ERASMUS IP project “Sustainable refurbishment, retrofit and energy management in residential buildings” Sustainable Refurbishment, Retrofit, Energy Management in Residential Buildings Corsica project 10.05.14 - 25.05.14 Morten Toft Jacobsen (VIA UNI) Carlos Ramos (IUT of Corsica) Selin Torun (UOW) Elisa Taccioli (Unibo) Alina Mukharova (HTW) Indrek Soots (TKTK) Joao Pinto (IPB) Brief An affordable, green design integrating thermal efficiency from sustainable and environmentally friendly materials to meet the Passivhaus retrofit design standards. Open spaces with maximum natural lighting Research was put into identifying the most modern and energy efficient materials available to ensure a new way of life for students/occupants that does not cost the earth! Phase A Phase B o Modernisation of buildings layout and design o Addition of a green roof and/or green (bathroom & kitchens). facade o Addition of elevators if deemed necessary o Addition of a student community o Reduction of energy consumption to retrofit house built in sustainable timber passive house guidelines and levels materials, containing: computer o Sustainable energy production (secondary studio, toilets, relaxation/party system). room, small kitchen and outside o Sustainable building materials & construction to terrace area. be implemented as much as possible in the o Sustainable energy production retrofitted building. (secondary system). o balcony renovation and/or addition of balconies, if deemed necessary o Management and cost calculations Conceptual climate and weather analysis Green building studio Vasari Solar analysis S/W FACADE N/E FACADE Conceptual climate and weather analysis Wind analysis Conceptual climate and weather analysis Focus areas Keywords for choice of materials Life span Communnity Use of C02 (production) Environment Cradle to cradle Floor plans (Phase A) level 1 level 2 level 3 level 4 level 5 Types of apartments Kitchens and common space Single rooms Disabled rooms Dublex (2 single rooms + 2 double rooms) Single room Average area: 14 m2 Number rooms: 44 Dublex Average area: 110 m2 Number rooms: 2 Disabled room Average area: 25 m2 Number rooms: 2 Kitchen and common space Average area: 25 m2 Number rooms: 6 Phase B Wall System Floor plan 2 Structural Insulated Panels (SIPs) • Offer fast-track, lightweight building solutions • Cost effective approach and are quick and easy to install • Manufactured using high-pressure foam injection to create strong composite panels that can be used as wall, roof and floor panels to create highly efficient structures. • U-value of 0.14 W/m2K Kitchen Computer room Toilets Party Room Terrace (green roof) Automatic taps o o Reduces the usage of water Saves money. Materials Ceramic tiles in all apartments, kitchens and bathrooms o Secure long life span o Cheap purchase cost because of the large quantity o Benefit of thermal mass, for natural heating.. Internal insulation regarding sound 63 dB Fire class A2-s1,d0 (Class1) Light reflection 70 – 75 % L´n,w value (impact sound) Walls: 12,5mm of gypsum board W. 30mm of Styrofoam glued on the backside. Ceilings: 12,5mm perforated gypsum board W. 30mm of Styrofoam glued on the backside. Regular gypsum on wood sound values (0,6) New internal walls Total thickness 145 mm (2 x 12,5, 95mm, 2 x 12,5) Fire value EI60 R´w value 52 Air bourne sound Solar reflection 82% (white 9010) Staircases 1. Control unit with emergency power backup for 1 window 2. Smoke ventilation window 3. Alarm buttons 4. Ventilation switch 5. Smoke sensor 6. Rain sensor Characteristics Expulsion of heat and smoke during fire: -automatic or manual opening of FSP smoke ventilation window in the event of fire -increased safety -building ventilation and automatic window closing after fixed time. External walls Renovated wooden and green facade: Aiming for natural facade materials U-value of 0,11 with 200mm insulation Minimizing thermal bridges while designing Anchors for cladding Only 230mm mass concrete will remain Connection of transforming balcony Different facades connected together Ventilation system Little ventilators with heat exchanger above windows Heat recovery percentage of 45 Covers single and double persons fresh air needs Extract fans in bathrooms