Environmental Infrastructure Section 219 and 592 Authorities Alabama Water Resources Conference Orange Beach, Alabama September 8, 2011 US Army Corps of Engineers BUILDING STRONG® Environmental Infrastructure Federal Funds Expended/Obligated TN TN • AL MS $42M AL $0M $0M GA GA $8.8M $10M FL FL 15 BUILDING STRONG ® Metro Atlanta Environmental Infrastructure Projects Section 219, WRDA 1992, as amended Cost shared 75% Federal / 25% Non-Federal Water Supply: Intakes, distribution, groundwater production, raw water treatment, etc. Stormwater: Detention, catch basins, piping, created wetlands, capacity improvements, storage, etc. Wastewater: Treatment, collection, connectivity, expansions, separation, etc. BUILDING STRONG® McDaniel Branch Stormwater Capacity Improvement Project Sponsor: City of Atlanta, Georgia This project consists of the design and construction of a system of storm water detention basins as a feasible watershed improvement project. These basins would provide water quality treatment and storm water runoff control from approximately 200 acres of urban watershed. Design is 85% Complete Delays due to sewer main relocation Expected Completion in 2013 BUILDING STRONG® Chattahoochee River Water Intake Sponsor: City of Atlanta, Georgia The purpose of this project is to upgrade upper and lower sill structures in order to improve conditions at the City of Atlanta’s Chattahoochee River Raw Intake structure and stabilize the east bank of the Defoors Island. Projected Cost - $1,900,000 Cost shared on a 75 / 25% (Federal /Non-Federal basis) UPPER SILL EROSION CONTROL DEFOORS ISLAND LOWER SILL Design Awarded August 2011 EROSION CONTROL CHATTAHOOCHEE RIVER Projected Construction Completion in 2013 5 BUILDING STRONG® Groundwater Production Wells Treatment Facility Sponsor: City of Roswell, Georgia This project focuses on the expansion of the Roswell Water Plant from its current 1.2 million gallons per day (MGD) to 5 MGD. The groundwater production wells will help the City meet the 5 MGD to comply with the Metro North Georgia Water Planning District Water Supply Plan. Projected Cost – Out for Bid Construction Award Sep 2011 Expected Project Completion in 2012 30 GPM WELL 350 GPM WELL COMBINED GROUNDWATER WELLS PROJECT BUILDING STRONG® Swaybranch Detention Pond Sponsor: City of Roswell, Georgia The purpose of this project is to rehabilitate and combine a failing dual detention pond by removing the existing wet pond and dry detention dams and creating a single storm water detention facility Projected Cost – Out for Bid Construction Award Sep 2011 Expected Project Completion in 2012 BUILDING STRONG® Mark Avenue/Noonday Creek Stormwater Structure - (ARRA) Sponsor: Cobb County, Georgia The purpose of this project is to construct a storm water detention structure across a tributary to Noonday Creek; about 300 to 400 feet upstream of Mark Avenue. Projected Cost - $2,500,000 ARRA Design Completed Spring of 2010 Construction started Mar 2011 Rock Encounter Delayed Construction 3 Months Expected Project Completion in Mar 2012 BUILDING STRONG® DeKalb County Stormwater Section 219 (ARRA) Sponsor: DeKalb County, Georgia The purpose of the project is to repair failing culverts that are inadequately sized to handle the storm water runoff. Repairs include limited bank shaping/rock stabilization upstream or downstream of the enlarged culvert Projected Cost - $3,500,000 ARRA Construction started Aug 2011 Expected Project Completion Aug 2012 BUILDING STRONG® Vistavia Drive Stormwater Crossing 10 BUILDING STRONG® Vistavia Drive Stromwater Crossing BUILDING STRONG® Metropolitan North Georgia Water Planning District The Water Resources Development Act (WRDA) of 2007, Section 5065 authorized the Corps to assist MNGWPD in carrying out environmental infrastructure projects. Assisting the City of Atlanta and the North Georgia Regional Water Planning District Addressing Environmental Infrastructural Problems. 