Presentation on FBC Boilers Welcome Fluidized Bed Combustion Systems By M.RAJAVEL, SDGM / R&D/PCPS BHEL, TRICHY -14 Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers What is Fluidization ? Fluidized Bed FLUIDISED BED BOILER When Buoyancy Force Buoyancy Force balances Gravity Force Gravity Force FUEL AIR ASH Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Why call it Fluidized Bed ? Light object Floats ; Heavier ones Sink (Fixes Fuel Size) AIR Bharat Heavy Electricals Limited TIRUCHIRAPALLI AIR 28th August 2012 Presentation on FBC Boilers Why call it Fluidized Bed ? Horizontality Maintained (Fixes Ash drain mechanism from Bed) ASH ASH ASH Fixed Bed Fluidised Bed Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Why call it Fluidized Bed ? Pressure drop is Bed Height (Fixes Fan Power) Umf P B A B A Flow / Velocity AIR AIR Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers What is Fluidization ? Fixed Bed STOKER FIRED BOILER Buoyancy Force When Gravitational Force ASH FUEL Upto 25mm AIR is predominant Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Why call it Fluidized Bed ? FLUIDISED BED BOILER A Bed of Solid Particles exhibit the properties of a FLUID namely: è Lighter objects float heavier ones sink è Pressure drop is Bed Height è Horizontality maintained hence termed as Fluidized Bed FUEL AIR ASH Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers How does a Fluidized Bed work ? The Bed of solid particles have to be retained at that size: Combustion Temperature has to be well below ash fusion temperature FLUIDISED BED BOILER Heat transfer walls are enclosed Ash does not fuse - no slagging Heat transfer by Gas / Particles Convection & Radiation Fuel size upto 10mm - No PULVERISING Ash soft amorphous state - less erosion FUEL AIR ASH Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers How does a Fluidized Bed work ? When Fuel is injected into a Fluidized Bed of solid particles which is heated to Ignition Temperature of Fuel, it burns imparting heat to the entire bed FLUIDISED BED BOILER Fuel Combustion takes place due to the heat available in the Bed Ash - millions of IGNITORS Fuel of any Quality can be fired FUEL AIR ASH Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers How does a Fluidized Bed work? Combustion of Solid Fuel leaves behind Ash. Finer fraction carried by flue gas, coarser fraction replenishes the bed solid inventory and excess is drained out by drain pipes FLUIDISED BED BOILER Ash is dry and granular and is easily handled. FUEL AIR ASH Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Summary of Combustion Technologies FLUIDIZED BED PNEUMATIC TRANSPORT PRESSURE DROP FIXED BED GAS FLOW/VELOCITY Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Technology Comparison FLUIDISED – BED FIRING FBC STOKER (FIXED BED) GAS PULVERISED FIRING (ENTRAINED BED) GAS GAS FUEL FUEL AIR AIR FUEL AIR ASH AIR FUEL ASH ASH Vel 2.3 - 3 m/s 1.2 - 6 m/s 4.6 - 6.1 m/s Par 6000 m 300 - 1000 m 50 m Temp 1600 C 850 C Bharat Heavy Electricals Limited TIRUCHIRAPALLI 1600 C 28th August 2012 Presentation on FBC Boilers Advantages of Fluidized Bed Combustion Boilers Low combustion temperature- <900 DegC lead to less Nox emission. Sulphur present in coal can be recovered in-situ by adding limestone. SOx emission can be reduced >90% S + O2 SO2 CaO + SO2 +1/2 (O2) --> CaSO4 Poor quality coal/lignite, coal washery rejects, containing ash >70%, can be used. Biomass fuel can be fired either independently or in combination with fossil fuels. Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Advantages of Fluidized Bed Combustion Boilers FBC Boilers can be operated in all loads without sacrificing combustion efficiency. Fuel of size less than 6 m.m. is used in FBC boilers and hence need not be pulverised as does in P.F. Boilers. No moving grate or burners in FBC boilers. Ash does not fuse at 900 DegC and hence soot blowers are not required. High combustion efficiency of fuel due to higher residence time and entire surface area of fuel in contact with air. • Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Stoker fired boiler Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Stoker Fired Boilers Moving Component (Travelling Grate) in the high temperature Furnace zone Combustion temperature 1400 - 1600°C; heat transfer in furnace by Flame Radiation Fuel Ignited by the already burning Fixed Bed Fuel Combustion time limited to grate travel length - hence fuels of poorer quality than design do not burn fully Due to grate cooling requirements a minimum air quantity is required - hence excess air is high at part loads Very low relative movement between Fuel and Air Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Fluidised Bed Combustion Boilers Atmospheric pressure Fluidised Bed Combustion Boilers (AFBC) Pressurised Fluidised Bed Combustion Boilers (PFBC) I Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Atmospheric Fluidised Bed Combustion Boilers Bubbling Fluidised Bed Combustion Boilers (BFBC) Circulating Fluidised Bed Combustion Boilers (CFBC) I Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers FBC Test Facilities 10 t/hr BFBC Prototype Boiler - 1977 BFBC