and kitchens Solar electricity mostly satisfies the extract air ventilator’s demands Change of the energy demands Today Energy usage for heating Energy usage for heating per squaremeter Energy usage for ventilation Energy usage for ventilation per squaremeter 49082,9 kWh/y 32,0 kWh/m²*y 545,3 kWh/y 0,4 kWh/m²*y After renovation Energy usage for heating Energy usage for heating per squaremeter Energy usage for ventilation Energy usage for ventilation per squaremeter 19396,7 kWh/y 12,6 kWh/m²*y 8415,7 kWh/y 5,5 kWh/m²*y Energy Efficiency - Lighting Why is it important? The efficient use of energy and the resulting cost savings are, nowadays, a concern not only of governments and officials as well as the general population. This concern increases when it becomes aware that it is not merely a matter of saving or, if you prefer not to spend, but also to preserve the environment that surrounds us. Thus, environmental concerns, such as CO2 emissions to the atmosphere and the consequent rise of the planet and increase of the ozone hole temperature, take paramount importance in our daily concerns. The proposal Replacing existing light bulbs with more efficient bulbs; Combine energy efficiency and lighting quality; Maintain comfort and user satisfaction; Reduction in electricity consumption and costs; Characteristics of lamps to check before their replacement Luminous Flux (lm); Power consumption (wh); Efficacy (lm/W); Color temperature (appearance of light) ; Refund chromatic (IRC); Life time (h); Consumption and costs per year Conventional lamps Total (kWh) Costs 30000 4,416.00 € Proposal lamps Total (kWh) Costs 6394.8 941.31 € Savings per year Energy savings (kwh) Money savings 23605.2 3,474.69 € Investement Investement Proposal lamp 1 (rooms) 2,058.16 € Proposal lamp 2 (rooms) 1,235.00 € Proposal lamp 3(rooms) 771.68 € Proposal lamp (toilets) 1,543.36 € Proposal lamp (corridors) 296.80 € Total 5,905.00 € Return on Investment approximately in two years Putting sensors in the corridors The sensor can reduce energy consumption 30 % Reduction per corridor per year (kwh) 52.56 Consumption per corridor without a sensor per year (kwh) Total (kwh) 175.2 700.8 Consumption per corridor with a sensor per year (kwh) Total (kwh) 122.64 490.56 Savings with sensors per year Energy saving (kWh) Saving money 490.56 72.21€ Investment (sensors) / Unity Total 130.71€ 522.84€ Return on the investiment approximately in seven years Final estimate Total consumption per year (kwh) Cost per year 5904.24 869.10€ Green Façade Sphagnum in metal cages • • • • • • Allows vegetation to grow Products clean air Easy on the eye Acoustic insulating Recyclable cages Protects the building from direct sun light Green Façade House on Paris’ 2nd arrodissement Windows Detail Components • Wooden frame with a plastic layer on the outside. U value 0,73 W x m-2 x K-1 • Double glazed low emisivity window. • Layer of argon between the windows Two way opening shading Window/ Balcony Green Roof + Solar Panels 48 solar panels produce 20.300 kwh/year By using a green roof on phase A we would save the environment from the emission of 710 kg CO2 compared to installing of another roof type. Green Roof structure Water/DP membrane Ridged insulation Galvanized trapezoid plates Skandek green line steel beams Mineral wool Fire protection Ceiling cladding • • • • • U-value for the construction of 600mm is 0,08W/m2k Fraction point is between 100,5kNm to 146,7kNm Per. Beam The weight of the elements varies from 19kg to 24kg per. running meter. 100% recyclable 90 years durability Roof constructions Terrace boards for the Phase B: Low maintenance Eco-friendly materials 60% reused wood + 30% high density polyethylene (reused plastic)+10% colour + UV stabilizer The lifespan of the boards of 25 to 30 years and are 90% reusable. Stands for terrace: stands/feet are 100% reusable not affected by any atmospheric impacts (UV/t) The load of each foot is distributed to an area of 320 cm2 Comparison of the existing and new building Saving 111.660,95€ Comparison of the existing and new building Saving 36 T/co2/yr Savings over 30 years = 1080 Tons/co2 108 times around the world for one car Co2 emission of 90 amr. Homes for one whole year Thank you for your attention