15 County Planning District Project Area. 75/25% Fed/Non-Fed Cost Share Total Project Authorization Limited to $20 Million. No Funds Appropriated Model After Mississippi 592 Program BUILDING STRONG® Environmental Infrastructure Summary of North Georgia Authorities (Sections 219, 5002, 5064 and 5065) Section 219 – Design & Construction of water-related environmental infrastructure and resource protection and development projects (Maximum Authority $25M). Section 5002 – Technical, Planning & Design Assistance. (No Construction) Section 5064 – Design and Construction of water-related development and protection projects in the Big Creek Watershed. Eroding Stormwater Detention Pond Spillway (219 Project) Section 5065 – Design & Construction of water & wastewater infrastructure projects (Maximum Authority $20M ) . BUILDING STRONG® Environmental Infrastructure WRDA 1999 - Section 592 Program, Mississippi Publicly owned Project Partnership Agreement (PPA) 75% Federal/25% non-Federal Operation & Maintenance 100% non-Federal Authorization Limit $200 Million BUILDING STRONG® Section 592 Project Status Regular Appropriations ARRA Appropriations Brooklyn – Installation of a New Centralized Wastewater System Biloxi, MS - Sewer Collection System Coahoma County –Sewer Rehabilitation and Installation of New Greenwood, MS - Replace Sewer Force Main Water Distribution System * Columbus, MS - Surface Water Resource Protection Improvements Culkin – Upgrade of Water Distribution System * Jackson County Utility Authority - Design & Construction For Cruger - New Water Well and Distribution System Installation Forest – Rehabilitation of the City’s Sewer System Macon, MS - Replace & Improve Sewerage System * Hattiesburg – Sewer System Improvements Pascagoula, MS - Improvements To Municipal Sewer System McComb – Surface Water Resource Improvements * Pearl River County, MS - Waste Water Treatment Facility Natchez – Surface Water Resource Improvements Olive Branch – Sewer Rehabilitation and Installation of a Collection Water Supply Improvement Installation System Philadelphia Utilities- Water System Improvements and Sewer System Rehabilitation Summit – Sewer System Improvements Wiggins – Rehabilitation and Extension of Sewer System * - Scheduled for Close-out in FY11 Richton, MS - Sanitary Sewer System Extension And Water Well Tupelo, MS - Surface Water Resource Improvements West Rankin Utility Authority – Wastewater Force Main Replacement Moss Point, MS – Sewer Rehabilitation Project Port Gibson, MS – Water System Improvements Pearlington, MS – New Water Well Installation Waveland, MS – Sewer Rehabilitation Project BUILDING STRONG® Section 592 Project Status CLOSED PROJECTS ► FY08 • MS Gulf Coast Community College, Perkinston, MS • City of Gulfport • City of Helena ► FY09 • City of Picayune • City of Vicksburg • West Rankin Utility Authority ► FY10 • Madison County Wastewater Authority • City of Richland • Community of Pearlington BUILDING STRONG® Section 592 Projections Project Partnership Agreement Execution Schedule ► Regular Obligations • • • • Pearl River Valley Water Supply District – August 2010 East Reservoir Area Sewer System Improvements Total Cost: $5,995,100 Federal Cost: $4,016,325 Hiwannee Water Association – September 2010 Water Well Installation Total Cost: $1,075,000 Federal Cost: $806,200 City of Vicksburg, MS – September 2010 Water Distribution System Improvements Total Cost: $3,271,538 Federal Cost: $2,203,653 Ocean Springs, MS – September 2010 Sewer Rehabilitation Project Total Cost: $4,045,000 Federal Cost: $2,833,750 BUILDING STRONG® Section 592 Projects Culkin Water District ► 300,000 Gallon Elevated Water Tank ► Total Project Cost: $1,560,950 BUILDING STRONG® Section 592 Projects Madison County Wastewater Authority ► Sewer Collection System BUILDING STRONG® Planning Process Non-Federal public interest (sponsor) request USACE (Corps) for assistance. Must have a detailed description of project, design concept and a detailed cost; Corps prepares letter report showing Federal interest for Division approval; Upon report approval – Corps and sponsor sign Project Partnership Agreement (PPA); Sponsor provides share of project funds to initiate design and construction. Sponsor can design and construct and be reimbursed against contract invoices; All projects are subject to the National Environmental Policy Act (NEPA) requirements; Sponsor shall acquire all needed lands, easements, rights-of-way, relocations and disposal (LERRD); and, Sponsor operate and maintain 100 percent of the completed project. BUILDING STRONG® Environmental Infrastructure Projects Questions? US Army Corps of Engineers BUILDING STRONG®