to reduce the level of purification treatment required in the production of drinking water. The RBMP will identify the source protection zones in respect of each water abstraction (surface and groundwater) and the associated measures necessary to ensure compliance with Article 7 of the WFD. Controls on the abstraction or impoundment of water will have a significant impact on the sourcing of adequate quantities of water for the provision of water services. River Basin Management Plans and Associated Programmes of Measures under the WFD Controls on abstraction and impoundment of water. Controls adopted for point source discharges Measures taken to apply the principle of recovery of the costs of water use in accordance with Article 9. A water services authority will have to identify in the strategic plan where it intends to source water to meet projected demands across it’s functional area. Such controls may also apply to existing abstractions, which may have to be reduced or physically modified to meet RBMP objectives. Controls on point source discharges will impact on the siting of discharges from treatment plants and stormwater & emergency overflows. In addition, these controls may limit the quantity and quality of discharges, which may require water services authorities to provide additional treatment processes or storage capacity for both existing and planned facilities. The cumulative impact of existing and proposed discharges will also have to be considered, to ensure that the quality objectives for receiving waters set in the RBMP continue to be met. The recovery of the cost of water services in accordance with Government policy will form the cornerstone of the financial plan for their delivery. Projected income and expenditure will have to be reconciled as part of water services strategic plans. Vol 3 Section 4, Page 3-14 64 Water Quality Plans Table 4.1 Plan and Programme Element to be considered Relevance of consideration Such measures should be achievable, affordable and compatible with the provisions of the overall Measures to promote an efficient and sustainable water use, demand water services strategic plan. The measures will assist in determining future demand profiles for water services. management measures and efficiency & re-use measures Compliance with the various directives dealing with urban water-water treatment, nitrates, habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution prevention control will ensure the water environment is protected. River Basin Management Plans and Associated Programmes of Measures under the WFD Measures required under Directives listed in Annex VI of the WFD The Urban Waste Water Treatment Directive dictates compliance criteria in agglomerations >2,000 population by specific dates and set standards in relation to the final effluent discharges after treatment. For agglomerations < 2,000 population the level of appropriate treatment required by the directive will be set on an evidential basis by the RBMP and PoM. Measures required under the Habitats and Birds Directives may limit the siting of water services infrastructure or restrict abstractions from or discharges to water bodies within designated areas. Measures required under the Drinking Water Directive regulate the quality and monitoring of drinking water intended for human consumption. Measure required under the Bathing Water Directive may place limits on discharges from water services infrastructure (treatment plants and overflows) that discharge directly to or impact on designated bathing waters. Vol 3 Section 4, Page 3-15 65 Water Quality Plans Table 4.1 Plan and Programme Element to be considered Measures to promote an efficient and sustainable water use, demand management measures and efficiency & re-use measures Relevance of consideration Such measures should be achievable, affordable and compatible with the provisions of the overall water services strategic plan. The measures will assist in determining future demand profiles for water services. Compliance with the various directives dealing with urban water-water treatment, nitrates, habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution prevention control will ensure the water environment is protected. River Basin Management Plans and Associated Programmes of Measures under the WFD Measures required under Directives listed in Annex VI of the WFD The Urban Waste Water Treatment Directive dictates compliance criteria in agglomerations >2,000 population by specific dates and set standards in relation to the final effluent discharges after treatment. For agglomerations < 2,000 population the level of appropriate treatment required by the directive will be set on an evidential basis by the RBMP and PoM. Measures required under the Habitats and Birds Directives may limit the siting of water services infrastructure or restrict abstractions from or discharges to water bodies within designated areas. Measures required under the Drinking Water Directive regulate the quality and monitoring of drinking water intended for human consumption. Measure required under the Bathing Water Directive may place limits on discharges from water services infrastructure (treatment plants and overflows) that discharge directly to or impact on designated bathing waters. Vol 3 Section 4, Page 3-15 66 Water Quality Plans Table 4.1 Plan and Programme Element to be considered Measures to promote an efficient and sustainable water use, demand management measures and efficiency & re-use measures Relevance of consideration Such measures should be achievable, affordable and compatible with the provisions of the overall water services strategic plan. The measures will assist in determining future demand profiles for water services. Compliance with the various directives dealing with urban water-water treatment, nitrates, habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution prevention control will ensure the water environment is protected. River Basin Management Plans and Associated Programmes of Measures under the WFD Measures required under Directives listed in Annex VI of the WFD The Urban Waste Water Treatment Directive dictates compliance criteria in agglomerations >2,000 population by specific dates and set standards in relation to the final effluent discharges after treatment. For agglomerations < 2,000 population the level of appropriate treatment required by the directive will be set on an evidential basis by the RBMP and PoM. Measures required under the Habitats and Birds Directives may limit the siting of water services infrastructure or restrict abstractions from or discharges to water bodies within designated areas. Measures required under the Drinking Water Directive regulate the quality and monitoring of drinking water intended for human consumption. Measure required under the Bathing Water Directive may place limits on discharges from water services infrastructure (treatment plants and overflows) that discharge directly to or impact on designated bathing waters. Vol 3 Section 4, Page 3-15 67 Water Quality Plans Table 4.1 Plan and Programme Element to be considered Measures to promote an efficient and sustainable water use, demand management measures and efficiency & re-use measures Relevance of consideration Such measures should be achievable, affordable and compatible with the provisions of the overall water services strategic plan. The measures will assist in determining future demand profiles for water services. Compliance with the various directives dealing with urban water-water treatment, nitrates, habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution prevention control will ensure the water environment is protected. River Basin Management Plans and Associated Programmes of Measures under the WFD Measures required under Directives listed in Annex VI of the WFD The Urban Waste Water Treatment Directive dictates compliance criteria in agglomerations >2,000 population by specific dates and set standards in relation to the final effluent discharges after treatment. For agglomerations < 2,000 population the level of appropriate treatment required by the directive will be set on an evidential basis by the RBMP and PoM. Measures required under the Habitats and Birds Directives may limit the siting of water services infrastructure or restrict abstractions from or discharges to water bodies within designated areas. Measures required under the Drinking Water Directive regulate the quality and monitoring of drinking water intended for human consumption. Measure required under the Bathing Water Directive may place limits on discharges from water services infrastructure (treatment plants and overflows) that discharge directly to or impact on designated bathing waters. Vol 3 Section 4, Page 3-15 68 Water Quality Plans Table 4.1 Plan and Programme Element to be considered Measures to promote an efficient and sustainable water use, demand management measures and efficiency & re-use measures Relevance of consideration Such measures should be achievable, affordable and compatible with the provisions of the overall water services strategic plan. The measures will assist in determining future demand profiles for water services. Compliance with the various directives dealing with urban water-water treatment, nitrates, habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution prevention control will ensure the water environment is protected. River Basin Management Plans and Associated Programmes of Measures under the WFD Measures required under Directives listed in Annex VI of the WFD The Urban Waste Water Treatment Directive dictates compliance criteria in agglomerations >2,000 population by specific dates and set standards in relation to the final effluent discharges after treatment. For agglomerations < 2,000 population the level of appropriate treatment required by the directive will be set on an evidential basis by the RBMP and PoM. Measures required under the Habitats and Birds Directives may limit the siting of water services infrastructure or restrict abstractions from or discharges to water bodies within designated areas. Measures required under the Drinking Water Directive regulate the quality and monitoring of drinking water intended for human consumption. Measure required under the Bathing Water Directive may place limits on discharges from water services infrastructure (treatment plants and overflows) that discharge directly to or impact on designated bathing waters. Vol 3 Section 4, Page 3-15 69 Water Quality Plans Table 4.1 Plan and Programme Element to be considered Measures to promote an efficient and sustainable water use, demand management measures and efficiency & re-use measures Relevance of consideration Such measures should be achievable, affordable and compatible with the provisions of the overall water services strategic plan. The measures will assist in determining future demand profiles for water services. Compliance with the various directives dealing with urban water-water treatment, nitrates, habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution prevention control will ensure the water environment is protected. River Basin Management Plans and Associated Programmes of Measures under the WFD Measures required under Directives listed in Annex VI of the WFD The Urban Waste Water Treatment Directive dictates compliance criteria in agglomerations >2,000 population by specific dates and set standards in relation to the final effluent discharges after treatment. For agglomerations < 2,000 population the level of appropriate treatment required by the directive will be set on an evidential basis by the RBMP and PoM. Measures required under the Habitats and Birds Directives may limit the siting of water services infrastructure or restrict abstractions from or discharges to water bodies within designated areas. Measures required under the Drinking Water Directive regulate the quality and monitoring of drinking water intended for human consumption. Measure required under the Bathing Water Directive may place limits on discharges from water services infrastructure (treatment plants and overflows) that discharge directly to or impact on designated bathing waters. Vol 3 Section 4, Page 3-15 70 Water Quality Plans Table 4.1 Plan and Programme Element to be considered Measures to promote an efficient and sustainable water use, demand management measures and efficiency & re-use measures Relevance of consideration Such measures should be achievable, affordable and compatible with the provisions of the overall water services strategic plan. The measures will assist in determining future demand profiles for water services. Compliance with the various directives dealing with urban water-water treatment, nitrates, habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution prevention control will ensure the water environment is protected. River Basin Management Plans and Associated Programmes of Measures under the WFD Measures required under Directives listed in Annex VI of the WFD The Urban Waste Water Treatment Directive dictates compliance criteria in agglomerations >2,000 population by specific dates and set standards in relation to the final effluent discharges after treatment. For agglomerations < 2,000 population the level of appropriate treatment required by the directive will be set on an evidential basis by the RBMP and PoM. Measures required under the Habitats and Birds Directives may limit the siting of water services infrastructure or restrict abstractions from or discharges to water bodies within designated areas. Measures required under the Drinking Water Directive regulate the quality and monitoring of drinking water intended for human consumption. Measure required under the Bathing Water Directive may place limits on discharges from water services infrastructure (treatment plants and overflows) that discharge directly to or impact on designated bathing waters. Vol 3 Section 4, Page 3-15 71 Water Quality Plans Table 4.1 Plan and Programme Element to be considered Measures to promote an efficient and sustainable water use, demand management measures and efficiency & re-use measures Relevance of consideration Such measures should be achievable, affordable and compatible with the provisions of the overall water services strategic plan. The measures will assist in determining future demand profiles for water services. Compliance with the various directives dealing with urban water-water treatment, nitrates, habitats, drinking water, birds, bathing waters, sewage sludge and integrated pollution prevention control will ensure the water environment is protected. River Basin Management Plans and Associated Programmes of Measures under the WFD Measures required under Directives listed in Annex VI of the WFD The Urban Waste Water Treatment Directive dictates compliance criteria in agglomerations >2,000 population by specific dates and set standards in relation to the final effluent discharges after treatment. For agglomerations < 2,000 population the level of appropriate treatment required by the directive will be set on an evidential basis by the RBMP and PoM. Measures required under the Habitats and Birds Directives may limit the siting of water services infrastructure or restrict abstractions from or discharges to water bodies within designated areas. Measures required under the Drinking Water Directive regulate the quality and monitoring of drinking water intended for human consumption. Measure required under the Bathing Water Directive may place limits on discharges from water services infrastructure (treatment plants and overflows) that discharge directly to or impact on designated bathing waters. Vol 3 Section 4, Page 3-15 72 Water Quality Plans Table 4.1 Plan and Programme River Basin Management Plans and Associated Programmes of Measures of WFD Element to be considered Relevance of consideration Measures required under Directives listed in Annex VI of the WFD Measures required under the Nitrates & Sewage Sludge Directives may impact on the reuse of sewage sludge in agriculture and therefore will provide some guidance to a Water Services Authority as to the most appropriate means of dealing with waste sludges from treatment processes. Protected Areas Measures required under EU directives listed in Annex VI relating to the designation and protection of protected areas must be implemented by 2015. • • • Other elements that should be considered when preparing a water services strategic plan (Annex VII of WFD) • • Authorisations of direct discharges to groundwater (Article 11(3)(j) of the WFD). Measures taken to reduce the risk of pollution of water bodies by priority substances under Article 16 of the WFD Summary of measures taken to prevent or reduce the impact of accidental pollution. Details of supplementary measures identified as necessary in order to meet the environmental objectives established. Register of more detailed programmes and management plans for the river basin district dealing with particular sub-basins, sectors, issues or water types. Where such programmes and plans exist, a water services authority should give them the same level of consideration as the main river basin management plan when preparing a water services strategic plan. Vol 3 Section 4, Page 3-16 73 Water Quality Plans Table 4.1 Plan and Programme River Basin Management Plans and Associated Programmes of Measures of WFD Element to be considered Relevance of consideration Measures required under Directives listed in Annex VI of the WFD Measures required under the Nitrates & Sewage Sludge Directives may impact on the reuse of sewage sludge in agriculture and therefore will provide some guidance to a Water Services Authority as to the most appropriate means of dealing with waste sludges from treatment processes. Protected Areas Measures required under EU directives listed in Annex VI relating to the designation and protection of protected areas must be implemented by 2015. • • • Other elements that should be considered when preparing a water services strategic plan (Annex VII of WFD) • • Authorisations of direct discharges to groundwater (Article 11(3)(j) of the WFD). Measures taken to reduce the risk of pollution of water bodies by priority substances under Article 16 of the WFD Summary of measures taken to prevent or reduce the impact of accidental pollution. Details of supplementary measures identified as necessary in order to meet the environmental objectives established. Register of more detailed programmes and management plans for the river basin district dealing with particular sub-basins, sectors, issues or water types. Where such programmes and plans exist, a water services authority should give them the same level of consideration as the main river basin management plan when preparing a water services strategic plan. Vol 3 Section 4, Page 3-16 74 Water Quality Plans Table 4.1 Plan and Programme River Basin Management Plans and Associated Programmes of Measures of WFD Element to be considered Relevance of consideration Measures required under Directives listed in Annex VI of the WFD Measures required under the Nitrates & Sewage Sludge Directives may impact on the reuse of sewage sludge in agriculture and therefore will provide some guidance to a Water Services Authority as to the most appropriate means of dealing with waste sludges from treatment processes. Protected Areas Measures required under EU directives listed in Annex VI relating to the designation and protection of protected areas must be implemented by 2015. • • • Other elements that should be considered when preparing a water services strategic plan (Annex VII of WFD) • • Authorisations of direct discharges to groundwater (Article 11(3)(j) of the WFD). Measures taken to reduce the risk of pollution of water bodies by priority substances under Article 16 of the WFD Summary of measures taken to prevent or reduce the impact of accidental pollution. Details of supplementary measures identified as necessary in order to meet the environmental objectives established. Register of more detailed programmes and management plans for the river basin district dealing with particular sub-basins, sectors, issues or water types. Where such programmes and plans exist, a water services authority should give them the same level of consideration as the main river basin management plan when preparing a water services strategic plan. Vol 3 Section 4, Page 3-16 75 Water Quality Plans Table 4.1 Plan and Programme River Basin Management Plans and Associated Programmes of Measures of WFD Element to be considered Relevance of consideration Measures required under Directives listed in Annex VI of the WFD Measures required under the Nitrates & Sewage Sludge Directives may impact on the reuse of sewage sludge in agriculture and therefore will provide some guidance to a Water Services Authority as to the most appropriate means of dealing with waste sludges from treatment processes. Protected Areas Measures required under EU directives listed in Annex VI