DReAMS Project - Guntur

advertisement
Philippines
India
Italy
Sweden
Bhutan
Realizing DReAMS Second Partners Meet
Guntur Municipal Corporation
DReAMS Project - Guntur
Bangladesh
Cambodia
DReAMS Cities
in World Perspective
Philippines
India
Italy
Sweden
Bhutan
Bangladesh
Cambodia
Växjö(Sweden)
Antarctica
Asia
Europe
North
America
THIMPHU(Bhutan)
BOLOGNA(Italy)
RAJSHAHI(Bangladesh)
STUNG TRENG
(Cambodia)
Africa
GUNTUR (India)
South
America
BOHOL
(Philippines)
Australia
Welcome to the City of
Innovations
Guntur City
Constituted as
Municipal Council in
the year 1887
Upgraded to the
Corporation level in the
year 1994
Welcome to the City of
Innovations
Geographical Features
Geographical Features
: Latitude 16031 N / Longitude 800 451 E
Area of the City
: 52.58 Sq.Kms.
(Proposal including 10 villages) : 104.32 Sq.Kms. (Proposed Area)
Population as per 2001 Census
Present Population
No. of Municipal Wards
Average annual Rainfall
Fields
Water Source
Industries
: 514,000
: 650,000 (estimated)
: 52
: 831 mm
: Rich Field Black Cotton Soil
: Krishna River ( Perennial River )
: Tobacco, Chilli, Cold Storage, Plants &
Cotton Zining Mills
Climate Conditions :
>The climate is warm and dry. It ranges from 320 to 350 C.
>During severe summer, the Temperature may go up to 450 C.
>During severe winter the temperature may go down up to 120 C.
Political Scenario
B Ramanjaneyulu, IAS
Collector / Special Officer
GMC
Political Set Up
Mayor
Deputy
Mayor
Standing
Committee
Executive Set Up
Executive
Council
Mayor
Deputy Mayor
Standing Committee
[Chairman and
05 Members]
52 Elected Corporators
And 5 Co-opted Members
Commissioner
Executive Scenario
M Mallikarjuna Nayak, I.A.S
Commissioner
GMC
Political Set Up
Executive Set Up
Standing
Committee
Executive
Council
Engineering Education Administration
Urban
Poverty
Alleviation
Mayor
Dy .Mayor
Superintendent
Engineer
Additional
Commissioner
Commissioner
Revenue
Public
Health
Health Officer
Deputy
Commissioner
Biologist
Town
Planning
Accounts
Examiner of
Accounts
Deputy City
Planner
Key Parameters
Eco Budget Components
Water Quantity
Water Quality
Solid Waste Management System
Improving Greenery
Energy Savings
Service Level Benchmarks
Advantages of Service level Bench Marking
To know where we stand
To fix time bound targets to achieve
To fix Accountability on Administration/staff
Improve services to the Public by achieving the targets
To bring transparency in the system
Water Quantity
No of House Holds
: 1,10,000
No of House Holds with Water Connection : 60,500 [55%]
Total Quantity of Water Supplied per Day
: 115 MLD
No of Filtration Plants
:4#
Water Quantity
Structural improvements in the Existing water supply system, such as replacement of existing RCC
pipeline with the new PSC pipelines
Construction of New Filtration Plant of 10 MGD Capacity
Laying of New Pipe Lines from Filtration Plant to main ELSR etc.,
At present 85% of the area is covered by piped water supply from 25 reservoirs, the rest of the 15% is
supplied through tankers.
Water Supply - Indicators
Proposed Indicator
1.Coverage of Water Supply Connections
Benchmark
100%
Status
55%
2.Per capita availability of water at
consumer end (MLD)
135
115
3.Extent of metering of water connections
4.Extent of non revenue water
5.Continuity of Water Supply
6.Efficiency in redressal of customer
complaints
100%
15%
24x7
80%
2.2 %
52%
1hr
40 %
7.Adequacy
Disinfection
Supplied
100%
99%
100%
63%
90%
67%
of
and
Treatment
and
Quality of Water
8.Cost recovery in water supply services
9.Efficiency in collection of water supply
related charges
Water Quality
Before the ecoBudget project, GMC was monitoring only residual chlorine in the drinking water
supplied.
