Current and Future Energy Efficiency (Building Regulations Part L2) www.mpba.biz

Energy Compliance Agenda

 Synopsis

 Situation Analysis – ADL2A 2010

 Next enforced steps

– ADL2A 2013

 Part L2 (2013) Awareness Sessions www.mpba.biz

Synopsis

Route to zero carbon 2010 - 2019 www.mpba.biz

Current Situation

 ADL2A in force from 1 st October 2010

 25% aggregate reduction on emissions on 2006

 Reclassification of temporary buildings

 Generic scheme for hire

 Requirement for as designed and as built compliance

 Energy Performance Certificate required on completion www.mpba.biz

New Building Modular

 Must comply with new building regulations

 As Design Carbon Calculation

 As Constructed Carbon Calculation

 EPC

 Fabric and Services minimum standards

 Sale, Rental > 2 years or > 1000m2 individual building compliance required

 Rental < 2 years and < 1000m2 generic scheme applies www.mpba.biz

Existing (Relocation) Building Modular

 Must comply with new building regulations

 As Design Carbon Calculation

 As Constructed Carbon Calculation

 EPC

 Target adjustment factors to allow re-use of older modules

 Any new fabric or services must meet minimum standards

 Sale, Rental > 2 years or > 1000m2 individual building compliance required

 Rental < 2 years and < 1000m2 generic scheme applies www.mpba.biz

Hire Fleet – Temporary Buildings

 Challenges

 Temporary building = less than 28 days

 Hire fleet requires either

 Compliance as new/relocate build or

 Provision of generic calculation

 Generic scheme enables retention of majority of services

 Electric Heating and Lighting as original specification www.mpba.biz

Recap

Route to zero carbon 2010 - 2019 www.mpba.biz

Requirements for 2013

 Specific Guidance for Part L 2013 Development

 One in One out policy

 Do not increase commercial pressure on construction sector

 Align with European/Global targets for climate change

 Implement smart regulation where possible www.mpba.biz

Whats been done:

 Active participation in Buildings Regs Working Groups

 Regular one to one sessions with CLG

 Review meetings with BRE

 Submission of full consultation response

Whats next:

 Further detailed discussions with BRE and AECOM

 Review of Draft Part L2 (2013)

 Impact analysis of new SBEM for 2013

 Develop awareness sessions for members www.mpba.biz

Requirements for 2013

 Facts already known

 no major structural changes

 further 11 or 20% overall reduction

 retention of generic scheme

 retention of target adjustment factors www.mpba.biz

Requirements for 2013

 Items highlighted for change

 amendment to BRUKL to clarify modular specific compliance

 issues with current implementation of consultation version of SBEM

 simplify regulation in relation to heating for small hire buildings

 revision to lighting calculation for smaller buildings

 consideration of viability of PFC and aM&T for modular buildings www.mpba.biz

Part L2 (2013) Awareness

 Overview of new regulations

 Impact of the changes

 How to achieve compliance

 Highlight any known issues (regulatory or technical)

When: Planned for October 2013 (assuming CLG remain to schedule)

Where: Central location – Arden Hotel, Birmingham

Who Should Attend: Sales, Marketing & Technical Staff

£125.00 per delegate Members. £195.00 per delegate Non Members

Plus Vat www.mpba.biz

Conclusion

Zero carbon is the ultimate and inevitable objective.

www.mpba.biz

Download