relating to the designation and protection of protected areas must be implemented by 2015. • • • Other elements that should be considered when preparing a water services strategic plan (Annex VII of WFD) • • Authorisations of direct discharges to groundwater (Article 11(3)(j) of the WFD). Measures taken to reduce the risk of pollution of water bodies by priority substances under Article 16 of the WFD Summary of measures taken to prevent or reduce the impact of accidental pollution. Details of supplementary measures identified as necessary in order to meet the environmental objectives established. Register of more detailed programmes and management plans for the river basin district dealing with particular sub-basins, sectors, issues or water types. Where such programmes and plans exist, a water services authority should give them the same level of consideration as the main river basin management plan when preparing a water services strategic plan. Vol 3 Section 4, Page 3-16 76 Water Quality Plans Table 4.1 Plan and Programme River Basin Management Plans and Associated Programmes of Measures of WFD Element to be considered Relevance of consideration Measures required under Directives listed in Annex VI of the WFD Measures required under the Nitrates & Sewage Sludge Directives may impact on the reuse of sewage sludge in agriculture and therefore will provide some guidance to a Water Services Authority as to the most appropriate means of dealing with waste sludges from treatment processes. Protected Areas Measures required under EU directives listed in Annex VI relating to the designation and protection of protected areas must be implemented by 2015. • • • Other elements that should be considered when preparing a water services strategic plan (Annex VII of WFD) • • Authorisations of direct discharges to groundwater (Article 11(3)(j) of the WFD). Measures taken to reduce the risk of pollution of water bodies by priority substances under Article 16 of the WFD Summary of measures taken to prevent or reduce the impact of accidental pollution. Details of supplementary measures identified as necessary in order to meet the environmental objectives established. Register of more detailed programmes and management plans for the river basin district dealing with particular sub-basins, sectors, issues or water types. Where such programmes and plans exist, a water services authority should give them the same level of consideration as the main river basin management plan when preparing a water services strategic plan. Vol 3 Section 4, Page 3-16 77 Water Quality Plans Table 4.1 Plan and Programme River Basin Management Plans and Associated Programmes of Measures of WFD Element to be considered Relevance of consideration Measures required under Directives listed in Annex VI of the WFD Measures required under the Nitrates & Sewage Sludge Directives may impact on the reuse of sewage sludge in agriculture and therefore will provide some guidance to a Water Services Authority as to the most appropriate means of dealing with waste sludges from treatment processes. Protected Areas Measures required under EU directives listed in Annex VI relating to the designation and protection of protected areas must be implemented by 2015. • • • Other elements that should be considered when preparing a water services strategic plan (Annex VII of WFD) • • Authorisations of direct discharges to groundwater (Article 11(3)(j) of the WFD). Measures taken to reduce the risk of pollution of water bodies by priority substances under Article 16 of the WFD Summary of measures taken to prevent or reduce the impact of accidental pollution. Details of supplementary measures identified as necessary in order to meet the environmental objectives established. Register of more detailed programmes and management plans for the river basin district dealing with particular sub-basins, sectors, issues or water types. Where such programmes and plans exist, a water services authority should give them the same level of consideration as the main river basin management plan when preparing a water services strategic plan. Vol 3 Section 4, Page 3-16 78 Consultation With Adjoining Authorities Level of consultation depends on:-– Degree to which infrastructure is shared or planned to be shared. – Extent of shared planning and development objectives. – Extent of shared environmental objectives (e.g. RBMP). Maximise the use of shared resources and expertise – use existing structures Vol 3 Section 6, Page 3-19 79 Consultation With Adjoining Authorities Consultation to include:-– Review of planning and development objectives. – Assessment of technical and economic feasibility. – Consideration of common level of service delivery. – Examination of potential to share and optimise resources. – e.g. Single water abstraction or effluent discharge to a shared water body. Vol 3 Section 6, Page 3-18 80 Session 3 Synchronisation with other Plans Volume 3 81 Session 4 Levels of Service and Design Standards Volume 4 – Section 2 Levels of Service 82 Plan Approval & Review Financial Plan Specific – clearly defined Define / Review Levels of Service Measurable – for comparison purposes. Asset Management Plan Achievable – to Relevant Water Services ensure Strategic targets Plan Demand can me met Assessment – to strategic goals and customers Collect Strategic Timebound – to ensure progress is made Strategic Options Asset Data Strategic Capacity Assessment Vol 1 Section 2., Page 1-4/13 83 Levels of Service - Statutory Standard Water Quality Recommended Target Description & Definition Compliance with European Communities (Drinking Water) (No. 2) Regulations 2007. – SI No. 278 of 2007. Water supplied is wholesome and clean in that – It is free from any micro-organisms and parasites and from any substance in concentrations that constitute a potential danger to human health. It meets the 2 microbiological (Table A) and 26 chemical (Table B) water quality parametric value standards in Part 1 of the Schedule to the Regulations. % of Schemes in the functional area of the WSA fully compliant. % of consumers in the functional area of the WSA supplied from a scheme that is fully compliant. Compliance with conditions attaching to licences and certificates issued under the Waste Water Discharge (Authorisation) Regulations 2007 – SI No. 684 of 2007 or the Programme of Measures included in the River Basin Management Plan for the RBD in which the discharge is or is planned to be. Discharge Standards Waste Water Schemes - WTP/ Stormwater % of waste water schemes requiring a licence/certificate fully compliant with licence/certificate conditions. % of the p.e. in the functional area of the WSA served by a waste water scheme that is fully compliant with its licence/certificate conditions. % of discharges from WTP’s and stormwater systems which have conditions attached to them in the PoMs fully compliant with such conditions. Ref S1 Parameters to be analysed and minimum frequency of check and audit monitoring for each supply to be carried out in accordance with provisions of Tables A & B in Part 2 of the Schedule. The conditions attaching to a waste water discharge licence (agglomerations with a p.e. greater than 500) or certificate (agglomerations with a p.e. less than 500) will vary for each discharge depending on the overall impact on and the designation of the water body into which the waste water discharge is or will be made. The Licensing Authority will set emission limits for pollutants likely to be present in the wastewater concerned and a timeframe within which these are to be achieved with the overall objective of achieving good surface or nd groundwater status by 22 December 2015. For discharges that don’t require a licence or certificate (i.e. from water treatment plants and stormwater systems) conditions may attach arising out of the programme of measures included in the relevant river basin management plan with the overall objective of achieving good surface or groundwater status nd by 22 December 2015. The emission limits set will depend on the nature and impact of other pressures on the water body (e.g. other discharges and diffuse sources of pollution) and whether or not the water body is in an area that is protected under EU and/or national legislation (e.g. protected areas under the Water Framework Directive) Vol 4 Section 2, Page 4-7 S2 84 Levels of Service Plan Approval & Review Define // Review Review Define Levels of of Service Service Levels Financial Plan Statutory Water Quality – SI 278/2007 Discharge Standards – SI 684 of 2007 Asset Management Plan Customer – Water Services Strategic Plan Demand Assessment Service Pressures Adequate Capacity – treatment & storage Collect Strategic Leakage/Infiltration Strategic Options Asset Data Fireflows Strategic Capacity Assessment Vol 4 Section 2, Page 4-5 85 Levels of Service - Statutory Standard Standard S1 Water Quality Recommended Target Description & Definition Compliance with European Communities (Drinking Water) (No. 2) Regulations 2007. – SI No. 278 of 2007. Water supplied is wholesome and clean in that – It is free from any micro-organisms and parasites and from any substance in concentrations that constitute a potential danger to human health. It meets the 2 microbiological (Table A) and 26 chemical (Table B) water quality parametric value standards in Part 1 of the Schedule to the Regulations. % of Schemes in the functional area of the WSA fully compliant. % of consumers in the functional area of the WSA supplied from a scheme that is fully compliant. Water Quality Compliance with conditions attaching to licences and certificates issued under the Waste Water Discharge (Authorisation) Regulations 2007 – SI No. 684 of 2007 or the Programme of Measures included in the River Basin Management Plan for the RBD in which the discharge is or is planned to be. Discharge Standards Waste Water Schemes - WTP/ Stormwater % of waste water schemes requiring a licence/certificate fully compliant with licence/certificate conditions. % of the p.e. in the functional area of the WSA served by a waste water scheme that is fully compliant with its licence/certificate conditions. % of discharges from WTP’s and stormwater systems which have conditions attached to them in the PoMs fully compliant with such conditions. Ref S1 Parameters to be analysed and minimum frequency of check and audit monitoring for each supply to be carried out in accordance with provisions of Tables A & B in Part 2 of the Schedule. The conditions attaching to a waste water discharge licence (agglomerations with a p.e. greater than 500) or certificate (agglomerations with a p.e. less than 500) will vary for each discharge depending on the overall impact on and the designation of the water body into which the waste water discharge is or will be made. The Licensing Authority will set emission limits for pollutants likely to be present in the wastewater concerned and a timeframe within which these are to be achieved with the overall objective of achieving good surface or nd groundwater status by 22 December 2015. For discharges that don’t require a licence or certificate (i.e. from water treatment plants and stormwater systems) conditions may attach arising out of the programme of measures included in the relevant river basin management plan with the overall objective of achieving good surface or groundwater status nd by 22 December 2015. The emission limits set will depend on the nature and impact of other pressures on the water body (e.g. other discharges and diffuse sources of pollution) and whether or not the water body is in an area that is protected under EU and/or national legislation (e.g. protected areas under the Water Framework Directive) Vol 4 Section 2, Page 4-7 S2 86 Levels of Service - Statutory Standard Recommended Target Compliance with European Communities (Drinking Water) (No. 2) Regulations 2007. – SI No. 278 of 2007. Water Quality Description & Definition Compliance with European Communities (Drinking Water) (No. 2) Regulations 2007. – SI No. 278 of 2007. Water supplied is wholesome and clean in that – It is free from any micro-organisms and parasites and from any substance in concentrations that constitute a potential danger to human health. It meets the 2 microbiological (Table A) and 26 chemical (Table B) water quality parametric value standards in Part 1 of the Schedule to the Regulations. % of Schemes in the functional area of the WSA fully compliant. % of consumers in the functional area of the WSA supplied from a scheme that is fully compliant. Compliance with conditions attaching to licences and certificates issued under the Waste Water Discharge (Authorisation) Regulations 2007 – SI No. 684 of 2007 or the Programme of Measures included in the River Basin Management Plan for the RBD in which the discharge is or is planned to be. % of Schemes in the functional area of the WSA fully compliant. % of consumers in the functional area of the WSA supplied from a scheme that is fully compliant. Recommended Target Discharge Standards Waste Water Schemes - WTP/ Stormwater % of waste water schemes requiring a licence/certificate fully compliant with licence/certificate conditions. % of the p.e. in the functional area of the WSA served by a waste water scheme that is fully compliant with its licence/certificate conditions. % of discharges from WTP’s and stormwater systems which have conditions attached to them in the PoMs fully compliant with such conditions. Ref S1 Parameters to be analysed and minimum frequency of check and audit monitoring for each supply to be carried out in accordance with provisions of Tables A & B in Part 2 of the Schedule. The conditions attaching to a waste water discharge licence (agglomerations with a p.e. greater than 500) or certificate (agglomerations with a p.e. less than 500) will vary for each discharge depending on the overall impact on and the designation of the water body into which the waste water discharge is or will be made. The Licensing Authority will set emission limits for pollutants likely to be present in the wastewater concerned and a timeframe within which these are to be achieved with the overall objective of achieving good surface or nd groundwater status by 22 December 2015. For discharges that don’t require a licence or certificate (i.e. from water treatment plants and stormwater systems) conditions may attach arising out of the programme of measures included in the relevant river basin management plan with the overall objective of achieving good surface or groundwater status nd by 22 December 2015. The emission limits set will depend on the nature and impact of other pressures on the water body (e.g. other discharges and diffuse sources of pollution) and whether or not the water body is in an area that is protected under EU and/or national legislation (e.g. protected areas under the Water Framework Directive) Vol 4 Section 2, Page 4-7 S2 87 Levels of Service - Statutory Description & Definition Standard Water supplied is wholesome and clean in that Statutory - Water Quality Description & Definition Compliance with European Communities (Drinking Water) (No. 2) Regulations 2007. – SI No. 278 of 2007. Water supplied is wholesome and clean in that – It is free from any micro-organisms and parasites and from any substance in concentrations that constitute a potential danger to human health. It meets the 2 microbiological (Table A) and 26 chemical (Table B) water quality parametric value standards in Part 1 of the Schedule to the Regulations. % of Schemes in the functional area of the WSA fully compliant. % of consumers in the functional area of the WSA supplied from a scheme that is fully compliant. - It is free from any micro-organisms and parasites and from any substance in concentrations that constitute a potential danger to human health. It meets the 2 microbiological (Table A) and 26 chemical (Table B) water quality parametric value standards in Part 1 of The Schedule to the Regulations. - Parameters to be analysed and minimum frequency of check and audit monitoring for each supply to be carried out in accordance with provisions of Tables A & B in Part 2 of the Schedule. Recommended Target Compliance with conditions attaching to licences and certificates issued under the Waste Water Discharge (Authorisation) Regulations 2007 – SI No. 684 of 2007 or the Programme of Measures included in the River Basin Management Plan for the RBD in which the discharge is or is planned to be. Discharge Standards Waste Water Schemes - WTP/ Stormwater % of waste water schemes requiring a licence/certificate fully compliant with licence/certificate conditions. % of the p.e. in the functional area of the WSA served by a waste water scheme that is fully compliant with its licence/certificate conditions. % of discharges from WTP’s and stormwater systems which have conditions attached to them in the PoMs fully compliant with such conditions. Ref S1 Parameters to be analysed and minimum frequency of check and audit monitoring for each supply to be carried out in accordance with provisions of Tables A & B in Part 2 of the Schedule. The conditions attaching to a waste water discharge licence (agglomerations with a p.e. greater than 500) or certificate (agglomerations with a p.e. less than 500) will vary for each discharge depending on the overall impact on and the designation of the water body into which the waste water discharge is or will be made. The Licensing Authority will set emission limits for pollutants likely to be present in the wastewater concerned and a timeframe within which these are to be achieved with the overall objective of achieving good surface or nd groundwater status by 22 December 2015. For discharges that don’t require a licence or certificate (i.e. from water treatment plants and stormwater systems) conditions may attach arising out of the programme of measures included in the relevant river basin management plan with the overall objective of achieving good surface or groundwater status nd by 22 December 2015. The emission limits set will depend on the nature and impact of other pressures on the water body (e.g. other discharges and diffuse sources of pollution) and whether or not the water body is in an area that is protected under EU and/or national legislation (e.g. protected areas under the Water Framework Directive) Vol 4 Section 2, Page 4-7 S2 88 Levels of Service - Statutory Standard Water Quality Recommended Target Description & Definition Compliance with European Communities (Drinking Water) (No. 2) Regulations 2007. – SI No. 278 of 2007. Water supplied is wholesome and clean in that – It is free from any micro-organisms and parasites and from any substance in concentrations that constitute a potential danger to human health. It meets the 2 microbiological (Table A) and 26 chemical (Table B) water quality parametric value standards in Part 1 of the Schedule to the Regulations. % of Schemes in the functional area of the WSA fully compliant. % of consumers in the functional area of the WSA supplied from a scheme that is fully compliant. Compliance with conditions attaching to licences and certificates issued under the Waste Water Discharge (Authorisation) Regulations 2007 – SI No. 684 of 2007 or the Programme of Measures included in the River Basin Management Plan for the RBD in which the discharge is or is planned to be. Standard S2 Discharge Standards Discharge Standards Waste Water Schemes - WTP/ Stormwater Waste Water Schemes -WTP/ Stormwater % of waste water schemes requiring a licence/certificate fully compliant with licence/certificate conditions. % of the p.e. in the functional area of the WSA served by a waste water scheme that is fully compliant with its licence/certificate conditions. % of discharges from WTP’s and stormwater systems which have conditions attached to them in the PoMs fully compliant with such conditions. Ref S1 Parameters to be analysed and minimum frequency of check and audit monitoring for each supply to be carried out in accordance with provisions of Tables A & B in Part 2 of the Schedule. The conditions attaching to a waste water discharge licence (agglomerations with a p.e. greater than 500) or certificate (agglomerations with a p.e. less than 500) will vary for each discharge depending on the overall impact on and the designation of the water body into which the waste water discharge is or will be made. The Licensing Authority will set emission limits for pollutants likely to be present in the wastewater concerned and a timeframe within which these are to be achieved with the overall objective of achieving good surface or nd groundwater status by 22 December 2015. For discharges that don’t require a licence or certificate (i.e. from water treatment plants and stormwater systems) conditions may attach arising out of the programme of measures included in the relevant river basin management plan with the overall objective of achieving good surface or groundwater status nd by 22 December 2015. The emission limits set will depend on the nature and