GMC decided to increase the number of parameters monitored by it to 14, including fecal coliform,
fluoride, nitrate, chloride, hardness, and turbidity among others.
TWO mobile water testing Jaltara kits (approved by UNICEF), were procured and tests were
conducted by the GMC and the stakeholders committee to cross check the results.
Quality of Water Supplied
Check for Quality at HWW
•
•
•
•
•
Water Quality Testing Lab was established at Head Water Works and Qualified Lab technician was
appointed.
Every day 8 quality tests are being conducted on hourly basis by the technician. Those tests are
Turbidity, Ph value, Chlorine, Electric Conductivity, Color, Odor, Taste, TDS.
Every week 9 quality tests are being conducted. Those tests are Dissolved oxygen, Residual
Chlorine, Chloride, Nitrite, Fluoride, Phosphorous, Iron, hardness, Ammonia.
Third Party Quality check is being done by Civil Surgeon Bacteriologist, Regional Public health
Laboratory
Physico-chemical Analysis (16 tests) and Micro biological Analysis tests (1) are being conducted
by TPQ
Water Testing Lab
List of 14 Parameters :
1-Ph value (raw / clear water)
2-Temperature
3-Faecal Coliform
4-Fluoride
5-Dissolved Oxygen
6-Residual Chlorine
7-Phosphorous
8-Nitrate
9-Iron
10-Hardness
11-Chlorides
12-Ammonia
13-Turbidity(raw / clear water)
14-Bentos
Rain Water Harvesting
In the process of Eco Budget System Rain Water Harvesting is taken up as priority Item
At present 20% of the house holds are using the system of rain water harvesting in the city.
There are 700 apartments in the city out of which 10% are covered under the scheme of RWH.
On the other hand 10% of the individual houses are using the process of RWH system.
GMC was planning for increase in the coverage with innovative schemes like reduction in
property tax etc. the pit size should be 9ft(depth) and 5ft(width).
Two pits are been maintained in some of the apartments of the city. The houses with 100s.ft
should maintain the pit accordingly with their required size.
Solid Waste
Before the ecoBudget project, MSW is not Properly Structured. After ecoBudget project there is
structural monitoring by fixing Benchmarks and started systematic improvement.
Garbage Collected Per Day
: 350 MT
Door to Door Collection of Garbage
: 65%
Segregation of Garbage at source
: 15%
GMC is planning to achieve 100% Door to Door Collection of Garbage with community
Participation by conducting
Awareness Camps
Door to Door Campaign by separate resource persons including NGOs, Flat Owners
Associations, Rate Payers Association etc.,
Awareness Camps on two bin system and DTD
Solid Waste Management - Indicators
Proposed Indicator
1.Household level coverage of Solid
Waste Management services
2.Efficiency of collection of municipal
solid waste
3.Extent of segregation of municipal
solid waste
4.Extent of municipal solid waste
recovered/recycled
5.Extent of scientific disposal of
municipal solid waste
6.Extent of processing of solid waste
7.Extent of cost recovery in solid waste
management services
8.Efficiency in redressal of customer
complaints
9.Efficiency in collection of user charges
Benchmark
100%
Status
65 %
100%
85 %
100%
15%
80%
0
100%
45%
100%
100%
0
0
80%
75 %
90%
72%
Greenery
Improvement of Greenery in year 2010
The green area per 1000 persons was increased to 123m2
Nearly 14,000 saplings have been planted and the survival is 45%
Renovation of existing ponds and parks, walking tracks.
Survey has been under taken by the Dept. of Botany and Microbiology of
Acharya Nagarjuna University (ANU) on Enumeration of Flora
GMC has taken up a novel schemes like plantation of trees by every house
in front of their residence, making the NGO’s participation along with the
public involvement for the development of the parks
Self Help Groups
Peoples Participation to achieve Goals
Self Help Groups
7005
Community Organizers
12
GMC is Using Self Help Groups for Community Mobilization for awareness camps in slums
on various activities.