Test Facility-1986 Combustion Test Rig-1979 (90 t/hr Hot water) Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers AFBC Technology Development 1981 : First 12 t/h Commercial Boiler commissioned 1984 : First 10 MW power plant for Washery Rejects 1987 : First 10 MW power plant for Straw 1992 : First 20 MW (100 t/h) power plant for Rejects and Char 2000 : Largest boiler in operation of 180 t/h (45 MW) 2002 : Export of 17 MW Boilers to PT IBR Indonesia 2003 : Largest Boiler (300 t/hr) offered 2006 : Design of 120 MW Boiler ready 2008 : 3x18 MW Order from PT KPP, Indonesia 2009 : 2 X 180 t/hr BFBC Boiler order from JSPL, Angul 66 Boilers Contracted Over 2.5 million operating hours Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Drum SHI Eco Coal Bunker DESH Air Heater S H II Feeder Main Steam EVA ESP Ash Air Distributor I D Fan P A Fan F D Fan Schematic of AFBC Boiler Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers AFBC Components 1 5 10 4 9 2 3 7 8 6 Bharat Heavy Electricals Limited TIRUCHIRAPALLI 1 Steam Drum 2 Bed Superheater 3 Bed Evaporator 4 Convection Superheater 5 Economiser 6 Windbox 7 Air Distributor Plate 8 Hot Air Duct 9 Cold Air Duct 10 Air Preheater 28th August 2012 Presentation on FBC Boilers Compartment – Unique Operational feature Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Flow Diagram of CFBC Boiler - Separate FBHE DRUM Spiess Valve SECONDARY AIR ID Fan Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers CFB Process Advantages Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Major Milestone -CFBC Technology Development 1995 : First CFBC boiler of capacity 175 TPH contracted 1995 : Utility size 2x125 Mwe capacity plant order received from Surat Lignite plant (SLPP) 2003 : RVUNL, Rajasthan -2x125 Mwe plant using high sulphur content lignite (6%) 2005 : First 2x250 MW CFBC power plant order received from NLC,Neyveli. 2008 : Export order received from New Calidonia to supply 405 TPH steam generator 28 CFBC Boilers Contracted . Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Typical Fuel analysis ( Assam Coal) Proximate Moisture Volatile Matter Ash Fixed Carbon HHV % % % % kcal/kg 4.50 39.58 3.77 52.15 7792 Ultimate Carbon Hydrogen Sulphur Nitrogen Moisture Ash Oxygen % % % % % % % 78.36 5.04 2.57 0.98 4.50 3.77 4.78 Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Chemical composition of fuel ash (Assam Coal) and limestone: Assam Coal Lime Stone Silica (SiO2) % 56.70 4.90 Aluminium Oxide(Al2O3) % 15.0 1.20 Iron Oxide (Fe2O3) % 17.90 1.00 Titanium Oxide (TiO2) % 0.80 1.00 Calcium Oxide (CaO) % 1.70 53.70 Magnesium Oxide (MgO) % 1.60 0.50 Sodium Oxide (Na2O) % 3.50 1.00 Potassium Oxide (K2O) % 2.60 0.10 Carbon di Oxide (CO2) % - 37.00 Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers C. ASH ANALYSIS Silica (SiO2) 1. 51.08 48.42 52.38 48.15 52.56 (%) 14.83 13.84 15.73 13.66 15.97 (%) 18.60 25.16 15.31 26.14 14.36 1.30 1.04 1.42 0.96 1.49 0.26 0.19 0.32 0.16 0.37 2.04 1.73 2.18 1.68 2.25 (%) 2. Alumina (Al2O3) 3. Iron Oxide (Fe2O3) Titania (TiO2) 4. (%) 5. Phosphoric Anhydride(P2O5) (%) Lime (CaO) 6. (%) 7. Magnesia (MgO) (%) 0.51 0.41 0.65 0.37 0.73 8. Sulphuric Anhydride(SO3) (%) 8.82 7.08 9.09 6.81 9.91 (%) 0.16 0.10 0.26 0.10 0.31 (%) 2.41 2.03 2.66 1.97 2.76 Sodium Oxide (Na2O) max 9. 10. D. 1. 2. 3. Potassium Oxide ASH FUSION RANGE (under reducing atmosphere) Initial Deformation Temp.(IDT) oC 1075 1050 1100 1050 1100 oC 1125 1100 1150 1100 1150 1175 1150 1200 1150 1200 Hemispherical Temp. FusionTemp. oC Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Supercritical 600 MWe CFBC Boiler- Baima, China Research on supercritical CFB was started in 2003. A demonstration of 600MWe supercritical CFB was initiating in 2006 supported by government. The first demonstration in Baima was approved in 2008, that shall be commissioned in 2011 Steam T : 571℃/569℃ Steam P : 25.4MPa Steam Flow: 1900t/h, Boiler efficiency: 92% SO2 : <300mg/Nm3, Nox : <200mg/Nm3, Generation efficiency:42% Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Design of 600MWe Supercritical CFB Boiler , Design features: Vertical tube design with partial rifle tube ; Mass flow rate is 1400kg/m2s 6 cyclones with 6 external heat exchangers (EHEs); Bottom ash drained from both two side walls through roller type ash cooler; Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Design Feature: Benson vertical tube water membrane, mass flow 800kg/M2S. Twin furnace (with total cross section 15x28m2 and 55 m height) divided by a partition water wall. Six cyclones with inner diameter 9m. six external heat exchanger (EHE). In furnace superheater panels. The LT SH and LT RH in second pass. The HT RH , the MT SH located in EHEs. There are two options for the cyclone selection –steam cooled and insulated. Water jacketed rotary ash cooler is used bed ash 2011. Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Arrangement of 600MWe supercritical CFB Boiler of Tsinghua’s Design Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012 Presentation on FBC Boilers Take Care of Our Environment Thanks for Your Patient Listening Bharat Heavy Electricals Limited TIRUCHIRAPALLI 28th August 2012