impact of other pressures on the water body (e.g. other discharges and diffuse sources of pollution) and whether or not the water body is in an area that is protected under EU and/or national legislation (e.g. protected areas under the Water Framework Directive) Vol 4 Section 2, Page 4-7 S2 89 Levels of Service - Statutory Standard Recommended Target Compliance with conditions attaching to licences and certificates issued under the Waste Water Discharge (Authorisation) Regulations 2007 – SI No. 684 of 2007 or the PoMs included in the RBMP. Water Quality % of discharges from WTP’s and stormwater systems which have conditions attached to them in the PoMs fully compliant with such conditions. Description & Definition Compliance with European Communities (Drinking Water) (No. 2) Regulations 2007. – SI No. 278 of 2007. Water supplied is wholesome and clean in that – It is free from any micro-organisms and parasites and from any substance in concentrations that constitute a potential danger to human health. It meets the 2 microbiological (Table A) and 26 chemical (Table B) water quality parametric value standards in Part 1 of the Schedule to the Regulations. % of Schemes in the functional area of the WSA fully compliant. % of consumers in the functional area of the WSA supplied from a scheme that is fully compliant. Compliance with conditions attaching to licences and certificates issued under the Waste Water Discharge (Authorisation) Regulations 2007 – SI No. 684 of 2007 or the Programme of Measures included in the River Basin Management Plan for the RBD in which the discharge is or is planned to be. % of waste water schemes requiring a licence/certificate fully compliant with licence/certificate conditions. % of the p.e. in the functional area of the WSA served by a waste water scheme that is fully compliant with its licence/certificate conditions. Recommended Target Discharge Standards Waste Water Schemes - WTP/ Stormwater % of waste water schemes requiring a licence/certificate fully compliant with licence/certificate conditions. % of the p.e. in the functional area of the WSA served by a waste water scheme that is fully compliant with its licence/certificate conditions. % of discharges from WTP’s and stormwater systems which have conditions attached to them in the PoMs fully compliant with such conditions. Ref S1 Parameters to be analysed and minimum frequency of check and audit monitoring for each supply to be carried out in accordance with provisions of Tables A & B in Part 2 of the Schedule. The conditions attaching to a waste water discharge licence (agglomerations with a p.e. greater than 500) or certificate (agglomerations with a p.e. less than 500) will vary for each discharge depending on the overall impact on and the designation of the water body into which the waste water discharge is or will be made. The Licensing Authority will set emission limits for pollutants likely to be present in the wastewater concerned and a timeframe within which these are to be achieved with the overall objective of achieving good surface or nd groundwater status by 22 December 2015. For discharges that don’t require a licence or certificate (i.e. from water treatment plants and stormwater systems) conditions may attach arising out of the programme of measures included in the relevant river basin management plan with the overall objective of achieving good surface or groundwater status nd by 22 December 2015. The emission limits set will depend on the nature and impact of other pressures on the water body (e.g. other discharges and diffuse sources of pollution) and whether or not the water body is in an area that is protected under EU and/or national legislation (e.g. protected areas under the Water Framework Directive) Vol 4 Section 2, Page 4-7 S2 90 Levels of Service - Statutory Standard Description & Definition Conditions will vary depending on the overall impact on and the designation of the water body. Water Quality Description & Definition Compliance with European Communities (Drinking Water) (No. 2) Regulations 2007. – SI No. 278 of 2007. Water supplied is wholesome and clean in that – It is free from any micro-organisms and parasites and from any substance in concentrations that constitute a potential danger to human health. It meets the 2 microbiological (Table A) and 26 chemical (Table B) water quality parametric value standards in Part 1 of the Schedule to the Regulations. % of Schemes in the functional area of the WSA fully compliant. % of consumers in the functional area of the WSA supplied from a scheme that is fully compliant. The Licensing Authority will set emission limits for pollutants and a timeframe within which these are to be achieved For discharges that don’t require a licence or certificate (i.e. from WTPs plants and stormwater systems) conditions may attach arising out of the PoMs included in the relevant RBMP. Recommended Target Compliance with conditions attaching to licences and certificates issued under the Waste Water Discharge (Authorisation) Regulations 2007 – SI No. 684 of 2007 or the Programme of Measures included in the River Basin Management Plan for the RBD in which the discharge is or is planned to be. Discharge Standards Waste Water Schemes - WTP/ Stormwater % of waste water schemes requiring a licence/certificate fully compliant with licence/certificate conditions. % of the p.e. in the functional area of the WSA served by a waste water scheme that is fully compliant with its licence/certificate conditions. % of discharges from WTP’s and stormwater systems which have conditions attached to them in the PoMs fully compliant with such conditions. Ref S1 Parameters to be analysed and minimum frequency of check and audit monitoring for each supply to be carried out in accordance with provisions of Tables A & B in Part 2 of the Schedule. The conditions attaching to a waste water discharge licence (agglomerations with a p.e. greater than 500) or certificate (agglomerations with a p.e. less than 500) will vary for each discharge depending on the overall impact on and the designation of the water body into which the waste water discharge is or will be made. The Licensing Authority will set emission limits for pollutants likely to be present in the wastewater concerned and a timeframe within which these are to be achieved with the overall objective of achieving good surface or nd groundwater status by 22 December 2015. For discharges that don’t require a licence or certificate (i.e. from water treatment plants and stormwater systems) conditions may attach arising out of the programme of measures included in the relevant river basin management plan with the overall objective of achieving good surface or groundwater status nd by 22 December 2015. The emission limits set will depend on the nature and impact of other pressures on the water body (e.g. other discharges and diffuse sources of pollution) and whether or not the water body is in an area that is protected under EU and/or national legislation (e.g. protected areas under the Water Framework Directive) Vol 4 Section 2, Page 4-7 S2 91 Levels of Service - Customer Standard Recommended Target Description & Definition (value to be set by WSA) Ref Customer Service Standards Number and % of properties with between 15m and 40m head above ground level at any time when the zonal demand is equal to the normal daily peak demand Minimum /Maximum Pressure This indicator identifies the number of properties that are at risk of having a water pressure below and above reference levels due to deficiencies of the supply and distribution system under normal operating conditions. The identification of properties for this indicator has two separate but related elements: Number and % of properties with less than 15m head above ground level. Number and % of properties with more than 40m head above ground level. An appropriate technical assessment of the properties that the Water Services Authority considers are at risk of receiving a service pressure below or above the reference levels. The basis of this assessment should be detailed. It should also identify the location of the properties affected for cross-referencing to the incident records. S3 An incident based recording system. The information should be collated from the telemetry data, network data and network analysis supplemented with monitoring by data loggers at strategic locations, operational data and customer reactions and should be summarised and reported on a monthly basis. Vol 4 Section 2, Page 4-9 92 Levels of Service - Customer Standard Recommended Target Description & Definition (value to be set by WSA) Ref Customer Service Standards Number and % of properties with between 15m and 40m head above ground level at any time when the zonal demand is equal to the normal daily peak demand Standard S3 Minimum /Maximum Pressure Minimum /Maximum Pressure This indicator identifies the number of properties that are at risk of having a water pressure below and above reference levels due to deficiencies of the supply and distribution system under normal operating conditions. The identification of properties for this indicator has two separate but related elements: Number and % of properties with less than 15m head above ground level. Number and % of properties with more than 40m head above ground level. An appropriate technical assessment of the properties that the Water Services Authority considers are at risk of receiving a service pressure below or above the reference levels. The basis of this assessment should be detailed. It should also identify the location of the properties affected for cross-referencing to the incident records. S3 An incident based recording system. The information should be collated from the telemetry data, network data and network analysis supplemented with monitoring by data loggers at strategic locations, operational data and customer reactions and should be summarised and reported on a monthly basis. Vol 4 Section 2, Page 4-9 93 Levels of Service - Customer Standard Recommended Target Number and % of properties with between 15m and 40m head above ground level at any time when the zonal demand is equal to the normal daily peak demand Number and % of properties with less than 15m head above ground level. Number and % of properties with more than 40m head above ground level. Recommended Target Description & Definition (value to be set by WSA) Ref Customer Service Standards Number and % of properties with between 15m and 40m head above ground level at any time when the zonal demand is equal to the normal daily peak demand Minimum /Maximum Pressure This indicator identifies the number of properties that are at risk of having a water pressure below and above reference levels due to deficiencies of the supply and distribution system under normal operating conditions. The identification of properties for this indicator has two separate but related elements: Number and % of properties with less than 15m head above ground level. Number and % of properties with more than 40m head above ground level. An appropriate technical assessment of the properties that the Water Services Authority considers are at risk of receiving a service pressure below or above the reference levels. The basis of this assessment should be detailed. It should also identify the location of the properties affected for cross-referencing to the incident records. S3 An incident based recording system. The information should be collated from the telemetry data, network data and network analysis supplemented with monitoring by data loggers at strategic locations, operational data and customer reactions and should be summarised and reported on a monthly basis. Vol 4 Section 2, Page 4-9 94 Levels of Service - Customer Description & Definition Standard Recommended Target Description & Definition (value to be set by WSA) Ref Customer Service Standards This indicator identifies the number of properties that are at risk of having a water pressure below and above reference levels. The identification of properties for this indicator has two separate but related elements: - An appropriate technical assessment of the properties that the WSA considers are at risk of receiving a service pressure below or above the reference levels. Number and % of properties with between 15m and 40m head above ground level at any time when the zonal demand is equal to the normal daily peak demand Minimum /Maximum Pressure This indicator identifies the number of properties that are at risk of having a water pressure below and above reference levels due to deficiencies of the supply and distribution system under normal operating conditions. The identification of properties for this indicator has two separate but related elements: Number and % of properties with less than 15m head above ground level. Number and % of properties with more than 40m head above ground level. An appropriate technical assessment of the properties that the Water Services Authority considers are at risk of receiving a service pressure below or above the reference levels. The basis of this assessment should be detailed. It should also identify the location of the properties affected for cross-referencing to the incident records. S3 An incident based recording system. The information should be collated from the telemetry data, network data and network analysis supplemented with monitoring by data loggers at strategic locations, operational data and customer reactions and should be summarised and reported on a monthly basis. - An incident based recording system. Vol 4 Section 2, Page 4-9 95 Levels of Service - Other Other Service Standards Fire-fighting minimum desired capability for new or rehabilitated facilities: [8] l/s in residential areas not more than two stories (urban and village), [15] l/s to village halls and small community facilities [20] l/s to primary schools and single story health centres [25] l/s to lorry/truck parks and multi storey car parks Standard S4 Fireflows Fireflows [20-35] l/s to multioccupancy and multistory residential Note: Achievement of desired fire flows may not be achievable under existing network conditions and high leakage levels. This is particularly the case in rural networks. It is likely that in order to achieve recommended fire flows significant boosting of supplies would be required which would lead to oversized mains for general operation. This may give rise to water quality issues. A reasoned approach should be adopted involving liaison with the Fire Officer to achieve practical solutions suited to local environments. In assessing network capacities for fireflows the recommended fireflow should be applied to the network hydraulic model during the peak diurnal demand periods while ensuring that the minimum pressure anywhere on the network does not drop below 5m head. S4 [35] l/s to secondary schools, colleges, large health and community facilities [20 - 75] l/s to commercial developments (shopping, offices, recreation & tourism) [20] l/s to Industrial estates up to 1 Ha [35] l/s to Industrial estates of 1 to 2 Ha [50] l/s to Industrial estates of 2 to 3 Ha [75] l/s to Industrial estates over 3 Ha Vol 4 Section 2, Page 4-9 & 4-10 96 Levels of Service - Other Recommended Target (1 of 2) Other Service Standards Fire-fighting minimum desired capability for new or rehabilitated facilities: [8] l/s in residential areas not more than two stories (urban and village), Fire-fighting minimum desired capability for new or rehabilitated facilities where it is economically practicable and the mains network is the sole solution to meeting fire-fighting requirements: [15] l/s to village halls and small community facilities [20] l/s to primary schools and single story health centres [8] l/s in residential areas not more than two stories (urban and village) [15] l/s to village halls and small community facilities [20] l/s to primary schools and single story health centres [25] l/s to lorry/truck parks and multi storey car parks [20-35] l/s to multi-occupancy and multi-story residential [25] l/s to lorry/truck parks and multi storey car parks Fireflows [20-35] l/s to multioccupancy and multistory residential Note: Achievement of desired fire flows may not be achievable under existing network conditions and high leakage levels. This is particularly the case in rural networks. It is likely that in order to achieve recommended fire flows significant boosting of supplies would be required which would lead to oversized mains for general operation. This may give rise to water quality issues. A reasoned approach should be adopted involving liaison with the Fire Officer to achieve practical solutions suited to local environments. In assessing network capacities for fireflows the recommended fireflow should be applied to the network hydraulic model during the peak diurnal demand periods while ensuring that the minimum pressure anywhere on the network does not drop below 5m head. S4 [35] l/s to secondary schools, colleges, large health and community facilities [20 - 75] l/s to commercial developments (shopping, offices, recreation & tourism) [20] l/s to Industrial estates up to 1 Ha [35] l/s to Industrial estates of 1 to 2 Ha [50] l/s to Industrial estates of 2 to 3 Ha [75] l/s to Industrial estates over 3 Ha Vol 4 Section 2, Page 4-9 & 4-10 97 Levels of Service - Other Recommended Target (2 of 2) Other Service Standards Fire-fighting minimum desired capability for new or rehabilitated facilities: [8] l/s in residential areas not more than two stories (urban and village), Fire-fighting minimum desired capability for new or rehabilitated facilities where it is economically practicable and the mains network is the sole solution to meeting fire-fighting requirements: [15] l/s to village halls and small community facilities [20] l/s to primary schools and single story health centres [35] l/s to secondary schools, colleges, large health and community facilities [20 - 75] l/s to commercial developments (shopping, offices, recreation & tourism) [20] l/s to Industrial estates up to 1 Ha [35] l/s to Industrial estates of 1 to 2 Ha [50] l/s to Industrial estates of 2 to 3 Ha [25] l/s to lorry/truck parks and multi storey car parks Fireflows [20-35] l/s to multioccupancy and multistory residential Note: Achievement of desired fire flows may not be achievable under existing network conditions and high leakage levels. This is particularly the case in rural networks. It is likely that in order to achieve recommended fire flows significant boosting of supplies would be required which would lead to oversized mains for general operation. This may give rise to water quality issues. A reasoned approach should be adopted involving liaison with the Fire Officer to achieve practical solutions suited to local environments. In assessing network capacities for fireflows the recommended fireflow should be applied to the network hydraulic model during the peak diurnal demand periods while ensuring that the minimum pressure anywhere on the network does not drop below 5m head. S4 [35] l/s to secondary schools, colleges, large health and community facilities [20 - 75] l/s to commercial developments (shopping, offices, recreation & tourism) [20] l/s to Industrial estates up to 1 Ha [35] l/s to Industrial estates of 1 to 2 Ha [50] l/s to Industrial estates of 2 to 3 Ha [75] l/s to Industrial estates over 3 Ha [75] l/s to Industrial estates over 3 Ha Vol 4 Section 2, Page 4-9 & 4-10 98 Levels of Service - Other Other Service Standards Fire-fighting minimum desired capability for new or rehabilitated facilities: [8] l/s in residential areas not more than two stories (urban and village), Description & Definition Desired fire flows may not be achievable under existing network conditions. [15] l/s to village halls and small community facilities It may require significant boosting of supplies leading to oversized mains for general operation. Reasoned approach required involving liaison with Fire Officer to achieve practical solutions. In assessing network capacities the recommended fireflow should be applied to the network hydraulic model during the peak diurnal demand periods while ensuring that the minimum pressure anywhere on the network does not drop below 5m head. [20] l/s to primary schools and single story health centres [25] l/s to lorry/truck parks and multi storey car parks Fireflows [20-35] l/s to multioccupancy and multistory residential Note: Achievement of desired fire flows may not be achievable under existing network conditions and high leakage levels. This is particularly the case in rural networks. It is likely that in order to achieve recommended fire flows significant boosting of supplies would be required which would lead to oversized mains for general operation. This may give rise to water quality issues. A reasoned approach should be adopted involving liaison with the Fire Officer to achieve practical solutions suited to local environments. In assessing network capacities for fireflows the recommended fireflow should be applied to