A49 - B4349 Link meeting June 2013

advertisement
BELMONT TRANSPORT PACKAGE
A49 – B4349 (Relief Road Southern
Section) Meeting
14 June 2013
Belmont Transport Package
•
The Belmont Transport Package appraisal is
interventions to meet local issues and challenges.
•
These interventions will consider both measures on existing road
network and a new road link in an attempt to provide suitable
solutions.
•
A full appraisal of impacts of each package of measures is being
undertaken following relevant guidance.
•
This meeting will provide an update on work done to date, provide
a detailed update on the assessment of a new road link and
explain work yet to be done and detail of next steps.
•
Formal public consultation on whole package of measures will
follow in coming months.
14 June 2013
considering
2
Belmont Transport Package
Hereford City Centre
Junction layout and
location to be
confirmed
B4349
Measures on
existing highway
“Belmont”
A465
New road link
Rotherwas
Access Road
A49 (T)
14 June 2013
3
B4349 / A465
junction layout and
location to be
confirmed
14 June 2013
4
A49 – B4349 (Relief Road Southern Section)
The appraisal process follows guidance as set out in
Department for Transport web based Transport Analysis
Guidance (WebTAG) and considers:
• environmental impacts;
• social impacts;
• economic impacts; and
• public accounts.
14 June 2013
5
A49 – B4349 (Relief Road Southern Section)
Progress since March:
– Biodiversity surveys completed
– Topographical surveys completed
– Traffic surveys completed
– Landscape surveys completed
– Townscape surveys completed
– Heritage of Historical Resources surveys completed
– Site visits with landowners
– Development of extension to B4349 Clehonger Road
– Development of options on existing highways on-going
14 June 2013
6
A49 – B4349 (Relief Road Southern Section)
Feedback:
1. Stakeholder discussions on-going
– Local issues
2. Link from A465 to B4349 (Clehonger Road junction)
– Position of junction
– Type of junction
3. Junctions with Grafton Lane and / or Haywood Lane
– Strategic link road
– Junctions not considered
– Agricultural accesses considered
14 June 2013
7
A49 – B4349 (Relief Road Southern Section)
“Emerging Route”
• Although some elements of the appraisal process
have not yet been completed, it is possible at this
stage to provide information on the current ‘emerging
preferred option for a new highway link’ which will
form part of the overall package of measures.
• There is still further work to be completed to provide a
definitive preferred option for the Belmont Transport
Package.
14 June 2013
8
A49 – B4349 (Relief Road Southern Section)
Next Stages - work yet to be completed:
– traffic modelling work including scenario testing
following on from the LDF modelling;
– Liaison with Highways Agency regarding model
outputs;
– Appraisal of impacts due to noise;
– Appraisal of impacts due to air quality;
– Appraisal of carbon emissions (CO2);
14 June 2013
9
A49 – B4349 (Relief Road Southern Section)
Next Stages (cont’d)
– Appraisal of costs (capital costs and maintenance
costs);
– Appraisal of economic impacts – i.e. benefits
associated with Belmont Transport Package;
– Appraisal of social impacts – including
affordability, severance, journey quality, accidents,
physical activity
14 June 2013
10
A49 – B4349 (Relief Road Southern Section)
Indicative Timetable
•
Traffic Modelling & Appraisal – to end September 2013
•
Presentation of Amey Technical Appraisal – end September 2013
•
Public Consultation – October 2013
•
Preparation of Planning Submission – Autumn 2013 – Spring 2014
•
Planning & Detailed Design – Spring 2014 to Spring 2015
•
Statutory Order Process – Spring 2015 – Summer 2016
•
Construction* – Winter 2016 to end 2017
*
14 June 2013
Current programme includes all statutory processes. Construction start date
could be significantly brought forward if not all of these statutory process are
required e.g. land is acquired by agreement.
11
Thank You For Your Time
14 June 2013
12