SHG’s Group Meetings and Pavala Vaddi Programe
Awareness Meeting on SHG’s
Energy
GMC installed 45 LED lights in major roads and junctions of the city.
GMC is planning for Solar lights in all the parks of the city.
GMC has taken up some strategies and proposals on the long run. Regarding energy conservation.
-planning to provide adequate number of street lights as per standards, in the city.
-Installation of energy efficient light fixtures without reduction in lumens.
-Providing adequate machinery for O&M of street lights.
-Addressing Transco for provision of sufficient transformers etc.
-Conversion of all light fittings to energy efficient fixtures with the technical guidance from
NEDCAP
-Regular energy audit and energy saving tips by employing suitable HR
-Exploring the feasibility and implementation of remote operation of street lights.
The Proposed Master Budget of Guntur Municipal Corporation
Resource /
Indicator
Unit of Measure
Referenc
e Year
Current value
(2009 / 2010)
Short-Term Target
(2012 / 2013)
Long-Term Target
(2015)
Reasons / background for
target
The number of parameters
checked is instrumental to a
better control and thus a
better quality of water / To
monitor the water more
frequently and regularly
helps in identifying the
proper measures to improve
the quality
Water (Quality / Quantity & Rain Water Harvesting)
Number of
parameters
monitored /
Frequency of
monitoring
No of analysis
per month, at
each reservoir,
on a basis of 40
samples per day
Supply of
drinking water
MLD
Rain water
Harvesting
%
2010
2010
2010
14 Parameter with 2
samples at each
Reservoir
(40 Samples/day)
14 Parameters with 3
samples at each
Reservoir
(40 Samples/day)
14 Parameters
with 5 samples
at each
Reservoir
(with an
increase in no.
samples/day)
115 MLD
125 MLD
Drinking water supply
to be covered to at
least 2 Pilot areas
135 MLD
Drinking water
supply to be
covered to
entire city
No. of house using
RWH system – 20%
To increase in
coverage of house
holds – 40%
To increase in
coverage of
house holds –
75%
Increase in the % of RWH
system in the city. In the
future the whole city will be
covered.
85% collection
and 65% segregation
100% DTD
(Door to
Door)collection
and with an
increase in % of
segregation
Guntur (GMC) is improving
the collection system. In the
future the whole city will be
served.
Solid waste (DTD)
Waste
collection
(% of citizen
served)
2010
70% - Collection
and 45% Segregation
The Proposed Master Budget of Guntur Municipal Corporation
Resource /
Indicator
Unit of Measure
Referenc
e Year
Current value
(2009 / 2010)
Short-Term Target
(2012 / 2013)
Long-Term Target
(2015)
Reasons / background for
target
Environment / Green city (% of green area / plantation)
Surface of
green area
(m2 per 1000
inhabitants)
2010
123
Plantation
Number
2010
14000 – saplings with
45% survival
25000 – saplings
with
50% survival
50000 saplings with
increasing in the 75% of
survival
Ponds / Parks
Number
2010
8
10
12
2010
99
125
130
Green areas are instrumental
for better quality of life
Health (slum development)
Slums
Number of slums
developed
(in terms of physical
/ environmental and
social elements)
28
The aim is to make slum free
city by 2017
0%
Solar lighting in
parks
&
LED lights in
streets
(20%)
Solar lighting in parks
&
LED lights in streets
With increase in 60%
Climate Protection /
Energy Saving
78%
(High schools)
95%
(High schools)
98%
(High schools)
95%
(Primary schools)
98%
(Primary schools)
100%
(Primary schools)
58
Energy
Energy
conservation
Solar lighting in
parks
&
LED lights in
streets
2010
Education (municipal schools)
Municipal
Schools
Result in %
(high schools and
primary schools)
2010
Achieving Goals
with Team Work
Peoples Participation to achieve Goals
GMC is Using Self Help Groups for Community Mobilization for awareness camps in slums
on various activities
GMC is Taking the help of Residential Colony Associations , Flat Owners Associations,
Rate Payers Associations & NGOs etc
Main Objective of Corporation
‘Sarvejana Sukhinobhavatu’
‘Krishi to Nasti Durbikham’
We Make DReAMS Come True
Download