the network hydraulic model during the peak diurnal demand periods while ensuring that the minimum pressure anywhere on the network does not drop below 5m head. S4 [35] l/s to secondary schools, colleges, large health and community facilities [20 - 75] l/s to commercial developments (shopping, offices, recreation & tourism) [20] l/s to Industrial estates up to 1 Ha [35] l/s to Industrial estates of 1 to 2 Ha [50] l/s to Industrial estates of 2 to 3 Ha [75] l/s to Industrial estates over 3 Ha Vol 4 Section 2, Page 4-9 & 4-10 99 Levels of Service - Other Sufficient to cater for the average day in the peak week plus a minimum headroom of 10 % above this. WTP Capacity Standard S5a % of schemes with target 10% headroom Water Services Authorities should assess the demand for water services for each scheme and review on a yearly basis against the available supply. The ratio between the reliable daily capacity of the WTP and the average daily demand in the peak week should not be less than 1.1. S5a % of population served by a scheme with target 10% headroom. Sufficient to cater for the average day in the peak week flow and load plus a minimum headroom of 10 %. WTP Capacity WwTP Capacity % of schemes with target 10% headroom S5b % of p.e. served by a scheme with target 10% headroom. Storage A minimum of [24] hours storage capacity at average day demand in the peak week to allow for a full days service. Consideration to be given to providing greater than 24 hours storage volume for strategic storage facilities where there is a risk of a significant interruption to supply in the event of a failure in the trunk system (e.g. the estimated time taken to isolate, drain down, repair and re-commission a burst on a trunk main feeding the reservoir is greater than 24 hours). Vol 4 Section 2, Page 4-10 S6 100 Levels of Service - Other Sufficient to cater for the average day in the peak week plus a minimum headroom of 10 % above this. Recommended Target Sufficient to cater for the average day in the peak week plus a minimum headroom of 10 % above this. % of schemes with target 10% headroom WTP Capacity % of schemes with target 10% headroom Water Services Authorities should assess the demand for water services for each scheme and review on a yearly basis against the available supply. The ratio between the reliable daily capacity of the WTP and the average daily demand in the peak week should not be less than 1.1. S5a % of population served by a scheme with target 10% headroom. Sufficient to cater for the average day in the peak week flow and load plus a minimum headroom of 10 %. WwTP Capacity % of schemes with target 10% headroom S5b % of p.e. served by a scheme with target 10% headroom. % of population served by a scheme with target 10% headroom. Storage A minimum of [24] hours storage capacity at average day demand in the peak week to allow for a full days service. Consideration to be given to providing greater than 24 hours storage volume for strategic storage facilities where there is a risk of a significant interruption to supply in the event of a failure in the trunk system (e.g. the estimated time taken to isolate, drain down, repair and re-commission a burst on a trunk main feeding the reservoir is greater than 24 hours). Vol 4 Section 2, Page 4-10 S6 101 Levels of Service - Other Sufficient to cater for the average day in the peak week plus a minimum headroom of 10 % above this. Description & Definition Water Services Authorities should assess the demand for water services for each scheme and review on a yearly basis against the available supply. The ratio between the reliable daily capacity of the WTP and the average daily demand in the peak week should not be less than 1.1. WTP Capacity % of schemes with target 10% headroom Water Services Authorities should assess the demand for water services for each scheme and review on a yearly basis against the available supply. The ratio between the reliable daily capacity of the WTP and the average daily demand in the peak week should not be less than 1.1. S5a % of population served by a scheme with target 10% headroom. Sufficient to cater for the average day in the peak week flow and load plus a minimum headroom of 10 %. WwTP Capacity % of schemes with target 10% headroom S5b % of p.e. served by a scheme with target 10% headroom. Storage A minimum of [24] hours storage capacity at average day demand in the peak week to allow for a full days service. Consideration to be given to providing greater than 24 hours storage volume for strategic storage facilities where there is a risk of a significant interruption to supply in the event of a failure in the trunk system (e.g. the estimated time taken to isolate, drain down, repair and re-commission a burst on a trunk main feeding the reservoir is greater than 24 hours). Vol 4 Section 2, Page 4-10 S6 102 Levels of Service - Other Sufficient to cater for the average day in the peak week plus a minimum headroom of 10 % above this. WTP Capacity % of schemes with target 10% headroom Water Services Authorities should assess the demand for water services for each scheme and review on a yearly basis against the available supply. The ratio between the reliable daily capacity of the WTP and the average daily demand in the peak week should not be less than 1.1. S5a % of population served by a scheme with target 10% headroom. Sufficient to cater for the average day in the peak week flow and load plus a minimum headroom of 10 %. Standard S5b WwTP Capacity WwTP Capacity % of schemes with target 10% headroom S5b % of p.e. served by a scheme with target 10% headroom. Storage A minimum of [24] hours storage capacity at average day demand in the peak week to allow for a full days service. Consideration to be given to providing greater than 24 hours storage volume for strategic storage facilities where there is a risk of a significant interruption to supply in the event of a failure in the trunk system (e.g. the estimated time taken to isolate, drain down, repair and re-commission a burst on a trunk main feeding the reservoir is greater than 24 hours). Vol 4 Section 2, Page 4-10 S6 103 Levels of Service - Other Sufficient to cater for the average day in the peak week plus a minimum headroom of 10 % above this. Recommended Target Sufficient to cater for the average day in the peak week flow and load plus a minimum headroom of 10 %. % of schemes with target 10% headroom % of p.e. served by a scheme with target 10% headroom. WTP Capacity % of schemes with target 10% headroom Water Services Authorities should assess the demand for water services for each scheme and review on a yearly basis against the available supply. The ratio between the reliable daily capacity of the WTP and the average daily demand in the peak week should not be less than 1.1. S5a % of population served by a scheme with target 10% headroom. Sufficient to cater for the average day in the peak week flow and load plus a minimum headroom of 10 %. WwTP Capacity % of schemes with target 10% headroom S5b % of p.e. served by a scheme with target 10% headroom. Storage A minimum of [24] hours storage capacity at average day demand in the peak week to allow for a full days service. Consideration to be given to providing greater than 24 hours storage volume for strategic storage facilities where there is a risk of a significant interruption to supply in the event of a failure in the trunk system (e.g. the estimated time taken to isolate, drain down, repair and re-commission a burst on a trunk main feeding the reservoir is greater than 24 hours). Vol 4 Section 2, Page 4-10 S6 104 Levels of Service - Other Sufficient to cater for the average day in the peak week plus a minimum headroom of 10 % above this. WTP Capacity % of schemes with target 10% headroom Water Services Authorities should assess the demand for water services for each scheme and review on a yearly basis against the available supply. The ratio between the reliable daily capacity of the WTP and the average daily demand in the peak week should not be less than 1.1. S5a % of population served by a scheme with target 10% headroom. Sufficient to cater for the average day in the peak week flow and load plus a minimum headroom of 10 %. Standard S6 WwTP Capacity % of schemes with target 10% headroom S5b % of p.e. served by a scheme with target 10% headroom. Storage Storage A minimum of [24] hours storage capacity at average day demand in the peak week to allow for a full days service. Consideration to be given to providing greater than 24 hours storage volume for strategic storage facilities where there is a risk of a significant interruption to supply in the event of a failure in the trunk system (e.g. the estimated time taken to isolate, drain down, repair and re-commission a burst on a trunk main feeding the reservoir is greater than 24 hours). Vol 4 Section 2, Page 4-11 S6 105 Levels of Service - Other Sufficient to cater for the average day in the peak week plus a minimum headroom of 10 % above this. WTP Capacity % of schemes with target 10% headroom Water Services Authorities should assess the demand for water services for each scheme and review on a yearly basis against the available supply. The ratio between the reliable daily capacity of the WTP and the average daily demand in the peak week should not be less than 1.1. S5a % of population served by a scheme with target 10% headroom. Sufficient to cater for the average day in the peak week flow and load plus a minimum headroom of 10 %. Recommended Target A minimum of [24] hours storage capacity at average day demand in the peak week to allow for a full days service. WwTP Capacity % of schemes with target 10% headroom S5b % of p.e. served by a scheme with target 10% headroom. Storage A minimum of [24] hours storage capacity at average day demand in the peak week to allow for a full days service. Consideration to be given to providing greater than 24 hours storage volume for strategic storage facilities where there is a risk of a significant interruption to supply in the event of a failure in the trunk system (e.g. the estimated time taken to isolate, drain down, repair and re-commission a burst on a trunk main feeding the reservoir is greater than 24 hours). Vol 4 Section 2, Page 4-11 S6 106 Levels of Service - Other Sufficient to cater for the average day in the peak week plus a minimum headroom of 10 % above this. WTP Capacity % of schemes with target 10% headroom Water Services Authorities should assess the demand for water services for each scheme and review on a yearly basis against the available supply. The ratio between the reliable daily capacity of the WTP and the average daily demand in the peak week should not be less than 1.1. S5a % of population served by a scheme with target 10% headroom. Sufficient to cater for the average day in the peak week flow and load plus a minimum headroom of 10 %. Description & Definition Consideration to be given to providing greater than 24 hours storage volume for strategic storage facilities where there is a risk of a significant interruption to supply in the event of a failure in the trunk system. WwTP Capacity % of schemes with target 10% headroom S5b % of p.e. served by a scheme with target 10% headroom. Storage A minimum of [24] hours storage capacity at average day demand in the peak week to allow for a full days service. Consideration to be given to providing greater than 24 hours storage volume for strategic storage facilities where there is a risk of a significant interruption to supply in the event of a failure in the trunk system (e.g. the estimated time taken to isolate, drain down, repair and re-commission a burst on a trunk main feeding the reservoir is greater than 24 hours). Vol 4 Section 2, Page 4-11 S6 107 Levels of Service - Other Distribution Network Economic Level of Leakage (ELL) to be achieved within [10] years provided sufficient water resources are available to meet demands. Standard S7 Leakage Targets Leakage Targets % of domestic consumers supplied by the Water Services Authority that are supplied from a scheme that is achieving the ELL target or better. Target levels of leakage should be set based on economic assessment. The economic level of leakage (ELL) effectively compares the cost of leak detection and repair with the variable costs of water production (primarily power and chemical costs) to arrive at a level of leakage that is most economical to maintain (i.e. the combined cost of active leakage control and variable production costs is lowest). S7 % of the total accounted for water (AFW) of all schemes run by or on behalf of the Water Services Authority that is from a scheme that is achieving the ELL target or better. Sewer Infiltration % of the average measured Dry Weather Flow (DWF) for all schemes run by or on behalf of the Water Services Authority that is infiltration. By measuring the inflow to a WwTP during a 24-hour “dry period” a comparison of the minimum night flow with the average flow over the 24-hour period will indicate the level of infiltration in the collection system. S8 The minimum night flow is the lowest hourly night flow recorded less an allowance for domestic (toilet flushing etc.) and nondomestic (based on metered “water in”) flow during that particular hour Vol 4 Section 2, Page 4-11 108 Levels of Service - Other Distribution Network Economic Level of Leakage (ELL) to be achieved within [10] years provided sufficient water resources are available to meet demands. Recommended Target Economic Level of Leakage (ELL) to be achieved within [10] years provided sufficient water resources are available to meet demands. Leakage Targets S7 % of the total accounted for water (AFW) of all schemes run by or on behalf of the Water Services Authority that is from a scheme that is achieving the ELL target or better. % of domestic consumers Supplied by the WSA that are supplied from a scheme that is achieving the ELL target or better. % of the total accounted for water (AFW) of all schemes run by or on behalf of the WSA that is from a scheme that is achieving the ELL target or better. % of domestic consumers supplied by the Water Services Authority that are supplied from a scheme that is achieving the ELL target or better. Target levels of leakage should be set based on economic assessment. The economic level of leakage (ELL) effectively compares the cost of leak detection and repair with the variable costs of water production (primarily power and chemical costs) to arrive at a level of leakage that is most economical to maintain (i.e. the combined cost of active leakage control and variable production costs is lowest). Sewer Infiltration % of the average measured Dry Weather Flow (DWF) for all schemes run by or on behalf of the Water Services Authority that is infiltration. By measuring the inflow to a WwTP during a 24-hour “dry period” a comparison of the minimum night flow with the average flow over the 24-hour period will indicate the level of infiltration in the collection system. S8 The minimum night flow is the lowest hourly night flow recorded less an allowance for domestic (toilet flushing etc.) and nondomestic (based on metered “water in”) flow during that particular hour Vol 4 Section 2, Page 4-11 109 Levels of Service - Other Distribution Network Economic Level of Leakage (ELL) to be achieved within [10] years provided sufficient water resources are available to meet demands. Description & Definition Target levels of leakage should be set based on economic assessment. Leakage Targets The economic level of leakage (ELL) effectively compares the cost of leak detection and repair with the variable costs of water production (primarily power and chemical costs) to arrive at a level of leakage that is most economical to maintain (i.e. the combined cost of active leakage control and variable production costs is lowest). % of domestic consumers supplied by the Water Services Authority that are supplied from a scheme that is achieving the ELL target or better. Target levels of leakage should be set based on economic assessment. The economic level of leakage (ELL) effectively compares the cost of leak detection and repair with the variable costs of water production (primarily power and chemical costs) to arrive at a level of leakage that is most economical to maintain (i.e. the combined cost of active leakage control and variable production costs is lowest). S7 % of the total accounted for water (AFW) of all schemes run by or on behalf of the Water Services Authority that is from a scheme that is achieving the ELL target or better. Sewer Infiltration % of the average measured Dry Weather Flow (DWF) for all schemes run by or on behalf of the Water Services Authority that is infiltration. By measuring the inflow to a WwTP during a 24-hour “dry period” a comparison of the minimum night flow with the average flow over the 24-hour period will indicate the level of infiltration in the collection system. S8 The minimum night flow is the lowest hourly night flow recorded less an allowance for domestic (toilet flushing etc.) and nondomestic (based on metered “water in”) flow during that particular hour Vol 4 Section 2, Page 4-11 110 Levels of Service - Other Distribution Network Economic Level of Leakage (ELL) to be achieved within [10] years provided sufficient water resources are available to meet demands. Leakage Targets % of domestic consumers supplied by the Water Services Authority that are supplied from a scheme that is achieving the ELL target or better. Target levels of leakage should be set based on economic assessment. The economic level of leakage (ELL) effectively compares the cost of leak detection and repair with the variable costs of water production (primarily power and chemical costs) to arrive at a level of leakage that is most economical to maintain (i.e. the combined cost of active leakage control and variable production costs is lowest). S7 % of the total accounted for water (AFW) of all schemes run by or on behalf of the Water Services Authority that is from a scheme that is achieving the ELL target or better. Standard S9 Sewer Infiltration Sewer Infiltration % of the average measured Dry Weather Flow (DWF) for all schemes run by or on behalf of the Water Services Authority that is infiltration. By measuring the inflow to a WwTP during a 24-hour “dry period” a comparison of the minimum night flow with the average flow over the 24-hour period will indicate the level of infiltration in the collection system. S8 The minimum night flow is the lowest hourly night flow recorded less an allowance for domestic (toilet flushing etc.) and nondomestic (based on metered “water in”) flow during that particular hour Vol 4 Section 2, Page 4-11 111 Levels of Service - Other Distribution Network Economic Level of Leakage (ELL) to be achieved within [10] years provided sufficient water resources are available to meet demands. Leakage Targets Recommended Target % of domestic consumers supplied by the Water Services Authority that are supplied from a scheme that is achieving the ELL target or better. Target levels of leakage should be set based on economic assessment. The economic level of leakage (ELL) effectively compares the cost of leak detection and repair with the variable costs of water production (primarily power and chemical costs) to arrive at a level of leakage that is most economical to maintain (i.e. the combined cost of active leakage control and variable production costs is lowest). S7 % of the total accounted for water (AFW) of all schemes run by or on behalf of the Water Services Authority that is from a scheme that is achieving the ELL target or better. % of the average measured Dry Weather Flow (DWF) for all schemes run by or on behalf of the WSA that is infiltration. Sewer Infiltration % of the average measured Dry Weather Flow (DWF) for all schemes run by or on behalf of the Water Services Authority that is infiltration. By measuring the inflow to a WwTP during a 24-hour “dry period” a comparison of the minimum night flow with the average flow over the 24-hour period will indicate the level of infiltration in the collection system. S8 The minimum night flow is the lowest hourly night flow recorded less an allowance for domestic (toilet flushing etc.) and nondomestic (based on metered “water in”) flow during that particular hour Vol 4 Section 2, Page 4-11 112 Levels of Service - Other Description & Definition By measuring the inflow to a WwTP during a 24-hour “dry period” a comparison of the minimum night flow with the average flow over the 24-hour period will indicate the level of infiltration in the collection system. The minimum night flow is the lowest hourly night flow recorded less an allowance for domestic (toilet flushing etc.) and non-domestic (based on metered “water in”) flow during that particular hour Distribution Network Economic Level of Leakage (ELL) to be achieved within [10] years provided sufficient water resources are available to meet demands. Leakage Targets % of domestic consumers supplied by the Water Services