What Is New/Updated in Air Quality?
TRC Companies, Inc.
August 2011
Overview
• Part 75 Industries
– On March 28, 2011, EPA issued its final rule to
establish two ongoing regulations that EPA believes
will ensure the accuracy of calibration gases and the
competency of emission stack testers. These two
regulations are:
 Air Emission Testing Bodies (AETB)
 Protocol Gas Verification Program (PGVP)
Results you can rely on
2
AETB
• Air Emission Test Body (ASTM D7036)
• Effective date as pertains to Part 75 testing:
– March 27, 2012
• Background
– Initial rule January 24, 2008 was petitioned and EPA
subsequently stayed this provision. On March 11,
2011 EPA reissued the final rule.
Results you can rely on
3
Stack Testing Companies
Requirements
• Companies must
– Develop a quality system, quality manual, and
quality policy.
– Perform audits of activities annually.
– Provide a Quality Individual (QI) on-site for each
test project who is qualified for each test method
performed.
– Maintain records.
– Certify conformance with ASTM D 7036 using
outside source (STAC) or self certify.
Results you can rely on
4
Stack Testing Companies
Requirements
• Individuals must
– Meet experience requirements
– Pass a qualification exam on specific test methods
and carry certification on-site.
– Sign a statement that all test projects conducted
under his supervision will conform to the Quality
Manual and to this practice in all respects.
– Re-take and pass a qualification exam at least
once every 5 years.
Results you can rely on
5
Plant Requirements for AETB
• Any RATAs, Appendix E NOx testing or low mass
emission testing at a Part 75 source must be performed
by an air emission testing body (AETB) that certifies
conformance with ASTM D 7036
Results you can rely on
6
Plant Requirements for AETB
• Testing must be overseen and supervised by at least
one on-site Qualified Individual
– QI must be qualified for the methods employed in
the test.
– QI must oversee and supervise the test for the
duration of the test; on-site.
– Only those portions of a test overseen and
supervised by a QI may be used under Part 75.
Results you can rely on
7
Plant Requirements for AETB
• At the time of testing, the owner/operator will collect the
following information from the AETB :
– Name, telephone number and email address of the AETB;
– Certificate of accreditation or interim accreditation for relevant
test methods by recognized national accreditation body; or
– Letter of certification for relevant test methods signed by
AETB senior management; and
– Name of the on-site Qualified Individual (QI);
– For the reference method(s) that were performed, the date
that the on-site Qualified Individual took and passed the
relevant qualification exams; and
– The name and e-mail address of the qualification exam
provider
Results you can rely on
8
Plant Requirements for AETB
• This collected data is to be in an electronic format:
– Recordkeeping/reporting is required to help assure
that Part 75 stack testing is conducted by AETBs
that conform with ASTM D 7036.
– AETB recordkeeping provisions for Part 75 sources
would commence 365 days after publication of rule.
Results you can rely on
9
References
• Reporting instructions are on EPA CAMD web site for
AETB and PGVP
• A rule fact sheet, and the final rule are posted at:
http://www.epa.gov/airmarkets/emissions/rules.html
Results you can rely on
10
PGVP
• EPA’s Protocol Gas Verification Program
• Effective date May 27, 2011
• History
Results you can rely on
11
PGVP
• Any Part 75 source using EPA Protocol gas must
obtain it from an EPA Protocol gas production site
participating in the PGVP.
• Any Method 3A, 6C or 7E using EPA Protocol gas for
testing on a Part 75 source, must obtain the gas from a
participating production site (RATAs).
Results you can rely on
12
Approved Vendors
• Current list of approved vendors:
– http://www.epa.gov/airmarkets/emissions/pgvpvendorID.html
Results you can rely on
13
References
• 2010 Report of Vendors
• ECMPS Reporting Information
• Complete information AETB & PGVP
– www.epa.gov/airmarkets/emissions/rules.html
Results you can rely on
14
SSAP
• Stationary Source Audit Program
• History
– Old Program
– Restructuring & Privatizing the Audit Sample
Program
Results you can rely on
15
SSAP
• When are Audits Samples Required?
– EPA specified that “the requirement to use an audit
sample during a compliance test will apply to all
test methods for which a commercially available
audit exists”.
– The source owner, operator, or representative of
the tested facility shall obtain and audit samples, if
commercially available, for each test method used
for regulatory compliance purposes.
Results you can rely on
16
SSAP
• No Audit Samples are required for the following test
methods:
– Methods 9, 22, 303
– Methods 3A, 3C, 6C, 7E, 10, 25A
– Method 18
– Methods 318, 320, and 321
• State & Local agencies have the approval to waive
Audit Requirements.
Results you can rely on
17
SSAP
• Before regulations can be implemented the following
will need to be completed:
– EPA needs to approve a voluntary consensus body
(VCB) program to administer the audit program
regulations
– EPA has to approve the acceptance criteria and
concentration ranges
– Providers must be accredited to VCB standards
– 2 providers must have an audit samples available
to be commercially viable
– Audit samples and providers must be listed on EPA
TTN web site for at least 60 days.
Results you can rely on
18
SSAP
• Check EPA TTN EMC web site
– You have 60 days AFTER the audit samples and
providers are listed on the EPA web site, before
audit samples are required for compliance testing.
Results you can rely on
19
Resources
• EPA Web Site
– www.epa.gov/ttn/emc
• TNI Web Site
– http://www.nelacinstitute.org/cms/posts/130582776.php
Results you can rely on
20
Download