Authority that are supplied from a scheme that is achieving the ELL target or better. Target levels of leakage should be set based on economic assessment. The economic level of leakage (ELL) effectively compares the cost of leak detection and repair with the variable costs of water production (primarily power and chemical costs) to arrive at a level of leakage that is most economical to maintain (i.e. the combined cost of active leakage control and variable production costs is lowest). S7 % of the total accounted for water (AFW) of all schemes run by or on behalf of the Water Services Authority that is from a scheme that is achieving the ELL target or better. Sewer Infiltration % of the average measured Dry Weather Flow (DWF) for all schemes run by or on behalf of the Water Services Authority that is infiltration. By measuring the inflow to a WwTP during a 24-hour “dry period” a comparison of the minimum night flow with the average flow over the 24-hour period will indicate the level of infiltration in the collection system. S8 The minimum night flow is the lowest hourly night flow recorded less an allowance for domestic (toilet flushing etc.) and nondomestic (based on metered “water in”) flow during that particular hour Vol 4 Section 2, Page 4-11 113 Performance Indicators Example - Water Quality Number of (& population served by) Water Supply Schemes in functional area of Water Services Authority (A) Number (& population) with the correct frequency of check and audit monitoring required by S.I. 278 of 2007. (A1) % of (& % population served by) Schemes with the correct frequency of check and audit required by S.I. 278 of 2007. (A2 = A1/A x 100) Number (& population) with the correct frequency of monitoring that are compliant with the water quality standards set out in SI 278 of 2007. (A3) % of (& % population served by) Schemes with the correct frequency of monitoring that are compliant with the water quality standards set out in SI 278 of 2007. (A4 = A3/A x 100) Vol 4 Section 2, Page 4-13 114 Performance Indicators Cost of Water Services – Potable Water Total annual cost of the provision of potable water. (J) Total annual volume (in m3) of AFW delivered to customers. (J2) Total population supplied with potable water. (J4) Average cost of provision of potable water services per m3 (J6 = J/J2) Average cost of provision of potable water services per head of population served (J7 = J/J4) Vol 4 Section 2, Page 4-15 & 4-16 115 Design Standards Demand Assessment – Design Horizon - 25 years Household Occupancy Rates – Current - from CSO Census data. Future - from projections in the National Water Study 2000 (or as updated). Per Capita Consumption (pcc) - from projections included in the National Water Study 2000 (or as updated) Household losses (losses at consumer side of stop-cock) - Current (2008) 60l/household/d - Design Horizon 40l/household/d Vol 4 Section 2, Page 4-16 & 4-17 116 Design Standards Demand Assessment – Domestic Waste Water Load - 60 g of BOD/day - one p.e. Non-Domestic Waste Water Load - Based on the recommended (in the absence of specific loadings given in Table 3 of the EPA allowable or reserved loads) “Treatment Systems for Small Communities, Business, Leisure Centres, and Hotels” manual. Vol 4 Section 2, Page 4-17 117 Design Standards Demand Assessment – Unaccounted For Water (UFW) - Current - from Prelim Water Audit Future - based on ELL Target. Water for Operational Use - 2% of accounted for water (AFW) Peaking Factor - Derived from historic distribution input records for previous 3 to 5 years. Industrial Water Consumption – (in the absence of specific supply agreements) Light =14m³/ha/day Medium = 28m³/ha/day Heavy = 56m³/ha/day Vol 4 Section 2, Page 4-17 118 Design Standards Infrastructural Capacity – (i) Water Treatment and Supply Water Treatment Plant (WTP) Capacity - 110% of average day in the peak week demand . WTP Balancing Storage Capacity - 2 hours storage of WTP throughput plus 24 hours storage of demand of any area served. Service Reservoir Capacity - 24 hours storage of the average day/peak week demand for area that is directly served from the reservoir. Trunk mains - 1.2 x the average day/peak week demand of the area served. Vol 4 Section 2, Page 4-18 119 Design Standards Infrastructural Capacity – (i) Water Treatment and Supply Pumping stations - 1.2 x the average day/peak week demand of the area served (equivalent to pumping demand over 20 hours) Distribution mains - 1.6 to 2.5 x the average day/peak week demand depending on the demand profile of the consumers served. A hydraulic model with the relevant consumer demand profiles will give a more accurate capacity requirement for distribution mains. Vol 4 Section 2, Page 4-18 120 Design Standards Infrastructural Capacity – (ii) Ww Collection and Treatment Combined Sewers – No surcharge under 2 x DWF plus runoff from storm with 2 year return period. No surface flooding in residential and commercial areas at the 1 in 20 and 1 in 30 storm events respectively, plus 2 x DWF Foul Sewers – 6 x DWF Foul/combined Sewer self cleansing velocity 0.7 m/s (minimum at 2 x DWF) Pumping Stations/ Continuation flow at cSOs Formula A : Q = DWF + 1360P + 2E Vol 4 Section 2, Page 4-18 & 4-19 121 Design Standards Infrastructural Capacity – (ii) Ww Collection and Treatment Foul Only Trunk Sewers - Between 3 and 6 x DWF depending on the area of the catchment. Hydraulic model will give a more accurate capacity requirement. Combined Trunk Sewers - No surcharge under 2 x DWF from subcatchments with combined sewers, 6 x DWF from sub-catchments with foul only sewers and runoff under the 2-year design storm. No surface flooding under the 1 in 20 and 1 in 30 year storm events for residential and commercial areas respectively. Waste Water Treatment Plant (WwTP) Capacity - (p.e.) 2 to 3 x DWF depending on p.e., catchment and receiving waters. Vol 4 Section 2, Page 4-19 122 Session 4 Levels of Service and Design Standards Volume 4 – Section 2 123 Session 5 Demand Forecasting Volume 4 – Section 3 124 Demand for Water Services Plan Approval & Review Define / Review Levels of Service Financial Plan Asset Management Plan Water Services Strategic Plan Demand Assessment Collect Strategic Asset Data Strategic Options Strategic Capacity Assessment Vol 1 Section 2., Page 1-4/13 125 Demand for Water Services Current Demand - Water Audit of existing usage required to assess the basic units of demand and to give an accurate base on which to predict future growth. Demand Management - Demand Assessment policy for managing demand (usage and leakage) impacts on predicting future growth. Future Demand - Realistic and accurate assessment is required to ensure the necessary infrastructure can be put in place. Vol 4 Section 3, Page 4-20 126 Demand for Water Services Current Demand - Water Audit Accounted for Water Distribution Input (DI) Domestic Demand Households x Occupancy x pcc Permanent Domestic Seasonal Domestic (AFW) Non-Domestic Demand Measured or assessed lergitimate water use Metered consumption Demand Assessment Operational Use – 2% of DI Unaccounted for Water (UFW) = DI - AFW Peaking Factor – Average Day/Peak Week Vol 4 Section 3, Page 4-21 to 4-24 127 Demand for Water Services Current Demand – Distribution Input Distribution Input Average daily amount of water entering the distribution network during the year. Demand Assessment (DI) Typically yearly bulk meter flow leaving WTP divided by 365. Vol 4 Section 3, Page 4-25 128 Demand for Water Services Current Demand – Accounted for Water Accounted for Water (AFW) Measured or assessed lergitimate water use Portion of DI that can be accounted for as legitimate use by the WSA or its customers. Demand Assessment Vol 4 Section 3, Page 4-25 129 Demand for Water Services Current Demand – Domestic Demand Domestic Demand Households x Occupancy x pcc Permanent Domestic Seasonal Domestic Domestic properties served - Geodirectory / CIS Permanent – proportion occupied on census night Seasonal - proportion unoccupied on census night Demand Assessment Occupancy Rates - CSO census data (county, borough, & towns) Seasonal – assume occupancy rate of 4 for 3 months of the year Per capita consumption (pcc) - National Water Study 2000 (Vol 2, Table 11) Vol 4 Section 3, Page 4-25 to 4-29 130 Demand for Water Services Current Demand – Non-Domestic Demand Non-Domestic Demand Metered consumption Demand Assessment Divide total yearly non-domestic metered consumption by the number of days in the year For combined domestic/non-domestic properties deduct “domestic allowance” Vol 4 Section 3, Page 4-29 131 Demand for Water Services Current Demand – Unaccounted for Water (UFW) Real Losses – leakage from trunk mains, reservoirs, distribution mains, customer service pipes, fittings and plumbing. Apparent Losses – unauthorised or illegal consumption and customer meter inaccuracies. Demand Assessment Unaccounted for Water (UFW) = DI - AFW Vol 4 Section 3, Page 4-30 Demand for Water Services 132 Current Demand – Peaking Factor Average day in the peak week demand (allows for seasonal variations) 1. Assess daily DI records for previous 3 to 5 years. 2. For each year determine the 7-day period with the highest DI – peak week. Demand Assessment 3. Divide by 7 to get the average day in the peak week. 4. Peaking Factor = Average day / peak week demand Average daily demand for the year Peaking Factor – Average Day/Peak Week Vol 4 Section 3, Page 4-30 & 4-31 133 Demand for Water Services Current Demand – Water Audit Calculation Summary Demand Assessment Vol 4 Section 3, Page 4-32 134 Demand for Water Services Current Demand – Waste Water Assessment Accounted for DWF Dry Weather Flow (DWF) Measured or assessed legitimate Waste water flow and load Domestic DWF Flow = Households x Occupancy x per capita flow Permanent Domestic Load = population x per capita load Seasonal Domestic Demand Assessment Non-Domestic DWF Flow based on water in = water out Load based on EPA Guidance Unaccounted for DWF Flow = Min night flow – metered flow – domestic allowance Load = Measured load less accounted for domestic and nondomestic load Peaking Factor – 10% Headroom Vol 4 Section 3, Page 4-33 to 4-35 135 Demand for Water Services Current Demand – Dry Weather Flow (DWF) Dry Weather Flow (DWF) Average daily amount of wastewater discharged from a collection system arising from all foul discharges - plus infiltration. Demand Assessment Flow measured during a 7day “dry” period – defined by EPA. Vol 4 Section 3, Page 4-36 136 Demand for Water Services Current Demand – Accounted for DWF Accounted for DWF Measured or assessed legitimate Waste water flow and load Portion of DWF that can be accounted for as legitimate use by the WSA or its customers. Demand Assessment Vol 4 Section 3, Page 4-36 137 Demand for Water Services Current Demand – Domestic DWF Domestic flow Same as the methodology used for domestic water demand with a per capita flow equivalent to the pcc (water in = water out) Domestic DWF Flow = Households x Occupancy x per capita flow Load = population x per capita load Permanent Domestic Seasonal Domestic Demand Assessment Domestic Load - National Urban Wastewater Study 2004. BOD5 - 60g/c/d (taken as one population equivalent - p.e.) Suspended Solids (SS) - 75g/c/d Phosphorus (P) – 10mg/l Nitrogen (N) – 50mg/l Ammonia (NH3) – 25 mg/l Vol 4 Section 3, Page 4-36 & 4-37 138 Demand for Water Services Current Demand – Non-Domestic DWF Three categories of non-domestic waste water service customers. 1. 2. 3. Those regulated by EPA IPPC licences (flow and load taken as the maximum allowed under the licence) Those receiving water and waste water services. Demand Assessment (flow based on metered Non-Domestic DWF water in & load derived Flow based on water in = water out Load based on EPA Guidance from EPA guidance manual) Those receiving waste water services only (flow and load derived from EPA guidance manual) Vol 4 Section 3, Page 4-37 & 4-38 139 Demand for Water Services Current Demand – Unaccounted for DWF Minimum hourly night flow during a “dry” period less metered consumption less allowance for domestic discharge (1.7 litres per property) Cross check against guideline infiltration levels (National Urban Waste Water Study 2004) to establish extent of unknown or illegal discharges. Where flow records are not available / reliable use guideline infiltration levels given in the NUWWS Unaccounted for DWF Flow = Min night flow – metered flow – domestic allowance Load = Measured load less accounted for domestic and nondomestic load Vol 4 Section 3, Page 4-38 to 4-40 140 Demand for Water Services Current Demand – DWF Calculation Summary Vol 4 Section 3, Page 4-41 141 Demand for Water Services Current Demand Demand Management Reduce water losses and infiltration Demand Assessment Reduce water consumption and associated waste water production Vol 4 Section 3, Page 4-43 142 Demand for Water Services Demand Management – Reduce losses/infiltration Water Conservation programme - Phase 1 Monitoring (modelling, DMA set-up, metering etc.) - Phase 2 Active Leakage Control (Leak detection & repair) - Phase 3 Rehabilitation / Replacement Demand Assessment Economic Model - Economic level of leagake (ELL) - Short Run ELL, balance between cost of leakage reduction and marginal cost of water lost - Long Run ELL – also takes into account the deferral of capital expenditure that would otherwise be needed to increase supply Vol 4 Section 3, Page 4-43 & 4-44 143 Demand for Water Services Demand Management – Reduce losses/infiltration Typical SRELL 400 Euro NPV ('000) 350 300 Value of water lost Demand 250 ALC Detection Assessment Total Costs 200 BLL 150 ELL Potential Savings 100 621 m3/day €31/day or €11,333/year 50 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Target Leakage (m3/km/d) Vol 4 Section 3, Page 4-43 & 4-44 144 Demand for Water Services Demand Management – Reduced Consumption Domestic consumption - National Water Study projections – trend is for increase in pcc - some success in promoting water conservation on a voluntary basis or through regulation. Demand Assessment Non- Domestic consumption - Universal metering should encourage a reduction in consumption. Customer side Losses - Currently estimated at 60 l/property/day. - Target reduction of 1% per annum over 20 years. Vol 4 Section 3, Page 4-44 & 4-45 145 Demand for Water Services Current Demand Demand Management Future Demand Population growth (25-Year Horizon) Demand Assessment - Top Down: Planning guidelines, CSO - Bottom Up: Availability of zoned land Water & Waste Water – Domestic demand as per audit using projected pcc, losses etc. - Non-domestic demand growth in line with domestic - UFW/Infiltration in line with level of service objectives. Vol 4 Section 3, Page 4-46 146 Demand for Water Services Future Demand – Population Growth Planning and Development Guidelines - National Spatial Strategy - Regional Planning Guidelines - County/City Development Plans Demand Assessment CSO Projections - 30-year population & labour force – 6 growth scenarios - 15-year regional projections – good correlation with RPG. Vol 4 Section 3, Page 4-46 to 4-49 147 Demand for Water Services Future Demand – Population Growth & Distribution Top-down Methodology Population Adopted Projected Pouplation Range Demand Assessment Base Year Population RPG Projected Pouplation Range Time RPG Horizon 25-Year Design Horizon Vol 4 Section 3, Page 4-49 148 Demand for Water Services Future Demand – Population Growth & Distribution Top-down Methodology – Population Distribution Demand Assessment Vol 4 Section 3, Page 4-50 149 Demand for Water Services Future Demand – Population Growth & Distribution Bottom-up Review – Assess potential population growth assuming full development of zoned lands. - Area of residentially zoned lands (CDP, LAP etc.) - Projected housing density (CDP, LAP or “Residential Density – Guidelines for Planning Authorities, 1999” - Projected occupancy rate (Planning Authority or projections in NWS 2004). Vol 4 Section 3, Page 4-51 & 4-52 150 Demand for Water Services Future Demand – Water Supply Domestic Consumption Permanent Domestic Demand = (design population) x (pcc derived from NWS or updated assessment) Seasonal Domestic Demand = (current seasonal demand) x (design permanent domestic demand) (current permanent domestic demand) Household Losses – reducing @ 1% pa (49l/p/d at 25 years) Vol 4 Section 3, Page 4-52 to 4-54 151 Demand for Water Services Future Demand – Water Supply Non-Domestic Consumption Increase in line with domestic demand growth. Redistribute a portion of the increase (30 to 50%) to significant commercial/employment centres Strategic industrial allowance (specific supply agreements or strategic zoned land x demand per hectare) Vol 4 Section 3, Page 4-55 152 Demand for Water Services Future Demand – Water Supply Operational Use – 2% Unaccounted for Water – as per UFW targets Demand Assessment Peak Day Demand – as per current peak factors Headroom & Outage – 10% of AFW Vol 4 Section 3, Page 4-56 to 4-59 153 Demand for Water Services Future Demand – Waste Water Services Same methodology as for Water Services (Water in = Water out) Domestic DFW & Load DWF = projected population x per capita flow (as per pcc projections in NWS) Load = as per recommendation of NUWWS Demand Assessment Non-Domestic DFW & Load DWF = equivalent to growth in non-domestic water demand Load = as current average pollution load - increasing in proportion to flow Unaccounted for DFW (Infiltration) – as per target or recommended levels in NUWWS Peaking Factor – as per contributing water supply scheme Vol 4 Section 3, Page 4-60 to 4--64 154 Session 5 Demand Forecasting Volume 4 – Section 3 155 Session 6 Asset Condition & Performance Volume 4 – Section 4 Asset Data Define / Review Levels of Service Financial Plan Asset Management Plan 156 Plan Approval & Review Water Services Strategic Plan Demand Assessment Collect CollectStrategic Strategic Asset AssetData Data Strategic Options Strategic Capacity Assessment Vol 1 Section 2., Page 1-4/13 157 Asset Assessment Has each scheme the necessary key assets to deliver demands? Elements of asset assessment – Asset data collection Identify scheme shortfalls Identify scheme options Collect Strategic Asset Data Vol 4 Section 3, Page 4-67 158 Asset Data Collection Key asset data Condition Performance Capacity Value Collect Strategic Asset Data 159 Data Collection Templates Water Data Collection Templates Waste Water NWS, Volume 2, "Database Requirement" Appendix B3 Table 1 Underground Sourceworks Section 2.1 Table 2 Surface Sourceworks Section 2.2 Table 3 Dams Table 3.10 Table 4 Raw Water Aqueducts Table 3.11 Table 5 Pumping Stations Table 3.12 Table 6 Water Treatment Works Table 3.13 Table 7 Trunk Mains Table 3.14 Service Reservoirs & Water Table 8 Table 3.16 Towers Table 9 Distribution Mains Table 3.17 Table 10 Operational Control Table 3.18 Table 3.19 Table 4.2 Table 6.1 Table 6.2 Table 6.3 Table 6.4 NUWWS, Volume 2, Part A Treatment Plant Questionnaire, Parts 1-4 Sewerage Network Questionnaire, Parts 3 & 4 Foul Gravity Sewers Storm Gravity Sewers Combined Gravity Sewers Sewer Rising Mains Trunk Sewers leading to WwTP Combined Storm Overflows Watercourse Pollution Pumping Stations Other Ancillaries Operational Control Hydrology Sewer Flooding Sewer Structural Failures Other Failures Vol 4 Section 3, Page 4-68 160 River Source Data Template Collect Strategic Asset Data 161 Water Treatment Works Collect Strategic Asset Data Distribution Mains Template 162 Sewer Network 163 164 Guidance on Template Completion Guidance on Completion of Data Collection Templates Water Waste Water NWS, Volume 2, "Database Requirement" Section 6.0 NUWWS, Volume 2, Part A, Section 2.3 Guidance on Data Confidence Water Waste Water NWS, Volume 2, "Database Requirement" Section 3.3.2 Table Data Confidence Indicators 3.2 Key asset data NUWWS, Volume 2, Part A, Section 2.3 Table 1.1 Data Source Code Collect Strategic Asset Data Vol 4 Section 3, Page 4-68 165 Asset Groupings Water Source/Intake Raw Water Conveyance Pumping Stations Water Treatment Trunk Network Storage Reservoirs Distribution Network Management Systems Waste Water Sewers Sewer Structures Sewage Pumping Stations Rising Mains Waste Water Treatment Plants, including outfalls (excluding sea outfalls) Sea Outfalls Sludge Treatment Management Systems Collect Strategic Asset Data Vol 4 Section 3, Page 4-69 General Condition Grading Collect Strategic Asset Data Table 3.1: “Database Requirements”: Volume 2 166 167 Condition Grades Water NWS, Volume 2, "Obligations, Policies, & Indicators", Appendix D Table 1 Buildings Table 2 Civil Works Electro-Mechanical Table 3 Equipment Table 4 Other Above Ground Assets Table 5 Underground Assets Waste Water NUWWS, Volume 2, Part A, Section 2.3 Table 1.2 Gravity Sewers Table 1.3 Pumping Mains Table 1.4 Above Ground Assets Collect Strategic Asset Data Vol 4 Section 3, Page 4-70 168 Civil Works Condition Grades Grade Description General Meaning 1 Good Sound modern structure, well maintained 2 Fair As 1, but showing minor wear and tear. Needs to be reinspected in the medium term. 3 Adequate Functionally sound structure but appearance affected by minor cracking, staining, vegetation, or minor leakage. Poor Structure functioning but with problems due to significant leakage, cracking, spalling, loss of stability of deformation, corrosion substantially reducing size of structural members or, strong possibility of regular contamination of potable water. Needs almost immediate action within 1-2 years. Decrepit Beyond economic repair because unsafe to use. Corrosion such that significant reduction in size of structural member likely to cause overstressing, or contamination of potable water has been known to occur on more than one occasion. Requires immediate action. 4 5 Table 2, Appendix D; “Obligations, Policies and Indicators” Volume 2 Vol 4 Section 3, Page 4-70 Condition / Performance Grade Predictive Asset Decay Curve 169 1 2 3 4 5 15% 35% 55% 75% Collect Strategic Asset Data 95% Percentage Effective Life Expended Vol 4 Section 3, Page 4-71 170 Condition Assessment Input Collect Strategic Asset Data Data Confidence Table 3.2; “Database Requirements” ; Volune 2 171 172 Data Confidence Collect Strategic Asset Data 173 Asset Performance Quality of output – compliance with standards Efficiency – against its design capacity Rated asset capacity – based on operational experience, review or original design Adequacy – rated/current Collect Strategic Asset Data requirement Vol 4 Section 3, Page 4-71 to 4-73 174 Performance Grading Sample Performance Grading Criteria established for WTP (Source – NWS) Grade Description General Meaning 1 Good Sound modern components, with no operational problems. 100% standby capacity (if applicable) 2 Fair As 1, but with minor operational problems Adequate All components operable but with some operational problems. Limited standby capacity. Some reduction in performance compared to an equivalent asset in good condition 4 Poor Function affected by significant operational problems. Significant operational constraints. Limited standby capacity. Reliable performance significantly reduced from design value. 5 Decrepit Beyond economical repair due to major components inoperable or unsafe to use. 3 The full suite of performance grade descriptions for water supply assets is included in Volume 2 of the NWS ("Obligations, Policies, & Indicators", Appendix E). Vol 4 Section 3, Page 4-73 Performance Considerations 175 O&M optimisation > improvement Capability to achieve standard Current v rated capacity Influent parameters differ from design Performance grading & rehab costs of components Collect Strategic Asset Data Vol 4 Section 3, Page 4-71 to 4-73 176 Wastewater Performance Grading Not included in NUWWS however Data templates include adequacy fields Collect Strategic Asset Data Vol 4 Section 3, Page 4-73 177 Wastewater Performance Grading Adequacy of WW System Vol 4 Section 3, Page 4-73 Performance Grading Summary 178 Supported by measured performance data: Water supply outages & interruptions Flooding incidents Maximum, minimum, average values Raw and final water quality results Influent and final effluent quality Burst information Collect Strategic Asset Data Customer complaints Leakage/infiltration levels (estimated if necessary) Vol 4 Section 3, Page 4-74 179 Overall Asset Assessment Condition/performance guides replacement/upgrading decision NWS recommends performance Grade 4/5 – replace/refurbish within 5 years Grade 3 – replace/refurbish within 10 years Grade 1 or 2 –replacement/refurbishment not required unless in poor condition Condition/performance linked Collect Strategic Asset Data Vol 4 Section 3, Page 4-75 Condition/Performance Matrix 180 Condition Grade Performance Grade 1 2 3 4 5 1 0 - 20% 20 - 40% 40 - 60% 75 - 98% 90 - 100% 2 20 - 40% 30 - 50% 50 - 70% 75 - 98% 90 - 100% 3 40 - 60% 50 - 70% 60 - 75% 75 - 98% 90 - 100% 4 65 - 80% 70 - 80% 75 - 90% 75 - 98% 90 - 100% 5 75 - 98% 75 - 98% 75 - 98% 90 - 100% 90 - 100% Indicative Age Only - Reassess Condition periodically Replace within 10 Years - Reassess Condition annually Replace within 5 Years Collect Strategic Asset Data Replace within 2 Years Vol 4 Section 4 Page 4-76 181 Session 6 Asset Condition & Performance Volume 4 – Section 4 182 Session 7 Asset Valuation Volume 4 – Section 4.2.2 183 Asset Classification Required for determining funding/replacement cost, assessing change in service potential, managing risk Vol 4 Section 4, Page 4-78 184 Asset Valuation Infrastructural assets: Gross modern equivalent asset (MEA) value – replacement value of new asset Allow for any O&M & quality differences Non-infrastructural assets: Net MEA value – cost of replacement depreciated to take into account remaining service life of existing asset Vol 4 Section 4, Page 4-78 185 Water Supply Asset Classification (Ref NWS Volume 2, “Asset Valuation Methodology”, Section 4.2). Vol 4 Section 4, Page 4-78 & 4-79 186 Valuation Problem Lack of reliable unit cost data Develop central database of unit costs DEHLG or CCMA Unit costs includes design fees 187 Wastewater Asset Classification Vol 4 Section 4, Page 4-80 188 Depreciated Asset Value Condition / Performance Grade Possible to use predictive decay curves 1 2 3 4 5 15% 35% 55% 75% 95% Percentage Effective Life Expended Use typical design life and straight line depreciation Vol 4 Section 4, Page 4-71 189 Typical Asset Design Lives Vol 4 Section 4, Page 4-82 Cost (€) Straight Line Depreciation 190 Replacement Value (MEA) Current Value (Based on Asset Condition) Age Remaining Life Time Economic Life Design Life Current Value = MEA (Replacement Value) x Remaining Life Economic Life Vol 4 Section 4, Page 4-83 Asset Condition Unknown? 191 Banding on materials/age may indicate significant unnecessary investment Budget to replace % of MEA value - 0.5% typically used in UK - Increase if lack of historical investment Asset budget renewal based on demonstrated need Vol 4 Section 4, Page 4-84 O&M Expenditure Capture 192 Required for annual budgeting Operational: Utilising & managing asset; no impact on asset condition Maintenance: Routine activities to keep asset operating at specified levels of service Replacement of minor assets of less than 1 years design life Vol 4 Section 4, Page 4-84 & 4-85 193 Typical Asset Summary (Water Supply Scheme) Vol 4 Section 4, Page 4-87 194 Typical Asset Summary (Water Supply Scheme) Vol 4 Section 4, Page 4-88 195 Typical Asset Summary (Waste Water Scheme) Vol 4 Section 4, Page 4-89 196 Typical Asset Summary (Waste Water Scheme) Vol 4 Section 4, Page 4-90 197 Authority Level Summary (Water Supply) Vol 4 Section 4, Page 4-85 Authority Level Summary 198 (Waste Water) Vol 4 Section 4, Page 4-86 199 Authority Level Financial Summary 200 Session 7 Asset Valuation Volume 4 – Section 4.2.2 201 Session 8 Asset Assessment and Options Volume 4 – Section 4 202 Asset Capacity Assessment Plan Approval & Review Define / Review Levels of Service Financial Plan Asset Management Plan Water Services Strategic Plan Demand Assessment Collect Strategic Asset Data Strategic Options Strategic Strategic Capacity Capacity Assessment Assessment Vol 1 Section 2., Page 1-4/13 Asset Capacity Assessment Potable Water Waste Water - - Source & Intake Raw Water Mains Treatment Plants Pumping Stations Trunk/Rising Mains Storage Reservoirs 203 Trunk Sewers/Rising Mains Pumping Stations Storm Balancing Tanks Treatment Plants Sludge Treatment Sea Outfalls Strategic Capacity Assessment Vol 4 Section 4, Page 4-91 204 Asset Capacity Assessment Demand / Capacity Projected Demand Range Capacity Shortfall Rated Asset Capacity Expected Time Range of Deficit 0 - 5 Yrs 5 - 10 Yrs 10 - 15 Yrs 15 - 20 Yrs 20 - 25 Yrs Design Horizon Strategic Capacity Assessment Vol 4 Section 4, Page 4-92 Asset Capacity Assessment 205 Demand / Capacity Increased Asset Capacity Rated Asset Capacity Expected Time Range of Deficit 0 - 5 Yrs 5 - 10 Yrs 10 - 15 Yrs 15 - 20 Yrs 20 - 25 Yrs Design Horizon Strategic Capacity Assessment Vol 4 Section 4, Page 4-92 206 Asset Capacity Assessment Typical Water Supply Capacity Shortfall Scheme Name Current Capacity Source/Intake River A 40 Ml/d Raw Water 600mm to WTP 20 Ml/d Treatment WTP A 17 Ml/d Raw Water 20 Ml/d To Res A 15 Ml/d 300mm to Res A 15 Ml/d 450 mm to Res B 9 Ml/d A 10 Ml B 7Ml 0 – 5 Yrs 5 - 10 Yrs 10 - 15 Yrs 15 - 20 Yrs 20 - 25 Yrs 2 to 5 Ml/d 3 to 8 Ml/d 2 to 5 Ml/d Pumping Station Trunk/Rising Mains 2 Ml 2 to 5 Ml/d Reservoirs 1 to 3 Ml/d Strategic Capacity Assessment Vol 4 Section 4, Page 4-93 207 Asset Capacity Assessment Typical Waste Water Supply Capacity Shortfall Scheme Name Current Capacity Outfall 600mm from WwTP X 10 Ml/d Treatment WwTP X 10,000 pe PH A to WwTP 3.75 Ml/d PH B to WwTP 9.8 Ml/d 0 – 5 Yrs 5 - 10 Yrs 10 - 15 Yrs 15 - 20 Yrs 20 - 25 Yrs 0 to 1.5Ml/d 5,000 to 7,000 pe 3.0 to 9.0 Ml/d Pumphouse Trunk Sewers 150mm from PH A /Rising Mains 350mm from PH B 3.75 Ml/d 3.0 to 9.0 Ml/d 9.8 Ml/d Strategic Capacity Assessment Vol 4 Section 4, Page 4-93 208 Asset Capacity Assessment Other Shortfalls - Future Legislative Changes e.g. more stringent DWR or discharge limits which may trigger a plan review - Customer Expectations e.g. Higher level of service expectation – can be postponed until next plan review. Strategic Capacity Assessment Vol 4 Section 4, Page 4-93 Identifying Scheme Options 209 Existing arrangements in place – Arrangements already planned or in place for meeting scheme deficits. Operational Options – Reduction in demand through demand management or leakage through active leakage control. Rehabilitation/Renewal Options – Increasing capacity when renewing or replacing assets that have reached the end of their useful life. Augmentation Options – Increasing scheme capacity by augmenting from an adjacent scheme that has surplus capacity. Replacement/Upgrade Options – Increasing capacity to meet scheme deficits by adding new infrastructure. Strategic Options Vol 4 Section 4, Page 4-94 to 4-102 Identifying Scheme Options 210 Existing Arrangements Existing feasibility or preliminary reports Critical assets may have extra capacity Plants may be designed for extension Old recommendations need critical review Existing WSIP Approved project may provide shortfall Strategic Options Vol 4 Section 4, Page 4-94 & 4-95 211 Identifying Scheme Options Operational Options Active Leakage Control Economic Level of Leakage (ELL) – short run ELL is cost effective Long Run ELL may defer capital spend Infiltration Reduction Reduction in pumping and treatment cost and deferment of capital spend Demand Management Water saving appliances. Strategic Options Vol 4 Section 4, Page 4-95 & 4-96 212 Identifying Scheme Options Rehab/Renewal Options Increase capacity when renewing assets Upsize pipe/sewer during rehab/replacement work Replace M&E plant with plant of higher capacity or improved efficiency Consider only marginal cost in economic assessment Strategic Options Vol 4 Section 4, Page 4-96 213 Identifying Scheme Options Augmentation Options Import service from adjoining scheme Environmentally/economically attractive Additional security due to shared resources Reduction in unit operating cost.- monitoring, management, O&M. Strategic links between schemes for improved security of supply Strategic Options Vol 4 Section 4, Page 4-97 214 Identifying Scheme Options Replacement/Upgrade Options Replace asset with one of higher capacity/improved performance. Provide additional asset to increase capacity/performance May be only option available Strategic Options Vol 4 Section 4, Page 4-97 Water Supply Options 215 Strategic Options Vol 4 Section 4, Page 4-98 Waste Water Options 216 Strategic Options Vol 4 Section 4, Page 4-98 217 Option Selection Criteria Economic - Discounted whole life unit cost. Environmental - Least negative (or most positive) impact. Social - Compatible with current thinking. Risk - Likely failure probability and impact. Strategic Options Vol 4 Section 4, Page 4-98 & 4-99 Risk Assessment Matrix 218 Strategic Options Vol 4 Section 4, Page 4-99 Option Selection – Decision Tree 219 Assess Capacity Requirement Can it be satisfied by Operational Optimisation? Yes No Can it be satisfied by Rehab/renewal option? Yes No Can it be satisfied by Augmentation Option? Yes No Can it be satisfied by Upgrade/Replacement? Yes Strategic Options Proceed with selected option Vol 4 Section 4, Page 4-100 220 Prioritisation for Investment NUWWS: Volume 2; part C Justification headings (in priority order) Statutory – compliance with EU/national legislation Developmental – cater for additional demand Maintenance – maintain existing levels of service Strategic Options Vol 4 Section 4, Page 4-101 Prioritisation Matrix 221 Strategic Options Vol 4 Section 4, Page 4-102 222 Session 8 Asset Assessment and Options Volume 4 – Section 4 223 Session 9 Strategic Environmental Assessment Volume 4 – Section 5 224 Introduction/Background Only elements that are likely to have a significant effect on the environment Required under SEA Directive, SEA Regs (435/2004) and WSA Not required for elements subjected to the SEA process in a previous plan Vol 4 Section 5.1, Page 4-103 225 Process Summary Screening plan to identify elements likely to have a significant effect on the environment Checking for elements previously processed Statutory scoping consultation on remaining elements EA on remaining elements Environmental Report Consultation on relevant elements SEA statement Vol 4 Section 5.1, Page 4-103 & 4-104 226 Elements previously processed Examined in other plans – higher level Not necessary to examine again Impacts, mitigation measures, etc to be restated in ER and SEA Cannot modify aspects of previous SEA Vol 4 Section 5.1, Page 4-103 & 4-104 227 Elements subject to SEA Baseline data from SEAs for existing plans RBMPs & PoMs likely sources RBMP & WSSP parallel processes SEAs for both likely to run concurrently Vol 4 Section 5.1,.3 Page 4-106 228 Screening and Checking Draft Plan sufficient to identify elements likely to have a significant effect Screening identifies these elements Check if any have been previously subjected to the SEA process Water quality standards in RBMPs Population growth impact in CDP Vol 4 Section 5..2 , Page 4-109 229 Scoping Elements that require SEA identifed Consultation on EIA level of detail Prescribed Environmental Authorities EPA Minister DEHLG – architectural, archeological heritage or nature conservation Minister(s) responsible for fisheries & marine where plan is likely to have a significant effect on same Vol 4 Section 5..2 , Page 4-111 Proforma Notice 230 Vol 1, Appendix A Scoping Report Contents 231 Introduction Outline of draft plan & map of area Elements likely to have significant effect Subset previously subjected to SEA SEA elements & methodology Reasonable alternatives Environmental issues to be considered Vol 4 Section 5..2 , Page 4-111 to 4-115 Scoping Report Contents 232 Plans, objectives that might impact Draft environmental issues for elements Interaction with other plans Conclusion on proposed scope Sources of data Contact point for comment Vol 4 Section 5..2 , Page 4-111 to 4-115 Sources of Baseline Data Environmental Issue Biodiversity including Flora & Fauna Population Human Health 233 Primary Information Source / Secondary Source DEHLG; DCENR: EPA Central Statistics Office; EPA Public Health Authorities; EPA; Radiological Protection Institute of Ireland; Department of Health; Health & Safety Authority Soil Teagasc; EPA; GSI. Water EPA; Marine Institute Air EPA Climatic Factors EPA Material Assets Water Service Authority Cultural Heritage including Architectural DEHLG and Archaeological Landscape Water Service Authority Interrelationship between the above See above information sources factors Source: Strategic Environmental Assessment – Environmental Protection Agency Customer Service published by EPA Vol 4 Section 5..2 , Page 4-113 & 4-114 234 Habitats & Birds Directives European Court (4/8/04/EC) Habitats & Birds Directives not fully implemented Plans prepared by LA to consider appropriate assessment of any element that might impinge on Natura 2000 site Possible legislation to transpose Directives Reasonable measures to conserve bird areas Vol 4 Section 5..2 , Page 4-114 Appropriate Assessment 235 Potential impact on conservation objectives of site by particular element Sites & objectives detailed in land use plans Scoping report Identify elements likely to impact on such areas Record management & conservation objectives Consult with DEHLG on requirement Vol 4 Section 5..2 , Page 4-114 236 SEA Process Establish baseline environment Predict implementation impact Evaluate significance Mitigation measures & monitoring programme Element justification taking into account feasible alternatives Vol 4 Section 5..2 , Page 4-115 to 4-124 237 Baseline Environment Aspects that are likely to be significantly affected: Bio-diversity – flora and fauna Water – surface, ground, estuarine,coastal Soil, landscape, cultural heritage Population, human health, material assets Air, climatic factors Interrelationships between the above Vol 4 Section 5..2 , Page 4-116 to 4-119 238 Predicting the Impacts Nature and extent of change Geographic location Frequency & duration of impact Temporary or permanent Probability of occurrence Cumulative impact Potential for transboundary effects Vol 4 Section 5..2 , Page 4-119 & 4-120 239 Evaluating Significance of Impacts Breach of environmental standard? Failure to achieve policies or targets? Effect on resource that are protected? Effect of valuable resources? Vol 4 Section 5..2 , Page 4-120 & 4-122 240 Matrix Compilation Significant beneficial impact Uncertain impact ? Significant adverse impact X Neutral or insignificant 0 Explanation of impact grading Scale of occurrence – local, regional, national Vol 4 Section 5..2 , Page 4-121 241 Matrix Element under assessment Any Element Environmental Receptor Biodiversity, flora & fauna Water (surface, ground, estuarine & coastal) Impact Comment Soil Landscape Cultural heritage (architectural & archaeological heritage) Population Human Health Air Climatic Factors Material Assets Interrelationships Other Vol 4 Section 5..2 , Page 4-121 & 4-122 242 Significant Impacts Preventing impacts Reducing their magnitude Reducing probability of occurrence Remediation measures after occurrence Compensation by benefits elsewhere Monitoring programme Existing where possible Vol 4 Section 5..2 , Page 4-122 243 Justification Demonstrate that alternatives considered Environmental considerations taken into account in selection of preferred option Outline environmental, social, economic balance in choice Benchmark choices against “do nothing” scenario Vol 4 Section 5..2 , Page 4-123 244 Environmental Report Content & main objectives of strategic plan & relationship with other plans Current state of environment & likely evolution without implementation Environmental characteristics of area Existing relevant environmental problems List of established protection objectives Vol 4 Section 5..2 , Page 4-123 & 4-124 245 Environmental Report Likely significant effects Mitigation measures Selection reasoning Assessment description & any difficulties Proposed monitoring measures Non-technical summary Vol 4 Section 5..2 , Page 4-123 & 4-124 246 Statutory Consultation On ER & elements of Plan likely to have a significant effect on environment EPA, DEHLG, Fisheries & Marine Proforma, ER and relevant elements Public notice inviting written submissions Reaching Out Guidelines – 8 weeks Vol 4 Section 5..2 , Page 4-125 247 Transboundary Consultation Art14 – NI – after consultation with Minister or where NI requests ER with elements of plan & letter inviting consultation to NI Environment Letter should include Elements likely to have transboundary environmental effect 8 week timeframe expected for initial reply Vol 4 Section 5..2 , Page 4-125 248 Final Plan & SEA Statement Art 15 – All submissions/observations (incl. Transboundary) to be taken into account Options are: No action Revise the environmental assessment Revise the particular element Check to ensure no new negative impacts Vol 4 Section 5..2 , Page 4-126 249 SEA Statement Contents How environmental issues integrated How submissions taken into account Why particular alternatives chosen Monitoring measures Vol 4 Section 5..2 , Page 4-127 250 Publication Article 16 of Regulations Copy Plan & SEA to Environmental Authorities Newspaper notice – Plan & SEA available for inspection at specified locations Vol 4 Section 5..2 , Page 4-127 251 Audit Trail Records Scoping consultation ER quality review ER consultation Comments received Transboundary consultation Integration of observations into final plan Publication of SEA and relevant elements Monitoring programme Vol 4 Section 5..2 , Page 4-128 252 Session 9 Strategic Environmental Assessment Volume 4 – Section 5 253 Session 10 Asset Management Volume 4 – Section 6 254 Asset Management Planning Plan Approval & Review Define / Review Levels of Service Financial Plan Asset Management Plan Water Services Strategic Plan Demand Assessment Collect Strategic Asset Data Strategic Options Strategic Capacity Assessment Vol 1 Section 2., Page 1-4/13 National Picture 255 Water Infrastructure is aging Status quo will result in increased risk to public health and the environment Failure to manage assets based on least life cycle cost strategies will result in increased cost over the long term to achieve service objectives. Changing Business Environment Demands do more with what you have Better focused capital and O&M budgets Move from reactive to planned work Transition from building and operating assets to managing them to:Extend asset life and reliability Optimise whole life cost Develop accurate long term funding models 256 257 Asset Management? Definition Integrated process of managing infrastructural assets to continuously deliver the levels of services customers desire, at acceptable levels of risk while minimising the total cost of owning and operating them Why? It is very difficult to run a first class county or city on second rate infrastructure Vol 4 Section 6, Page 4-130 Asset Management Definition 258 Asset Management Definition 259 260 Benefits Enhanced customer satisfaction Value for money Evidence to demonstrate compliance Improved risk management & corporate governance Improvement in safety, health, sustainability & environment Vol 4 Section 6, Page 4-131 & 4-132 261 Other Benefits Good business practice More efficient data management Better resource allocation reducing O&M costs Reduced service disruption & collateral costs More accurate financial planning More effective internal & external communication Clear consistent decision criteria Vol 4 Section 6, Page 4-131 & 4-132 262 Vol 4 Section 6, Page 4-131 263 Vol 4 Section 6, Page 4-133 264 Current Situation? Managing assets has always been part of water services delivery Typically the approach has been characterised by : Unintegrated departmental systems Decentralised data Intuitive condition assessments Unverified information Basic or non existent tools Inconsistent metrics Water services managed by stand alone decisions based on perceptions and politics rather than facts Core Questions 1. 2. 3. 4. 5. 6. 265 Levels of service Demand assessment Asset inventory Critical assets Life cycle costing Financial planning Vol 4 Section 6, Page 4-133 & 4-134 266 Asset Management Process Set Target LOS Determine residual life Determine appropriate CIP Assess demand Replacement cost & date Develop funding strategy Assemble inventory Assess condition Assign rating (criticality) Determine appropriate maintenance Prepare or refine the AMP 267 Asset Inventory Collection storage & management of information on all assets. Information consistent with organisational objectives Location, condition, rated capacity, condition, performance, trending, remaining life value, O&M costs. Vol 4 Section 6, Page 4-134 to 4-136 System Requirements 268 Clear & relevant application Easy access – web enabled Structured tiers of detail Easily updated (system & data) Self sustaining Affordable & cost effective GIS background Vol 4 Section 6, Page 4-131 & 4-132 269 Asset Hierarchy If we don’t know what we have, where it is, its condition and performance and its value, we can’t make the case that “it” is being properly managed System Requirements What do I own? What is it’s condition? What is it’s performance? What is it worth? What is its remaining service life? What is its O&M costs? What needs to be done and when? Capable of interrogation 270 Available software GIS based General purpose or asset class specific MIMS – Sierra Systems City Works – Azteca Systems Oracle Water Applications ESRI – ArcGIS with various templates CIS – would need some development Authorities should agree on a common platform 271 272 Critical Assets Criticality can vary with time! Vol 4 Section 6, Page 4-137 273 Criticality Assessment Matrix Vol 4 Section 6, Page 4-138 274 Life Cycle Costing All assets deteriorate and eventually fail The key is minimising the total life cycle cost Vol 4 Section 6, Page 4-138 275 Life Cycle Costing Least cost management of an asset is about spending at the right time on the right thing over the total life cycle Operational Planning Standardise operating procedures Compliance with regulatory monitoring Risk management – critical assets Drinking water quality Source monitoring and protection Emergency Demand management Current & projected operating costs 276 277 Asset Maintenance Performance Initial “Design” Capacity Maintenance Zone Minimum “Performance” Level Time Vol 4 Section 6, Page 4-140 278 Asset Maintenance Reliable maintenance data essential for rehab/renewal decision Unique identifier for each asset Start with recommended maintenance Usage considerations Optimum regime based on experience Collected data informs future cost projections Vol 4 Section 6, Page 4-140 & 4-141 279 Rehab/Replace/Dispose Choice depends on NPV of capital and O&M Costs Disposal cost has to be factored in Disruption to public and business Future demand may require increase in asset capacity – rehab not viable Vol 4 Section 6, Page 4-142 280 Expenditure Forecast € € Years Not Just For Engineering 281 282 Outputs to SWP Levels of service and demand Asset inventory & criticality O&M plans Rehab/replacement Financial plan – O&M, CIP and financing Vol 4 Section 6, Page 4-143 & 4-144 Moving Forward Extensive existing body of knowledge History of implementation in many countries with similar methodologies Continuous, iterative & evolving process 1- 3 years update Central funding may require asset management in place 283 Where Do You Begin Develop strategy & preliminary objectives Determine staff & budgetary restrictions Establish asset management team Draft programme & budget Start with what you have & begin building asset data 284 285 Session 10 Asset Management Volume 4 – Section 6 286 Session 11 Financial Planning Volume 4 – Section 7 287 Financial Planning Plan Approval & Review Define / Review Levels of Service Financial Plan Asset Management Plan Water Services Strategic Plan Demand Assessment Collect Strategic Asset Data Strategic Options Strategic Capacity Assessment Vol 1 Section 2., Page 1-4/13 288 Financial Planning Water Services Expenditure Categories Operational – Maintenance – day-to-day maintenance of assets to keep them necessary for utilising and managing assets but which have no impact on asset condition. - Variable (Energy & Chemicals) and administration costs. operating at specified levels of service. - routine maintenance/repairs (in-house or service contracts). Replacement/Renewal – restoration or replacement of existing assets to maintain original capacity and condition. New Capital – new or ungraded assets to increase capacity or enhance service (may contain an element of replacement/renewal) Disposal – disposal and decommissioning of asstes that have reached the end of their useful life. Vol 4 Section 7, Page 4-145 289 Financial Planning Capex Opex Water Services Funding Categories Domestic Non-Domestic Local Government Fund Water Charges Water Services Investment Programme Water Charges SLI Development Funding Levies (40%) (60%) Development Levies Vol 4 Section 7, Page 4-146 290 Financial Planning Water Services Expenditure Requirements Funding for Loan Repayment Funding for System Growth Sustainable level of expenditure to cover future investment needs Funding for Service Enhancement Funding for Historic Under-investment Asset Depreciation Interest Expenditure (if any) Operation and Maintenance Expenditure Just covering cash costs Covering cash costs and providing for maintaining current asset condition – no planning for the future Vol 4 Section 7, Page 4-148 291 Financial Planning Preparing a Financial Plan Prepare income statement & yearly forecast – Opex. Vol 4 Section 7, Page 4-154 292 Financial Planning Preparing a Financial Plan Prepare income statement & yearly forecast – Capex. BUDGET CATEGORY Last Year Annual Inflation 2008 2009 2010 2011 2012 2013 Asset Rehab/Replacement Mains Replacement* € 50,000 3.00% € 51,500 € 53,045 € 54,636 € 56,275 € 57,964 € 59,703 Sewer Replacement* € 20,000 3.00% € 20,600 € 21,218 € 21,855 € 22,510 € 23,185 € 23,881 Above ground asset replacement costs € 40,000 € 10,000 € 25,000 € 23,000 € 15,000 € 9,000 € 9,001 Annual Rehab Costs Sub-Total € 110,000 € 82,100 € 99,263 € 99,491 € 93,786 € 90,149 € 92,585 Total from Capital Investment Programme € 1,300,000 € 1,560,000 € 750,000 € 1,250,000 € 500,000 € 2,300,000 € 450,000 € 1,300,000 € 1,560,000 € 750,000 € 1,250,000 € 500,000 € 2,300,000 € 450,000 New Assets Annual New Asset Costs Sub-Total Summary Annual Operation Costs Sub-Total € 548,000 € 566,290 € 585,258 € 604,930 € 625,336 € 646,505 € 668,468 Annual Maintenance Costs Sub-Total € 85,000 € 86,700 € 88,434 € 90,203 € 92,007 € 93,847 € 95,724 Annual Rehab Costs Sub-Total € 110,000 € 82,100 € 99,263 € 99,491 € 93,786 € 90,149 € 92,585 Annual New Asset Costs Sub-Total € 1,300,000 € 1,560,000 € 750,000 € 1,250,000 € 500,000 € 2,300,000 € 450,000 Total Budget Projections € 2,043,000 € 2,295,090 € 1,522,955 € 2,044,624 € 1,311,129 € 3,130,501 € 1,306,777 Vol 4 Section 7, Page 4-156 293 Financial Planning Preparing a Financial Plan Prepare income statement & yearly forecast. Prepare a funding plan – balance of income and expenditure sufficient to:- - operate, maintain and repair existing asset base - replace assets when required - fund future growth and service enhancements - account for inflation and changes in technology Vol 4 Section 7, Page 4-157 Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Year 1 Financial Planning Operating Transactions Operating income from - Water Charges, Operation & Maintenance (OR1) - Water Charges, Capital Replacement (OR2) - Water Charges, Capital Acquisition (OR2) - Local Government Fund, Operation & Maintenance (OR3) - Local Government Fund, Capital Replacement (OR4) Total Operating Income (OR =OR1+OR2+OR3+OR4) operating costs for Operation & Maintenance (OC1) Capital Replacement (OC2) Financing Charges (OC3) Total Operating Costs (OC=OC1+OC2+OC3) Cash from operating transactions (OT=OR+OC) 430 444 500 Year 2 Year 3 461 500 Year 4 466 500 Preparing a Financial Plan 0 461 0 466 Year 5 Year 6 Year 8 294 Year 9 Year 10 484 500 600 500 610 500 611 500 623 500 647 500 656 500 0 484 225 500 220 515 215 521 210 538 205 567 200 581 430 0 444 500 500 500 500 500 500 500 500 500 500 860 1,887 1,923 1,931 1,969 2,324 2,346 2,348 2,371 2,419 2,437 -1,075 -1,107 -1,140 -1,174 -1,210 40 -1,200 40 -500 32 -1,200 52 -1,000 44 -1,000 -156 -500 -146 -1,000 -116 -1,600 -106 -800 -120 -1,200 -102 -860 -2,087 -1,423 -2,131 -1,969 -2,199 -1,721 -2,223 -2,846 -2,094 -2,512 0 -200 500 -200 0 125 625 125 -475 325 -75 125 125 125 125 125 125 125 Prepare a funding plan -900 – Typical Funding Plan -927 -955 -983 -1,013 -1,043 Capital Transactions Capital income from - Development levies (CR1) - Central Government Funding (CR2) Total Capital Revenue (CR =CR1+CR2) Capital Acquisitions Costs (CC) Cash from capital transactions (CT=CR+CC) Year 7 4,000 0 0 0 0 4,000 125 125 125 125 125 0 0 0 0 -9,000 0 0 0 0 0 0 0 0 0 0 -5,000 125 125 125 125 125 125 -250 4,500 -250 4,250 -250 4,000 -250 3,750 -250 3,500 Financial Transactions 5,000 17 Proceeds from debt issued (FR) 18 Debt Repayment (FC) 5,000 -250 4,750 0 0 0 0 5,000 -250 -250 -250 -250 -250 -250 0 -200 500 -200 0 0 500 0 -600 200 -200 1,000 1,000 1,000 800 800 1,300 1,300 1,100 1,100 1,100 1,100 1,100 1,100 1,600 1,600 1,600 1,600 1,000 1,000 1,200 1,200 1,000 1,000 50,000 800 50,000 1,300 50,000 1,100 50,000 -3,900 59,000 -3,650 59,000 -2,900 59,000 -2,650 59,000 -3,000 59,000 -2,550 59,000 -2,500 59,000 25,000 50.0% 25,200 50.4% 24,676 49.4% 24,842 49.7% 33,786 57.3% 33,530 56.8% 32,759 55.5% 32,484 55.1% 32,794 55.6% 32,279 54.7% 32,153 54.5% 19 Debt Balance 20 cash applied to finance transactions (FT =FR+FC) 21 22 23 24 25 26 27 Financial Position Increase/decrease in cash (C = OT+CT+FT) Cash reserve at beginning of period (CB) Cash reserve at end of period (CE=CB+C) Net financial assets (=Cash Reserve - Debt Balance) MEA Value of Assets Current Asset Value Current Asset Value as a % of MEA value Vol 4 Section 7, Page 4-160 Year 0 Year 1 Financial Planning Operating Transactions Operating Transactions Operating income from 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 - Water Charges, Operation & Maintenance (OR1) - Water Charges, Capital Replacement (OR2) - Water Charges, Capital Acquisition (OR2) - Local Government Fund, Operation & Maintenance (OR3) - Local Government Fund, Capital Replacement (OR4) Total Operating Income (OR =OR1+OR2+OR3+OR4) operating costs for Operation & Maintenance (OC1) Capital Replacement (OC2) Financing Charges (OC3) Total Operating Costs (OC=OC1+OC2+OC3) Cash from operating transactions (OT=OR+OC) Year 2 Year 3 Year Year 1 1 430 444 500 Year 4 Year 5 Year Year 2 2 461 500 466 500 Preparing a Financial Plan 0 461 0 466 Year 6 Year 8 295 Year 9 Year 10 Year Year 3 3 484 500 600 500 610 500 611 500 623 500 647 500 656 500 0 484 225 500 220 515 215 521 210 538 205 567 200 581 430 0 444 500 500 500 500 500 500 500 500 500 500 860 1,887 1,923 1,931 1,969 2,324 2,346 2,348 2,371 2,419 2,437 -1,075 -1,107 -1,140 -1,174 -1,210 40 -1,200 40 -500 32 -1,200 52 -1,000 44 -1,000 -156 -500 -146 -1,000 -116 -1,600 -106 -800 -120 -1,200 -102 -860 -2,087 -1,423 -2,131 -1,969 -2,199 -1,721 -2,223 -2,846 -2,094 -2,512 0 -200 500 -200 0 125 625 125 -475 325 -75 125 125 125 125 125 125 125 Prepare a funding plan -900 – Typical Funding Plan -927 -955 -983 -1,013 -1,043 Capital Transactions Capital income from - Development levies (CR1) - Central Government Funding (CR2) Total Capital Revenue (CR =CR1+CR2) Capital Acquisitions Costs (CC) Cash from capital transactions (CT=CR+CC) Year 7 4,000 0 0 0 0 4,000 125 125 125 125 125 0 0 0 0 -9,000 0 0 0 0 0 0 0 0 0 0 -5,000 125 125 125 125 125 125 -250 4,500 -250 4,250 -250 4,000 -250 3,750 -250 3,500 Financial Transactions 5,000 17 Proceeds from debt issued (FR) 18 Debt Repayment (FC) 5,000 -250 4,750 0 0 0 0 5,000 -250 -250 -250 -250 -250 -250 0 -200 500 -200 0 0 500 0 -600 200 -200 1,000 1,000 1,000 800 800 1,300 1,300 1,100 1,100 1,100 1,100 1,100 1,100 1,600 1,600 1,600 1,600 1,000 1,000 1,200 1,200 1,000 1,000 50,000 800 50,000 1,300 50,000 1,100 50,000 -3,900 59,000 -3,650 59,000 -2,900 59,000 -2,650 59,000 -3,000 59,000 -2,550 59,000 -2,500 59,000 25,000 50.0% 25,200 50.4% 24,676 49.4% 24,842 49.7% 33,786 57.3% 33,530 56.8% 32,759 55.5% 32,484 55.1% 32,794 55.6% 32,279 54.7% 32,153 54.5% 19 Debt Balance 20 cash applied to finance transactions (FT =FR+FC) 21 22 23 24 25 26 27 Financial Position Increase/decrease in cash (C = OT+CT+FT) Cash reserve at beginning of period (CB) Cash reserve at end of period (CE=CB+C) Net financial assets (=Cash Reserve - Debt Balance) MEA Value of Assets Current Asset Value Current Asset Value as a % of MEA value Vol 4 Section 7, Page 4-160 Year 0 Year 1 Financial Planning Operating Transactions Operating Transactions Operating income from 1 2 - Water Charges, Operation & Maintenance (OR1) Year 2 Year 3 Year 1 430 444 Year 4 Year 5 Year 2 461 466 Year 6 Year 7 484 600 610 Preparing a Financial Plan 11 Cash from operating transactions (OT=OR+OC) 12 13 14 15 16 Capital Transactions Capital income from - Development levies (CR1) - Central Government Funding (CR2) Total Capital Revenue (CR =CR1+CR2) Capital Acquisitions Costs (CC) Cash from capital transactions (CT=CR+CC) 296 Year 9 Year 10 Year 3 Operating Income from 500 500 500 500 500 500 - Water Charges, Capital Replacement (OR2) 444 461 466 Water charges, O&M 0 0 0 0 225 220 3 - Water Charges, Capital Acquisition (OR2) 430 444 461 466 484 500 515 - Local Government Fund, Operation & Maintenance (OR3) 4 Water 500 500 500 charges, Capital Replacement 500 500 500 500 500 500 5 - Local Government Fund, Capital Replacement (OR4) 0 0 0 Water charges, Capital Acquisition 860 1,887 1,923 1,931 1,969 2,324 2,346 6 Total Operating Income (OR =OR1+OR2+OR3+OR4) 444 461 466 Local Government Fund,aO&M operating costs for Prepare funding plan – Typical Funding Plan -900 -927 500 -955 -983 500 -1,013 -1,043 500 -1,075 Operation & Maintenance (OC1) 7 Local Government Fund, Capital Replacement -1,200 -500 -1,200 -1,000 -1,000 -500 8 Capital Replacement (OC2) Total Operating Income 1,92344 -1561,931 40 401,88732 52 -146 9 Financing Charges (OC3) 10 Total Operating Costs (OC=OC1+OC2+OC3) Year 8 611 500 623 500 647 500 656 500 215 521 210 538 205 567 200 581 500 500 500 500 2,348 2,371 2,419 2,437 -1,107 -1,140 -1,174 -1,210 -1,000 -116 -1,600 -106 -800 -120 -1,200 -102 -860 -2,087 -1,423 -2,131 -1,969 -2,199 -1,721 -2,223 -2,846 -2,094 -2,512 0 -200 500 -200 0 125 625 125 -475 325 -75 125 125 125 125 125 125 125 4,000 0 0 0 0 4,000 125 125 125 125 125 0 0 0 0 -9,000 0 0 0 0 0 0 0 0 0 0 -5,000 125 125 125 125 125 125 -250 4,500 -250 4,250 -250 4,000 -250 3,750 -250 3,500 Financial Transactions 5,000 17 Proceeds from debt issued (FR) 18 Debt Repayment (FC) 5,000 -250 4,750 0 0 0 0 5,000 -250 -250 -250 -250 -250 -250 0 -200 500 -200 0 0 500 0 -600 200 -200 1,000 1,000 1,000 800 800 1,300 1,300 1,100 1,100 1,100 1,100 1,100 1,100 1,600 1,600 1,600 1,600 1,000 1,000 1,200 1,200 1,000 1,000 50,000 800 50,000 1,300 50,000 1,100 50,000 -3,900 59,000 -3,650 59,000 -2,900 59,000 -2,650 59,000 -3,000 59,000 -2,550 59,000 -2,500 59,000 25,000 50.0% 25,200 50.4% 24,676 49.4% 24,842 49.7% 33,786 57.3% 33,530 56.8% 32,759 55.5% 32,484 55.1% 32,794 55.6% 32,279 54.7% 32,153 54.5% 19 Debt Balance 20 cash applied to finance transactions (FT =FR+FC) 21 22 23 24 25 26 27 Financial Position Increase/decrease in cash (C = OT+CT+FT) Cash reserve at beginning of period (CB) Cash reserve at end of period (CE=CB+C) Net financial assets (=Cash Reserve - Debt Balance) MEA Value of Assets Current Asset Value Current Asset Value as a % of MEA value Vol 4 Section 7, Page 4-160 Year 0 Year 1 Financial Planning Operating Transactions Operating Transactions Operating income from - Water Charges, Operation & Maintenance (OR1) 1 2 Year 2 Year 3 Year 1 430 444 Year 4 Year 5 Year 2 461 466 Year 6 484 600 610 Preparing a Financial Plan Operating costs for -Capital Operation and maintenance Transactions Capital income from - Capital Replacement 12 - Development levies (CR1) - Financing Charges 13 - Central Government Funding (CR2) Operating Total Capital RevenueCosts (CR =CR1+CR2) 14Total 11 Cash from operating transactions (OT=OR+OC) 20 21 22 23 24 25 26 27 623 500 647 500 656 500 215 521 210 538 205 567 200 581 500 500 500 500 2,348 2,371 2,419 2,437 -1,107 -1,140 -1,174 -1,210 -1,000 -116 -1,600 -106 -800 -120 -1,200 -102 -2,131 -1,969 -2,199 -1,721 -2,223 -2,846 -2,094 -2,512 0 -200 500 -200 0 125 625 125 -475 325 -75 125 125 125 125 125 125 125 125 0 0 0 0 125 125 125 125 125 -250 4,500 -250 4,250 -250 4,000 -250 3,750 -250 3,500 -927 -1,200 40 0 0 19 611 500 -1,423 16 Cash from capital transactions (CT=CR+CC) 17 18 Year 10 -2,087 0 Financial Transactions Proceeds from debt issued (FR) Debt Repayment (FC) Debt Balance cash applied to finance transactions (FT =FR+FC) Financial Position Increase/decrease in cash (C = OT+CT+FT) Cash reserve at beginning of period (CB) Cash reserve at end of period (CE=CB+C) Net financial assets (=Cash Reserve - Debt Balance) MEA Value of Assets Current Asset Value Current Asset Value as a % of MEA value 297 Year 9 -860 15 Capital Acquisitions Costs (CC) Cash from operating transactions Year 8 Year 3 Operating Income from 500 500 500 500 500 500 - Water Charges, Capital Replacement (OR2) 444 461 466 Water charges, O&M 0 0 0 0 225 220 3 - Water Charges, Capital Acquisition (OR2) 430 444 461 466 484 500 515 - Local Government Fund, Operation & Maintenance (OR3) 4 Water 500 500 500 charges, Capital Replacement 500 500 500 500 500 500 5 - Local Government Fund, Capital Replacement (OR4) 0 0 0 Water charges, Capital Acquisition 860 1,887 1,923 1,931 1,969 2,324 2,346 6 Total Operating Income (OR =OR1+OR2+OR3+OR4) 444 461 466 Local Government Fund,aO&M operating costs for Prepare funding plan – Typical Funding Plan -900 -927 500 -955 -983 500 -1,013 -1,043 500 -1,075 Operation & Maintenance (OC1) 7 Local Government Fund, Capital Replacement -1,200 -500 -1,200 -1,000 -1,000 -500 8 Capital Replacement (OC2) Total Operating Income 1,92344 -1561,931 40 401,88732 52 -146 9 Financing Charges (OC3) 10 Total Operating Costs (OC=OC1+OC2+OC3) Year 7 -955 -500 32 4,000 0 0 -2,087 0 0 0 -200 0 0 4,000 -1,423 0 -9,000 0 -5,000 500 -983 -1,200 125 125 52 125 125 -2,131 0 0 125 -200 5,000 5,000 -250 4,750 0 0 0 0 5,000 -250 -250 -250 -250 -250 -250 0 -200 500 -200 0 0 500 0 -600 200 -200 1,000 1,000 1,000 800 800 1,300 1,300 1,100 1,100 1,100 1,100 1,100 1,100 1,600 1,600 1,600 1,600 1,000 1,000 1,200 1,200 1,000 1,000 50,000 800 50,000 1,300 50,000 1,100 50,000 -3,900 59,000 -3,650 59,000 -2,900 59,000 -2,650 59,000 -3,000 59,000 -2,550 59,000 -2,500 59,000 25,000 50.0% 25,200 50.4% 24,676 49.4% 24,842 49.7% 33,786 57.3% 33,530 56.8% 32,759 55.5% 32,484 55.1% 32,794 55.6% 32,279 54.7% 32,153 54.5% Vol 4 Section 7, Page 4-160 Year 0 1 2 3 4 5 6 7 8 9 10 11 Year 1 Financial Planning Operating Transactions Operating income from - Water Charges, Operation & Maintenance (OR1) - Water Charges, Capital Replacement (OR2) - Water Charges, Capital Acquisition (OR2) - Local Government Fund, Operation & Maintenance (OR3) - Local Government Fund, Capital Replacement (OR4) Total Operating Income (OR =OR1+OR2+OR3+OR4) operating costs for Operation & Maintenance (OC1) Capital Replacement (OC2) Financing Charges (OC3) Total Operating Costs (OC=OC1+OC2+OC3) Cash from operating transactions (OT=OR+OC) 430 444 500 Year 2 Year 3 461 500 Year 4 466 500 Preparing a Financial Plan 0 461 0 466 Year 5 Year 6 Year 8 298 Year 9 Year 10 484 500 600 500 610 500 611 500 623 500 647 500 656 500 0 484 225 500 220 515 215 521 210 538 205 567 200 581 430 0 444 500 500 500 500 500 500 500 500 500 500 860 1,887 1,923 1,931 1,969 2,324 2,346 2,348 2,371 2,419 2,437 -1,075 -1,107 -1,140 -1,174 -1,210 40 -1,200 40 -500 32 -1,200 52 -1,000 44 -1,000 -156 -500 -146 -1,000 -116 -1,600 -106 -800 -120 -1,200 -102 -860 -2,087 -1,423 -2,131 -1,969 -2,199 -1,721 -2,223 -2,846 -2,094 -2,512 0 -200 500 -200 0 125 625 125 -475 325 -75 Prepare a funding plan -900 – Typical Funding Plan -927 -955 -983 -1,013 -1,043 Capital Transactions Capital Transactions Year 7 Year 4 Year 5 Year 6 Capital income from 12 - Development levies (CR1) 125 125 125 125 125 125 125 4,000 13 - Central Government Funding (CR2) 14 Total Capital Revenue (CR =CR1+CR2) 0 0 0 0 4,000 125 125 125 125 125 15 Capital Acquisitions Costs (CC) 0 0 0 0 -9,000 0 0 0 0 0 0 16 Cash from capital transactions (CT=CR+CC) 0 0 0 0 -5,000 125 125 125 125 125 125 -250 4,500 -250 4,250 -250 4,000 -250 3,750 -250 3,500 Financial Transactions 5,000 17 Proceeds from debt issued (FR) 18 Debt Repayment (FC) 5,000 -250 4,750 0 0 0 0 5,000 -250 -250 -250 -250 -250 -250 0 -200 500 -200 0 0 500 0 -600 200 -200 1,000 1,000 1,000 800 800 1,300 1,300 1,100 1,100 1,100 1,100 1,100 1,100 1,600 1,600 1,600 1,600 1,000 1,000 1,200 1,200 1,000 1,000 50,000 800 50,000 1,300 50,000 1,100 50,000 -3,900 59,000 -3,650 59,000 -2,900 59,000 -2,650 59,000 -3,000 59,000 -2,550 59,000 -2,500 59,000 25,000 50.0% 25,200 50.4% 24,676 49.4% 24,842 49.7% 33,786 57.3% 33,530 56.8% 32,759 55.5% 32,484 55.1% 32,794 55.6% 32,279 54.7% 32,153 54.5% 19 Debt Balance 20 cash applied to finance transactions (FT =FR+FC) 21 22 23 24 25 26 27 Financial Position Increase/decrease in cash (C = OT+CT+FT) Cash reserve at beginning of period (CB) Cash reserve at end of period (CE=CB+C) Net financial assets (=Cash Reserve - Debt Balance) MEA Value of Assets Current Asset Value Current Asset Value as a % of MEA value Vol 4 Section 7, Page 4-160 Year 0 1 2 3 4 5 6 7 8 9 10 11 Year 1 Financial Planning Operating Transactions Operating income from - Water Charges, Operation & Maintenance (OR1) - Water Charges, Capital Replacement (OR2) - Water Charges, Capital Acquisition (OR2) - Local Government Fund, Operation & Maintenance (OR3) - Local Government Fund, Capital Replacement (OR4) Total Operating Income (OR =OR1+OR2+OR3+OR4) operating costs for Operation & Maintenance (OC1) Capital Replacement (OC2) Financing Charges (OC3) Total Operating Costs (OC=OC1+OC2+OC3) Cash from operating transactions (OT=OR+OC) 430 444 500 Year 2 Year 3 461 500 Year 4 466 500 Preparing a Financial Plan 0 461 0 466 Year 5 Year 6 Year 8 299 Year 9 Year 10 484 500 600 500 610 500 611 500 623 500 647 500 656 500 0 484 225 500 220 515 215 521 210 538 205 567 200 581 430 0 444 500 500 500 500 500 500 500 500 500 500 860 1,887 1,923 1,931 1,969 2,324 2,346 2,348 2,371 2,419 2,437 -1,075 -1,107 -1,140 -1,174 -1,210 40 -1,200 40 -500 32 -1,200 52 -1,000 44 -1,000 -156 -500 -146 -1,000 -116 -1,600 -106 -800 -120 -1,200 -102 -860 -2,087 -1,423 -2,131 -1,969 -2,199 -1,721 -2,223 -2,846 -2,094 -2,512 0 -200 500 -200 0 125 625 125 -475 325 -75 125 125 125 125 Prepare a funding plan -900 – Typical Funding Plan -927 -955 -983 -1,013 -1,043 Capital Transactions Capital Transactions Year 7 Year 4 Year 5 Year 6 Capital income from 125 12 - Development levies (CR1) Capital Income from - Deveplopment Levies 14 Total Capital Revenue (CR =CR1+CR2) -Central Government Funding Capital Acquisitions Costs (CC) 15 Cash from capital transactions 16 Total Capital Revenue (CT=CR+CC) FinancialAcquisition Transactions Costs Capital 17 Proceeds from debt issued (FR) Cash from capital transactions 18 Debt Repayment (FC) 4,000 13 - Central Government Funding (CR2) 0 0 0 0 0 0 0 0 0 0 21 22 23 24 25 26 27 Financial Position Increase/decrease in cash (C = OT+CT+FT) Cash reserve at beginning of period (CB) Cash reserve at end of period (CE=CB+C) Net financial assets (=Cash Reserve - Debt Balance) MEA Value of Assets Current Asset Value Current Asset Value as a % of MEA value 125 125 4,000 125 125 125 125 125 0 -9,000 4,000 0 4,000-5,000 -9000 5,000 -5,000 0 0 0 0 0 0 125 125 125 125 125 125 -250 3,750 -250 3,500 125 0 125 -250 125 0 125 -250 5,000 4,750 -250 4,500 4,250 -250 4,000 0 0 0 0 5,000 -250 -250 -250 -250 -250 -250 0 -200 500 -200 0 0 500 0 -600 200 -200 1,000 1,000 1,000 800 800 1,300 1,300 1,100 1,100 1,100 1,100 1,100 1,100 1,600 1,600 1,600 1,600 1,000 1,000 1,200 1,200 1,000 1,000 50,000 800 50,000 1,300 50,000 1,100 50,000 -3,900 59,000 -3,650 59,000 -2,900 59,000 -2,650 59,000 -3,000 59,000 -2,550 59,000 -2,500 59,000 25,000 50.0% 25,200 50.4% 24,676 49.4% 24,842 49.7% 33,786 57.3% 33,530 56.8% 32,759 55.5% 32,484 55.1% 32,794 55.6% 32,279 54.7% 32,153 54.5% 19 Debt Balance 20 cash applied to finance transactions (FT =FR+FC) 125 125 Vol 4 Section 7, Page 4-160 Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Financial Planning Operating Transactions Operating income from - Water Charges, Operation & Maintenance (OR1) - Water Charges, Capital Replacement (OR2) - Water Charges, Capital Acquisition (OR2) - Local Government Fund, Operation & Maintenance (OR3) - Local Government Fund, Capital Replacement (OR4) Total Operating Income (OR =OR1+OR2+OR3+OR4) operating costs for Operation & Maintenance (OC1) Capital Replacement (OC2) Financing Charges (OC3) Total Operating Costs (OC=OC1+OC2+OC3) Cash from operating transactions (OT=OR+OC) 17 18 19 20 21 22 23 24 25 26 27 430 444 500 Year 2 Year 3 461 500 Year 4 466 500 Preparing a Financial Plan 0 461 0 466 Year 5 Year 6 Capital Transactions Capital income from - Development levies (CR1) - Central Government Funding (CR2) Total Capital Revenue (CR =CR1+CR2) Capital Acquisitions Costs (CC) Cash from capital transactions (CT=CR+CC) Financial Transactions Proceeds from debt issued (FR) Debt Repayment (FC) Debt Balance cash applied to finance transactions (FT =FR+FC) Financial Position Increase/decrease in cash (C = OT+CT+FT) Cash reserve at beginning of period (CB) Cash reserve at end of period (CE=CB+C) Net financial assets (=Cash Reserve - Debt Balance) MEA Value of Assets Current Asset Value Current Asset Value as a % of MEA value Year 7 Year 8 300 Year 9 Year 10 484 500 600 500 610 500 611 500 623 500 647 500 656 500 0 484 225 500 220 515 215 521 210 538 205 567 200 581 430 0 444 500 500 500 500 500 500 500 500 500 500 860 1,887 1,923 1,931 1,969 2,324 2,346 2,348 2,371 2,419 2,437 -1,075 -1,107 -1,140 -1,174 -1,210 40 -1,200 40 -500 32 -1,200 52 -1,000 44 -1,000 -156 -500 -146 -1,000 -116 -1,600 -106 -800 -120 -1,200 -102 -860 -2,087 -1,423 -2,131 -1,969 -2,199 -1,721 -2,223 -2,846 -2,094 -2,512 0 -200 500 -200 0 125 625 125 -475 325 -75 125 125 125 125 125 125 125 Prepare a funding plan -900 – Typical Funding Plan -927 -955 -983 -1,013 -1,043 Financial Transactions 16 Year 1 4,000 0 0 0 0 4,000 125 125 125 125 125 0 0 0 0 -9,000 0 0 0 0 0 0 0 0 0 125 Year 5 125 125 Year 6 125 125 125 -250 4,500 -250 4,250 -250 4,000 -250 3,750 -250 3,500 Year 4 0 -5,000 5,000 5,000 -250 4,750 0 0 0 0 5,000 -250 -250 -250 -250 -250 -250 0 -200 500 -200 0 0 500 0 -600 200 -200 1,000 1,000 1,000 800 800 1,300 1,300 1,100 1,100 1,100 1,100 1,100 1,100 1,600 1,600 1,600 1,600 1,000 1,000 1,200 1,200 1,000 1,000 50,000 800 50,000 1,300 50,000 1,100 50,000 -3,900 59,000 -3,650 59,000 -2,900 59,000 -2,650 59,000 -3,000 59,000 -2,550 59,000 -2,500 59,000 25,000 50.0% 25,200 50.4% 24,676 49.4% 24,842 49.7% 33,786 57.3% 33,530 56.8% 32,759 55.5% 32,484 55.1% 32,794 55.6% 32,279 54.7% 32,153 54.5% Vol 4 Section 7, Page 4-160 Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Financial Planning Operating Transactions Operating income from - Water Charges, Operation & Maintenance (OR1) - Water Charges, Capital Replacement (OR2) - Water Charges, Capital Acquisition (OR2) - Local Government Fund, Operation & Maintenance (OR3) - Local Government Fund, Capital Replacement (OR4) Total Operating Income (OR =OR1+OR2+OR3+OR4) operating costs for Operation & Maintenance (OC1) Capital Replacement (OC2) Financing Charges (OC3) Total Operating Costs (OC=OC1+OC2+OC3) Cash from operating transactions (OT=OR+OC) 430 444 500 Year 2 Year 3 461 500 Year 4 466 500 Preparing a Financial Plan 0 461 0 466 Year 5 Year 6 Capital Transactions Capital income from - Development levies (CR1) - Central Government Funding (CR2) Total Capital Revenue (CR =CR1+CR2) Capital Acquisitions Costs (CC) Cash from capital transactions (CT=CR+CC) Financial Transactions 17 Proceeds from debt issued (FR) Proceeds from debt issued 18 Debt Repayment (FC) Debt Repayment 19 Debt Balance Debt cash Balance applied to finance transactions (FT =FR+FC) 20 Financial Position Cash applied to financial transactions 21 Increase/decrease in cash (C = OT+CT+FT) 22 Cash reserve at beginning of period (CB) 23 Cash reserve at end of period (CE=CB+C) 24 Net financial assets (=Cash Reserve - Debt Balance) 25 MEA Value of Assets 26 Current Asset Value 27 Current Asset Value as a % of MEA value Year 7 Year 8 301 Year 9 Year 10 484 500 600 500 610 500 611 500 623 500 647 500 656 500 0 484 225 500 220 515 215 521 210 538 205 567 200 581 430 0 444 500 500 500 500 500 500 500 500 500 500 860 1,887 1,923 1,931 1,969 2,324 2,346 2,348 2,371 2,419 2,437 -1,075 -1,107 -1,140 -1,174 -1,210 40 -1,200 40 -500 32 -1,200 52 -1,000 44 -1,000 -156 -500 -146 -1,000 -116 -1,600 -106 -800 -120 -1,200 -102 -860 -2,087 -1,423 -2,131 -1,969 -2,199 -1,721 -2,223 -2,846 -2,094 -2,512 0 -200 500 -200 0 125 625 125 -475 325 -75 125 125 125 125 125 125 125 Prepare a funding plan -900 – Typical Funding Plan -927 -955 -983 -1,013 -1,043 Financial Transactions 16 Year 1 4,000 0 0 0 0 4,000 125 125 125 125 125 0 0 0 0 -9,000 0 0 0 0 0 0 0 0 0 Year 5 125 125 Year 6 125 125 125 -250 4,500 -250 4,250 -250 4,500 -250 -250 -250 4,000 -250 3,750 -250 3,500 -250 -250 -250 0 -600 200 -200 Year 4 0 -5,000 5,000 5,000 5,000 0 0 0 0 -200 500 1,000 1,000 1,000 800 1,000 50,000 25,000 50.0% 5,000 0 5,000 5,000 -200 0 800 1,300 1,300 1,100 800 50,000 1,300 50,000 25,200 50.4% 24,676 49.4% 125 -250 -250 4,750 4,750 -250 -250 -250 0 500 1,100 1,100 1,100 1,100 1,100 1,600 1,600 1,600 1,600 1,000 1,000 1,200 1,200 1,000 1,100 50,000 -3,900 59,000 -3,650 59,000 -2,900 59,000 -2,650 59,000 -3,000 59,000 -2,550 59,000 -2,500 59,000 24,842 49.7% 33,786 57.3% 33,530 56.8% 32,759 55.5% 32,484 55.1% 32,794 55.6% 32,279 54.7% 32,153 54.5% Vol 4 Section 7, Page 4-160 Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Year 1 Financial Planning Operating Transactions Operating income from - Water Charges, Operation & Maintenance (OR1) - Water Charges, Capital Replacement (OR2) - Water Charges, Capital Acquisition (OR2) - Local Government Fund, Operation & Maintenance (OR3) - Local Government Fund, Capital Replacement (OR4) Total Operating Income (OR =OR1+OR2+OR3+OR4) operating costs for Operation & Maintenance (OC1) Capital Replacement (OC2) Financing Charges (OC3) Total Operating Costs (OC=OC1+OC2+OC3) Cash from operating transactions (OT=OR+OC) 430 444 500 Year 2 Year 3 461 500 Year 4 466 500 Preparing a Financial Plan 0 461 0 466 Year 5 Year 6 Year 8 302 Year 9 Year 10 484 500 600 500 610 500 611 500 623 500 647 500 656 500 0 484 225 500 220 515 215 521 210 538 205 567 200 581 430 0 444 500 500 500 500 500 500 500 500 500 500 860 1,887 1,923 1,931 1,969 2,324 2,346 2,348 2,371 2,419 2,437 -1,075 -1,107 -1,140 -1,174 -1,210 40 -1,200 40 -500 32 -1,200 52 -1,000 44 -1,000 -156 -500 -146 -1,000 -116 -1,600 -106 -800 -120 -1,200 -102 -860 -2,087 -1,423 -2,131 -1,969 -2,199 -1,721 -2,223 -2,846 -2,094 -2,512 0 -200 500 -200 0 125 625 125 -475 325 -75 125 125 125 125 125 125 125 Prepare a funding plan -900 – Typical Funding Plan -927 -955 -983 -1,013 -1,043 Capital Transactions Capital income from - Development levies (CR1) - Central Government Funding (CR2) Total Capital Revenue (CR =CR1+CR2) Capital Acquisitions Costs (CC) Cash from capital transactions (CT=CR+CC) Year 7 4,000 0 0 0 0 4,000 125 125 125 125 125 0 0 0 0 -9,000 0 0 0 0 0 0 0 0 0 0 -5,000 125 125 125 125 125 125 -250 3,750 -250 3,500 Financial Transactions 17 Proceeds from debt issued (FR) 18 Debt Repayment (FC) Financial Position Year 4 21 22 23 24 25 26 27 Financial Position Increase/decrease in cash (C = OT+CT+FT) Cash reserve at beginning of period (CB) Cash reserve at end of period (CE=CB+C) Net financial assets (=Cash Reserve - Debt Balance) MEA Value of Assets Current Asset Value Current Asset Value as a % of MEA value Year-250 5 Year-2506 5,000 4,750 -250 4,500 4,250 -250 4,000 0 0 0 0 5,000 -250 -250 -250 -250 -250 -250 0 -200 500 -200 0 0 500 0 -600 200 -200 1,000 1,000 1,000 800 800 1,300 1,300 1,100 1,100 1,100 1,100 1,100 1,100 1,600 1,600 1,600 1,600 1,000 1,000 1,200 1,200 1,000 1,000 50,000 800 50,000 1,300 50,000 1,100 50,000 -3,900 59,000 -3,650 59,000 -2,900 59,000 -2,650 59,000 -3,000 59,000 -2,550 59,000 -2,500 59,000 25,000 50.0% 25,200 50.4% 24,676 49.4% 24,842 49.7% 33,786 57.3% 33,530 56.8% 32,759 55.5% 32,484 55.1% 32,794 55.6% 32,279 54.7% 32,153 54.5% 19 Debt Balance 20 cash applied to finance transactions (FT =FR+FC) 5,000 Vol 4 Section 7, Page 4-160 Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Year 1 Financial Planning Operating Transactions Operating income from - Water Charges, Operation & Maintenance (OR1) - Water Charges, Capital Replacement (OR2) - Water Charges, Capital Acquisition (OR2) - Local Government Fund, Operation & Maintenance (OR3) - Local Government Fund, Capital Replacement (OR4) Total Operating Income (OR =OR1+OR2+OR3+OR4) operating costs for Operation & Maintenance (OC1) Capital Replacement (OC2) Financing Charges (OC3) Total Operating Costs (OC=OC1+OC2+OC3) Cash from operating transactions (OT=OR+OC) 430 444 500 Year 2 Year 3 461 500 Year 4 466 500 Preparing a Financial Plan 0 461 0 466 Year 5 Year 6 Year 8 303 Year 9 Year 10 484 500 600 500 610 500 611 500 623 500 647 500 656 500 0 484 225 500 220 515 215 521 210 538 205 567 200 581 430 0 444 500 500 500 500 500 500 500 500 500 500 860 1,887 1,923 1,931 1,969 2,324 2,346 2,348 2,371 2,419 2,437 -1,075 -1,107 -1,140 -1,174 -1,210 40 -1,200 40 -500 32 -1,200 52 -1,000 44 -1,000 -156 -500 -146 -1,000 -116 -1,600 -106 -800 -120 -1,200 -102 -860 -2,087 -1,423 -2,131 -1,969 -2,199 -1,721 -2,223 -2,846 -2,094 -2,512 0 -200 500 -200 0 125 625 125 -475 325 -75 125 125 125 125 125 125 125 Prepare a funding plan -900 – Typical Funding Plan -927 -955 -983 -1,013 -1,043 Capital Transactions Capital income from - Development levies (CR1) - Central Government Funding (CR2) Total Capital Revenue (CR =CR1+CR2) Capital Acquisitions Costs (CC) Cash from capital transactions (CT=CR+CC) Year 7 4,000 0 0 0 0 4,000 125 125 125 125 125 0 0 0 0 -9,000 0 0 0 0 0 0 0 0 0 0 -5,000 125 125 125 125 125 125 -250 4,000 -250 3,750 -250 3,500 -250 -250 -250 -600 200 -200 1,600 1,000 1,000 1,200 1,200 1,000 -3,000 59,000 -2,550 59,000 -2,500 59,000 32,794 55.6% 32,279 54.7% 32,153 54.5% Financial Transactions 17 Proceeds from debt issued (FR) 18 Debt Repayment (FC) Financial Position Year 4 Increase/Decrease in cash 0 0 Financial Position Cash reserve at beginning of period 0 -200 21 Increase/decrease in cash (C = OT+CT+FT) Cash reserve at end of period 22 Cash reserve at beginning of period (CB) 1,000 1,000 Cashfinancial reserve at end of period (CE=CB+C) 23Net 1,000 position (=cash reserve-Debt Balance) 800 24 Net financial assets (=Cash Reserve - Debt Balance) 1,000 800 MEA Value of Assets 25 MEA Value of Assets 50,000 50,000 Current Asset ValueValue 26Current 25,000 25,200 Asset 27 Current Asset Value as a % of MEA value Current Asset Value as a % of MEA Value 50.0% 50.4% Year-250 5 5,000 19 Debt Balance 20 cash applied to finance transactions (FT =FR+FC) 5,000 0 1,100 500 -200 1,100 800 1,300 1,300 -3,900 1,100 1,300 1,100 50,00059,000 50,000 24,67633,786 24,842 49.4% 49.7% 57.3% 0 0 4,750 0 1,100 0 0 1,1001,100 1,100 1,100 1,100 -3,650 -3,900 -3,650 59,000 59,000 59,000 33,786 33,530 33,530 57.3% 56.8% 56.8% 5,000 -250 Year-2506 -250 4,500 4,250 -250 500 1,1000 500 1,1001,600 1,600 1,600 1,600 -2,900 -2,900 -2,650 59,000 59,000 59,000 32,759 32,484 32,759 55.5% 55.1% 55.5% -250 Vol 4 Section 7, Page 4-160 Financial Planning 304 Preparing a Financial Plan Prepare income statement & yearly forecast. Prepare a funding plan Review and Set Charges – assessment of the likely funding from:- - Water Charges – O&M and marginal capital cost of Non-Domestic consumers - Local Government Fund – O&M cost of domestic consumers - Central Government Fund – Domestic sector growth and service enhancement - Development Contributions - Marginal cost of non-domestic and future domestic - Significant User Contributions - e.g. large industrial reserve Periodic Review (annual roll-over basis) - Compare actual against budgeted expenditure under each category and adjust plan to suit new assumptions Vol 4 Section 7, Page 4-164 305 Session 11 Financial Planning Volume 4 – Section 7 306 Session 12 Plan Review Volume 4 – Section 8 Plan Review 307 PlanApproval Review && Plan Improvement Review (At least every 6 years) Define / Review Levels of Service Financial Plan Asset Management Plan Water Services Strategic Plan Demand Assessment Collect Strategic Asset Data Strategic Options Strategic Capacity Assessment Vol 1 Section 2., Page 1-4/13 Plan Review 308 Plan Review & Improvement (At least every 6 years) Levels of Service Demand for Water Services Asset Management Planning Financial Planning SEA Vol 4 Section 8, Page 4-166 Plan Review 309 Plan Review & Improvement (At least every 6 years) Levels of Service Review and comment on performance with respect to level of service objectives. Review changes in legislation relevant to water services planning & delivery with a view to revising or setting new level of service standards. Review and revision of design standards where necessary. Vol 4 Section 8, Page 4-167 & 4-168 Plan Review 310 Plan Review & Improvement (At least every 6 years) Demand for Water Services Current Demand Review methodology and assumptions made in existing plan. Determine current demand for water services (including review of demand components – Ref: Tables 8.1 & 8.2) Compare current demand with that projected in existing plan (may assist in adjusting estimates for future growth). Vol 4 Section 8, Page 4-169 to 4-171 Plan Review 311 Plan Review & Improvement (At least every 6 years) Demand for Water Services Demand Management Review progress on current demand management strategy. Review current international demand management policies for consideration for adoption. Identify the demand management strategy for the period of the replacement plan. Vol 4 Section 8, Page 4-172 Plan Review 312 Plan Review & Improvement (At least every 6 years) Demand for Water Services Future Demand Review approach to population growth projections and adjust in line with any changes in planning and development legislation (Ref Table 8.3). Review methodology and assumptions made in the existing plan with regard to calculating future demand. Project future demand for water services (including review of demand components – Ref: Tables 8.4 & 8.5) Vol 4 Section 8, Page 4-172 to 4-175 Plan Review 313 Plan Review & Improvement (At least every 6 years) Asset Management Planning Review and update the current asset inventory, value, condition, performance, and capacity with respect to levels of service and demand. Review O&M objectives and budgets for inclusion in the replacement plan . Review scheme shortfalls and strategic options, complete with Strategic Environmental Assessment (SEA) . Revise Capital Investment Programme (CIP) to reflect capital projects completed, ongoing, and newly identified . Vol 4 Section 8, Page 4-176 Plan Review 314 Plan Review & Improvement (At least every 6 years) Financial Planning Update budget for annual O&M costs and the revised capital investment programme. Review the current local and central government funding arrangements available to the water services authority . Review current guidance on water pricing policy. Balance projected expenditure against sources of funding available. Vol 4 Section 8, Page 4-177 315 Session 12 Plan Review Volume 4 – Section 8